Leonard SadauskasDoD CIO ITI&CPType Date of Brief
Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution Process
![Page 2: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution](https://reader035.vdocuments.site/reader035/viewer/2022072011/56649e115503460f94afd61c/html5/thumbnails/2.jpg)
Lean Six Sigma
UNCLASSIFIED
OSD, Business Transformation L6Green Belt Training2 UNCLASSIFIED
Charter & TimelineCharter & Timeline
CharterProblem Statement:
The Post-Implementation Review (PIR) planning and execution process is inadequate.
Business Case:
Unit:
Defect:
Customer Specifications:
Measure Start:
Measure Stop:
Scope:
TimelinePhase Planned Actual Status
Define dd mm yy dd mm yy
Measure dd mm yy
Analyze dd mm yy
Improve dd mm yy
Control dd mm yy
Take away message goes here(impact of problem)
Team Members
Name Role Affiliation DACI
Green Belt Driver
Master Black Belt Driver
Sponsor Approver
Process Owner Approver
![Page 3: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution](https://reader035.vdocuments.site/reader035/viewer/2022072011/56649e115503460f94afd61c/html5/thumbnails/3.jpg)
Lean Six Sigma
UNCLASSIFIED
OSD, Business Transformation L6Green Belt Training3 UNCLASSIFIED
Cross Functional TeamCross Functional Team
Team MembersName Role Affiliation DACI
Green Belt Driver
Master Black Belt Driver
Sponsor Approver
Process Owner Approver
Approver
Contributor
Contributor
Contributor
Contributor
Contributor
Contributor
Contributor
Contributor
Inform
Inform
Inform
Inform
![Page 4: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution](https://reader035.vdocuments.site/reader035/viewer/2022072011/56649e115503460f94afd61c/html5/thumbnails/4.jpg)
Lean Six Sigma
UNCLASSIFIED
OSD, Business Transformation L6Green Belt Training4 UNCLASSIFIED
High-Level SIPOCHigh-Level SIPOC
Suppliers Inputs Process Outputs Customers
Measurable Y:Measurable Y:
![Page 5: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution](https://reader035.vdocuments.site/reader035/viewer/2022072011/56649e115503460f94afd61c/html5/thumbnails/5.jpg)
Lean Six Sigma
UNCLASSIFIED
OSD, Business Transformation L6Green Belt Training5 UNCLASSIFIED
Measure the ProblemMeasure the Problem
Type your Take Away Message Here (extent of the problem)
MeasurePrimary Metric:
Average/Mean:
Standard Deviation:
Secondary Metric:
Data Source: <where, how, format, etc>
Time Period Analyzed:
<the time frame of the data to be analyzed, not when it was collected>
Gauge Issues:
Gauge Correction:
![Page 6: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution](https://reader035.vdocuments.site/reader035/viewer/2022072011/56649e115503460f94afd61c/html5/thumbnails/6.jpg)
Lean Six Sigma
UNCLASSIFIED
OSD, Business Transformation L6Green Belt Training6 UNCLASSIFIED
Process MapProcess Map
Type your Take Away Message Here (extent of the problem)
![Page 7: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution](https://reader035.vdocuments.site/reader035/viewer/2022072011/56649e115503460f94afd61c/html5/thumbnails/7.jpg)
Lean Six Sigma
UNCLASSIFIED
OSD, Business Transformation L6Green Belt Training7 UNCLASSIFIED
Why isn’t the Process Performing?Why isn’t the Process Performing?
Ranked XY Matrix Output Hypotheses P value
<validated root cause> <significant finding> <statistical evidence>
Cause & Effect DiagramCause & Effect Diagram
Type your Take Away Message
Here (extent of the problem)
![Page 8: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution](https://reader035.vdocuments.site/reader035/viewer/2022072011/56649e115503460f94afd61c/html5/thumbnails/8.jpg)
Lean Six Sigma
UNCLASSIFIED
OSD, Business Transformation L6Green Belt Training8 UNCLASSIFIED
How will we Improve the Process?How will we Improve the Process?
Validated Root Cause Improvement Plan Owner Status
<critical X>
<Chart Title><Chart Title>
<big take away message><big take away message>
![Page 9: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution](https://reader035.vdocuments.site/reader035/viewer/2022072011/56649e115503460f94afd61c/html5/thumbnails/9.jpg)
Lean Six Sigma
UNCLASSIFIED
OSD, Business Transformation L6Green Belt Training9 UNCLASSIFIED
What Results did we see?What Results did we see?
Key Metrics Before After Delta
<First Metric> x.x% y.y% +/- z.z%
<Second Metric> x.x% y.y% +/- z.z%
<Third Metric> x.x% y.y% +/- z.z%
<Before Chart Title><Before Chart Title> <After Chart Title><After Chart Title>
<big take away message><big take away message>
![Page 10: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution](https://reader035.vdocuments.site/reader035/viewer/2022072011/56649e115503460f94afd61c/html5/thumbnails/10.jpg)
Lean Six Sigma
UNCLASSIFIED
OSD, Business Transformation L6Green Belt Training10 UNCLASSIFIED
How will we Maintain Improvement?How will we Maintain Improvement?
Triggers Corrective Actions
1 Name who
2 Name who
3 Name who
4 Name who
<FMEA Chart Title><FMEA Chart Title>
Type your Take Away Message
Here (extent of the problem)
![Page 11: Leonard Sadauskas DoD CIO ITI&CP Type Date of Brief Lean Six Sigma Project Briefing Improving The Post-Implementation Review (PIR) Planning and Execution](https://reader035.vdocuments.site/reader035/viewer/2022072011/56649e115503460f94afd61c/html5/thumbnails/11.jpg)
Lean Six Sigma
UNCLASSIFIED
OSD, Business Transformation L6Green Belt Training11 UNCLASSIFIED
Project CharterProblem StatementDefined BenefitsBusiness Case
Process Map Potential Xs “To Be” Process Map Transition Plan
Measurable YCustomer Specs/VOC
Data Collection PlanData Collected
Critical Xs Improvement StrategyImprovement Model“X” Improvement Target
QC Chart
Cross Functional Team Data PresentationRun Chart; Histogram;
Mean/Stand. Dev.
Required Data Display: Pareto Charts; Fish
Bone / C&E; Histograms;
Mistake Proofing Communication to Impacted Areas
Timeline Updated CTQs/CTPs Optional Data Display: Descriptive Stats.; Time
Series Plots; Control Charts; Box Plots
FMEA Project Documentation
SIPOC “Y” Performance Target XY Matrix Risk Analysis & Risk Mitigation Plan
I accept the Define Tollgate. Signed:
I accept the MeasureTollgate. Signed:
I accept the Analyze Tollgate. Signed:
I accept the Improve Tollgate. Signed:
I accept the ControlTollgate. Signed:
(Sponsor) (Sponsor) (Sponsor) (Sponsor) (Sponsor)
(Process Owner) (Process Owner) (Process Owner) (Process Owner) (Process Owner)
(MBB / PE Leader) (MBB / PE Leader) (MBB / PE Leader) (MBB / PE Leader) (MBB / PE Leader)
(Finance Owner) (Finance Owner) (Finance Owner)
Define Measure Analyze Improve Control
The Six Sigma Tollgate ToolThe Six Sigma Tollgate Tool