limited time only!
TRANSCRIPT
RARE CLEANROOM FACILITYLIMITED TIME ONLY! CLASS 1/100 CLEANROOM TOTALS 15,635 SF
R&D BUILDING AVAILABLE FOR LEASE93,848 Square Feet
Availability4000 N. First Street, San Jose, CA
Available now - 93,848 SF total (full building)
Corner location fronting N. First Street and Headquarters Drive
Walk to amenities - @First Retail/Dining/Entertainment Center across street
Access to Milpitas BART Station via VTA Light Rail (2017)
Cleanroom Highlights: Rare cleanroom facility – limited time only, requires a lease commitment before June 2017 as the ownership is currently evaluating their campus reposition strategy. Once construction begins, the cleanroom infrastructure will be removed and the opportunity will be gone, without a prior lease commitment.
Former Lam Research Fab
Class 1/100 area totals 15,635 SF
Class 1: 4,446 SF
Class 100: 11,189 SF
Gross Manufacturing Area is approximately 34,000 SF
Facility is operationally ready for move in
Facility contains required support and facility systems operating as originally designed
Areas and systems can be easily modified to provide custom manufacturing solutions
Complete facility is being decontaminated from Hazardous Production Materials and is on schedule to receive AHJ certification
Drawings Not Exact/Not To Scale. The information furnished has been obtained from sources we deem reliable and is submitted subject to errors, omissions and changes. Although Colliers International has no reason to doubt its accuracy, we do not guarantee it. All information should be verified by the recipient prior to lease, purchase, exchange, or execution of legal documents. © 2017 Colliers International
FLOOR PLANS
1ST FLOOR 2ND FLOOR
OPEN TO BELOW
NOT A PART
OPEN TO BELOW
Open OfficeOpen Office Open OfficeOpen Office
Dock Well
Lobby
Cleanroom
Drawings Not Exact/Not To Scale. The information furnished has been obtained from sources we deem reliable and is submitted subject to errors, omissions and changes. Although Colliers International has no reason to doubt its accuracy, we do not guarantee it. All information should be verified by the recipient prior to lease, purchase, exchange, or execution of legal documents. © 2017 Colliers International
N First Street
Rose Orchard WayHo
lger
Way
Rose Orchard Way
N First St
4000 1st St.93,848 SF
partial 2-story building AVAIL: NOW
Lamplighter W
ay
Assembly at North First
Head
quar
ters
Dr
@FirstRetail/Dining/Entertainment
Site Plan
Drawings Not Exact/Not To Scale. The information furnished has been obtained from sources we deem reliable and is submitted subject to errors, omissions and changes. Although Colliers International has no reason to doubt its accuracy, we do not guarantee it. All information should be verified by the recipient prior to lease, purchase, exchange, or execution of legal documents. © 2017 Colliers International
Project Overview
Project Overview
Rare 470,000+ square foot campus available now for lease (divisible by building)
6 buildings on 27 acres combining for a total of 470,000+ SF (3930-4000 N. First Street and 90 Headquarters Drive)
Extensive modern renovations in the early stages of being planned. Opportune time to influence campus design:
Repositioning: 470,000 SF in 6 buildings post renovation
Hybrid: 832,550 SF in 5 buildings (renovate 3 existing buildings and develop 2 new buildings)
New Construction: 1.3M SF in 2 buildings (develop 2 new buildings)
Drawings Not Exact/Not To Scale. The information furnished has been obtained from sources we deem reliable and is submitted subject to errors, omissions and changes. Although Colliers International has no reason to doubt its accuracy, we do not guarantee it. All information should be verified by the recipient prior to lease, purchase, exchange, or execution of legal documents. © 2017 Colliers International
CLEANROOMThe Facility at 4000 North First Street, San Jose, CA is a uniquely designed multiple Class rated cleanroom providing extreme flexibility to support clean area processes and manufacturing needs.
