(PREPARED UNDER RULE 12 (1) AND AS PER AMENDMENT RULES 41 & 42 UNDER TAMILNADU MINOR MINERAL CONCESSION RULES, 1959) (Lease Periods = Three Months) IN LOCATION OF THE QUARRY LEASE APPLIED AREA EXTENT : 3.00.0Ha, S.F.NO : 162 (PART), VILLAGE : AYANPAPPAKUDI, TALUK : MADURAI SOUTH, DISTRICT : MADURAI, STATE : TAMIL NADU. FOR APPLICANT Thiru. G.Dhanabalan, S/o. Gurunathan, 378, Pokkuvarathu Nagar, PTC Post, Perungudi, Madurai -625 022. PREPARED BY A.Jagannathan, B.E., F.C.C., M.M.E.A., Qualified Person RQP/MAS/019/87/A. Old.No.260-B, New No :17, Advaitha Ashram Road, Alagapuram, Salem – 636 004. Cell: 94433 56539, E-mail: [email protected]

Upload: others

Post on 13-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

(PREPARED UNDER RULE 12 (1) AND AS PER AMENDMENT RULES 41 & 42 UNDER TAMILNADU

MINOR MINERAL CONCESSION RULES, 1959)

(Lease Periods = Three Months)

IN

LOCATION OF THE QUARRY LEASE APPLIED AREA

EXTENT : 3.00.0Ha,

S.F.NO : 162 (PART),

VILLAGE : AYANPAPPAKUDI,

TALUK : MADURAI SOUTH,

DISTRICT : MADURAI,

STATE : TAMIL NADU.

FOR

APPLICANT

Thiru. G.Dhanabalan,

S/o. Gurunathan,

378, Pokkuvarathu Nagar,

PTC Post, Perungudi,

Madurai -625 022.

PREPARED BY

A.Jagannathan, B.E., F.C.C., M.M.E.A.,

Qualified Person

RQP/MAS/019/87/A.

Old.No.260-B, New No :17,

Advaitha Ashram Road,

Alagapuram, Salem – 636 004.

Cell: 94433 56539,

E-mail: [email protected]

Page 2: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

G.Dhanabalan,

S/o. Gurunathan,

378, Pokkuvarathu Nagar,

PTC Post, Perungudi,

Madurai -625 022.

CONSENT LETTER FROM APPLICANT

The Mining Plan in respect of Gravel Quarry in S.F.No. 162 (Part) over

an extent of 3.00.0Ha of Government Poramboke land (Aivathankulam BDO

tank) in Ayanpappakudi Village, Madurai South Taluk, Madurai District,

Tamilnadu State has been prepared by

A.Jagannathan, B.E., F.C.C., M.M.E.A.,

RQP/MAS/019/87/A

I request the District Collector, Madurai to make further

correspondence regarding the modification of the Mining Plan with the said

recognized qualified person at his following address.

A.Jagannathan, B.E., F.C.C., M.M.E.A.,

Old.No.260-B, New No:17,

Advaitha Ashram Road,

Alagapuram, Salem – 636 004.

Cell: 94422 78601, 94433 56539.

I hereby undertake that all the modifications, if any made in the

mining plan by the qualified person may be deemed to have been made

with my knowledge and consent and shall be acceptable to me and binding

on me in all respects.

Signature of Applicant

G.Dhanabalan

Place: Madurai

Date: 26.05.2017

Page 3: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

G.Dhanabalan,

S/o. Gurunathan,

378, Pokkuvarathu Nagar,

PTC Post, Perungudi,

Madurai -625 022.

DECLARATION OF THE APPLICANT

The Mining Plan in respect of Gravel Quarry in S.F.No. 162 (Part)

over an extent of 3.00.0Ha of Government Poramboke land (Aivathankulam

BDO tank) in Ayanpappakudi Village, Madurai South Taluk, Madurai District,

Tamilnadu State has been prepared in full consultation with me.

I have understood its contents and agree to implement the same

in accordance with Laws, Rules and Act applicable to Quarry.

Signature of Applicant

G.Dhanabalan

Place: Madurai

Date: 26.05.2017

Page 4: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

A.Jagannathan, B.E., F.C.C., M.M.E.A.,

Old.No.260-B, New No:17,

Advaitha Ashram Road,

Alagapuram, Salem – 636 004.

Cell: 94422 78601, 94433 56539.

CERTIFICATE FROM THE QUALIFIED PERSON

This is to certify that the Provisions of Rule 12 (1) and as per

amendment rules 41 & 42 Under Tamilnadu Minor Mineral Concession Rules,

1959 have been observed in the preparation of Mining Plan for Gravel

Quarry in S.F.No. 162 (Part) over an extent of 3.00.0Ha of Government

Poramboke land (Aivathankulam BDO tank) in Ayanpappakudi Village,

Madurai South Taluk, Madurai District, Tamilnadu State has been prepared

for

Thiru. G.Dhanabalan,

S/o. Gurunathan,

378, Pokkuvarathu Nagar,

PTC Post, Perungudi,

Madurai -625 022.

Whenever specific permissions/exemptions/ relaxations and

approvals are required, the applicant will approach the concerned authorities

of the District Collectorate, Madurai, Tamilnadu for such

permissions/exemptions/relaxations and approvals.

It is also certified that information furnished in the above Mining plan

are true and correct to the best of my knowledge.

