Link Connections Public Engagement Summary Phase One Outreach November 5 – December 5, 2014 Contents Outreach Plan and Activities ......................................................................................................................... 2 Overview .................................................................................................................................................... 2 Notifications—how we let people know they could participate .................................................................. 3 Feedback methods—how people shared their opinions ........................................................................... 6 Equity and social justice ............................................................................................................................ 6 Public Feedback Summary ........................................................................................................................... 8 Who we heard from ................................................................................................................................... 8 What we heard ........................................................................................................................................ 11 Appendix A – Media coverage .................................................................................................................... 17 Appendix B – List of Community Partners .................................................................................................. 18

Upload: others

Post on 28-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections Public Engagement Summary Phase One Outreach

November 5 – December 5, 2014 Contents

Outreach Plan and Activities ......................................................................................................................... 2

Overview .................................................................................................................................................... 2

Notifications—how we let people know they could participate .................................................................. 3

Feedback methods—how people shared their opinions ........................................................................... 6

Equity and social justice ............................................................................................................................ 6

Public Feedback Summary ........................................................................................................................... 8

Who we heard from ................................................................................................................................... 8

What we heard ........................................................................................................................................ 11

Appendix A – Media coverage .................................................................................................................... 17

Appendix B – List of Community Partners .................................................................................................. 18

Page 2: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 2

Outreach Plan and Activities

Overview

In the first quarter of 2016, Sound Transit will open Link light rail stations on Capitol Hill and next to the University of Washington’s Husky Stadium. As we integrate this new asset into Seattle’s transportation system, Metro and Sound Transit are considering changes to bus service that would complement the new light rail system, creating a multi-modal transit network that provides efficient, convenient, and reliable service.

King County transportation community relations planners are working with Sound Transit, in coordination with the Seattle Department of Transportation, the University of Washington, and Seattle Children’s Hospital, to engage people who may be affected by service changes related to this integration of bus and new light rail service.

Our outreach is intended to proactively engage the public to help shape the final Metro service change proposal that will be transmitted to the King County Council, as well as the final amended service implementation plan that will be submitted to the Sound Transit board for approval next summer.

Our outreach will have three phases. This report summarizes the first phase, which was done between Nov. 5 and Dec. 5 of 2014. This phase had the following goals:

Introduce the public and stakeholders to the planning process for changing bus service to integrate with Link light rail service to Capitol Hill and Husky Stadium.

Hear from the public about how they are using transit service today—what’s working, what isn’t, what’s most important to them about integrating bus and light rail service, and what they’d like to see improved.

Recruit a sounding board whose membership reflects those who will be affected by the changes being considered.

We spoke with about 6,000 people during this phase of outreach, and more than 4,000 gave us direct feedback. Our next steps for outreach will include sharing our background report, which has information about current service in the project area, with the public; reflecting back what we heard during the first phase of outreach via the website and social media; and selecting and confirming sounding board members. The sounding board will begin meeting mid-January. Our second phase of outreach, when we will share two alternative network concepts and ask for feedback on them, will take place in March 2015.

Page 3: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 3

Notifications—how we let people know they could participate

Website content We created a Have-a-Say website with information about Link Connections outreach and how to participate. This page, viewed more than 9,400 times during the month of outreach, included a calendar of upcoming outreach events, a way to sign up to receive email or text updates on the project, an online survey, and an application to serve on the Link Connections sounding board. It also had links to the Metro Matters blog, Metro’s Facebook page, and other social media outlets with related content. Contact information was provided in English and Spanish, and project information was provided in 12 languages.

Media and social media At the start of the outreach period, Metro and Sound Transit sent a joint news release (www.kingcounty.gov/transportation/kcdot/NewsCenter/NewsReleases/2014/November/nr141106_LinkConnections.aspx ) to area news outlets, ethnic media, and community blogs. (See Appendix B for a list of media coverage.)

