Page 1: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

LIEF Project Plan

Jeremy Mould & Jon Lawrence

Page 2: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Agenda KISS Kickoff Meeting 12/30900 JM/LW Meeting overview / Skype0930 Science requirements ETC1000 XY Telescope & optical designBreak1100 JL Optical/cryostat/thermal/

system1200 MCBA Control system/interfacesLunch1400 JL System/data pipeline1500 LW Deployment/logistics1600 or Friday JM Project management

Page 3: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Kunlun Infrared Sky Survey

Page 4: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Document Scope

• project definition plan for AST3-NIR Antarctic instrument project, – funded via a successful ARC LIEF grant

• includes instrument high level aims & objectives, – key project personnel, – the proposed concept, – budget, and schedule, – assessment of key risks at initialisation phase

Page 5: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Project Aims

Primary aims of this project are to:• conduct a deep high-cadence wide-field Kdark

infrared sky survey (KISS) from Antarctica;

• enhance Australia/China/US collaboration in Antarctic astronomy;

• gain knowledge on operation of & procurement for IR detector arrays to be used in Antarctica.

Page 6: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Project Objectives

• Design & build a wide-field K-band imager for AST3-NIR telescope– AST3-NIR telescope is designed & built by NAOIT;

• Integrate & interface imager with AST3-NIR telescope – location for integration to be determined, – possibly U Tas in Hobart per John Dickey & Andrew Cole

• Support commissioning activities (in-person and/or remotely) for the AST3-NIR telescope + instrument in Antarctica – at Dome A, South Pole, or Dome C.

Page 7: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

KISS LIEF proposal Investigators• Jeremy Mould (SUT) as Lead Investigator• Karl Glazebrook (SUT) as Chief Investigator• Michael Ashley (UNSW) as Chief Investigator• Michael Burton (UNSW) as Chief Investigator• Lifan Wang (TAMU) as Partner Investigator• Ji Yang (PMO) as Partner Investigator• Anna Moore (Caltech) as Partner Investigator• Jon Lawrence (AAO) as Partner Investigator• Peter Tuthill (USyd) as Chief Investigator• Mike Ireland (ANU) as Chief Investigator.

Page 8: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Key instrument project roles

• Jeremy Mould (SUT) as Lead Investigator• Jon Lawrence (AAO) as Project Leader• Julia Tims (AAO) as Project Manager• Jessica Zheng (AAO) as Instrument Scientist• Nic Bingham (AAO) as Control System Engineer • Michael Ashley (UNSW) as Control System Lead• Xiangyan Yuan (NIAOT) as Telescope Lead Scientist

Page 9: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Ownership

• “The instrument developed and all materials procured for the instrument project will be owned by Swinburne and made available on-loan to the project team for the duration of the project”– i.e. to the end of the KISS survey phase

• this is of no consequence for the science– and doesn’t apply to the telescope or its other

attachments, such as the data system

Page 10: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Science case

Science case (more detail in LIEF text) includes: • supernovae, • exo-planets, • variable stars, • AGN reverberation mapping, • gamma-ray-bursts, • young stellar objects, • young massive stars, • cosmic infrared background.

Page 11: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Concept

Baseline instrument concept consists of • 2.5 m cut-off HgCdTe detector array, • mounted in a cryostat with internal baffling, • Kdark filter and optically powered window• camera mounts to flange on telescope providing focal

control. • Narcissus mirrors mounted on telescope structure are

used to reduce thermal emission– rather than a cold stop within the cryostat.

• instrument includes control system – interfaces with AST3 telescope & PLATO Supervisor computer.

