level one, one chifley square sydney nsw 2000 australia

1
GR +12 SFL 3.658 L1 +30 SFL 9.140 Y10 Y20 BENNELONG PASSAGE VOID SERVICES ZONE GR.007 D07 FFL 3.78 FFL 3.75 EX.RL 3.69 EX.RL 6.39 550 725 725 725 SPLIT BATTENS @550 AND 725 MM CENTERS ACCESS HATCH AH-102 4 CD520 18290 1690 130 460 17700 560 1080 300 810 820 2685 775 90 3040 2415 200 310 130 410 2820 275 16085 1690 1565 1 CD501 4S SPEAKER IN CEILING 5950 4S SPEAKER IN CEILING 4795 4S SPEAKER IN WALL 4400 4S SPEAKER IN WALL 4000 4S SPEAKER IN WALL 4095 AM-202 AM-201 IWS-252 GR +12 SFL 3.658 L1 +30 SFL 9.140 Y10 Y20 3 CD210 SERVICES ZONE BENNELONG PASSAGE 3 CD200 4 CD200 2 CD515 FFL 3.78 FFL 3.75 EX.RL 3.69 GR.003 D03 550 725 725 725 SPLIT BATTENS @550 AND 725 MM CENTERS ACCESS HATCH AH-102 2 CD516 1690 18155 135 90 4280 810 300 3740 630 1110 130 310 200 835 15160 1655 1690 560 17745 540 5480 3690 555 4275 4040 3805 3685 ACCESS HATCH AH-104 10S LOUD SPEAKERS AS SPECIFIED BY OTHERS FIXED TO AM-202 AM-201 AM-202 GR +12 SFL 3.658 L1 +30 SFL 9.140 X50 1 CD200 2 CD200 SERVICES ZONE SERVICES ZONE SERVICES ZONE PROJECTOR AS SPECIFIED BY OTHERS GR.002 D02 FFL 3.78 FFL 3.75 190 1450 115 2435 2150 115 190 115 5480 300 810 4250 120 300 810 160 65 2400 175 270 1450 1 CD510 1 CD515 01 GR +12 SFL 3.658 L1 +30 SFL 9.140 X50 1 CD200 2 CD200 PROJECTOR AS SPECIFIED BY OTHERS SERVICES ZONE SERIVES ZONE SERIVES ZONE FFL 3.78 FFL 3.75 1 CD516 115 2455 3375 5360 120 300 01 0 0.5 1 1.5 2 2.5 m Sydney Opera House Trust Phone: +61 2 9250 7541 email: [email protected] Sydney Opera House Trust A1 Rev: Sheet: Drawing No: Location Project Title Date S t a t u s Dwn Contract Ckd Scale L o c a t i o n Date Apvd Drwn Description Issue © SOH-583 GENERAL NOTES 1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES. 2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY. 3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THE SAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOT ALTER ANY ASPECT WITHOUT WRITTEN PERMISSION. 4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSE BUILDING SERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANT AUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THE REQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA. COPYRIGHT THIS DRAWING AND DESIGN ARE SUBJECT TO COPYRIGHT AND SHALL NOT BE COPIED IN ANY FORM WITH THE WRITTEN PERMISSION OF THE SYDNEY OPERA HOUSE TRUST GPO Box 4274 Sydney NSW Australia 2001 Level One, One Chifley Square Sydney NSW 2000 Australia www.scottcarver.com.au +61 2 9957 3988 1 : 100 @ A3 49-FB-SC029 SF GF GENERAL NOTES: 1. THESE DRAWINGS SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT STRUCTURAL, CIVIL AND SERVICE CONSULTANTS DRAWINGS AND/OR COMPUTATIONS AND WITH ANY OTHER WRITTEN INSTRUCTIONS ISSUED IN THE COURSE OF THE CONTRACT; 2. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES. 3. DO NOT SCALE DRAWINGS. 4. ALL WALL THICKNESSES DIMENSIONED OR NOTED ARE NOMINAL. 5. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THE SAFE AND PROPER FUNCTIONING OF THE PROJECT. DO NOT ALTER ANY ASPECT WITHOUT REFERENCE TO THE ARCHITECT. 6. INFORM THE ARCHITECT OF ANY DISCREPANCIES. 7. GREY TYPICALLY DENOTES EXISTING STRUCTURE. 8. REFER ARCHITECTURAL FINISHES AND FIXTURES SCHEDULE FOR FINISHES AND FITMENTS DETAILS. 