libis consulting
TRANSCRIPT
LLIBISIBISC O N S U L T I N GC O N S U L T I N G
Telecommunications, Renewable Energiesand Planning Consultancy
We do as we think
At Libis Consulting we are the right mix of a group of engineers highly qualified in telecommunications, renewable energies, and consultancy. We combine the expertise of profesionals with more than twenty years of experience with new engineers and consultants with high skills in different disciplins.Trough these years we have developed and participated in a diversity of complexity and scope projects.
As a result of our policy of looking for sinergies to get the best to our customers we have had iniatie collaboration some years ago with great architech studios and some other professionals.This last years we have participate at “Libis, Araiz, Duque & Parners” - LAD&P- in designing Planning solutions for great challenges at a city scale.
We try to deliver excellence to our cutomers, optymizing their resources and looking for the maximum quality at projects we do.
We are as we do
We have design specificsolutions to meet the needs of our customer at diverse areas.
Telecom infrastructures, technical equipment for big Buildings, Solar Photovoltaic, Control&monitoring a wasterecycling plant, water cycle consulting for hotels and residential, systems for building management, security, audiovisual systems.
At LAD&P we have proposethe design of the infraestructures for energy, savings, telecom and water and waste manegement for a city at the south of Morroco and for an Open International Competition at Copenhague.
Agents of change
Our work is developed on a variety of areas and disciplines.
At Engineering we have design and in some cases implement the solution through our subsisiary company
– Telecommunication Networks– Access Control /intrusion– Solar Photovoltaic – Building Management Systems (BMS)– Data networks, conectivity– Audio systems– Security- TV surveillance– Project Management
At Planning consultancy– City Planning– Project management– Energy generation&consumption
planning– Telecom networks– Renewable energies consultancy
Countries where we act
Libis has experience in the following Countries
SpainCanary Islands. We have projects and
customers in the seven islands.Zaragoza
Denmark, CopenhagenUSA, MiamiMarocco, Essaouira
Solar Photovoltaic plant and enviromental recovery
Our customer has bought an old 240.000 square meter farm with a very diminish land, because of raw material extractions.
The scheme we have fixed for the project is:We have done an environmental analisys of the zone with technical experts to define the areas where we can act causing the minimum impact on land, fauna and flora.
With it this we have redraw the land to recover the original land slope.
After a deep analisys of the posibilities we consider to create a mix use for the land. On one side the objective is to create a profitable vineyard farm and on the other side a Solar PV Plant.Folwer production is planned to add under the solar modules.
Solar Photovoltaic plant and enviromental recovery
Using only the 37% of the surface we’ve define a8,7 Mwatt Solar Photovoltaic modules Plant
to produce around 12,6 Miil KWh.
Figures:240.000 m2
9 Mwatt Solar PV180 Wp PV modules ,
100 & 60 Kw inverters
Farm recoveryVineyards
Flower production under PV modules
Garbage Plant Monitoring & TV surveillance
The Plant it´s in a 2 m2
area with different subprocessing garbage plants (Compost, Edar, Packs, ...).
Every single one has it´s own control system but is did not give info as whole.
We have design and implement a global system that captures info from any single plant and present it to the staff.
A Solar and Wind 1Kw autonomous energy systemhas been also implemented to feed a remote water tankequiment (chlorine, water level, ...).
To comunicate with the Control Rack, a Wide Bandwith wifi system has been added.
Garbage Plant Monitoring & TV surveillance
With a twenty onecameras Close TV Circuit is been covered the key points of the area.
The system is an IP one controlled via the network using the optic fiber as backbone. The central unit manage all the cameras and the images, with the ability to control it remotely via a common ADSL communication line.
A 26 Km Optic Fiber ring act as a commonNetwork Infrastructure.
Eco-sustainable Hotel
The scope is a designwith high environmental respect, sustainable and profitable at short and long term.
A 80 KW Photovoltaic plant will be at the upper floor, and South Glass Wall.
