leed nd analysis for highland mall redevelopment

9
1 MASTERS PROFESSIONAL REPORT | MAY 2014 Feasibility Study: highland Redevelopment LOCATION AND CURRENT STATE Source(s): Google Earth, 2013. CASE STUDY BOUNDARY (PREVIOUSLY DEVELOPED SITE) 0.5 0.25 0 n Miles

Upload: juliourbano

Post on 07-Apr-2016

225 views

Category:

Documents


0 download

DESCRIPTION

Maps describing compliance with LEED ND thresholds and metrics for the Highland Mall Redevelopment Project (Austin, TX)

TRANSCRIPT

Page 1: LEED ND analysis for Highland Mall Redevelopment

1MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment

LOCATION AND CURRENT STATE

millaskm

12

Source(s): Google Earth, 2013.

CASE STUDY BOUNDARY (PREVIOUSLY DEVELOPED SITE)

0.50.250

n

Miles

Page 2: LEED ND analysis for Highland Mall Redevelopment

2MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment

VICINITY MAP

Source(s): City of Austin GIS, 2013.

CASE STUDY BOUNDARY

0 0.5 10.25MilesN

Legendbuildp-2003

NHM_LEEDboundary

0.50.250

n

Miles

BUILDING FOOTPRINTS

Page 3: LEED ND analysis for Highland Mall Redevelopment

3MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment

SITE BASE MAP

0 1,000 2,000500FeetN

LegendNHM_buildp

HM_buildp

NHM_LEEDboundary

Single Family

Mobile Home

Large Lot Single Family

Multi-family

Commercial

Office

Industrial

Resource Extraction

Civic

Open Space

Transportation

Roads

Utilities

Undeveloped

Water

Unknown

HM_treecanopy_2006

HM_railroads

R HM_CMbustops

1,0005000

n

Feet

CASE STUDY BOUNDARY

RAILROADS

CREEKS

CANOPY COVER

PUBLIC TRANSIT STOPS

TRANSPORTATION

CIVIC

INDUSTRIAL

UNDEVELOPED

OFFICE

OPEN SPACE

COMMERCIAL

MULTI FAMILY

SINGLE FAMILY

PROPOSED BUILDING FOOTPRINTS

EXISTING LAND USE

RELEVANT FEATURES

Source(s): City of Austin GIS, CAPMetro, 2013.

Page 4: LEED ND analysis for Highland Mall Redevelopment

4MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment

PROJECT BASE MAP

Office/Commercial

ACC Buildings

Multi-Family Residntial

Hotel

Ground Level Retail

Highland Mall Boulevard

Jona

than

Driv

e

Mid

dle

Fisk

ville

Roa

d

Tirado Street

Clayton Lane

US 290

Airp

ort B

oule

vard

Hig

hlan

d St

atio

n

Denson Drive

DRAFT

ILLUSTRATIVE PLANHighland

Prepared by McCann Adams Studio for RedLeaf Properties and Austin Community CollegeAPRIL 19, 2013

DRAFTConceptual Plan

Subject to Change

Office/Commercial

ACC Buildings

Multi-Family Residntial

Hotel

Ground Level Retail

Highland Mall Boulevard

Jona

than

Driv

e

Mid

dle

Fisk

ville

Roa

d

Tirado Street

Clayton Lane

US 290

Airp

ort B

oule

vard

Hig

hlan

d St

atio

n

Denson Drive

DRAFT

ILLUSTRATIVE PLANHighland

Prepared by McCann Adams Studio for RedLeaf Properties and Austin Community CollegeAPRIL 19, 2013

DRAFTConceptual Plan

Subject to Change

Source(s): McCann-Adams Studio, 2013.

6003000

n

Feet

Page 5: LEED ND analysis for Highland Mall Redevelopment

5MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment

INFILL SITE DEFINITION

0 0.5 10.25MilesN

LegendHM_Undvprc_hlfmi

HM_PreDevParc_hlfmi

HMall_parcels

HM_buildp0.50.250

n

Miles

PROJECT SITE (PREVIOUSLY DEVELOPED)

PREVIOUSLY DEVELOPED LAND WITHIN 1/2 MILE RADIUS(853.36 Acres = 98.79%)

UNDEVELOPED LAND WITHIN 1/2 MILE RADIUS(10.48 Acres = 1.21%)

PARKS

1/2-MILE RADIUS FROM PROJECT BOUNDARY

LEED ND - INFILL SITE DEFINITION

Compact Development and Connectivity are indicators that LEED ND (Neighborhood Development) addresses within their pre-requisites and credits.

This rating system defines an Infill Site as a site that meets any of the following conditions:

1. When at least 75% of the site’s boundary borders parcels that individually are at least 50% previously developed and that in aggregate are at least 75% previously developed.

2. The site, in combinations with bordering parcels, forms an aggregate parcel whose boundary is 75% bounded by parcels that individually are at least 50% previously developed and that in aggregate are at least 75% previously developed.

3. At least 75% of the land area, exclusive of rights-of-way, within a ½-mile distance from the project boundary is previously developed.

4. The lands within a ½-mile distance from the project boundary have a preproject connectivity of at least 140 intersections per square mile.

This map shows compliance with definition #3 above.

Source(s): City of Austin GIS, 2013.

