link light rail p tacoma link expansion - sound transit...from july 2010 through january 2011 sound...

2
Expanding Tacoma Link The 1.6 mile Tacoma Link light rail line currently serves six stations from the Theater District to the Tacoma Dome Station. Trains run every 12 minutes during the day and served nearly a million riders in 2011. Voters in 2008 approved an expansion of Tacoma Link as part of the Sound Transit 2 ballot measure. Sound Transit’s Tacoma Link Expansion Alternatives Analysis project will identify and study alternative travel corridors for expansion of the Tacoma Link light rail system. Over the next 12 months, Sound Transit in cooperation with the City of Tacoma and Pierce Transit will engage the wider community to help identify a range of alternatives, study these alternatives, and determine a preferred corridor alternative for the expansion. The study will also produce a project financing plan that will identify committed and potential funding sources. Tacoma Link Expansion Stakeholder Group Final Report 2011 From July 2010 through January 2011 Sound Transit, the City of Tacoma and Pierce Transit convened a group of community stakeholders, including neighborhood and business leaders, to begin looking at possible routes and station locations to expand Tacoma Link. This document details the work of the Tacoma Link Expansion stakeholder group and its recommendations on potential corridor alternatives for expanding Tacoma Link. The group’s mission was to provide commentary and feedback on potential corridor alternatives using their expertise as representatives of diverse constituencies. This qualitative, community-focused report should help guide decision-makers during further technical planning. Para información acerca del proyecto llame al: 1800 8239230 18008239230 18008239230, чтобы получить информацию о проекте. 프로젝트에 관한 정보는 다음으로 연락하십시오: 1 8008239230 Involving the Tacoma community Sound Transit is committed to communicating with Tacoma residents and businesses about the Tacoma Link Expansion and providing you with meaningful opportunities to get involved. Over the next year, you will have opportunities to: Receive advance notice about public meetings and opportunities to provide input on the Tacoma Link Expansion project through local newspapers, blogs, project mailings and the project website. Attend public meetings to hear project updates, learn how decisions will be made and provide input on the Tacoma Link Expansion. Meet Sound Transit staff in your community and talk to us about your questions, comments or concerns. P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 130th 120th Lakewood Puyallup Sumner Federal Way Auburn Kent Tukwila Renton Issaquah Tacoma Redmond Kirkland Bothell Everett Seattle Bellevue Woodinville Edmonds Mukilteo Lynnwood Tacoma Dome Issaquah Highlands Overlake Transit Center Mercer Island Rainier University of Washington Canyon Park Ash Way South Everett Eastgate SeaTac /Airport DuPont SODO Stadium Pioneer Square Westlake University Street International District/ Chinatown & King Street S 200th Kent/Des Moines Totem Lake South Sammamish South Tacoma Union Station/ S 19th Convention Center/ S 15th Commerce Street/ S 11th Theater District/ S 9th S 25th West Seattle Northgate TBD Tacoma Community College S 272nd/ Federal Way Mountlake Terrace U District Roosevelt Bellevue Transit Center South Bellevue Hospital First Hill Capitol Hill Overlake Village Shoreline Burien To Gig Harbor and Purdy East Main Beacon Hill Mount Baker Columbia City Othello Rainier Beach Tukwila/ International Blvd Bonney Lake SE Redmond Link Light Rail Central Link (SeaTac/Airport–Westlake/Seattle) Tacoma Link (Tacoma Dome–Theater District) Under Construction (Opens 2016) In Design In Planning/ Planned Sounder Commuter Rail Everett–Seattle Sounder Lakewood–Tacoma–Seattle Sounder ST Express Regional Bus Express Bus Service Future Bus Rapid Transit (BRT) Supporting Investments Park & Ride – Rail Station or Bus Facility Rail Station, Transit Center or Bus Stop Improvements First Hill Streetcar (Opens 2014) HOV/Transit Improvements HOV Direct Access Ramp, Freeway Station or Overpass Ferry Terminal Amtrak Sea-Tac Airport MAP KEY P For information in alternative formats, call 1-800-201-4900/ TTY Relay: 711 or email [email protected]. AUG 2012 STAY INVOLVED! Find project information, updates and upcoming events on our website. Please visit www.soundtransit.org/TacomaLinkExpansion For additional information about Tacoma Link Expansion or to request a project briefing for your organization, Erin Hunter, South Corridor Outreach Lead, at 206-370-5511 or [email protected]. Sign up for email updates at www.soundtransit.org/subscribe. CURRENT AND FUTURE SOUND TRANSIT SERVICE Sound Transit plans, builds and operates regional transit systems and services to improve mobility for Central Puget Sound. Sound Transit l 401 S. Jackson St. l Seattle, WA 98104-2826 l 1-800-201-4900 / TTY Relay: 711 l [email protected] l www.soundtransit.org Tacoma Link Expansion Tacoma Link Expansion Alternatives Analysis Identify and study alternative travel corridors for expansion of the Tacoma Link light rail system.