We posted information on the Metro and Have-a-Say Facebook pages before each of the five community conversation meetings. These Facebook pages have 2,570 and 507 followers, respectively. We also posted information on the Metro Matters blog about the project and opportunities to participate.

King County Metro tweets alerted more than 25,000 followers about these meetings and the opportunities to serve on the sounding board or share feedback and ideas through the online survey. Sound Transit and others got the word out about opportunities to participate using the Twitter hashtag #Bus2Link.

Page 4: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 4

Posters We put up posters with a project description and an invitation to participate at stops in the project area that average 200 or more daily boardings.

Take-away cards on buses and in customer kiosks We printed 7,500 cards for drivers to put on buses coming out of Metro’s North, Central, and Atlantic bus bases. These cards were also available in customer kiosks at the University of Washington student union building, the University Bookstore, and Seattle Central College.

Route subscriber notification We sent an email or text message with a description of the project and an invitation to participate to 25,332 subscribers of service alerts for 54 routes that serve the project area. Tracking data show that this notification had an open rate of 32 percent and a click rate of five percent.

Page 5: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 5

Sound Transit Rider Panel notification A notification went out to 2,055 members of Sound Transit SoundWaves rider panel during the week of November 10. This had information about the project, upcoming meetings, and the survey. (SoundWaves is an online community where riders can get information and share experiences, opinions, and preferences through surveys.)

Community partner email We sent an email with a description of the project, an invitation to participate, and a request to help spread the word to more than 80 community-based organizations and stakeholder groups in the project area (see list of organizations in Appendix B). The email included a fill-in questionnaire and poster.

Echo emails to stakeholder lists Several stakeholder organizations forwarded our initial notification to their lists. Those we are aware of include:

Seattle Department of Neighborhoods’ Northeast Seattle “News You Can Use” Commute Trip Reduction-affected employers in the project area ORCA Passport customers U-PASS holders Seattle Children’s Hospital employees University of Washington Medical Center employees Eastlake Community Council’s e-news Ravenna Community Association’s e-news

Mailing We mailed a cover letter, poster, and take-away cards to key locations, such as libraries, schools, senior centers, health and social service organizations, and community centers in the project area.

Page 6: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 6

Feedback methods—how people shared their opinions

During this first phase of outreach, we wanted to have a conversation with members of the public about how they use transit service today—what’s working and what isn’t—as well as what’s most important to them about bus and light rail integration, and what they’d like to see improved. We wanted to listen with an open mind, without preconceived bus change concepts on the table. It was important to create welcoming and open space for sharing and let participants shape the conversation. Using a set of open-ended questions as our guide, we provided online and face-to-face opportunities for people to share their thoughts with us.

Online questionnaire As of Dec. 5, 4,087 people had completed the online questionnaire.

Community conversations A total of 80 people joined us across five public meetings (locations, dates, and times are listed below), which were publicized on our poster and promoted on our website and via social media. The meetings started with a brief introduction by project staff. Participants then broke into small groups to discuss a set of questions for an hour or more.

Ravenna-Eckstein Community Center, Nov. 13, 6-8 p.m. Seattle University Brown Bag Lunch, Nov. 17, 12-1 p.m. Seattle First Baptist Church, Nov. 17, 6-8 p.m. University of Washington, Nov. 20, 11:30-1:30 p.m. Multi-lingual event, Lake City Court, Nov. 25, 6:30-8:30 p.m.

Street teams and information tables Staff members distributed 2,000 take-away cards to people at bus stops and information tables during the outreach period. They also asked people what questions they could about how they’re using transit today and what they’d like to see improved. The following street team events were promoted on Metro’s website and via social media:

Bus stops on Campus Parkway and Brooklyn Avenue NE, Nov. 6, 2:30-5:30 p.m. Bus stops on Stevens Way NE (on UW campus), Nov. 6, 2:30-5:30 p.m. Downtown Seattle Transit Tunnel Westlake Station, Bay A, Nov. 12, 3-6 p.m. Fourth Avenue and Pike Street, eastbound bus stop, Nov. 13, 3-6 p.m. Downtown Seattle Transit Tunnel, International District Station, Bay A, Nov. 18, 7-9 a.m. Seattle Central College information table, Nov. 18, 10-1 p.m. University of Washington Medical Center information table, Nov. 19, 10-1 p.m.