Key Facility Highlights: • Former LAM Research fab • Class 1/100 area totals 15,635 square feet • Gross Manufacturing Area is approximately 34,000 square feet • The Facility is operationally ready for move in • Facility contains required support and facility systems operating as originally designed • Areas and systems can be easily modified to provide custom manufacturing solutions • Complete facility is being decontaminated from Hazardous Production Materials and is
on schedule to receive AHJ certification
Specific Key Facility Systems
Chiller/Condenser System 800 Tons/1280 GPM for each of two systems
Hot Water/Boiler System 2000 MBH Boilers for each of two systems
Clean Air System-Air Handling Systems Varies-(10 units) Totaling over 188,000 CFM
Clean Air System-Recirculating Cooling Units (Hepa Filters)
Varies-(over 80 units) with flow rates between 12,000 to 20,000 CFM each
Exhaust Scrubber System-if not demolished 26,000 CFM for each of two systems
General/Heat Exhaust 20,000 CFM
UPW System 20 GPM
UPW Distribution 20 GPM
Process Cooling Water 700 GPM
Bulk Gas Distribution Systems-High Purity N2 Approximately 25 CFM
Bulk Gas Distribution Systems-General Purpose N2 Approximately 250 CFM
Clean Dry Air Distribution System 300 CFM System
Clean Dry Air Equipment System 300 CFM System
Purge Nitrogen System ---
Industrial Cold Water System Approximately 50 GPM
Electrical Power Distribution 8,000 Amps @ 480 Volts
Drawings Not Exact/Not To Scale. The information furnished has been obtained from sources we deem reliable and is submitted subject to errors, omissions and changes. Although Colliers International has no reason to doubt its accuracy, we do not guarantee it. All information should be verified by the recipient prior to lease, purchase, exchange, or execution of legal documents. © 2017 Colliers International
CLEANROOM
Topgolf Coming Soon
Topgolf is a one-of-a-kind experiential concept that is entertaining millions and growing the game of golf.
Each venue features fun and competitive golf games for all ages, climate-controlled playing “bays” similar to a bowling lane, an impressive food and drink menu, private spaces for groups of any size, HDTVs to watch the big game and a music selection that will make every visit feel like a party.
Topgolf Coming Soon
N. F
irst S
tree
t1
Mile
Drawings Not Exact/Not To Scale. The information furnished has been obtained from sources we deem reliable and is submitted subject to errors, omissions and changes. Although Colliers International has no reason to doubt its accuracy, we do not guarantee it. All information should be verified by the recipient prior to lease, purchase, exchange, or execution of legal documents. © 2017 Colliers International
Prepared By Colliers International
N. San Jose Amenities Map - Walking
Santa Clara Convention
Center
Topgolf Coming Soon
GUADALUPE RIVER TRAIL
SAN JOSE CITY SOCCER FIELD/PARK
Mi Jalisco MarketEl Taco De Oro Restaurante
& TaqueriaLunch with Tony
Rosita’s RestaurantStarwood Hotel
LUXURY MIXED USE DEVELOPMENT
PROPOSED “CENTENNIAL GATEWAY”
Mina’s Korean BBQSri’s Kitchen
Nicholson PlazaLegend
Restaurants
Lodging
Fitness
Banks
Service
Gas
@ First
Shans Indian & Pakistani CuisineRok Steakhouse & Grill
Sajj Mediterranean
Across Street/1 Minute Walk
Tasman Station
Dona Maria Mexican, Butter & Zeus, Bistro Siam
Thai Cuisine, Mikayla’s Cafe, Pho Khang
Vietnamese Cuisine
LUXURY MIXED USE DEVELOPMENT
PROPOSED “CITY PLACE SANTA CLARA”
Levi’s Stadium
Walking Distance Amenities Map