Page 6: LEED ND analysis for Highland Mall Redevelopment

6MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment

0 0.5 10.25MilesN

Legend

HM_LEEDIntersections

HMall_parcels

HM_buildp

0.50.250

n

Miles

INFILL SITE DEFINITION

LEED ND - INFILL SITE DEFINITION

Compact Development and Connectivity are indicators that LEED ND (Neighborhood Development) addresses within their pre-requisites and credits.

This rating system defines an Infill Site as a site that meets any of the following conditions:

1. When at least 75% of the site’s boundary borders parcels that individually are at least 50% previously developed and that in aggregate are at least 75% previously developed.

2. The site, in combinations with bordering parcels, forms an aggregate parcel whose boundary is 75% bounded by parcels that individually are at least 50% previously developed and that in aggregate are at least 75% previously developed.

3. At least 75% of the land area, exclusive of rights-of-way, within a ½-mile distance from the project boundary is previously developed.

4. The lands within a ½-mile distance from the project boundary have a preproject connectivity of at least 140 intersections per square mile.

This map shows non-compliance with definition #4 above.

Calculation: 182 intersecions / 1.6 sq. miles = 113.75

1/2-MILE RADIUS FROM PROJECT BOUNDARY (1.6 sq miles)

ELIGIBLE INTERSECTIONS(TOTAL = 182)

Source(s): City of Austin GIS, 2013.

Page 7: LEED ND analysis for Highland Mall Redevelopment

7MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment

PROJECT CONNECTIVITY

0 1,000 2,000500FeetN

Legend

NHM_NtAn_trails_ND_Junctions

NHM_LEEDIntersections

NHM_trails

NHM_streets

NHM_buildp

HM_buildp

NHM_LEEDboundary

NHM_landuse

HM_LandUse2010

HM_railroads

1,0005000

n

Feet

CASE STUDY BOUNDARY(0.12 sq. miles)

ELIGIBLE NON-MOTORIZED INTERSECTIONS(TOTAL = 16)

ELIGIBLE STREET INTERSECTIONS(TOTAL = 22)

LEED ND - CONNECTIVITY REQUIREMENT

Compact Development and Connectivity are indicators that LEED ND (Neighborhood Development) addresses within their pre-requisites and credits.

This rating system requires at least a minimum project connectivity of 140 intersections per square mile. Non-motorized intersections can be counted in this calculation but no more than 20% of the total number of intersections.

Calculation:

Total intersections = 38Total eligible intersections = 22 + (38 x 0.2) = 29.6

Intersection density = 29.6 / 0.12 sq miles = 246.67

Source(s): Master Plan designed by McAnn Adams Studio, Apri l 2013.

Page 8: LEED ND analysis for Highland Mall Redevelopment

8MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment

right-of-way boundary intersections

0 1,000 2,000500FeetN

Legend

NHM_NtAn_trails_ND_Junctions

NHM_LEEDIntersections

NHM_trails

NHM_streets

NHM_buildp

HM_buildp

NHM_LEEDboundary

NHM_landuse

HM_LandUse2010

HM_railroads

1,0005000

n

Feet

CASE STUDY BOUNDARY(0.12 sq. miles)

NON-COMPLIANT BOUNDARY SECTION (GREATER THAN 800’)

NON-ELIGIBLE BOUNDARY

COMPLIANT BOUNDARY (LESS THAN 800’)

ELIGIBLE NON-MOTORIZED INTERSECTIONS(TOTAL = 16)

ELIGIBLE STREET INTERSECTIONS(TOTAL = 22)

475’

512’

437’

632’509’ 393’ 495’

404’

992’

LEED ND - ROW BOUNDARY INTERSECTIONS

Compact Development and Connectivity are indicators that LEED ND (Neighborhood Development) addresses within their pre-requisites and credits.

This rating system requires right-of-way (ROW) boundary intersections to be separated no more than 800’.

This map shows non-compliance with LEED ND, NPDp3 (Connected and Open Community - Prerequisite - Option 1) requirements.

Page 9: LEED ND analysis for Highland Mall Redevelopment

9MASTERS PROFESSIONAL REPORT | MAY 2014Feasibility Study: highland Redevelopment

1/4 mile boundary connectivity

0 1,500 3,000750FeetN

Legend

HM_LEEDInt_qtmi

NHM_LEEDboundary_qtmi

buildp-2003

NHM_LEEDboundary

HM_LandUse2010

HM_railroads

1,5007500

n

Feet

ELIGIBLE STREET INTERSECTIONS(TOTAL = 35)

1/4 MILE RADIUS FROM PROJECT BOUNDARY(0.66 sq. miles)

CASE STUDY BOUNDARY(0.12 sq. miles)

LEED ND - INTERSECTION DENSITY

Compact Development and Connectivity are indicators that LEED ND (Neighborhood Development) addresses within their pre-requisites and credits.

This rating system requires a minimum connectivity rating of 90 intersections per square mile (using only the net area) within a 1/4 mile radius from the project boundary.

Calculation:

Net area = 0.66 - 0.12 = 0.54 sq. miles

Intersection density = 35/ 0.54 = 64.8

This map shows non-compliance with LEED ND, NPDp3 (Connected and Open Community - Prerequisite - Option 2) requirements.

Source(s): City of Austin GIS, 2013.