Upload: others

Post on 27-Jan-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • Expanding Tacoma LinkThe 1.6 mile Tacoma Link light rail line currently serves six stations from the Theater District to the Tacoma Dome Station. Trains run every 12 minutes during the day and served nearly a million riders in 2011. Voters in 2008 approved an expansion of Tacoma Link as part of the Sound Transit 2 ballot measure. Sound Transit’s Tacoma Link Expansion Alternatives Analysis project will identify and study alternative travel corridors for expansion of the Tacoma Link light rail system.

    Over the next 12 months, Sound Transit in cooperation with the City of Tacoma and Pierce Transit will engage the wider community to help identify a range of alternatives, study these alternatives, and determine a preferred corridor alternative for the expansion. The study will also produce a project financing plan that will identify committed and potential funding sources.

    Tacoma Link Expansion Stakeholder Group Final Report 2011From July 2010 through January 2011 Sound Transit, the City of Tacoma and Pierce Transit convened a group of community stakeholders, including neighborhood and business leaders, to begin looking at possible routes and station locations to expand Tacoma Link. This document details the work of the Tacoma Link Expansion stakeholder group and its recommendations on potential corridor alternatives for expanding Tacoma Link. The group’s mission was to provide commentary and feedback on potential corridor alternatives using their expertise as representatives of diverse constituencies. This qualitative, community-focused report should help guide decision-makers during further technical planning.

    Para  información  acerca  del  proyecto  llame  al:  1-‐800-‐823-‐9230  

    1-‐800-‐823-‐9230    1-‐800-‐823-‐9230,  чтобы  получить  

    информацию  о  проекте.  프로젝트에  관한  정보는  다음으로  연락하십시오:  1-‐800-‐823-‐9230  

    Involving the Tacoma community•Sound Transit is committed to

    communicating with Tacoma residents and businesses about the Tacoma Link Expansion and providing you with meaningful opportunities to get involved. Over the next year, you will have opportunities to:

    •Receive advance notice about public meetings and opportunities to provide input on the Tacoma Link Expansion project through local newspapers, blogs, project mailings and the project website.

    •Attend public meetings to hear project updates, learn how decisions will be made and provide input on the Tacoma Link Expansion.

    •Meet Sound Transit staff in your community and talk to us about your questions, comments or concerns.

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    PP

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    P

    130th120th

    Lakewood

    Puyallup

    Sumner

    Federal Way Auburn

    Kent

    Tukwila

    Renton

    Issaquah

    Tacoma

    RedmondKirkland

    Bothell

    Everett

    Seattle Bellevue

    Woodinville

    Edmonds

    Mukilteo

    Lynnwood

    Tacoma Dome

    IssaquahHighlands

    Overlake Transit Center

    MercerIsland

    Rainier

    University ofWashington

    Canyon Park

    Ash Way

    South Everett

    Eastgate

    SeaTac /Airport

    DuPont

    SODO

    Stadium

    Pioneer Square

    Westlake

    University Street

    International District/Chinatown & King Street

    S 200th

    Kent/Des Moines

    Totem Lake

    SouthSammamish

    South Tacoma

    Union Station/ S 19thConvention Center/ S 15thCommerce Street/ S 11thTheater District/ S 9th

    S 25th

    West Seattle

    Northgate

    TBD

    TacomaCommunityCollege

    S 272nd/Federal Way

    Mountlake Terrace

    U District

    Roosevelt

    Bellevue Transit Center

    SouthBellevue

    Hospital

    First Hill

    Capitol Hill

    Overlake Village

    Shoreline

    Burien

    To Gig Harbor and Purdy

    East Main

    Beacon Hill

    Mount Baker

    Columbia City

    Othello

    Rainier Beach

    Tukwila/International Blvd

    Bonney Lake

    SE Redmond

    Link Light RailCentral Link (SeaTac/Airport–Westlake/Seattle)Tacoma Link (Tacoma Dome–Theater District)Under Construction (Opens 2016)In DesignIn Planning/ Planned