9. ALL INTERIOR FINISHES AS SCHEDULED/SPECIFIED AND IN LINE WITH THE STANDARD SOH SPECIFICATIONS 10. ALL MATERIALS AND WORK PRACTICES SHALL COMPLY WITH, BUT NOT LIMITED TO THE BUILDING CODE OF AUSTRALIA AND ALL RELEVANT CURRENT AUSTRALIAN STANDARDS (AS AMENDED) REFERRED TO THEREIN. 11. THE CONTRACTOR SHALL SITE-CHECK AND VERIFY ALL DIMENSIONS, EXISTING CONDITIONS, SET- BACKS, LEVELS SPECIFICATIONS AND ALL OTHER RELEVANT DOCUMENTATION PRIOR TO THE COMMENCEMENT OF ANY WORKS, SUBMIT SHOP DRAWINGS, ORDERING OF MATERIALS ETC. AND SHALL REPORT ANY DISCREPANCIES TO THIS OFFICE FOR CLARIFICATION 12. IT IS INTENDED THAT ALL THE WORKS SHOWN ON THE DRAWINGS SHALL BE CARRIED OUT BY THE CONTRACTOR. IT IS NOT INTENDED TO SHOW ON THE DRAWINGS EACH AND EVERY ITEM REQUIRED TO CARRY OUT THE CONTRACT WORKS, IT IS EXPECTED THAT THE CONTRACTOR WILL VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXTENT OF WORKS; 13. THE CONTRACT INCLUDES FOR ALL NECESSARY LABOUR, MATERIAL, APPLIANCES, TRANSPORTATION AND SERVICES REQUIRED TO COMPLETE THE CONTRACT WORKS; 14. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND CARRY OUT ALL ALTERATIONS, ADJUSTMENTS, ETC TO COMPLETE THE CONTRACT WORKS; 15. THE CONTRACTOR SHALL, BEFORE ANY WORKS COMMENCE, MAKE-SAFE THE FIRE SPRINKLERS AND EMERGENCY SYSTEMS. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL COSTS ASSOCIATED WITH ANY BUILDING FIRE ALARM BEING ACTIVATED BY THE CONTRACTOR; 16. THE CONTRACTOR SHALL ENSURE THAT ALL NECESSARY PERMITS, INCL. HOT WORK PERMITS ARE OBTAINED PRIOR TO ANY SUCH WORKS GOING AHEAD; 17. THE CONTRACTOR IS TO ENSURE THAT ANY SMOKE ALARMS OR THE LIKE ARE ISOLATED WHEN ANY SMOKE OR FUME PRODUCING WORKS ARE LIKELY TO BE CARRIED OUT; 18. THE CONTRACTOR IS TO SIGN IN AT STAGE DOOR AND ENSURE THAT THERE ARE NO LAST MINUTE SHOWS, REHEARSALS, ETC. SCHEDULED TO OCCUR THAT WILL PREVENT ANY WORKS FROM BEING CARRIED OUT; 19. PROVIDE A COMPREHENSIVE LIST OF SUPPLIERS/INSTALLERS OF ALL PROPRIETY AND CUSTOM MADE MATERIALS AND EQUIPMENT USED WITHIN THE CONTRACT WORKS, OTHER THAN THOSE GENERALLY AVAILABLE FROM BUILDERS MERCHANTS AND THE LIKE; 20. THE CONTRACTOR SHALL, AT THE COMPLETION OF WORKS, PROFESSIONALLY CLEAN ALL SURFACES AND ENSURE THAT NO CONSTRUCTION DEBRIS REMAINS; 21. THE CONTRACTOR SHALL ACQUAINT THEMSELF WITH THE ACCESS ROUTES TOGETHER WITH THE SIZE OF ENTRIES TO ENABLE ALL EQUIPMENT, MATERIALS, COMPONENTS ETC. TO BE SAFELY DELIVERED TO SITE; 22. THE CONTRACTOR IS RESPONSIBLE FOR THE TIMELY ARRIVAL OF ALL EQUIPMENT, MATERIALS, ETC. TO SITE AND SHALL MAKE HIMSELF FULLY AWARE OF LEAD TIMES FOR ANY MATERIALS, ETC. AND SHALL INFORM THE SUPERINTENDENT, 5 DAYS PRIOR TO THE CONTRACT START, OF ANY SPECIFIED ITEMS THAT WOULD NOT BE AVAILABLE IN TIME TO MEET THE CONTRACT DATES. IF NO SUCH ADVICE IS GIVEN TO THE SUPERINTENDENT THEN THE RESPONSIBILITY FOR SUCH DELAYS WILL FALL ON THE CONTRACTOR; 23. CONTRACTOR SHALL REMOVE ALL SURFACE MOUNTED SERVICES WITHIN PLANT IN ACCORDANCE WITH CONSULTANTS DETAIL DOCUMENT AND COORDINATE ALL SERVICE REMOVAL WORKS AND NEW PENETRATIONS WITH SOH BEFORE PROCEEDING WITH WORKS. Nom. Architect Doug Southwell/7362 IFC SF SYDNEY OPERA HOUSE WHITE BOX 1 : 50 @ A1 1 1/11/2019 12:28:35 PM 1 : 50 @ A1 PROPOSED SECTIONS IFC DS YY CD200 1 : 50 PROPOSED SECTION 1 1 : 50 PROPOSED SECTION 2 1 : 50 PROPOSED SECTION 3 1 : 50 PROPOSED SECTION 4 A PRELIMINARY YY DS 23.09.2019 B PRELIMINARY YY DS 02.10.2019 C PRELIMINARY YY DS 11.10.2019 D PRELIMINARY 25.10.2019 1 ISSUED FOR CONSTRUCTION 01.11.2019