Page 12: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Detector Array & Cryo System• Supplier of detector array • Baseline is Teledyne;• Also to be explored is Selex ES, a European company who may be offer an

alternative without ITAR restrictions. • Array size and configuration• Baseline and preferred option is science grade H2RG (2k x 2k);• De-scope options include engineering grade H2RG (with contiguous 1k x 1k

region), and science grade H1RG (1k x 1k array). • Detector and cryo system supplier• Baseline is Teledyne+GL Scientific to supply detector with detector mounting

plate and SIDECAR ASIC focal plane electronics– AAO to design cryostat body, cooling & vacuum system, baffling, window mount,

& filter holder– Alternative #1 is Teledyne+GL Scientific to supply complete winterised

detector/cryo/controller system– Other alternatives to be explored.

Page 13: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Telescope InterfaceTelescope configuration

• AST3-3 is a clone of the AST3-2 telescope but with a folded Nasmyth focus– this telescope is currently in the construction phase;

• AST3-4 Cassegrain-focus infrared-optimised telescope with the same mirror diameter as AST3-2 (i.e. 0.68 m). – likely to have superior performance for AST3-NIR camera– currently unfunded with a longer lead time. A preliminary

optical design exists for this telescope• A larger telescope with 1 m diameter (unfunded).

Page 14: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

TelescopeTelescope mount

Alt-Azimuth orEquatorial

Telescope location

• Preferred option is Chinese Kunlun station at Dome A; – Alternatives (due to ITAR restrictions) are US Amundsen-Scott

South Pole station or French-Italian Dome C station.

• Telescope/instrument integration• Preferred option would be to integrate & test instrument with

telescope in China, but this is unlikely due to ITAR• Camera integration may be at Swinburne (pending lab space)• Camera/telescope integration may be at U Tas in Hobart (lab

space available)

Page 15: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Outside ScopeFollowing activities not within scope of project but are essential:• AST3-NIR telescope & telescope control system: To be provided by NIAOT.• Deployment & logistics to & in Antarctica: To be provided by PRIC or NSF OPP. • PLATO power supply: existing PLATO-A power supply module does not provide

sufficient power for AST3-1, AST3-2, and AST3-NIR & instrumentation. – new module is required – likely dedicated to AST3-NIR+instrument. – this is currently not funded.

• Operations: Observatory and telescope operations are not included within project scope. To be provided by NAIOT+UNSW.

• Survey program: Development and management of science cases & observing program to be provided by science team(s) coordinated by Lead Investigator.– See preliminary KISS plan for M.Burton, M.Ashley and team roles

• Data pipeline: Under this project a functioning software/control system will be provided with limited capability to transfer data or for image analysis.

• A more sophisticated on-site data reduction pipeline is not currently assigned or funded. Capability to create source catalogs on site is required.

• Data archive is allocated to ANU according to the LIEF.

Page 16: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Project subsystems (WBS)• Systems & Management: Project management, systems engineering and

instrument requirements management• Interfaces: Development of interface specifications and drawings for

telescope, detector, and electronics/control systems • Detector & Controller: Design & procurement for detector & detector

controller • Cryostat System: Design & procurement for cryostat body and cryo-controller; • Control System: Design, procurement, & assembly for instrument controller. • Software: Development and testing of low level control software and high

level instrument control and interface software; • AIT: Camera sub-system integration & testing, and integration of camera with

telescope to occur within Australia. – If integration in China is allowed, additional travel funding will be required.

Page 17: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Anticipated Scheduled MilestonesID Milestone Completion Due Date0 Preliminary discussions with DoS re: ITAR January 20151 Project Kick-off (Meeting at HKU) Feb.– Mar. 20152 Requirements Review June 20153 Detector & Interface Specification July 20154 RFQ Teledyne August 20155 Contract Negotiation (Detector) September 20156 Purchase Order (Detector) October 20157 PDR (De-Scope Option) December 20158 SAIL Readiness Review at SUT July 20169 Procurement Lead-time (Detector) November 201610 Float Procurement Lead-time (Detector) January 201711 AIT Feb. – June 201712 Camera Pre Delivery Review Late 201713 Shipping to Antarctica Nov. 201714 Commissioning Jan. 201815 Science Survey commences Feb. 2018

Page 18: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Management

• AAO’s Project Leader and Project Manager will manage the camera project.

