legend n approx. volume = 28,000m³ - epa
TRANSCRIPT
PORT ZONE BOUNDARY
MAN
OEU
VRIN
G B
ASIN
-9.2
5m N
ZVD
2016
(-8.
25m
CD
)
-11.0m NZVD(-10.0m CD)
-9.0m NZVD(-8.0m CD)
-10.0m NZVD(-9.0m CD)
-8.0m NZVD(-7.0m CD)
-7.0m NZVD(-6.0m CD)
-9.25m NZVD(-8.25m CD)
-11.0m NZVD(-10.0m CD)
-12.0m NZVD(-11.0m CD)
-13.0m NZVD(-12.0m CD)
-12.0m NZVD(-11.0m CD)
BERTH POCKET-9.25m NZVD2016 (-8.25m CD)
BERTH POCKET-9.25m NZVD2016 (-8.25m CD)
SCO
UR
PR
OTE
CTI
ON
FO
RM
ATIO
N L
EVEL
-10.
85m
NZV
D20
16 (-
9.85
m C
D)
LANDSIDE WORKSOMITTED FOR CLARITY
CO
MM
ERC
IAL
JETT
Y AR
EA-5
.0m
NZV
D20
16 (-
4.0m
CD
)
SCOUR PROTECTIONFORMATION LEVEL-10.85m NZVD2016 (-9.85m CD)
-7.0m NZVD(-6.0m CD)
CO
MM
ERC
IAL
JETT
Y AR
EA-5
.0m
NZV
D20
16 (-
4.0m
CD
)C
OM
MER
CIA
L JE
TTY
AREA
-6.0
m N
ZVD
2016
(-5.
0m C
D)
1:5000 5 10 2015 25 4530 35 40 50 m
@ A1@ A31:1000
APPROVED DATEREVISION AMENDMENT
A PRELIMINARY CONCEPT DESIGN PMW 2019-08-16B INITIAL CONCEPT FOR CONSENT SCOPING PMW 2019-08-23C ISSUED FOR COST ESTIMATE PMW 2019-11-01D SHORT ARM REALIGNED. LEVELS AND NOTES AMENDED PMW 2019-11-13E FOR COMMENT PMW 2020-03-03F ISSUED FOR EXTERNAL REVIEW MT 2020-05-29G CONCEPT DESIGN ISSUE MT 2020-06-12H ISSUED FOR RMA CONSENTS MT 2020-06-26I REVISED FOR RMA CONSENTS MT 2020-10-07
0
SCALES
DRAWN
A1
DESIGN VERIFIED
PROJECT
SHEET NO.
TITLE
PROJ-ORIG-PHS-ZNE-TYPE
200
100
5010
mm
300
mm
OPUS PROJECT NO. REVISION
APPROVED
APPROVED DATE
ORIGINAL SIZE
DRAWING VERIFIED
Original sheet size A1 (841x594) Plot Date 2020-10-28 at 2:51:30 PM U:\ProjectsNZ\5m\5-MB97C.01 Picton Ferry Precinct Development\Home\800 Drawings\(C) Civil\+AutoCAD\5MB97C-WSP-01-ZZ-DR-C-1451.dwg C-1451
DESIGNED
Christchurch Office PO Box 1482Christchurch 8140New Zealand
+64 3 363 5400
CIVIL CONCEPT DESIGN
PORT MARLBOROUGH NEW ZEALAND LIMITED / KIWIRAILWAITOHI PICTONFERRY PRECINCT REDEVELOPMENT
No1 BERTH REPLACEMENT - GENERAL ARRANGEMENTDREDGING REQUIREMENTS - FERRY
1:500 (1:1000 AT A3)
T GRANT
B MCNEILL
I MACDONALD
P WESTAWAY
M TAYLOR
2020-06-12
5-MB97C.01 5MB97C-WSP-01-ZZ-DR C-1451 I
N
LEGEND
NOTES:1. LEVELS SHOWN ARE NZVD2016. CHART DATUM
LEVELS SHOWN IN BRACKETS e.g. (-X.Xm CD)
2. BATHYMETRY POINT CLOUD DATA OBTAINEDFROM 2016-17 LINZ SURVEY "HS51 QUEENCHARLOTTE SOUND AND TORY CHANNEL"
3. BATHYMETRY CONTOURS SHOWN AT 1.0mMAJOR INTERVALS AND 0.25m MINOR INTERVALS
4. SCOUR PROTECTION FORMATION LEVEL SHOWNIS FOR ARMOURSTONE OPTION REFER SHEETC-3426
0.000m VD16NZVD(2016)
0.000m CDPICTON CHART DATUM
0.996m CD
-0.996m VD16
REQUIRED DREDGING FOR SEAWALL,AZIPOD SCOUR PROTECTION ANDMANOEUVRING BASINAPPROX. VOLUME = 28,000m³
REQUIRED DREDGING FOR EXTENTOF FURTHER SCOUR PROTECTIONAPPROX. VOLUME = 1,500m³
REQUIRED DREDGING FORCOMMERCIAL JETTIES ZONESCOUR PROTECTIONAPPROX. VOLUME = 13,500m³
JOINLINE SEE INSERT
JOINLINE SEE ABOVE VIEWPORT
NNO BATHYMETRY SURVEY BELOW EXISTINGSTRUCTURES (AREA = 580m2)ASSUMED BED LEVEL OF -7m NZVD 2016 (-6mCD)
PORT ZONE BOUNDARY
BATHYMETRIC CONTOURSUNRELIABLE IN THIS LOCATIONDUE TO SURVEY LIMIT
MAN
OEU
VRIN
G B
ASIN
-11.
