Lancs’ Best Practice Club – BIM for FM
Liam Brady Manchester City Council 7th March 2013
Huge Complex = Huge amount of data
Poorly maintained O&M’s
MCC : Cabinet Office BIM Workshops
Transferring BIM data for operational use.
C-Pad C O B i e
C O B
i e - U K - 2
0 1 2
Manual Data
S u r v e y D a t a
EDMS
Content Management System
Building Management
System
Maintenance Management
Integration Head End Granfen Control technologies Fire , security , bookings , etc…
Manchester Library Project BIM / Operational Data Architecture Sept 2012
/ .
Design and Construction
Laing O’Rourke BIM Data
Transfer BIM Data beneficial to FM Operational life of
Complex
Create and maintain an accurate repository
of Building assets Operational
Management of the Complex
Concept Design
Scheme / Detailed Design
Pre-Construction
Construction
Operational / FM/Lifecycle
Design
Development
Considering FM and
Operational requirements
FM Team
Embedded within Design
development
BIM Design and FM Integration
ArtRA – Using the Building Information Model and surround Database
ARCHITECTURAL MODELS
MECHANICAL & ELECTRICAL MODEL
MECHANICAL & ELECTRICAL MODEL
Sprinkler System
MECHANICAL & ELECTRICAL MODEL
Sprinkler System
DOCUMENTATION
Sprinkler System - Tank
MECHANICAL & ELECTRICAL MODEL
Low Temperature Hot Water System
MECHANICAL & ELECTRICAL MODEL
Low Temperature Hot Water System
MECHANICAL & ELECTRICAL MODEL
Low Temperature Hot Water System
MECHANICAL & ELECTRICAL MODEL
Low Temperature Hot Water System
Transferring BIM data for operational use.
C-Pad C O B i e
C O B
i e - U K - 2
0 1 2
Manual Data
S u r v e y D a t a
EDMS
Content Management System
Building Management
System
Maintenance Management
Integration Head End Granfen Control technologies Fire , security , bookings , etc…
Manchester Library Project BIM / Operational Data Architecture Sept 2012
/ .
Design and Construction
Laing O’Rourke BIM Data
Transfer BIM Data beneficial to FM Operational life of
Complex
Create and maintain an accurate repository
of Building assets Operational
Management of the Complex
Maintaining Accurate Asset Data – During Operational Life
C-Pad: Job raised on helpdesk to Repair - Buffer Vessel No. 22
C-Pad
Asset Ref: 22 M&E Model in
ArtRa with attached
documentation/ Information
BIM Job Ticket :issued to contractor Job Request – Repair Work to Building Ref: THX Asset No. 22 Level: LG Area Ref: THX-LG-03 Location: Plantroom
Contractor Carry’s out Job
(Replaces Buffer Vessel!)
UPDATE DATA - Any new material /
Documentation for new Vessel to be put into C-Pad & amended in the
BIM
ARRIVE ON SITE: • Building Ref • Level Ref • Area/room Ref • Asset Ref: 22 ADDITIONAL INFORMATION AVAILABLE ON SITE FROM THE BIM (Plant Spec, etc)
Soft Landings Challenges and opportunities
Controlled approach to Handover
(Clarity of roles and responsibilities)
Involve end users / FM Team
POE
Environmental / energy performance Visitor targets
Customer / staff satisfaction
Training and aftercare
Share risks and responsibilities
Focus on operational outcomes
Set performance Objectives
Environmental performance Metering strategy
Energy assessment (POE)
Familiarisation and commissioning
MCC : Cabinet Office Soft Landings Workshops
Town Hall Complex Soft Landing Forums • Hand-Over Steering Group - Full Project Team (fortnightly meetings)
• Core Operational Team – M&E Focused group (fortnightly meetings)
• Development of TM 39 (metering strategy)
• Development of TM 22 (POE review of metering strategy)
• Fire Management Information workshops
Architects
Cabinet Office
Construction Partners
Supply Chain
Salford University
NW Construction Hub - Partners
BIM Academy
Attendance at BIM Conferences &
Workshops Facilities
Management
Stakeholders
NIEP
COLLABORATION Sharing Knowledge, Ideas
& Aspirations
Data Richness
Life Cycle Views
Roles or Disciplines
Business Process
Delivery Method
Timeliness/Response Change Management
Graphical Information
Spatial Capability
Information Accuracy
Interoperability/ IFC Support
2 3 4 5 6 7 8 9
10
1
0
Maturity Level
• Link to fire strategy / evacuation plan
• Link to security strategy
• Thermal modelling building changes
• Link to digital Signage.
• Using BIM (hand held technologies)
• Link to Energy Management System (Zoning, out of hours use, event management etc)
• Staff induction tool
• Customer communication tool (Linked to website)
• Marketing tool, events and community schemes (Clicks and Links)
• Link to operational zones, cleaning, events etc
• Ability to run logistical tests / models (flow and movement)
BIM – other uses being considered