Phone and email We received 5 emails and phone calls during this outreach period. People who were unable to make it to our outreach events provided feedback on what they would like to see improved as a result of this project.

Page 7: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 7

Equity and social justice

Our data do not indicate any languages spoken in high enough numbers in the project area to justify the expense of full translation of all project materials. However, after conversations with the University of Washington, Seattle Department of Neighborhoods, and Seattle Housing Authority, we determined to translate some project information into Tier 1 and 2 languages as identified in the County’s Executive Order on Translation. We have established voice message lines and provided a handout that is available online and to distribute to the public in the following languages:

Amharic Arabic Chinese - Mandarin Korean Oromo Punjabi

Russian Somali Spanish Tigrinyan Ukrainian Vietnamese

We also held a multi-lingual community conversation at Lake City Court, with interpreters in Arabic, Chinese, Oromo, Tigrinyan, Amharic, and Russian available. This event was advertised to residents in all 11 languages. While turnout was low, we gathered good feedback from participants and interpreters about the important issues facing these populations.

Page 8: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 8

Public Feedback Summary

Who we heard from

At the end of the comment period, we had heard from about 6,000 people through our online survey, community conversations, street team events, information tables, phone lines, and email.

Participants told us they use many modes to get around, as reflected in the chart below. Those who choose transit over driving do so for many reasons. For example, one respondent to our survey lives in a dense urban environment (Capitol Hill), has little to no parking available for a personal vehicle, has close proximity to groceries and amenities, and is centrally located to reach work downtown. Most respondents said they use transit to commute to work and school. Many said they would prefer to use transit more for other trip purposes if the service was more reliable, frequent, and available at night and on weekends.

Page 9: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 9

Page 10: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 10

Participants said they use the following bus routes to travel from many points outside the project area to many points within it, as well as to travel within the project area. The chart on the next page shows a response count by route, from largest to smallest.

Route Response Count 71/71X 1921 73/73X 1908 72/72X 1883

48 1658 43 1557 49 1351 44 1242 70 987 10 916 8 880 75 817 66 783 74 756 11 744 2 694 65 658 3 632

26/28 625 12 612 32 601 4 597 16 567 31 539 67 514

372 488 271 486

ST 545 479 30 466 68 465 60 436 25 408 76 361

255 345 ST 512 287

1 280 14 268 9 257

373 248 13 243 77 243

ST 542 236 64X 228

ST 540 209 ST 556 177

106 165 316 161

ST 555 156 27 128

None of these 111 242 110

ST 586 97 167 92 197 90 311 76 252 69 277 61 107 53 257 43

Total who responded 4017

If you ride the bus, or have in the past, please indicate which of the following route(s) you use or have used.

Page 11: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 11

What we heard

Where do you go, or where would you like to go, using transit? We’re mapping specific destinations and neighborhoods noted in people’s answers to this open-ended question in a Google map (http://bit.ly/1BA6wgu). Coding these responses is resource intensive, so as of this report’s publication date the map shows only about half of the survey responses. It includes destinations people told us were significant (such as cultural, religious, low-income, senior, and social service locations or parks), and should be included in the analysis of service needs. It also includes destinations or corridors identified as needing service in the evening, late at night, early in the morning, or on weekends. A legend for the symbols found on the map follows:

Green Star = more than 100 mentions Blue Diamond = 50-100 mentions Gold Square = 15-50 mentions Red Circle = 1-15 mentions

When viewing the map, click on a symbol to learn more about the characteristics of each destination (e.g. whether it was indicated as a destination of cultural significance, or specific businesses or cross streets that were bunched together into one symbol)

Some key themes that came up consistently in answers to this question were:

People come from around the Puget Sound area to the University of Washington. We heard from people in Pierce, Snohomish, and the far-reaches of King County who make this trek daily using and transferring between several different modes of transportation. As it becomes less affordable for students and staff at UW to live in the U District and surrounding neighborhoods, many are commuting from the south part of King County and Pierce County to work and go to school. Concern was expressed that the more transfers we impose on those coming from these locations, the more burden we are putting on low income populations – who suffer disproportionate impacts of unpredictable service and long travel times.