• Lead Investigator’s role will be to provide sign-off on the Instrument Requirements and take responsibility for all high-level decisions – e.g. design trade-offs.

• Lead Investigator will have responsibility for developing science teams & survey program.

Page 19: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Project Reviews• Consistent with similar sized instrument projects

at AAO, there will be no formal external reviews. • There will be a series of internal reviews – as given in the scheduled milestones:

• Requirements Review, • Final Design Review, • SAIL Readiness Review, • Camera Pre-Delivery Review. • These reviews will involve a subset of: – LIEF team– AAO/SUT/UNSW project team – representatives from the NIAOT telescope team.

Page 20: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Work Distribution Option A• In this model, AAO will be responsible for overall

management and systems engineering of project and for the design and procurement of all components.

• AAO will be responsible for assembly and testing of instrument control electronics and software – some fraction possibly subcontracted to UNSW

• SUT will be responsible for AIT of detector and cryostat subsystem, & overall instrument system integration & test – These tasks will occur at SUT laboratories – employment of a new SUT detector engineer.

• AAO and SUT will both contribute to the telescope integration and commissioning support activities

Page 21: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Work Distribution Option B

• In this model, all available funds ($1,175k) will be transferred to the AAO – responsible for all aspects of camera project,

including management, systems engineering, design and procurement, & assembly & testing.

– NB: Some fraction of the control system may be sub-contracted to UNSW.

Page 22: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Contracts

• MIA will distribute all project funds to SUT. • After MIA signed, subcontract will be prepared to

arrange for transfer of funds between SUT & AAO • subcontract specifies detailed Statement of Work– based on an AAO template – previously used with other Australian unis for LIEF

Page 23: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Preliminary Risk Assessment (in order)• US export license for Dome A denied move to South Pole• Aust. export license for Dome A denied move project to SP• US export license for South Pole denied re-evaluate• Australian export license for South Pole denied re-evaluate• US export license for China denied integration in Australia• No funds to fill funding shortfall de-scope to H1RG• Project estimate too low de-scope to H1RG• No SUT funding for lab camera AIT at AAO, SUT engineer to AAO for assembly;• No SUT detector engineer camera AIT at AAO using AAO personnel• SUT detector engineer not well qualified camera AIT at AAO• No SUT detector engineer overlap with detector delivery SUT to extend position;• Detectors (long lead item) are delayed project is delayed;• Partners do not contribute full amount de-scope to H1RG;• Scope creep de-scope to H1RG;• Power module not funded replace AST3-1 and AST3-2 or deploy to South Pole;• Deployment (Dome A) not approved by PRIC project delayed;• Deployment (South Pole) not approved by US NSF project delayed

Page 24: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Team planDec 2014 SRO Send out MIA to partners AAO Ordering H2RG: contact ITAR J. Mould Advertise with SPIE for EngineerFeb 2015 Project kickoff meeting SUT Development Find donor to equip SAIL All partners Sign MIA and return it to SROMarch SRO Invoice TAMU, Sydney, ANU, UNSW

AAO Put $80k in escrow for design work at AAO M. Burton Form KISS Science Team,

study impact of descope options1,2

M. Ashley Form KIS Survey Management Team

Page 25: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Team plan 2April AAO Commence detailed designJune A. Moore Organize PDR at AAOJuly AAO Pay itself $80k & invoice SUT for $20k M. Burton Science Team reportAugust D. Hicks Organize CDRs at AAO and NIAOTOctober AAO Place purchase order for detectorNovember AAO If CDR satisfactory, invoice SUT

for up to $100k design work AAO & SRO Procure all material against $773k budget*2016 Mould & Wang If ITAR OK, discard SPole descope option1

