lg&e - cane run station capacity: 610 mw 3 units burn: 1.5 mm tpy receipts by: rail and barge...

6
LG&E - Cane Run Station Capacity: 610 MW 3 Units Burn: 1.5 MM TPY Receipts By: Rail and Barge (via Riverport) Quality: Moisture 12% Ash 12% SO2 6.2 BTU/# 11,000

Upload: marion-richard

Post on 13-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

LG&E - Cane Run Station Capacity:

610 MW

3 Units

Burn: 1.5 MM TPY

Receipts By:

Rail and Barge (via Riverport)

Quality:Moisture 12%

Ash 12%

SO2 6.2

BTU/# 11,000

LG&E – Trimble County Station Capacity:

547 MW

1 Units

Burn: 1.6 MM TPY

Receipts By:

Barge

Quality:Moisture 15%

Ash 14%

SO2 6.5

BTU/# 11,000

LG&E – Mill Creek Station Capacity:

1,610 MW

4 Units

Burn: 4.4 MM TPY

Receipts By:

Rail and Barge

Quality:Moisture 13%

Ash 14%

SO2 6.2

BTU/# 11,000

KU – Brown Station

Capacity:

755 MW

3 Units

Burn: 1.6 MM TPY

Receipts By:

Rail

Quality:Moisture 10%

Ash 12%

SO2 2.75

BTU/# 12,000 Scrubber Units Scheduled To Be Online:All Units- Spring 2009

KU – Ghent Station Capacity:

2,189 MW

4 Units

Burn: 1.4 MM TPY High Sulfur

3.9 MM TPY Compliance

Receipts By:Barge

Quality: Unit #1 Unit

#2,3,4

Moisture 10% 10%

Ash 12% 12%

SO2 6.25 1.2

BTU/# 11,000 12,000

Scrubber Units Scheduled To Be Online:Unit 2- Spring 2007Unit 3- Spring 2008Unit 4- Spring 2009

KU – Green River and Tyrone Stations Green River Capacity:

175 MW

2 Units

Burn: .350 MM TPY High Sulfur

Receipts By:Truck

Quality: Moisture 12%

Ash 12%

SO2 4.57

BTU/# 11,500

Tyrone Capacity:

75 MW

1 Units

Burn: .150 MM TPY High Sulfur

Receipts By:Truck

Quality: Moisture 8%

Ash 10%

SO2 1.8

BTU/# 12,000