link zambia 8000 projects-2014 workplan

Upload: christinenyambe

Post on 09-Jan-2016

5 views

Category:

Documents


0 download

DESCRIPTION

Plans for Road Project

TRANSCRIPT

  • 2014 LINK ZAMBIA 8000 PROJECT ESTIMATES

    No. Project Name (Road, bridge etc) Type Intervention

    Sta

    tus

    Pro

    vin

    ce

    So

    urc

    e o

    f

    Fu

    nd

    ing

    Ro

    ad

    Co

    de

    To

    tal

    Le

    ng

    th

    Ta

    rge

    t

    Le

    ng

    th f

    or

    Ye

    ar

    20

    14

    (km

    )

    20

    14

    Bu

    dg

    eta

    ry

    Est

    ima

    tes

    1 Lot 1: Upgrading of the Leopards Hill Road (D152) to jnc RD481 Up-grading Road Infrastructure Development On-going Lusaka GRZ D152 43.80 5.25 18,000.00

    2 Design & Supervision for Lot 1 Consultancy Supervision Services On-going Lusaka GRZ D152 - - 2,000.00

    3 Upgrading of the D145 (T4 - Feira) Up-grading Road Infrastructure Development On-going Lusaka GRZ D145 91.00 47.24 188,976.00

    4 Supervision Services for Upgrading of the D145 (T4 - Feira) Consultancy Supervision Services On-going Lusaka GRZ D145 - 2,000.00

    5 Upgrading of Monze - Niko Road Up-grading Road Infrastructure Development On-going Southern GRZ D365 74.00 22.00 70,000.00

    6 Supervision Monze - Niko Road Consultancy Road Infrastructure Development On-going Southern GRZ D365 - 2,000.00

    7

    Upgrading of RD149 and D151 from Great East Road at Chongwe District Hospital to Katoba Basic

    School (48.5km) including D150 from Great East Road at CC Farms to RD 149 (12.5km) Road Lot 1

    in Lusaka Province

    Up-grading Road Infrastructure Development On-going Lusaka GRZ RD149/RD151 61.00 12.50 50,000.00

    8

    Supervision of of RD149 and D151 from Great East Road at Chongwe District Hospital to Katoba

    Basic School (48.5km) including D150 from Great East Road at CC Farms to RD 149 (12.5km) Road

    Lot 1 in Lusaka Province

    Consultancy Construction Supervision On-going Lusaka GRZ RD149/RD152 - - 2,000.00

    9 Upgrading of Moono Police Check point via Palabana Up-grading Road Infrastructure Development New Lusaka GRZ various 54.00 12.50 50,000.00

    10 Supervsion of the upgrading of Moono Police check point via Palabana Consultancy Constrction Supervision On-going Lusaka GRZ various - 2,000.00

    11Upgrading and Realignment to bitumous standard of Safwa to Mulilansolo from Km00 to Km94 in

    Muchinga Province of zambia - Lot 1Up-grading Road Infrastructure Development On-going Muchinga GRZ D56 94.00 20.00 80,000.00

    12 Supervision of the Upgrading and Realignment to bitumous standard of Safwa to Mulilansolo - Lot 1 Up-grading Road Infrastructure Development On-going Muchinga GRZ D56 - - 2,500.00

    13Upgrading and Realignment to bitumous standard of Safwa to Mulilansolo from Km94 to Km194 in

    Muchinga pronvince of zambia - Lot 2Up-grading Road Infrastructure Development On-going Muchinga GRZ D056 100.00 15.00 60,000.00

    14 Supervision of the Upgrading and Realignment to bitumous standard of Safwa to Mulilansolo - Lot 2 Consultancy Construction Supervision Muchinga GRZ - 2,500.00

    15 Mbesuma - Isoka Up-grading Road Infrastructure Development On-going Muchinga GRZ D018 60.00 15.00 60,000.00

    16 Mbesuma - Isoka - Supervision Consultancy Road Infrastructure Development On-going Muchinga GRZ D019 - - 2,000.00

    17 Mpika - Nabwalya - Lot 1 (Link Zambia) Up-grading Road Infrastructure Development On-going Muchinga GRZ RD49 118.00 25.00 100,000.00

    18 Mpika Nabwalya Mfuwe - Supervision Lot 1 Consultancy Construction Supervision On-going Muchinga GRZ RD49 - - 2,500.00

    19 Nabwalya - Mfuwe - Lot 2 (Link Zambia) Up-grading Road Infrastructure Development New Muchinga GRZ RD$( 117.00 25.00 100,000.00

    20 Mpika Nabwalya Mfuwe - Supervision Lot 2 Consultancy Construction Supervision On-going Muchinga GRZ RD49 - - 2,500.00

    21

    Upgrading and Re-alignment of D301 from Muyombe Junction to Chama (32 km) and Road from

    Chama to Luangwa River (42 km) including 12 km of Urban Roads in Chama in Muchinga Province

    of Zambia- Lot 1

    Up-grading Road Infrastructure Development On-going Muchinga GRZ D301 86.00 17.50 70,000.00

    22

    Upgrading and Re-alignment of D301 from Muyombe Junction to Chama (32 km) and Road from

    Chama to Luangwa River (42 km) including 12 km of Urban Roads in Chama in Muchinga Province

    of Zambia- Lot 1 - Supervision

    Consultancy Construction Supervision On-going Muchinga GRZ D301 - - 2,000.00

    23Upgrading and Re-Alignment of R231 from Great North Road at Matumbo to Luangwa Bridge (115

