leed version 3 project management tool

Upload: niranjwan-chettiar

Post on 09-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/7/2019 LEED Version 3 Project Management Tool

    1/21

    LEEDProjectInformationrequiredforLEEDRegistration

    *ProjectName:

    *Istheprojectconfidential?

    *Howdidyouhearabout

    LEED?

    *ProjectAddress1:

    ProjectAddress2:

    *ProjectCity:

    *ProjectState/US

    Territory/CanadianProvince:

    *ProjectZip/PostalCode:

    *ProjectCountry:

    Multi-UnitResidential

    Single-FamilyResidential

    CommercialOffice

    SpecialNeedsHousing

    Retail

    Healthcare

    Laboratory

    Recreation

    InterpretiveCenter

    Hotel/Resort

    Stadium/Arena

    PublicOrder&Safety

    Transportation

    Daycare

    K-12Education

    HigherEducation

    Restaura

    nt

    Library

    Park(eg,Greenway)

    Campus

    Community

    AnimalCare(eg,veterinary)

    Industria

    l(eg,Manufacturing)

    Assembly(eg,conv.center)

    Financial&Communication

    MilitaryB

    ase

    Other

    GeneralProjectInformation

    ProjectOwnerInformation

    *FirstName:

    *LastName:

    *OrganizationName:

    *EmailAddress:

    ProjectDetails

    *OwnerType:

    *CurrentProjectPhase:

    *ProjectType(SelectALL

    usesthatapply)

    :

    *ProjectScope:

    *SiteConditions:

    *OccupantType:

    *OwnerOccupied:

    *GrossSquareFootage:

    *ProjectBudget:

    John

    Thomas

    ABC

    [email protected]

    ProfitOrganization

    Core&Shell

    PreviouslyDeveloped

    MixedOccupancy

    No

    121,800

    15Mil

    --SelectOne--

    ABC

    No

    --S

    elect

    One--

    Bldg897

    545

    Austin

    Texas

    USA

  • 8/7/2019 LEED Version 3 Project Management Tool

    2/21

  • 8/7/2019 LEED Version 3 Project Management Tool

    3/21

  • 8/7/2019 LEED Version 3 Project Management Tool

    4/21

  • 8/7/2019 LEED Version 3 Project Management Tool

    5/21

  • 8/7/2019 LEED Version 3 Project Management Tool

    6/21

  • 8/7/2019 LEED Version 3 Project Management Tool

    7/21

  • 8/7/2019 LEED Version 3 Project Management Tool

    8/21

  • 8/7/2019 LEED Version 3 Project Management Tool

    9/21

  • 8/7/2019 LEED Version 3 Project Management Tool

    10/21

    Y ? ?? N Credit Requirements Action Items % Complete

    Architect

    Landscape

    Architect

    MEPDesigner

    CivilEngineer

    GeneralContractor

    Client

    Sustainability

    Consultant

    Remarks/Challenges

    1

    Credit EQ4.4 Low-Emitting Materials, Composite Wood &

    Agrifiber Products

    Composite wood and agrifiber products used on the

    interior of the building (defined as inside of the

    weatherproofing system) shall contain no added urea-formaldehyde resins. Laminating adhesives used to

    fabricate on-site and shop-applied composite wood and

    agrifiber assemblies shall contain no added urea-

    Include in specs 1

    Include in the design Entry way 6 feet long 1

    Negative pressure 1

    MERV-13 1 Complies

    Credit EQ6.1 Controllability of Systems,

    Lighting

    Provide individual lighting controls for 90% (minimum) of

    the building occupants to enable adjustments to suit

    individual task needs and preferences. AND Provide

    lighting system controllability for all shared multi-

    occupant spaces to enable lighting adjustment that

    meets group needs and preferences.

    Not Applicable.

    1Credit EQ6.2 Controllability of Systems,

    Thermal Comfort

    Tenant operated windows; manually operable vents.Discuss manually operable vents. 1 1 2 2

    Affects indoor air quality; mech

    systems, etc.

    Credit EQ5 Indoor Chemical & Pollutant Source Control Minimize and control pollutant entry into buildings and

    later cross-contamination of regularly occupied areas:

    Permanent entr wa s stems at least six feet lon .

