Life Cycle of an Order
Copyright 2002 New Edge Networks. All rights reserved.
![Page 2: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/2.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
2
Agenda• Players – Who’s coming to dinner?
• Address Validation & PreQual – Why all the drama over an address?
• Order Process – What happens when I press submit?
• Exceptions & Processing – When things go wrong…
• Communications – The game of telephone…
• MACD’s – Moves, Adds, Changes & Discos
![Page 3: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/3.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
3
Players
•EU / Business – The Customer
•ISP – Our Partner
•NEN – What groups are working here?
•LEC – Is anyone home?
![Page 4: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/4.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
4
Address Validation & PreQual
Service Address • Service Address vs. Billing, Mailing, or Listed• Service Address Telephone Number is Reference
(unless ADSL-SL)• PILOT: SAG; LEC: LEC Service Address Records• Move recently?• New Construction• Troubleshooting Address entry in PILOT
– Changing things to get hit– Can’t get a hit at all - Manual LEC Prequal Request to
Customer Care
![Page 5: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/5.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
5
Address Validation & PreQual
PreQualification• PreQual Factors: LL, Line Quality, Service
Obstructions• PILOT: Only Est. of LL (air-miles)• LEC PreQual: LEC Records (problems here too)• LEC Engineering Design Group: More LEC Records• LEC Outside Plant / CO Technicians connects
physical copper• SOC TESTING – NEN Tests line w/ Hekimian for
usability
![Page 6: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/6.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
6
Order Processing - Vanilla1. ISP – Order Entry in PILOT
2. NEN Service Activation – LEC Address Validation & PreQual
3. NEN Service Activation – assign CFA & Sent to ILEC
4. LEC – Provisioning New
5. LEC – FOC
6. LEC – DLR
7. LEC – SOC
“Days” = business days
![Page 7: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/7.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
7
Providing DSL – The Process
8. NEN - SOC test
9. NEN - Build PVC
10.NEN - Schedule IW – Dispatch / AIC / EU
11.AIC – Inside Wiring Installation
12.STB!
“Days” = business days
![Page 8: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/8.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
8
Providing DSL – The Process
Timeline
End User
ISP
PILOT
New Edge Networks
LEC
2-8 days 5 to 15 days 1 to 5 days 1 to 6 days
Prequalifyend user
usingPILOT
Verify address; locate servingCO; calculate distancebetween EU and CO;
determine ISP aggregationcircuit connectivity; return
services available
CompleteNew Order
Form
Validateorder
Assign portand CFA
CreateLSR andsubmit to
LEC
Issue FOC Issue DLR
ReceiveFOC
ReceiveDLR andanalyze
RequestSOC
Test LineAcceptSOC
Schedule enduser
installation
Scheduleinstallation
Make reminder callto end user one daybefore scheduled
appointment
Notify ISP ofSOC andinstallationschedule
Receive SOCand installation
information
Dispatchinstaller with
CPE
Installinside
wiring andconnect
CPE
Obtain enduser
acceptance
Acceptservice
Completeserviceorder
Notify ISP &Billing
installationcomplete
Receivecompletion
notice
ReceiveLSR
Test line
ReceiveFOC notice
Receivereminder call
![Page 9: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/9.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
9
Timeline
End User
ISP
PILOT
New Edge Networks
LEC
2-8 days 5 to 15 days 1 to 5 days 1 to 6 days
Prequalifyend user
usingPILOT
Verify address; locate servingCO; calculate distancebetween EU and CO;
determine ISP aggregationcircuit connectivity; return
services available
CompleteNew Order
Form
Validateorder
Assign portand CFA
CreateLSR andsubmit to
LEC
Issue FOC Issue DLR
ReceiveFOC
ReceiveDLR andanalyze
RequestSOC
Test LineAcceptSOC
Schedule enduser
installation
Scheduleinstallation
Make reminder callto end user one daybefore scheduled
appointment