Drawings Not Exact/Not To Scale. The information furnished has been obtained from sources we deem reliable and is submitted subject to errors, omissions and changes. Although Colliers International has no reason to doubt its accuracy, we do not guarantee it. All information should be verified by the recipient prior to lease, purchase, exchange, or execution of legal documents. © 2017 Colliers International
Prepared By Colliers International
N. San Jose Amenities Map
Currently Under Construction
Brandon Park Retail - 45,000 SF
Mi Jalisco Market El Taco De Oro Restaurante
& Taqueria
Twin Creeks Sports Complex
Sunnyvale Baylands County
Park
Santa Clara Convention
Center
Levi’s Stadium
SanJose_SunnyvaleAmenitiesMap.151125
Luxury Mixed Use Development
Proposed “Centennial Gateway”
Capriotti’s Sandwich Shop
The UPS Store®
The Verdant
Mina’s Korean BBQSri’s Kitchen
Nicholson PlazaMoffett Plaza
Legend
Restaurants
Lodging
Fitness
Banks
Service
Gas
Milpitas Square
Gourmet Hut, Chili Garden, CBI Kitchen,Fantasia Tea
Cafe, Sizzling Stone Korean Bistro, Pepper Lunch, My
Dumpling, Nutrition House, Penang Garden, Cafe Won
Kee, Shanghai Delight, Dragon, Gate Cafe, HIT, Darda Seafood
Restaurant, CBI Kitchen, Sweetheart Coffee & Tea, Liang’s Kitchen, Anjappar, Chettinad Indian, Perfect, Chinese Food, Maruichi,
Golden Milpitas OptometryGolden Pro Golf
@ First
Shans Indian & Pakistani CuisineRok Steakhouse & Grill
Sajj Mediterranean
Dos A’ Biryani, Indian Restaurant & Bar, Java Sushi, Stop & Go Food, Robbee’s Falafel, iBagel Bakery & Cafe, Dr. Burrito, Professional Cuts,
Cleaners
Professional CutFalafels N’ More
River Oaks DentalRiver Oaks Chiropractic
Acupuncture
River Oaks
Mercado
Crescent Village
Mortar & Pestle BarCurry Up Now
Tasman Station
Dona Maria Mexican, Butter & Zeus, Bistro Siam
Thai Cuisine, Mikayla’s Cafe, Pho Khang
Vietnamese Cuisine
Tasman Square
Gobi Mongolian BBQ, Pho Queen Noodle House
McCarthy Ranch Marketplace
Cinnamon Club Asian GrillGreen Cafe
Sushi KingTaqueria Los CunadosBanfiled Pet Hospital
Rosita’s Restaurant
Luxury Mixed Use Development
Proposed “City Place Santa Clara”
Rivermark Village
Rivermark NailsFantasia Tea CafeRivermark Dental
Asteria Grill
TopgolfComing Soon
Amenities Map
Drawings Not Exact/Not To Scale. The information furnished has been obtained from sources we deem reliable and is submitted subject to errors, omissions and changes. Although Colliers International has no reason to doubt its accuracy, we do not guarantee it. All information should be verified by the recipient prior to lease, purchase, exchange, or execution of legal documents. © 2017 Colliers International
MST 81
10
1010
10
217
217
217
217
239
239
239
104
121
180
181
181
181
104
104
181
120
120
181181
104
140
140
120
304
321
321
304
304
304
328
328
330
522
522
522
2226
22
5857
58
26
26
26
53
53
54
53
54
53
55
5555
55
55
81
81 81
8160
60
58
81
2260
60
60
60
60
58
58
5857
47
47
4747
47 4747
66
4646
4666
66
46
58
77
77
2654
58
58
58
55
55
55
54
54
54
66
66
66
22
51
32
32
32
32
32
32
32
32
32
32
32
22
53 54 55
304 12212112026 54
321 328
Lockheed MartinTransit Center
LRT
SunnyvaleTransit Center
10522
32
81
E Empire
Monroe
Lafayette
Technology
Naglee
Newhall
The Alameda
Guadalupe Pkwy N 1st
E Taylor
E Hedding
Gish
Skyport
Rosemary
Coleman
De La C
ruz
N 1st
Brokaw
Karina
Gish
Oakland
O’Toole
Airport
Aldo
Trimble
Plumeri
a
Zanker
Montague Expwy
McCarthy
Lundy
S Main
Milpitas
Calaveras
Abel
Abel
Marylinn
Jacklin N Park Vi ctoria
Washington
Arizona
Dixon Landing
Kato
Page
Kato
Warm
Springs
Milp
itas
Gol
d
N 1st
Tasman
N 1st
Lafayette
Caribbean
ywkP acire
mA t aerG
Patri
ck H
enry
Old
Iron
side
s
Mission College
Lakehaven
Hidd
enla
ke
E Duane
Oakm
ead ArquesScott