People would like to see better East-West service, including service between the following locations:

o Lake City and Northgate o Sand Point and Greenlake via 65th Avenue NE o Northeast Seattle and Ballard through the heart of “The Ave” (University Way NE) instead

of through the south or north end o Northeast Seattle and Queen Anne o Northeast Seattle and Fremont o Capitol Hill and Ballard o Capitol Hill and Fremont o Capitol Hill and West Seattle

People offered ideas for frequent and reliable service down 25th Avenue NE to connect with Link light rail.

Many people are excited about Link connecting them to Capitol Hill, downtown Seattle, Rainier Valley, and Sea-Tac Airport.

Some areas and travel patterns that people don’t want planners to lose sight of include: o North Capitol Hill and Montlake communities to/from downtown Seattle and the University

District

Page 12: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 12

o Coming from the south (Southeast Seattle and Beacon Hill) to the south part of Capitol Hill, Yesler Terrace, and First Hill hospitals (Harborview, Swedish on First Hill and Cherry Hill, Virginia Mason, and the Polyclinic on Madison Street)

o Eastlake community to/from downtown Seattle and University District/northeast Seattle o Madison Valley to/from downtown Seattle and the University District o Other north-south corridors of Capitol Hill—Bellevue/Summit/Belmont, 15th and 19th

avenues on Capitol Hill o Various northeast neighborhoods, like Wedgewood, View Ridge, and Laurelhurst

connecting to the University District

People expressed desire for better service to the Sand Point corridor connecting riders to Magnuson Park, NOAA, and Children’s Hospital.

How do the transit options you use work for you? Do they get you where you want to go? A majority of those who responded to this question said their transit options work for them. The top three complaints about service are that it takes too long, buses are overcrowded, and the schedule is unreliable. Because of these experiences, a number of people said they prefer direct routes because transfers increase travel time. People expressed a desire for increased frequency of service, especially outside peak times. They also want improved network connectivity, east-west connectivity, and diagonal/cross-town connections in Seattle. There is excitement and a belief that the coming light rail service will improve transit overall in the affected communities and beyond.

Some people really like their routes and don’t want them changed. These include riders of routes 68, 74, 75, and 271.

Others miss routes that have been cut, including routes 45, 46, and 48X, because of the faster service these routes provided to connect Queen Anne, Ballard, Greenwood, and southeast Seattle/Central Area with the University of Washington. People in the Leschi, Central Area, and Yesler communities would like all-day, evening, and weekend service back that was lost when Route 27 was scaled back to peak-only service last September. Riders in the Summit/Belmont area of Capitol Hill expressed desire for a return of Route 47, which connected them to downtown all day and at night.

What’s most important to you when riding transit? We asked what prevents people from using transit, what would make them use transit more, and what’s most important to them about using transit. The length of time the trip takes and the reliability of the trip time were clearly the most important concerns. The more they have to transfer, the less reliable they perceive their trips to be, especially if service is not frequent. We heard countless stories from people about their transfer experiences. If one leg of a trip runs late and a rider misses a connecting trip, and it’s a half-hour wait for the next trip, transit can become too unpredictable and inconvenient. If service were more frequent and reliable, people would find transfers more acceptable.

