Page 1: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution

Leonard SadauskasDoD CIO ITI&CPType Date of Brief

Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution Process

Page 2: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution

Lean Six Sigma

UNCLASSIFIED

OSD, Business Transformation L6Green Belt Training2 UNCLASSIFIED

Charter & TimelineCharter & Timeline

CharterProblem Statement:

The Post-Implementation Review (PIR) planning and execution process is inadequate.

Business Case:

Unit:

Defect:

Customer Specifications:

Measure Start:

Measure Stop:

Scope:

TimelinePhase Planned Actual Status

Define dd mm yy dd mm yy

Measure dd mm yy

Analyze dd mm yy

Improve dd mm yy

Control dd mm yy

Take away message goes here(impact of problem)

Team Members

Name Role Affiliation DACI

Green Belt Driver

Master Black Belt Driver

Sponsor Approver

Process Owner Approver

Page 3: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution

Lean Six Sigma

UNCLASSIFIED

OSD, Business Transformation L6Green Belt Training3 UNCLASSIFIED

Cross Functional TeamCross Functional Team

Team MembersName Role Affiliation DACI

Green Belt Driver

Master Black Belt Driver

Sponsor Approver

Process Owner Approver

Approver

Contributor

Contributor

Contributor

Contributor

Contributor

Contributor

Contributor

Contributor

Inform

Inform

Inform

Inform

Page 4: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution

Lean Six Sigma

UNCLASSIFIED

OSD, Business Transformation L6Green Belt Training4 UNCLASSIFIED

High-Level SIPOCHigh-Level SIPOC

Suppliers Inputs Process Outputs Customers

Measurable Y:Measurable Y:

Page 5: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution

Lean Six Sigma

UNCLASSIFIED

OSD, Business Transformation L6Green Belt Training5 UNCLASSIFIED

Measure the ProblemMeasure the Problem

Type your Take Away Message Here (extent of the problem)

MeasurePrimary Metric:

Average/Mean:

Standard Deviation:

Secondary Metric:

Data Source: <where, how, format, etc>

Time Period Analyzed:

<the time frame of the data to be analyzed, not when it was collected>

Gauge Issues:

Gauge Correction:

Page 6: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution

Lean Six Sigma

UNCLASSIFIED

OSD, Business Transformation L6Green Belt Training6 UNCLASSIFIED

Process MapProcess Map

Type your Take Away Message Here (extent of the problem)

Page 7: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution

Lean Six Sigma

UNCLASSIFIED

OSD, Business Transformation L6Green Belt Training7 UNCLASSIFIED

Why isn’t the Process Performing?Why isn’t the Process Performing?

Ranked XY Matrix Output Hypotheses P value

<validated root cause> <significant finding> <statistical evidence>

Cause & Effect DiagramCause & Effect Diagram

Type your Take Away Message

Here (extent of the problem)

Page 8: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution

Lean Six Sigma

UNCLASSIFIED

OSD, Business Transformation L6Green Belt Training8 UNCLASSIFIED

How will we Improve the Process?How will we Improve the Process?

Validated Root Cause Improvement Plan Owner Status

<critical X>

<Chart Title><Chart Title>

<big take away message><big take away message>

Page 9: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution

Lean Six Sigma

UNCLASSIFIED

OSD, Business Transformation L6Green Belt Training9 UNCLASSIFIED

What Results did we see?What Results did we see?

Key Metrics Before After Delta

<First Metric> x.x% y.y% +/- z.z%

<Second Metric> x.x% y.y% +/- z.z%

<Third Metric> x.x% y.y% +/- z.z%

<Before Chart Title><Before Chart Title> <After Chart Title><After Chart Title>

<big take away message><big take away message>

Page 10: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution

Lean Six Sigma

UNCLASSIFIED

OSD, Business Transformation L6Green Belt Training10 UNCLASSIFIED

How will we Maintain Improvement?How will we Maintain Improvement?

Triggers Corrective Actions

1 Name who

2 Name who

3 Name who

4 Name who

<FMEA Chart Title><FMEA Chart Title>

Type your Take Away Message

Here (extent of the problem)

Page 11: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution

Lean Six Sigma

UNCLASSIFIED

OSD, Business Transformation L6Green Belt Training11 UNCLASSIFIED

Project CharterProblem StatementDefined BenefitsBusiness Case

Process Map Potential Xs “To Be” Process Map Transition Plan

Measurable YCustomer Specs/VOC

Data Collection PlanData Collected

Critical Xs Improvement StrategyImprovement Model“X” Improvement Target

QC Chart

Cross Functional Team Data PresentationRun Chart; Histogram;

Mean/Stand. Dev.

Required Data Display: Pareto Charts; Fish

Bone / C&E; Histograms;

Mistake Proofing Communication to Impacted Areas

Timeline Updated CTQs/CTPs Optional Data Display: Descriptive Stats.; Time

Series Plots; Control Charts; Box Plots

FMEA Project Documentation

SIPOC “Y” Performance Target XY Matrix Risk Analysis & Risk Mitigation Plan

I accept the Define Tollgate. Signed:

I accept the MeasureTollgate. Signed:

I accept the Analyze Tollgate. Signed:

I accept the Improve Tollgate. Signed:

I accept the ControlTollgate. Signed:

(Sponsor) (Sponsor) (Sponsor) (Sponsor) (Sponsor)

(Process Owner) (Process Owner) (Process Owner) (Process Owner) (Process Owner)

(MBB / PE Leader) (MBB / PE Leader) (MBB / PE Leader) (MBB / PE Leader) (MBB / PE Leader)

(Finance Owner) (Finance Owner) (Finance Owner)

Define Measure Analyze Improve Control

The Six Sigma Tollgate ToolThe Six Sigma Tollgate Tool