25m
NZV
D20
16 (-
10.2
5m C
D)
-11.0m NZVD(-10.0m CD)
-9.0m NZVD(-8.0m CD)
-10.0m NZVD(-9.0m CD)
-8.0m NZVD(-7.0m CD)
-7.0m NZVD(-6.0m CD)
-11.0m NZVD(-10.0m CD) -12.0m NZVD
(-11.0m CD)
-13.0m NZVD(-12.0m CD)
-12.0m NZVD(-11.0m CD)
BERTH POCKET-11.25m NZVD2016 (-10.25m CD)
BERTH POCKET-9.25m NZVD2016 (-8.25m CD)
SCO
UR
PR
OTE
CTI
ON
FO
RM
ATIO
N L
EVEL
-14.
0m N
ZVD
2016
(-13
.0m
CD
)
LANDSIDE WORKSOMITTED FOR CLARITY
-11.25m NZVD(-10.25m CD)
FUR
THER
EXT
ENSI
ON
SC
OU
R P
RO
TEC
TIO
N F
OR
MAT
ION
LEV
EL-1
4.0m
NZV
D20
16 (-
13.0
m C
D)SC
OU
R P
RO
TEC
TIO
N F
OR
MAT
ION
LEV
EL-1
2.0m
NZV
D20
16 (-
11.0
m C
D)
1:7
SLO
PE T
RAN
SITI
ON
OVE
R N
O.1
JET
TY
-1:5.0
-1:2
.0
-1:2
.0
-1:1.8
-1:1.8
-1:2.0
-1:2
.0
-1:1.8
-13.0m NZVD(-12.0m CD)
1:5000 5 10 2015 25 4530 35 40 50 m
@ A1@ A31:1000
APPROVED DATEREVISION AMENDMENT
A PRELIMINARY CONCEPT DESIGN PMW 2019-08-16B INITIAL CONCEPT FOR CONSENT SCOPING PMW 2019-08-23C ISSUED FOR COST ESTIMATE PMW 2019-11-01D SHORT ARM REALIGNED. LEVELS AND NOTES AMENDED PMW 2019-11-13E FOR COMMENT PMW 2020-03-03F FOR CONSULTATION MT 2020-03-13G CONCEPT DESIGN ISSUE MT 2020-06-12H ISSUED FOR RMA CONSENTS MT 2020-06-26
0
SCALES
DRAWN
A1
DESIGN VERIFIED
PROJECT
SHEET NO.
TITLE
PROJ-ORIG-PHS-ZNE-TYPE
200
100
5010
mm
300
mm
OPUS PROJECT NO. REVISION
APPROVED
APPROVED DATE
ORIGINAL SIZE
DRAWING VERIFIED
Original sheet size A1 (841x594) Plot Date 2020-06-26 at 10:11:36 AM U:\ProjectsNZ\5m\5-MB97C.01 Picton Ferry Precinct Development\Home\800 Drawings\(C) Civil\+AutoCAD\5MB97C-WSP-01-ZZ-DR-C-1452.dwg C-1452
DESIGNED
Christchurch Office PO Box 1482Christchurch 8140New Zealand
+64 3 363 5400
CIVIL CONCEPT DESIGN
PORT MARLBOROUGH NEW ZEALAND LIMITED / KIWIRAILWAITOHI PICTONFERRY PRECINCT REDEVELOPMENT
No1 BERTH REPLACEMENT - GENERAL ARRANGEMENTDREDGING REQUIREMENTS - CRUISE SHIP
1:500 (1:1000 AT A3)
T GRANT
B MCNEILL
I MACDONALD
P WESTAWAY
M TAYLOR
2020-06-12
5-MB97C.01 5MB97C-WSP-01-ZZ-DR C-1452 H
N
LEGEND
NOTES:1. LEVELS SHOWN ARE NZVD2016. CHART DATUM
LEVELS SHOWN IN BRACKETS e.g. (-X.Xm CD)
2. BATHYMETRY POINT CLOUD DATA OBTAINEDFROM 2016-17 LINZ SURVEY "HS51 QUEENCHARLOTTE SOUND AND TORY CHANNEL"
3. BATHYMETRY CONTOURS SHOWN AT 1.0mMAJOR INTERVALS AND 0.25m MINOR INTERVALS
4. SCOUR PROTECTION FORMATION LEVEL SHOWNIS FOR ARMOURSTONE OPTION
0.000m VD16NZVD(2016)
0.000m CDPICTON CHART DATUM
0.996m CD
-0.996m VD16
REQUIRED DREDGING FOR SEAWALL,AZIPOD SCOUR PROTECTION ANDMANOEUVRING BASINAPPROX. VOLUME = 37,000m³
REQUIRED DREDGING FOR EXTENTOF FURTHER SCOUR PROTECTIONAPPROX. VOLUME = 20,000m³