Feedback from immigrant communities suggests that many immigrants are used to relying on a service network that is less complex and comes more frequently. Several people talked about how in their native countries, they never used any “system” to plan a trip. They could walk to a bus stop, wait no longer than 15 minutes, and make connections to other modes and services at major transfer points throughout their cities. They would find our bus service easier if it operated in more of a grid and service were frequent enough to not require the use of a schedule. The service would also be easier to use if wayfinding signs were in multiple languages, particularly at major inter-modal transfer points and where people need to know how to get to a key activity center.

Page 13: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 13

The first chart on the next page shows survey responses about which factors would make the person more willing to transfer. The second chart shows how many minutes respondents said they would be willing to spend getting to very frequent (i.e., every 10 minutes or less) service. This second chart also reflects what we heard from people in face-to-face conversations.

Page 14: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 14

34.3%

56.7%

17.9%

23.4%

57.9%

31.3%

22.4%

39.8%

1.9%

0.7%

1.0%

0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0%

I only had to wait 5 minutes or less for my first bus or…

I only had to wait 5 minutes or less for my next bus or…

I only had to wait 10 minutes or less for my first bus or…

I only had to wait 10 minutes or less for my next bus or…

Buses and/or trains arrived on time

There was enough room on buses/trains

The transfer stop was safe

The transfer stop had good shelter from the weather

The transfer was more accessible for people with…

The transfer was more accessible for wheelchair users

The transfer was more accessible for people who are…

A more-efficient network of service that connects more people to more places may require more transfers. What would make transfers more acceptable to you? I would be willing to transfer if (choose up to 3):

Page 15: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 15

Other Many respondents understand the connection between reliable and fast bus service and bus priority investments. Where people advocated for higher frequency service on major corridors, they also advocated for bus priority transit investments, such as transit only lanes and transit signal priority improvements.

Feedback about our outreach process The top three ways participants heard about the opportunity to participate were from their employers, via a Metro transit text or email notification, or the news media or a neighborhood blog.

Nearly 90 percent of respondents strongly or somewhat agreed that the notice, advertisement, and/or invitation to learn more and share thoughts about Metro's Link Connections project was clear and welcoming.

More than 80 percent of respondents felt they were given enough time to provide meaningful feedback.

More than 80 percent of respondents strongly or somewhat agreed that taking the time to share their feedback will result in better decisions being made.

What people appreciated That we asked for input—Overwhelmingly, we heard people say “thank you” for giving the public

an opportunity to tell us what they are experiencing and what they want so that we can shape changes based on their input.

Our street teams—Our staff members who talked with people at bus stops received several compliments.

Metro—We received numerous compliments about our drivers, how the agency has weathered the past several years of financial turmoil, investments we’ve made in new buses and technologies, and how we generally do a good job.

Disappointments or doubts Some people expressed doubt that their input will make a difference.

Some expressed disappointment in the open-ended nature of the questions we were asking, wishing we had actual changes or ideas they could provide feedback about.

Some people said we should stop asking for input. They encouraged planners to just make decisions that are best from a planning perspective and not to “water this down” with public input.

Suggestions for change Posters—People appreciated that we had them up, but suggested we put them inside buses, make

them better able to stand up to the elements, and use fewer words so they would be easier to read.

Survey—Make it more mobile accessible. Some people suggestions for rephrasing some of the questions we asked; some felt our survey made assumptions about who was answering (too commuter focused, focused on those who don’t use transit every day, somehow not applicable to how they or their family use transit, too broad).

Inclusiveness of outreach—People want to make sure we include south Seattle and do more to reach students at the University of Washington, residents in northeast Seattle and Yesler Terrace, and people at Harborview Medical Center, seniors, and people with disabilities.

Page 16: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 16

Topics for feedback—Some asked us to consider getting more feedback to shape connections between additional modes (e.g. bikes and transit).

Keep people informed—People asked us to keep them and other stakeholders informed about the project as it moves forward, and to be more transparent about Metro’s finances, decision making, and management.

Keep up the good work—Many comments expressed the sentiment that we should keep providing good and better service, and keep up this level of engagement.