MonroeReed
ttocS
Market
Homestead
Franklin
Bellomy
El Camino Real
Granada
Law
renc
e Ex
pres
sway
Benton
Bowe
rs
dR agot ar aS- el avynnuS
Homestead
Fremont
Remington
Mar
y
kcebnell oH
efl oW
Remington
S
Fai
r Oak
s
Sun
nyva
le S
unny
vale
Mat
hild
aIn
dio
Central Expressway
E Maude
N Fa
ir O
aks
Washington
Bern
ardo
California
Whi
sman
Ellis
McCord
N Akron
S Akron
Java
Cros
sman
McC
arth
y
Flora
Vist
a
Middlefield
ZankerRanch
McC
andless
GreatMallPkwy
Alder
Old San Francisco
Junction
Central Expwy
Tasman
Evelyn
Airport Blvd
Gua
dalup
e
De La Cruz
BunkerHill
Escuela
River Oaks
AlamedaThe
El Camino Real
Millm
ont Scott Creek
MinetaSan JoseInternationalAirport
Terminal A
Terminal B
ValleyHealthCenter
AmesResearchCenter
MoffettFederalAirfield
LockheedMartin
TownCenterMall
CityHall
SunnyvaleMunicipalCourt
SantaClaraCentralPark
CityHall
TritonMuseumof Art
DMV
MissionCollege
GreatAmerica
SantaClaraConventionCenter
Great AmericaAmtrak/ACE StationSunnyvale
BaylandsPark
TwincreeksSoftballComplex
AlvisoMarina
SanFranciscoBayNationalWildlifeRefuge
SanFranciscoBayNationalWildlifeRefuge
CityHall
KaiserMilpitas
KaiserMilpitas
GreatMall of theBay Area
AdultProbation
EmploymentDevelopmentDepartment
Santa ClaraCounty Office ofEducation
SantaClara MunicipalCourt
SantaClaraUniversity
EmploymentDevelopmentDepartment
McCarthyRanchShoppingCenter
Note:Southbound carpool lane only, north of Calaveras
&ParkRide
&ParkRide
&ParkRide
&ParkRide&ParkRide
680
880
880
101
237
237
87
Metro/AirportStation
OldIronsidesStation
ReamwoodStation
ViennaStation
Fair OaksStation
CrossmanStation
LockheedMartinStation
Bayshore/NASAStation
MoffettParkStation
MiddlefieldStation
WhismanStation
BorregasStation
GreatAmericaStation
Levi’sStadium
LickMillStation
TasmanStation
Cisco WayStation
I-880/Milpitas Station
BaypointeStation
Santa ClaraTransit Center
CaltrainAmtrak
Caltrain
ACE
ChampionStation
GreatMall/MainStation
MontagueStationRiver
OaksStation
OrchardStation
BonaventuraStation
ComponentStation
KarinaStation
GishStation
CollegeParkCaltrainStation
LawrenceCaltrainStation
SunnyvaleCaltrainStation
Sunnyvale SantaClara
Fremont
To MissionBlvd &FremontBARTStation
ToFremontBARTStation
M
M
M
M
M
H
M
H
H
H
M
H
(See lower left corner for details)
32 60
Light Rail: Alum Rock – Santa Teresa
101
304
35
10
(final destination of specific route)
DB1
0 1 km 1 mile
MST 55
Altamont Commuter Express (ACE)/Capitol Corridor
Light Rail: Ohlone/Chynoweth – Almaden
522
35DASH
Route Terminus
ECR SamTrans Bus Routes
217 AC Transit Bus Routes
Dumbarton Express Bus Routes
Caltrain Line & Stations
BART Line & Stations - Future
Monterey to San JoseExpress Bus Route
HWY17 Highway 17 Express Bus Route
Local Bus Routes
Community Bus Routes
Limited Stop Bus Routes
Express Bus Routes
Rapid 522 Free
Light Rail: Mountain View – Winchester
Free Shuttles to Light Rail Stations
Free Downtown Area Shuttle (DASH)
48
Active Carpool Lane
Start/End of Carpool Lane
C lick on your bus route number/ light rai l s tation for deta iled information . ®
880
Light Rail: Alum Rock – Santa Teresa101
304
35
(final destination of specific route)
0 1 km 1 mile
Altamont Commuter Express (ACE)/Capitol Corridor522
35 Route TerminusLocal Bus Routes
Community Bus Routes
Limited Stop Bus Routes
Express Bus Routes
Rapid 522
Light Rail: Mountain View – Winchester
48 Active Carpool Lane
Start/End of Carpool LaneMajor highways 237 and 880/17 along with Montague Expressway are within 2.5 miles offering convenient access by car or truck. A short 17 minute drive to Mineta San Jose International Airport makes domestic and international travel very convenient.