    1

  • 8/7/2019 LEED Version 3 Project Management Tool

    11/21

  • 8/7/2019 LEED Version 3 Project Management Tool

    12/21

  • 8/7/2019 LEED Version 3 Project Management Tool

    13/21

    Finishes Plaster Patching 1 LS 178,030.00 178,030 178,030 3.08% ABC

    Interior Framing & Drywall 1 LS CDE

    Tape, Float, Paint 1 LS 881,750.00 - - 881,750 881,750 15.27% BCA

    Carpet 7,800 SY 21.00 163,800 163,800 2.84% BCA Flooring

    VCT 12,400 SF 1.50 18,600 18,600 0.32% BCA Flooring

    Ceramic Tile 9,000 SF 13.88 124,920 124,920 2.16% BCA Flooring

    Cove Base 13,500 LF 1.50 20,250 20,250 0.35% BCA Flooring

    Basement Ceramic Tile 5,500 SF 11.27 61,985 61,985 1.07% BCA Flooring

    Stairwell Ceramic Tile 1 LS 75,654.00 75,654 75,654 1.31% BCA Flooring

    Wallcovering (Estimate) 1 LS 15,456.00 15,456 15,456 0.27% ABC

    Granite Tops (Estimate) 1 LS 54,666.00 54,666 54,666 0.95% ABC

    Sounds Panels 1 LS 4,355.00 4,355 4,355 0.08% ABC

    Acoustical Ceiling 1 LS 234,000.00 - - 234,000 234,000 4.05% BCA Drywall

    Specialties Lockers 28 EA 249.34 6,982 6,982 0.12% AB

    Toilet Partitions & accessories 1 LS 62,500.00 62,500 62,500 1.08% BCA Drywall

    Furniture 1,000,000

    Total Construction Cost -Div 2-10 5,360,251.53 6,775,363.23 5,775,363.23

    Total Material Cost - 45% of the total construction cost 3,048,913.45

    2.5% for MR calculations 76,222.84

    5% for MR calculations 152,445.67

    10% for MR calculations 304,891.35

    20% for MR calculations 609,782.69

  • 8/7/2019 LEED Version 3 Project Management Tool

    14/21

    Signature

    Name

    Name of Firm:

    PROJECT NAME

    LEED Submittal Form - (MR 4 & 5) - Recycled Content and Regional Materials

    Please include the Material / Product Name. If the Product is composed of Multiple Materials, Please list them. Supporting documents

    (Cut sheets, fact sheets, MSDS, etc) should be submitted to validate the information provided in the form.

    As required by the project's specifications we provide the following certifications regarding our materials & products:

    CSI

    Div

    Material / Material

    Assembly Provided

    Manufacturer's

    Name

    Distance b/w Project

    & Manufacturer (mi)

    Distance b/w Project &

    Extraction/Harvest

    (mi)

    Material Value

    ($)

    Post Consumer

    Recyled Content

    (%)

    Pre Consumer

    Recyled Content

    (%)

  • 8/7/2019 LEED Version 3 Project Management Tool

    15/21

    03200

    032001

    Signature

    Name

    Name of Firm:

    PROJECT NAME

    LEED Submittal Form - (MR 4 & 5) - Recycled Content and Regional Materials

    Please include the Material / Product Name. If the Product is composed of Multiple Materials, Please list them. Supporting documents

    (Cut sheets, fact sheets, MSDS, etc) should be submitted to validate the information provided in the form.

    As required by the project's specifications we provide the following certifications regarding our materials & products:

    CSI

    Div

    Material / Material

    Assembly Provided

    Manufacturer's

    Name

    Distance b/w Project

    & Manufacturer (mi)

    Distance b/w Project &

    Extraction/Harvest

    (mi)

    Material Value

    ($)

    Post Consumer

    Recyled Content

    (%)

    Pre Consumer

    Recyled Content

    (%)

    Cast in Place Concret ABC

    100.00%

    Cement 25 25

    24 24

    Fly Ash 25 25

    Water 2 2

    Sand

    Total $100,000.00

    250 250 $56,000.00 90.00%Reinforcing Steel ABC

  • 8/7/2019 LEED Version 3 Project Management Tool

    16/21

    SAMPLE Imperviousness and Run-off Calculations

    Baseline Case Imperviousness/ Pre-Construction

    Surface Type Run off Coefficient Area (Acre) Area (SF) Impervious Area

    (Acre) (Squarefeet)

    Pavement, Asphalt 0.95 1.945 84722.255 80486.14225

    Vegetation,Grass 0.25 0.535 23304.065 5826.01625

    Total Site Area 108026.32

    Total Impervious Area 86312.1585

    Imperviousness 79.89919355

    Proposed Case Imperviousness / Post Construction

    Surface Type Run off Coefficient Area (Acre) Impervious Area

    (Acre) (Squarefeet)