July A. Moore SAIL Readiness Review at SUTMould & Lawrence If review successful, discard 1K array descope

option2

Page 26: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Team plan 3 September SUT VC Open Swinburne Astro Instrument LabDecember D. Hicks Supervise project handover AAO to SAILFeb 2017 SAIL Ass-Integrate-Test camera subsystemsMarch A. Moore Survey & System Software Review at SUTApril M. Ashley Survey Management Team reportMay M. Ireland Data Management ReviewJune SAIL AIT camera systemJuly UNSW Survey power reviewAugust D. Hicks Camera Pre Delivery ReviewSeptember Xiangyan Yuan AIT telescopeNovember SAIL Ship camera to Hobart for integration with telescopeFeb 2018 M. Ashley & PMO Commissioning

Page 27: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Kickoff Meeting Summary 12/3/15Jeremy Mould Swinburne Co Lead Investigator (Camera) Lifan Wang TAMU Co lead investigator (System)Nick Suntzeff TAMU VisitorShihai Yang NIAOT Control system engineerHaiping Li NIAOT OpticsHaikun Wen NIAOT Mechanical designXiaoyan Li NIAOT Control software & remote opsXiangyan Yuan NIAOT Optical design & telescope mngmtVlad Churilov AAO Mechanical and system engineerJon Lawrence AAO Lead camera projectMichael Ashley UNSW Control systems and powerJessica Zheng AAO Instrument scientist

Page 28: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

By phone

Michael Burton UNSW Science Team ChairPeter Tuthill Sydney Chief InvestigatorMichael Ireland ANU Chief Investigator, Data archiveJulia Tims AAO Project Manager

Page 29: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Management

• Jeremy Mould will make an org chart• Jessica Zheng will make an ETC• Michael Burton will create and maintain a set

of science requirements• Jeremy & Lifan will consider the composition

of an External Advisory Committee

Page 30: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Telescope• We agreed that the baseline plan is to design mods to AST3-3 to meet

the science reqs, not to propose AST3-4.• Jessica & Haiping will work on baffle design to meet the science

requirements. – This is preferred to changing the speed of the telescope beam, or changing the

bent Cassegrain design. – They will also specify the mirror coatings (gold or …..).

Environment control• Jon, Michael, Xiangyan, Vlad will develop a thermal model of telescope. • Some of the resources to maintain optical transmission & thermal

equilibrium are CaH absorber, ITO, waste heat. • AST3 only monitors temp of encoder not tube but some Mohe data exist.

Page 31: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

System requirements• Science = Jessica• Transport = PRIC• Operation, includes telescope, services, ops, environment, work.• Sunpower cryocooler will be used. • To handle outgassing of plastics, getter will be used.• Vlad, Xiangyan and Haikun will study the focus mechanism to avoid

duplication if possible.• Jon, Xiangyan and Jessica will study other optics issues, such as the edge

treatment of the fold mirror.Control system• Michael talked about power system redundancy, power down modes,

transients (ESD & EOS), testing manufacturers’ specs, maximizing software control.

Page 32: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Detector

• ANU currently has most Teledyne experience.• Cognizant engineer to visit AAO• Jeremy Mould and Nick Suntzeff will develop a

calibration strategy. (Is a shutter required?)Computers• Can we develop hardware and software standards

for the project? Shihai Yang , Xiaoyan Li and Michael will review the computer architecture of AST3-2. Can it be improved? Should we use new low power processors and He filled disks?

Page 33: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Interface Control Document

• TBD• Xiangyan will develop a schedule for the NIAOT work and compare

with the schedule for AAO work. Jeremy will add a software review to the team plan. When is the science project complete?

Backup deployment plans• Lifan will write an NSF OPP proposal. – Jeremy will develop an iPeV proposal.Data Management

• Michael Ireland will develop a technical data management plan. This does not include any changes to the AST3 collaboration’s data access policies. There will be data releases to the community.

Page 34: LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope

Filter

• Peter Tuthill will study the impact of changing Kdark’s Delta lambda from 0.18 um.

• There is no filter wheel in the baseline design.Enabling data• Jeremy will list our needsNew policies• Lifan will consider a policy to support instrument builders.Next meetings• SCAR AAA Hawaii August• Nanjing Meeting 2015 end