SNAPSHOT: DISTANCE TIME
VTA Light Rail “Champion Station” 0.5 Miles 10 min walk
VTA Light Rail “Baypointe Station” 0.7 Miles 15 min walk
Amtrak/Ace – Great America Station 1.2 miles 6 min drive
Bus – Lines 58 across street 1 min walk
Highways – 237, 880/17 & Montague Expressway within 2.5 miles 4 min drive
Mineta San Jose International Airport 4.3 miles 15 min drive
VTA LIGHT RAIL - BAYPOINTE STATION
Transportation Map
Drawings Not Exact/Not To Scale. The information furnished has been obtained from sources we deem reliable and is submitted subject to errors, omissions and changes. Although Colliers International has no reason to doubt its accuracy, we do not guarantee it. All information should be verified by the recipient prior to lease, purchase, exchange, or execution of legal documents. © 2017 Colliers International
Prepared By Colliers International
= New Housing
N. San Jose New Residential Development Map (Constructed, Under Construction & Planned)
N. First Street
Zanker Road
Crescent Village Apartments1,750 Units
121 Tasman Apartments 240 Units
Aire Apartments 293 Units
Brandon Park Apartments 1,579 Units
Verona Apartments 438 Units
Domain Apartments 444 Units
The Verdant/Latitude Apartments 704 Units
Enso Apartments 183 Units
Epic Apartments 769 Units
Tasman Apartments 554 Units
Project/Development Dwelling Units1. Crescent Village Apartments 1,7502. Domain Apartments 4443. North Park Apartment Village 2,7004. The Verdant / Latitude Apartments 7045. Enso Apartments 1836. 121 Tasman Apartments 2407. Aire Apartments 2938. Epic Apartments 7699. Brandon Park Apartments 1,57910. Tasman Apartments 55411. Verona Apartments 438Total: 9,654
10
2
5
6
4
7
11
8
19
North Park Apartment Village 2,700 Units
3
Residential Development Map
Drawings Not Exact/Not To Scale. The information furnished has been obtained from sources we deem reliable and is submitted subject to errors, omissions and changes. Although Colliers International has no reason to doubt its accuracy, we do not guarantee it. All information should be verified by the recipient prior to lease, purchase, exchange, or execution of legal documents. © 2017 Colliers International
SUNNYVALE
SANTA CLARA
SAN JOSE
MILPITAS
SanJose_SunnyvaleCompanies.160928
Prepared By Colliers International
Nearby Companies Map
®
Apple
Nearby Companies
CRAIG FORDYCE, sior, ccim+1 408 282 [email protected] License No. 00872812
MIKE ROSENDIN, sior, ccim+1 408 282 [email protected] License No. 00826095
COLLIERS INTERNATIONALSilicon Valley450 West Santa Clara Street San Jose, CA 95113www.colliers.com
237
SHANE MINNIS, leed ap+1 408 282 [email protected] License No. 01708656
Tasman Drive