    Pavement, Asphalt 0.95 1.195 52053.005 49450.35475

    Vegetation,Grass 0.25 0.874 38070.566 9517.6415

    Roof,Clay 0.95 0.411 17902.749 17007.61155

    Total Site Area 108026.32

    Total Impervious Area 75975.6078

    Imperviousness 70.33064516

  • 8/7/2019 LEED Version 3 Project Management Tool

    17/21

    1 Baseline Case Run-off Calculations

    Surface Type Run off Coefficient Area Area Impervious Area Rainfall Rainfall Flow

    (Acre) (Squarefeet) (inch/hr) (feet/sec) cfs

    Pavement, Asphalt 0.95 1.945 84722.255 80486.14225 4.25 9.83757E-05 7.91788

    Vegetation,Grass 0.25 0.535 23304.065 5826.01625 4.25 9.83757E-05 0.573138

    Total Site Area 108026.32

    Total Impervious Area 86312.1585

    Imperviousness 79.89919355

    1 Proposed Case Run-off calculations

    Surface Type Run off Coefficient Area (Acre) Impervious Area Flow

    (Acre) (Squarefeet) (inch/hr) (feet/sec) cfs

    Pavement, Asphalt 0.95 1.195 52053.005 49450.35475 4.25 9.83757E-05 4.864713Vegetation,Grass 0.25 0.874 38070.566 9517.6415 4.25 9.83757E-05 0.936305

    Roof,Clay 0.95 0.411 17902.749 17007.61155 4.25 9.83757E-05 1.673136

    Total Site Area 108026.32

    Total Impervious Area 75975.6078

    Imperviousness 70.33064516

  • 8/7/2019 LEED Version 3 Project Management Tool

    18/21

    2 Baseline Case Run-off Calculations

    Surface Type Run off Coefficient Area Area Impervious Area Rainfall Rainfall Flow(Acre) (Squarefeet) (inch/hr) (feet/sec) cfs

    Pavement, Asphalt 0.95 1.945 84722.255 80486.14225 4.25 9.83757E-05 7.91788

    Vegetation,Grass 0.25 0.535 23304.065 5826.01625 4.25 9.83757E-05 0.573138

    Total Site Area 108026.32

    Total Impervious Area 86312.1585

    Imperviousness 79.89919355

    2 Proposed Case Run-off calculations

    Surface Type Run off Coefficient Area (Acre) Impervious Area Flow

    (Acre) (Squarefeet) (inch/hr) (feet/sec) cfs

    Pavement, Asphalt 0.95 1.195 52053.005 49450.35475 4.25 9.83757E-05 4.864713

    Vegetation,Grass 0.25 0.874 38070.566 9517.6415 4.25 9.83757E-05 0.936305

    Roof,Clay 0.95 0.411 17902.749 17007.61155 4.25 9.83757E-05 1.673136Total Site Area 108026.32

    Total Impervious Area 75975.6078

    Imperviousness 70.33064516

  • 8/7/2019 LEED Version 3 Project Management Tool

    19/21

    WE C2 Innovative Wastewater Technologies

    Baseline Case Calulations

    Building : 120 Occupants ( 50:50 Male :Female)

    Urinal (Male) 2.00 1.00 60.00 120.00gal/day = 504.00

    days/yr = 260.00

    gal/year = 131,040.00

    50% reduction = 65,520.00

    WE C2 Innovative Wastewater Technologies

    Actual Case Calulations

    Building : 120 Occupants ( 50:50 Male :Female)

    Urinal (Male) 2.00 0.50 60.00 60.00

    gal/day = 367.20

    days/yr = 260.00

    gal/year = 95,472.00

    % reduction compared to baseline #DIV/0!