Geothermic system reduce at 40% the energy consumption for Clima and reduce CO2emissions.
Grey water recycling system for cleaning, gardening and cistern filling. This system will reduce 5 Mill liter/year of tap water consumption.
ControladorDe sistemaB-BC
Modulo de
campo
Modem
Control temperatura
A LEED Certification Proccess will label the building as a
green one.
Telecommunications
The “Netwok Access Point West Africa Canary Islands” –NAPWACI- is The most powerfull building for IP communications on this area of the atlantic seaThe design of the NAP is a TIER4 level of service data center. The strict specficications in terms of communications and security redunndacymade this a unique buiding.The conection of the NAP with the rest of the world it´s been designed throgh a Fiber Optic ring surounding the city and connecting with submarine cable landing and also via Satellite Antennas.
The project cover not only the Network but also Security Systems (TV, Access Control and Perimeter Security), Audiovisuals and Building Mangement System.
As part of the commitment of the Owner with the environment a 380KW Solar Photovoltaic Plant has been designed at the flat roof..
Telecommunications
The conection of the NAP with the rest of the world it´s been designed throgh a Fiber Optic ring around the city.
A twenty two km Fiber Optic Ringsurounds the metropolitan area, getting contact with the main Telecommunication Operators and with the future submarine cable landing site.
Audio and Consultancy
As part of a global renovation of the Main and Historical Park of the city of Santa Cruz, we did the desing and implementation of the Audio System for the Park.
The figures of the project
250.000 m2 of green area
56 outdoor 30 Watts speakers to cover the Park
Local control at the Meeting Point of the Park
Remote control from police control centre
Audio and Consultancy
We have done for our customer, a big company from Zaragoza, there-design of the Audio&messaging system of an important CarRace Track near the city.
The scope includes not only the global audio system for general purposes but also the press and conference rooms, intefaces to TV racks, etc. Also the Marshall Communications System was completely changed.
Some other projects for our customers
A six floor Public Offices Building plus three garage floors, where we design and implement all the communications infrastructure, TV surveillance, television and the audio system.
The figures of the propject:
+ 1400 Voice/Data Points, Fiber Optic Backbone, 10 Racks
+ 90 Km of data cable
+ 500 speakers for music and messaging
+ 100 TV points
+ 50 TV cameras for surveillance
A three buildings art museum, TEA, where we design and implement all the communications infrastructure, TV surveillance, television and the audio system.
The figures of the propject:
+ 300 Voice/Data points, 7 Racks, FO Backbones, IP Voice, 20 Wifi Access Points
+ 300 speakers and a centralized control system
IP TV control and IP Access Control system
Engineering & Planning Consultancy
We have been involve in an Open International Ideas Competition concerning Nordhavnen -northern harbour in Copenhague-.
The vision is to create the sustainable city of the future at Copenhague, beeing intended to set the new standards for sustainable development in the 21st century.
A 120 MKwh of ecoenergy is produce by mean of Wind,
Geothermal, Wave energy Systems, and some Photovoltaic.
A whole water cycle is designed to get the best from it
Underground ducts will suround the city, serving
District Heating, Telecommunications and Power,
Tap&Grey water, Garbage
A City Bluetooth Network willmonitor the city operations parameters(flows, wastes, temperatures)
Special Lightning tech “LIFI” is used to create a eco, warming and bright city
Engineering & Planning Consultancy
Big Green Areas
An image link to Nature
The best waterfront use
Sustanaible urban design
Noise&Pollution reduction
Saving energy criterias
465 Ha´s
40.000 people
40.000 workers
Engineering & Planning Consultancy
Eco touristic city, Master plan tech focus
17 hotels5000 villas
5 golf course20.000 blocks of
apartments
40 Km Fiber optic ring for Communications and Digital Services
Water ponds to create fresh clima, to recicle grey waters and to reduce the Clima Systems needs.
Solar Photovoltaic plant
Global Energy Management System surounding the city