Upload: others

Post on 26-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

GR +12SFL 3.658

L1 +30SFL 9.140

Y10 Y20

BENNELONG PASSAGE

VOID

SERVICES ZONE

GR.007D07

FFL 3.78 FFL 3.75EX.RL 3.69

EX.RL 6.39

550

725

725

725

SPLIT BATTENS @550 AND 725 MM CENTERS

ACCESS HATCH AH-102

4CD520

18290 1690

130 460 17700 560 1080

300

810

820

2685

775

90

3040

2415

2003101304102820275 16085 16901565

1CD501

4S SPEAKER IN CEILING 5950

4S SPEAKER IN CEILING 4795

4S SPEAKER IN WALL4400

4S SPEAKER IN WALL4000

4S SPEAKER IN WALL4095

AM-202

AM-201

IWS-252

GR +12SFL 3.658

L1 +30SFL 9.140

Y10Y20 3CD210

SERVICES ZONE

BENNELONG PASSAGE

3CD200

4CD200

2CD515

FFL 3.78FFL 3.75 EX.RL 3.69

GR.003D03

550

725

725

725

SPLIT BATTENS @550 AND 725 MM CENTERS

ACCESS HATCH AH-102

2CD516

1690 18155 135

9042

8081

030

0

3740

630

1110

1303102008351516016551690

560 17745 540

5480

3690

555

4275

4040

3805

3685

ACCESS HATCH AH-104

10S LOUD SPEAKERS AS SPECIFIED BY OTHERS

FIXED TO AM-202

AM-201

AM-202

GR +12SFL 3.658

L1 +30SFL 9.140

X50

1CD200

2CD200

SERVICES ZONE

SERV

ICES

ZON

E

SERV

ICES

ZON

E

PROJECTOR AS SPECIFIED BY OTHERS

GR.002D02

FFL 3.78FFL 3.75

190 1450 115 2435 2150 115 190 115

5480

300

810

4250

120

300

810

160

65

2400

175 270

14501

CD5101

CD515

01

GR +12SFL 3.658

L1 +30SFL 9.140

X50

1CD200

2CD200

PROJECTOR AS SPECIFIED BY OTHERS

SERVICES ZONE

SERI

VES

ZONE

SERI

VES

ZONE

FFL 3.78 FFL 3.75

1CD516

115 2455 3375

5360

120

300

01

0 0.5 1 1.5 2 2.5 mSydney Opera House Trust

Phone: +61 2 9250 7541 email: [email protected]