    Sounder Commuter RailEverett–Seattle SounderLakewood–Tacoma–Seattle Sounder

    ST Express Regional BusExpress Bus ServiceFuture Bus Rapid Transit (BRT)

    Supporting InvestmentsPark & Ride – Rail Station or Bus FacilityRail Station, Transit Center or Bus StopImprovementsFirst Hill Streetcar (Opens 2014)HOV/Transit ImprovementsHOV Direct Access Ramp, Freeway Station or Overpass

    Ferry Terminal AmtrakSea-Tac Airport

    MAP KEY

    P

    For information in alternative formats, call 1-800-201-4900/ TTY Relay: 711 or email [email protected].

    AUG 2012

    STAY INVOLVED!Find project information, updates and upcoming events on our website. Please visit www.soundtransit.org/TacomaLinkExpansion For additional information about Tacoma Link Expansion or to request a project briefing for your organization, Erin Hunter, South Corridor Outreach Lead, at 206-370-5511 or [email protected].

    Sign up for email updates at www.soundtransit.org/subscribe.

    CURRENT AND FUTURE SOUND TRANSIT SERVICE

    Sound Transit plans, builds and operates regional transit systems and services to improve mobility for Central Puget Sound.Sound Transit l 401 S. Jackson St. l Seattle, WA 98104-2826 l 1-800-201-4900 / TTY Relay: 711 l [email protected] l www.soundtransit.org

    Tacoma Link Expansion

    Tacoma Link Expansion Alternatives Analysis Identify and study alternative travel corridors for expansion of the Tacoma Link light rail system.

  • Alternatives Analysis Alternatives Evaluation

    Public Comment

    Alternatives ReportSummer 2012 Winter 2013 Spring 2013Fall

    NOV DEC MARCHPublic Comment Public CommentPublic Comment AUG

    PreferredCorridor Identified Early Scoping

    Early Scoping MeetingsSound Transit holds meetings for the public to comment on:

    Routes and station locations Sound Transit should consider

    Screening criteria Sound Transit should use to evaluate and compare different routes and station locations

    Alternatives ScreeningSound Transit revises the list of alternatives and screening criteria based on public comments. Sound Transit screens route and stations and narrows it down to a few alternatives.

    Alternatives Screening Public MeetingsSound Transit explains the criteria used to screen alternatives, presents which alternatives will be studied further, and collects public comment.

    Sound Transit continues to study the alternatives. Consultants complete conceptual engineering to begin estimating the risks and costs of each alternative.

    Alternatives EvaluationPublic MeetingsSound Transit presents a Draft Alternatives Analysis Report summarizing alternatives evaluation and collects public comment.

    Report Revisions and Board PreparationSound Transit revises the Alternatives Analysis Report based on public comments and prepares to present to the Sound Transit Board.

    Identification of Preferred Corridor by the Sound Transit BoardUsing the Alternatives Analysis Report, the Sound Transit Board identifies a preferred corridor.

    Pre Alternatives Analysis ReportConcurrent with the work conducted by the Tacoma Link Expansion Stakeholder Group, Sound Transit prepared a technical report providing an initial analysis of the alternative corridors identified by the Stakeholder Group and two additional alternatives. The purpose of this analysis was to determine if the alternative corridors could meet community and Sound Transit objectives.

    Alternatives AnalysisBuilding an expansion of Tacoma Link will require substantial federal funding. The Federal Transit Administration’s (FTA) discretionary New Starts program is the federal government’s primary financial resource for supporting locally-planned, implemented, and operated transit “guideway” capital investments, such as Tacoma Link. New Starts funding is awarded nationwide on a competitive basis following a rigorous, objective review of potential projects. Sound Transit plans to request New Starts funds for the Tacoma Link expansion project.

    To be eligible and competitive for these federal funds we are completing an alternatives analysis (AA) for the project. An AA is the local forum for evaluating the costs, benefits, and impacts of a range of alternatives designed to address mobility problems and other locally-identified objectives in a defined transportation corridor, and for determining which particular investment strategy should be advanced for more focused study

    and development. The goal of an AA is to provide the public, local officials, and potential funding partners with sufficient information for the decision-at-hand: that is, “What is the best solution for addressing our problems? What are its benefits? How much is it going to cost? And how are we going to pay for it?”