    Km) Road in Muchinga Province of Zambia- Lot 2Up-grading Road Infrastructure Development On-going Muchinga GRZ R231 115.00 17.50 70,000.00

    24Upgrading and Re-Alignment of R231 from Great North Road at Matumbo to Luangwa Bridge (115

    Km) Road in Muchinga Province of Zambia- Lot 2 - SupervisionConsultancy Construction Supervision On-going Muchinga GRZ R231 - - 2,000.00

    25Upgrading and Realignment to bitumous starndard 158km of Mpika via Katibunga through Chief

    Mukungule Lufila-Kakoko-Kalalantekwe (RD54) in Muchinga Province of Zambia Up-grading Road Infrastructure Development New Muchinga GRZ various 135.00 25.00 100,000.00

    Page 1 of 2

  • 2014 LINK ZAMBIA 8000 PROJECT ESTIMATES

    No. Project Name (Road, bridge etc) Type Intervention

    Sta

    tus

    Pro

    vin

    ce

    So

    urc

    e o

    f

    Fu

    nd

    ing

    Ro

    ad

    Co

    de

    To

    tal

    Le

    ng

    th

    Ta

    rge

    t

    Le

    ng

    th f

    or

    Ye

    ar

    20

    14

    (km

    )

    20

    14

    Bu

    dg

    eta

    ry

    Est

    ima

    tes

    26Supervision -Upgrading and Realignment to bitumous starndard 158km of Mpika via Katibunga

    through Chief Mukungule Lufila-Kakoko-Kalalantekwe (RD54) in Muchinga Province of Zambia Consultancy Construction Supervision New Muchinga GRZ various - 2,000.00

    27Kenneth Kaunda International Airport to Kasisi to GER, Ngwerere Road from GNR to junction with

    Kasisi mission road (D176/D564/D753)Up-grading Road Infrastructure Development On-going Lusaka GRZ

    D176/D564/D7

    5363.00 21.25 85,000.00

    28Supervision - Kenneth Kaunda International Airport to Kasisi to GER, Ngwerere Road from GNR to

    junction with Kasisi mission road (D176/D564/D753)Consultancy Construction Supervision New Lusaka GRZ

    D176/D564/D7

    53- - 2,000.00

    29 Upgrading of Mumbwa (M009) - Itezhi tezhi, D769 Up-grading Road Infrastructure Development On-going Central GRZ M9/D769 110.00 25.00 100,000.00

    30 Supervision of Mumbwa (M009) - Itezhi tezhi, D769 Consultancy Construction Supervision On-going Northern GRZ D018 - - 2,000.00

    31 Sabina - Mufulira-Ndola /Mufulira - Mokambo/T3- Kalulushi - Supervision Consultancy Construction Supervision On-going CopperbeltRoad FundM005/M004/M

    017- 2,000.00

    32 Sabina - Mufulira-Kalulushi Rehabilitation Rehabilitation works On-going CopperbeltRoad Fund M005 140.00 20.00 90,000.00

    33Feasibility study and deailed engineering design including tender documentation Kawambwa -

    Mung'anga, Mwenda Kashiba Consultancy Construction Supervision New Luapula GRZ 90000 - - 10,000.00

    34 Kawambwa - Mung'anga, Mwenda Kashiba Up-grading Road Infrastructure Development New Luapula GRZ M13/D85 - - -

    35 Nchelenge, Chienge, Kaputa, Lunchinda - Lot 1 Up-grading Road Infrastructure Development On-going Luapula GRZ D76/D77/D440 115.70 25.00 100,000.00

    36 Nchelenge, Chienge, Kaputa, Lunchinda - Lot 1 Supervision Consultancy Construction Supervision On-going Luapula GRZ D76/D77/D440 - - 2,500.00

    37 Nchelenge, Chienge, Kaputa, Lunchinda - Lot 2 Up-grading Road Infrastructure Development On-going Luapula GRZ 104.60 25.00 100,000.00

    38 Nchelenge, Chienge, Kaputa, Lunchinda - Lot 2 Supervision Consultancy Construction Supervision On-going Luapula GRZ - - 2,500.00

    39 Mansa - Luwingu Road Design & Supervision Consultancy Construction Supervision On-going Luapula GRZ M003 - - 2,000.00

    40 Samfya Via Lubwe - Kasaba Up-gradingUp-grading to bituminous

    StandardOn-going Luapula GRZ D96 113.00 25.00 100,000.00

    41 Supervsiion of Samfya Via Lubwe - Kasaba Consultancy Construction Supervision On-going Luapula GRZ D96 - - 2,000.00

    42 Upgrading of the Chipata-Vubwi-Chadiza Road Up-grading Road Infrastructure Development On-going Eastern GRZ D145 139.00 25.00 100,000.00

    43 Upgrading of the Chipata-Vubwi-Chadiza Road Supervision Consultancy Construction Supervision On-going Eastern GRZ D145 - - 2,000.00

    44 Chipata-Chadiza-Katete (Link Zambia) Up-grading Road Infrastructure Development On-going Eastern GRZD128/RD593/T

    6150.00 25.00 100,000.00

    45 Chipata-Chadiza-Katete (Link Zambia) - Supervision Consultancy Construction Supervision On-going Eastern GRZD128/RD593/T

    6 - - 2,000.00

    2,084.10 450.74 1,848,976.00 Grand total

    Page 2 of 2