Regardless of how people felt about this phase of outreach, we received a clear message that they want to see the results of their feedback and how we reflect this in the changes we put forth. This feedback will be taken into consideration as we plan the next phase of outreach.

Page 17: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 17

Appendix A – Media coverage

Capitol Hill Seattle – Bus Stop | The year ahead in Capitol Hill transit

http://www.capitolhillseattle.com/2015/01/bus-stop-the-year-ahead-in-transit/

Capitol Hill Seattle – Metro, Sound Transit planning how best to restructure routes, connect buses to Capitol Hill Station

http://www.capitolhillseattle.com/2014/11/metro-sound-transit-planning-how-best-to-restructure-routes-connect-buses-to-capitol-hill-station/

Capitol Hill Seattle – With eye on 2016 Capitol Hill light rail, plans readied to integrate Metro, Sound Transit service — UPDATE

http://www.capitolhillseattle.com/2014/09/with-eye-on-2016-capitol-hill-light-rail-plans-readied-to-integrate-metro-sound-transit-service/

UW Daily – Transit agencies to discuss light rail plans

http://dailyuw.com/archive/2014/11/12/news/transit-agencies-discuss-light-rail-plans#.VL7dXoXR8wk

UW Daily – (photo)

http://dailyuw.com/photo/2014/11/20/news/metro-and-sound-transit

Page 18: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 18

Appendix B – List of Community Partners

15th Ave Community Amazon Bullitt Foundation Capitol Hill Chamber of Commerce Capitol Hill Community Council Capitol Hill Housing Capitol Hill Triangle Cascade Bicycle Club Central Area Transit Coalition Children's Home Society of Washington-North Seattle Family Support Center Children's Hospital City of Seattle, Department of Neighborhoods City of Seattle, Department of Transportation Colman Neighborhood Association East District Council Eastlake Community Council Families for Lake City Feet First First Hill Improvement Association Friends of Frink Park Greater University Chamber of Commerce Group Health Cooperative Hawthorne Hills Community Council Holy Names Academy Jackson Commons Jewish Family Services Lake City Neighborhood Alliance Lake Union Community Council Laurelhurst Community Club League of Women Voters - NE Seattle Chapter Leshi Community Council Lighthouse for the Blind Madison Park Business Association Madison Park Seattle Madrona Moms Madrona Neighborhood Magnuson Park Advisory Committee Mallard Cove House Boats Maple Leaf Community Council Meadowbrook Community Council Meredith Matthews E Madison YMCA Miller Park Neighborhood Association MLK FAME Community Center Montlake Community Club NOAA Sand Point

Page 19: Link Connections Public Engagement Summary Phase One ...metro.kingcounty.gov › have-a-say › projects › link...with Link light rail service to Capitol Hill and Husky Stadium

Link Connections—Phase 1 Outreach Summary 19

North Capitol Hill Neighborhood Association North County Mobility Coalition Northeast District Council PCC Natural Markets Pronto Bike Share Puget Sound Sage Ravenna-Bryant Community Association Ravenna-Bryant Senior Center Roosevelt Neighborhood Association Roosevelt Neighbors' Alliance Seattle Central College Seattle Commission on People with Disabilities Seattle Deaf-Blind Center Seattle Floating Homes Seattle Housing Authority: Lake City Court Seattle Neighborhood Greenways Seattle Preparatory School Seattle University Senior Services - Transportation Program South Lake Union Chamber of Commerce Squire Park Community Council Sustainable Northeast Seattle Swedish Hospital The Northwest School The U District Partnership Thornton Creek Alliance Transit Riders Union Transportation Choices Coalition U District Conversation on Homelessness U District Farmers Market United Indians of All Tribes University District Community Council University District Food Bank University District Rotary Club University Family YMCA University Greenways University Heights Center University of Washington University of Washington Medical Center University Village View Ridge Community Council Virginia Mason Wedgewood Community Council Yesler Community Council