Notify ISP ofSOC andinstallationschedule
Receive SOCand installation
information
Dispatchinstaller with
CPE
Installinside
wiring andconnect
CPE
Obtain enduser
acceptance
Acceptservice
Completeserviceorder
Notify ISP &Billing
installationcomplete
Receivecompletion
notice
ReceiveLSR
Test line
ReceiveFOC notice
Receivereminder call
Timeline
End User
ISP
PILOT
New Edge Networks
LEC
2-8 days 5 to 15 days 1 to 5 days 1 to 6 days
Prequalifyend user
usingPILOT
Verify address; locate servingCO; calculate distancebetween EU and CO;
determine ISP aggregationcircuit connectivity; return
services available
CompleteNew Order
Form
Validateorder
Assign portand CFA
CreateLSR andsubmit to
LEC
Issue FOC Issue DLR
ReceiveFOC
ReceiveDLR andanalyze
RequestSOC
Test LineAcceptSOC
Schedule enduser
installation
Scheduleinstallation
Make reminder callto end user one daybefore scheduled
appointment
Notify ISP ofSOC andinstallationschedule
Receive SOCand installation
information
Dispatchinstaller with
CPE
Installinside
wiring andconnect
CPE
Obtain enduser
acceptance
Acceptservice
Completeserviceorder
Notify ISP &Billing
installationcomplete
Receivecompletion
notice
ReceiveLSR
Test line
ReceiveFOC notice
Receivereminder call
Providing DSL – The Process (cont’d)
![Page 10: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/10.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
10
Exceptions – the bumpy roadAddress Issues• Moves• New Construction• Lost Outside Plant TechsFacilities Issues• Lack of facilities
– No Copper to Prem (build or no build)– Full Drop - No Space at Demarc
• Pair Gain & DLCs• Remote Cos• Bridge Taps & Load Coils – Line Conditioning• Tested Loop Length – too long
![Page 11: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/11.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
11
Exception Processing
• Pending Status
• SUP Status
• On Hold Status
• Exceptions Codes
• Reason Codes
![Page 12: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/12.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
12
MACD’s
• Moves
• Changes
• Cancellations / Disconnect
Insert Ronalds Face Here
![Page 13: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/13.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
13
Communications
• ISP to NEN, NEN to LEC, & Vice VersaOutbound
– DOSe Reports– Status Letters from CRM
Inquiry Resources– Partner Network / My Account status viewer
• www.newedgenet.com
– Customer Care
![Page 14: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/14.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
14
New Edge Networks Support
• Customer Care
• Technical Assistance Center(TAC)
• Network Operations Center(NOC)
![Page 15: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/15.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
15
Customer Care Duties• Inbound
– General inquiries and product info– Billing calls– PILOT trouble– Escalation and trouble status– Front desk reception– Order status calls– TAC inbound– Order Cancellation
• Outbound– Scheduled maintenance notifications– IW schedule and “dentist”calls– Outage/maintenance updates– Dispatch AICs for each order– Satisfaction checks
Phone -
1-877-435-7950
Email - [email protected]
![Page 16: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/16.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
16
TAC Duties• DSL Test and Turn-up• Work with Authorized
Installation Contractors to ensure successful installs
• Work with ISP technical support staff to troubleshoot end-user problems (7 X 24)
• Work with ILECs to resolve provisioning issues
![Page 17: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/17.jpg)
Last Revised – June 03, 2002New Edge Networks – Proprietary & Confidential
17
NOC Duties
• Monitor network• Maintenance and repair
support of all products (7 X 24)
• Minimize Mean Time to Repair (MTTR) – Service Level Agreements vary by product type
![Page 18: Life Cycle of an Order Copyright 2002 New Edge Networks. All rights reserved](https://reader035.vdocuments.site/reader035/viewer/2022072017/56649f0c5503460f94c1f6d8/html5/thumbnails/18.jpg)
Questions?