    Phase I (June 2012-September 2012):Develop a list of possible corridor alternatives for expanding Tacoma Link. This list will be built upon the corridors identified by the Tacoma Link Expansion Stakeholder Group and Sound Transit’s Pre-AA study as well as additional input from the community.

    •Hold open houses to seek input from the public and agencies on corridor alternatives. (August 2012). This public process will be accomplished as a part of “early scoping” under NEPA and SEPA, in order to obtain public input on the potential alternatives prior to any formal environmental documentation.

    •Develop a written statement that explains the project’s purpose, need, goals and objectives.

    •Define the alternatives and prepare for initial screening of alternatives.

    •Submit “AA Initiation Package” to Federal Transit Administration (FTA).

    •Phase II (October 2012-April 2013)

    •Initial screening of alternatives including public and agency input. Screen the alternatives based on their ability to meet the project’s purpose and need.

    •Define evaluation methods and evaluate the alternatives that come out of the screening, including public and agency input.

    •Hold public meetings to discuss findings of the alternatives evaluation process.

    •Prepare draft Alternatives Analysis report summarizing the alternatives evaluation and public/agency involvement process.

    •Hold public meetings to discuss and take comments on the draft Alternatives Analysis Report.

    •Finalize the Alternatives Analysis report and present to the Sound Transit Board.

    •Sound Transit Board selects a preferred alternative to enter into the environmental review process and a project funding plan.

    •Determine type of environmental review documentation needed and next steps for the project. An additional formal environmental scoping process under NEPA and SEPA may be required.

    •Submit application for FTA New Starts/ Small Starts grant funding.

    Thea Foss Waterw

    ay

    Puyallup River

    Commencement Bay

    N 15th St

    Broadway

    N M St

    N I St

    N Tacoma Ave

    N 12th St

    Pacific Ave Pacific Ave

    Comm

    erce St

    Dock St

    S 9th St

    6th Ave

    6th Ave

    Martin Luther King Jr W

    ayS J St

    S Tacom

    a Way

    S 28th St

    Puyallup Ave

    S 30th St

    E L St

    E Portland Ave

    S 34th St

    S Wilkeson St

    S 19th St

    E 38th St

    E 34th St

    S 38th St

    Pacific AvePacific Ave

    N 1s

    t St

    Divisio

    n Ave

    S 15th St

    S 11th St

    Yakima Ave

    Earnest S Brazill St

    Market St

    Holgate St

    Jeffe

    rson

    Ave

    S State St

    S Ce

    dar S

    t

    S 25th StS 25th St

    Center St

    S M St

    E D St

    S 43rd st

    Mckinley AveS Thom

    pson Av

    Yakima Av

    S Alaska St

    S 48th St

    Tacoma Ave S

    E Portland Ave

    E 21st St

    Lincol

    n Ave

    E 11th

    St

    E L St

    S 8th St

    S 12th St

    S 19th St

    S M St

    S G St

    Tacoma Av S

    E Portland Ave

    Dock StA ST

    S 12th St

    S 10th StE 11th St

    E 15th St

    St Helens Ave

    S 8th St

    S 14th St

    S J St

    S J St

    S 27th St

    S 28th S

    t

    S G St

    A St

    S C St

    St Paul Ave

    S Taco

    ma Wa

    y

    S 14th St

    S 34th St

    Theater District/ South 9th Street

    Commerce Street/S 11th St

    Convention Center/South 15th Street

    Union Station/South 19th Street

    Tacoma Dome

    South 25th Street

    McKinley Park

    Rogers Park

    McKinley Playfield

    Foss Waterway Park

    Lincoln/Eldridge

    Sawyer Tot Lot

    Sheridan Park

    McCarver Playground

    People's Community

    Center

    Stanley Playfield

    Peck Field

    Ferry Park

    People's Park

    Lincoln Heights

    Irving Park

    Thea's Park

    Fireman's Park

    Wright Park

    Neighbors Park

    Garfield Park

    Ursich Gulch

    Lot For Tots

    5

    5

    5

    705

    705

    16

    509

    UW Tacoma

    Continued on back

    Tacoma Link