Sydney Opera House Trust

A1Rev:Sheet:Drawing No:Location

Project

Title

Date

Status

Dwn

Contract

Ckd Scale

LocationDateApvdDrwnDescriptionIssue

©SOH-583

GENERAL NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THE

SAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOT ALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.

4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSE BUILDING SERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANT AUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THE REQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.

COPYRIGHTTHIS DRAWING AND DESIGN ARE SUBJECT TO COPYRIGHT AND SHALL NOT BE COPIED IN ANY FORM WITH THE WRITTEN PERMISSION OF THE SYDNEY OPERA HOUSE TRUST

GPO Box 4274 Sydney NSW Australia 2001

Level One, One Chifley Square Sydney NSW 2000 Australiawww.scottcarver.com.au +61 2 9957 3988

1 : 100 @ A3

49-FB-SC029SF GF

GENERAL NOTES:1. THESE DRAWINGS SHOULD BE READ IN

CONJUNCTION WITH ALL RELEVANT STRUCTURAL, CIVIL AND SERVICE CONSULTANTS DRAWINGS AND/OR COMPUTATIONS AND WITH ANY OTHER WRITTEN INSTRUCTIONS ISSUED IN THE COURSE OF THE CONTRACT;

2. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.3. DO NOT SCALE DRAWINGS.4. ALL WALL THICKNESSES DIMENSIONED OR NOTED

ARE NOMINAL.5. INFORMATION INDICATED IN THIS DOCUMENT MAY

BE CRUCIAL TO THE SAFE AND PROPER FUNCTIONING OF THE PROJECT. DO NOT ALTER ANY ASPECT WITHOUT REFERENCE TO THE ARCHITECT.

6. INFORM THE ARCHITECT OF ANY DISCREPANCIES.7. GREY TYPICALLY DENOTES EXISTING STRUCTURE.8. REFER ARCHITECTURAL FINISHES AND FIXTURES

SCHEDULE FOR FINISHES AND FITMENTS DETAILS.9. ALL INTERIOR FINISHES AS SCHEDULED/SPECIFIED

AND IN LINE WITH THE STANDARD SOH SPECIFICATIONS

10. ALL MATERIALS AND WORK PRACTICES SHALL COMPLY WITH, BUT NOT LIMITED TO THE BUILDING CODE OF AUSTRALIA AND ALL RELEVANT CURRENT AUSTRALIAN STANDARDS (AS AMENDED) REFERRED TO THEREIN.

11. THE CONTRACTOR SHALL SITE-CHECK AND VERIFY ALL DIMENSIONS, EXISTING CONDITIONS, SET-BACKS, LEVELS SPECIFICATIONS AND ALL OTHER RELEVANT DOCUMENTATION PRIOR TO THE COMMENCEMENT OF ANY WORKS, SUBMIT SHOP DRAWINGS, ORDERING OF MATERIALS ETC. AND SHALL REPORT ANY DISCREPANCIES TO THIS OFFICE FOR CLARIFICATION

12. IT IS INTENDED THAT ALL THE WORKS SHOWN ON THE DRAWINGS SHALL BE CARRIED OUT BY THE CONTRACTOR. IT IS NOT INTENDED TO SHOW ON THE DRAWINGS EACH AND EVERY ITEM REQUIRED TO CARRY OUT THE CONTRACT WORKS, IT IS EXPECTED THAT THE CONTRACTOR WILL VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXTENT OF WORKS;

13. THE CONTRACT INCLUDES FOR ALL NECESSARY LABOUR, MATERIAL, APPLIANCES, TRANSPORTATION AND SERVICES REQUIRED TO COMPLETE THE CONTRACT WORKS;

14. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND CARRY OUT ALL ALTERATIONS, ADJUSTMENTS, ETC TO COMPLETE THE CONTRACT WORKS;

15. THE CONTRACTOR SHALL, BEFORE ANY WORKS COMMENCE, MAKE-SAFE THE FIRE SPRINKLERS AND EMERGENCY SYSTEMS. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL COSTS ASSOCIATED WITH ANY BUILDING FIRE ALARM BEING ACTIVATED BY THE CONTRACTOR;

16. THE CONTRACTOR SHALL ENSURE THAT ALL NECESSARY PERMITS, INCL. HOT WORK PERMITS ARE OBTAINED PRIOR TO ANY SUCH WORKS GOING AHEAD;

17. THE CONTRACTOR IS TO ENSURE THAT ANY SMOKE ALARMS OR THE LIKE ARE ISOLATED WHEN ANY SMOKE OR FUME PRODUCING WORKS ARE LIKELY TO BE CARRIED OUT;

18. THE CONTRACTOR IS TO SIGN IN AT STAGE DOOR AND ENSURE THAT THERE ARE NO LAST MINUTE SHOWS, REHEARSALS, ETC. SCHEDULED TO OCCUR THAT WILL PREVENT ANY WORKS FROM BEING CARRIED OUT;

19. PROVIDE A COMPREHENSIVE LIST OF SUPPLIERS/INSTALLERS OF ALL PROPRIETY AND CUSTOM MADE MATERIALS AND EQUIPMENT USED WITHIN THE CONTRACT WORKS, OTHER THAN THOSE GENERALLY AVAILABLE FROM BUILDERS MERCHANTS AND THE LIKE;

20. THE CONTRACTOR SHALL, AT THE COMPLETION OF WORKS, PROFESSIONALLY CLEAN ALL SURFACES AND ENSURE THAT NO CONSTRUCTION DEBRIS REMAINS;

21. THE CONTRACTOR SHALL ACQUAINT THEMSELF WITH THE ACCESS ROUTES TOGETHER WITH THE SIZE OF ENTRIES TO ENABLE ALL EQUIPMENT, MATERIALS, COMPONENTS ETC. TO BE SAFELY DELIVERED TO SITE;

22. THE CONTRACTOR IS RESPONSIBLE FOR THE TIMELY ARRIVAL OF ALL EQUIPMENT, MATERIALS, ETC. TO SITE AND SHALL MAKE HIMSELF FULLY AWARE OF LEAD TIMES FOR ANY MATERIALS, ETC. AND SHALL INFORM THE SUPERINTENDENT, 5 DAYS PRIOR TO THE CONTRACT START, OF ANY SPECIFIED ITEMS THAT WOULD NOT BE AVAILABLE IN TIME TO MEET THE CONTRACT DATES. IF NO SUCH ADVICE IS GIVEN TO THE SUPERINTENDENT THEN THE RESPONSIBILITY FOR SUCH DELAYS WILL FALL ON THE CONTRACTOR;

23. CONTRACTOR SHALL REMOVE ALL SURFACE MOUNTED SERVICES WITHIN PLANT IN ACCORDANCE WITH CONSULTANTS DETAIL DOCUMENT AND COORDINATE ALL SERVICE REMOVAL WORKS AND NEW PENETRATIONS WITH SOH BEFORE PROCEEDING WITH WORKS.

Nom. Architect Doug Southwell/7362

IFCSF

SYDNEY OPERA HOUSEWHITE BOX

1 : 50 @ A11

1/11/201912:28:35 PM

1 : 50 @ A1

PROPOSED SECTIONS

IFC

DS

YYCD200

1 : 50

PROPOSED SECTION1

1 : 50

PROPOSED SECTION2

1 : 50

PROPOSED SECTION3 1 : 50

PROPOSED SECTION4

A PRELIMINARY YY DS 23.09.2019B PRELIMINARY YY DS 02.10.2019C PRELIMINARY YY DS 11.10.2019D PRELIMINARY 25.10.20191 ISSUED FOR CONSTRUCTION 01.11.2019