swisstek · leveling and trigonometric leveling. measurements are made in two phases. in the first...

21
http://swisstek.com Urs A. Reinhardt Swisstek Inc. General Manager Surveying Instruments Optical Tooling Theodolites Repaired-Serviced Bought-Sold-Traded 10 Balsam Drive Brewster NY 10509 Voice/Fax: 845 278-2335 email: [email protected] cc: [email protected]

Upload: others

Post on 12-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located

http://swisstek.com

Urs A. Reinhardt Swisstek Inc.General Manager

Surveying InstrumentsOptical Tooling TheodolitesRepaired-ServicedBought-Sold-Traded

10 Balsam DriveBrewster NY 10509Voice/Fax: 845 278-2335email: [email protected]: [email protected]

ralfboehnke
Stamp
Page 2: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 3: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 4: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 5: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 6: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 7: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 8: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 9: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 10: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 11: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 12: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 13: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 14: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 15: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 16: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 17: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 18: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 19: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 20: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located
Page 21: swisstek · leveling and trigonometric leveling. Measurements are made in two phases. In the first phase controlling points that are of significance to the entire project, are located