lg&e - cane run station capacity: 610 mw 3 units burn: 1.5 mm tpy receipts by: rail and barge...
TRANSCRIPT
LG&E - Cane Run Station Capacity:
610 MW
3 Units
Burn: 1.5 MM TPY
Receipts By:
Rail and Barge (via Riverport)
Quality:Moisture 12%
Ash 12%
SO2 6.2
BTU/# 11,000
LG&E – Trimble County Station Capacity:
547 MW
1 Units
Burn: 1.6 MM TPY
Receipts By:
Barge
Quality:Moisture 15%
Ash 14%
SO2 6.5
BTU/# 11,000
LG&E – Mill Creek Station Capacity:
1,610 MW
4 Units
Burn: 4.4 MM TPY
Receipts By:
Rail and Barge
Quality:Moisture 13%
Ash 14%
SO2 6.2
BTU/# 11,000
KU – Brown Station
Capacity:
755 MW
3 Units
Burn: 1.6 MM TPY
Receipts By:
Rail
Quality:Moisture 10%
Ash 12%
SO2 2.75
BTU/# 12,000 Scrubber Units Scheduled To Be Online:All Units- Spring 2009
KU – Ghent Station Capacity:
2,189 MW
4 Units
Burn: 1.4 MM TPY High Sulfur
3.9 MM TPY Compliance
Receipts By:Barge
Quality: Unit #1 Unit
#2,3,4
Moisture 10% 10%
Ash 12% 12%
SO2 6.25 1.2
BTU/# 11,000 12,000
Scrubber Units Scheduled To Be Online:Unit 2- Spring 2007Unit 3- Spring 2008Unit 4- Spring 2009
KU – Green River and Tyrone Stations Green River Capacity:
175 MW
2 Units
Burn: .350 MM TPY High Sulfur
Receipts By:Truck
Quality: Moisture 12%
Ash 12%
SO2 4.57
BTU/# 11,500
Tyrone Capacity:
75 MW
1 Units
Burn: .150 MM TPY High Sulfur
Receipts By:Truck
Quality: Moisture 8%
Ash 10%
SO2 1.8
BTU/# 12,000