    Fixture Type Daily UsesFlowrate

    (GPF)

    # of

    OccupantsSewerage Generation (gal)

    Water Closet

    (Female)3.00 1.60 60.00 288.00

    Water Closet

    (Male)1.00 1.60 60.00 96.00

    Fixture Type Daily UsesFlowrate

    (GPF)

    # of

    OccupantsSewerage Generation (gal)

    Water Closet

    (Female)3.00 1.28 60.00 230.40

    Water Closet

    (Male) 1.00 1.28 60.00 76.80

  • 8/7/2019 LEED Version 3 Project Management Tool

    20/21

    WE C3 Water-Use Reduction

    Baseline Case Calulations

    Building : 120 Occupants ( 50:50 Male :Female)

    Urinal (Male) 2.00 1.00 60.00 120.00Kitchen Sink 1.00 2.50 120.00 75.00 15 sec

    Shower 0.10 2.50 120.00 30.00

    Lavatory 3.00 2.50 120.00 225.00 15sec

    gal/day = 834.00

    days/yr = 260.00

    gal/year = 216,840.00

    20% reduction = 173,472.0030% reduction = 151,788.00

    40% reduction = 130,104.00

    50% reduction 108,420.00

    60% reduction 86,736.00

    WE C3 Water-Use Reduction

    Actual Case Calulations

    Building: 120 Occupants ( 50:50 Male :Female)

    Urinal (Male) 2.00 0.50 60.00 60.00Kitchen Sink 1.00 1.80 120.00 54.00 15 sec

    Shower 0.10 1.50 120.00 18.00

    Lavatory 3.00 0.50 120.00 45.00 15 sec

    gal/day = 484.20

    Fixture Type Daily UsesFlowrate

    (GPF)

    # of

    OccupantsSewerage Generation (gal)

    Water Closet

    (Female)3.00 1.60 60.00 288.00

    Water Closet

    (Male)1.00 1.60 60.00 96.00

    Fixture Type Daily UsesFlowrate

    (GPF)

    # of

    OccupantsSewerage Generation (gal)

    Water Closet

    (Female)3.00 1.28 60.00 230.40

    Water Closet

    (Male)1.00 1.28 60.00 76.80

  • 8/7/2019 LEED Version 3 Project Management Tool

    21/21

    Project Waste Mgmt - LEED Tracking

    Metals Material Weight (lbs.) Tons

    Concrete, Brick and CMU 7/29/2010 18-20 Forty yard roll offs * wil l get breakdown of each metal from final ticket.

    One Cubic Foot Containers 7/28/2010 #1 Copper 26 0.013 TrashTally Date 1 CF Weights (field) 1 CF Weights #1 Copper Bare Bright 434 0.217 Truck Tare Weight 39440 lbs.

    (lbs) (tons) 8/31/2010 Sims Metals Mngmt 195 Total Weight (lbs.) Net Weight (lbs.) Tons7/29/2010 139 0.0695 7/8/2010 73860 34420 17.21

    121 0.0605 71420 31980 15.99

    137 0.0685 70240 30800 15.4

    123 0.0615 65780 26340 13.17

    131 0.0655 68420 28980 14.49

    100 0.05 7/10/2010 69360 29920 14.96

    126 0.063 72860 33420 16.71

    128 0.064 70180 30740 15.37

    122 0.061 77680 38240 19.12

    8/4/2010 124 0.062 Total 195.23 97780 58340 29.17

    130 0.065 7/14/2010 74420 34980 17.49

    Total 0.6905 78360 38920 19.4680220 40780 20.39

    Two CM Front Loader Bucket Asbestos 81240 41800 20.9Assumed Void Space in Bucket (percent): 2 Friable Asbestos (Assumed Shredded) Density (tons/CY) 0.300991953 7/16/2010 66360 26920 13.46

    Assumed Volume of Concrete in Each Bucket (CM): 1.96 68200 28760 14.38

    Concrete Density (kg/CM) 2320 Date c.u. Yards Tons 77480 38040 19.02

    Tons of Concrete per Bucket (tons) 5.00192 8/12/2010 20 6.02 68300 28860 14.43

    Tally Date

    2 CM Buckets Counts

    (Front Loader)

    Tons of Concrete per

    Tally Date Total 6.02 63960 24520 12.26

    (Count) (tons) 70740 31300 15.65

    7/29/2010 173 865.33 85980 46540 23.27

    184 920.35 84640 45200 22.6

    136 680.26 85360 45920 22.96

    8/4/2010 132 660.25 70640 31200 15.6

    135 675.26 71740 32300 16.15

    63 315.12 74600 35160 17.58

    8 40.02 7/17/2010 68020 28580 14.29

    Total 4156.59 76520 37080 18.54

    73440 34000 17

    Total Tons of Concrete, Brick and CMU 68180 28740 14.374157.28 75440 36000 18

    70540 31100 15.55

    75320 35880 17.94

    79740 40300 20.15

    7/20/2010 83200 43760 21.88

    89600 50160 25.08

    90840 51400 25.7

    97740 58300 29.15

    Total 694.84