Signature of the Qualified person

A.Jagannathan, B.E., F.C.C., M.M.E.A.,

RQP/MAS/019/87/A

Place: Salem

Date: 06.06.2017

Page 5: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

LIST OF CONTENTS

S.No. Description Page

No.

1.0 General Information 3

2.0 Location 4

3.0

PART-A

Geology and Mineral Reserves

5

4.0 Mining 6

5.0 Blasting 8

6.0 Mine Drainage 8

7.0 Other Permanent Structures 8

8.0 Employment Potential & Welfare Measures 10

9.0

PART-B

Environment Management Plan

11

10.0 Mine Closure Plan 16

11.0 Any Other Details Intend to Furnish by the Applicant 17

Page 6: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

LIST OF ANNEXURES

S.No. Description Annx.no.

1. Copy of Precise Area Communication Letter I

2. Copy of FMB II

3. Copy of Village map III

4. Copy of Adangal IV

5. Copy of A-Register V

6. Copy of BDO Letter VI

7. Copy of ID Proof VII

8. Copy of QP Certificate VIII

LIST OF PLATES

S.NO Description Plate No

1 Location plan I

2 Environmental Plan and Land use Land Cover IA

3 Key Plan IB

4 Topographical, Geological Plan and Sections II

5 Conceptual plan and sections III

Page 7: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

1

MINING PLAN FOR GRAVEL QUARRY OVER AN EXTENT OF 3.00.0HA IN

AYANPAPPAKUDI VILLAGE, MADURAI SOUTH TALUK, MADURAI DISTRICT, TAMILNADU.

(Prepared Under Rule 12 (1) and as per amendment rules 41 & 42 Under Tamilnadu Minor

Mineral Concession Rules, 1959)

GENERAL INFORMATION AND EXECUTIVE SUMMARY The present Mining plan & Environmental Management plan is prepared

for Thiru. G.Dhanabalan, S/o. Gurunathan, 378, Pokkuvarathu Nagar, PTC Post, Perungudi,

Madurai -625 022.

The applicant applied to quarry for Gravel in Government Poramboke Land

(Aivathankulam BDO tank), Survey field No.162 (Part) over an Extent of 3.00.0Ha out of

60.45.5Ha in Ayanpappakudi Village, Madurai South Taluk, Madurai District for a period of

Three Months only.

The application was meritoriously processed by the District Collector, Madurai and passed

an order vide Rc.No.509/2015-Mines, Dated:26.05.2017 to obtain an approved mining plan

and Environmental Clearance from the Appropriate Authorities, Madurai, Tamil Nadu as per the

order of the Hon’ble Supreme Court of India in I.A.No 12-13/2011 in S.L.P.No. 19628-

19629 of 2009 etc., dt. 27.02.2012 the Ministry of Environment and Forest office

Memorandum Dt 18.05.2012 and as per the Rule 41 & 42 Amendment vide

G.O.MS.No.79, Industries (MMC.1), 6th April 2015 in the TAMIL NADU MINOR

MINERAL CONCESSION RULES, 1959.

Rule 41. Mining plan is pre – requisite to the grant of lease and submission and

approval of Mining plan for Minor Minerals other than Granite.

Rule 42 Submission of environment clearance for the grant of quarry lease for

Minor Minerals including Granite.

Hence this Mining plan is prepared as per precise area communication letter received

from the District Collector, Madurai District.

Short Notes of Mining plan

a. Village Panchayat - Ayanpappakudi

b. Panchayat Union - Madurai South

c. The proposed total mineable reserves = 30,000m3 of Gravel.

d. The proposed quantity of reserves (level of production)

to be mined = 30,000m3 of Gravel for a

period of Three months.

e. Total extent of the area = 3.00.0Ha

f. Period of mining = Three months.

g. Depth of mining =1.0m from the surface level.

Page 8: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

2

h. Method of mining (level of mechanization)

Opencast Semi mechanized method without drilling and blasting.

i. Type of machineries used in the quarry = Machinaries like excavators are proposed for

quarrying Gravel.

j. No trees are uprooted due to this quarrying operations.

k. There is No Export of Gravel.

l. Toposketch covering an 1Km radius around the proposed area with markings of

habitations, water bodies including streams, rivers, roads, major structure like

bridges, wells, archeological importance, places of worships is marked and enclosed

as plate No.IA.

m. The lease applied area is about 3.00.0Ha, is bounded by four corners, they are

designated as 1-4 Clockwise from the south western, the coordinates for all the

corners are clearly marked and enclosed as Plate No 1A.

n. The diagram of proposed mining area showing the dimensions of the pit, its proposed

depth of mining, proposed extent of area are marked enclosed as Plate No. II.

o. The area applied for lease is 10Km away from the interstate boundary, protected

area, under wild life protection ACT 1972, critically polluted areas as identified by

CPCB and notified Eco sensitive areas.

p. No wastages are anticipated in the lease applied area, hence waste dump is not

proposed.

q. Around 7 employees are proposed to be deployed for the quarrying operation.

r. Total cost of the project is about Rs. 7,45,000/-

This mining plan and Environment Management plan is prepared by incorporating the

conditions stipulated in the precise area communication and by considering all the

parameters required for the safe and systematic quarrying operations in order to excavate

30,000m3 of Gravel for a period of Three months only.

Gravel is composed of unconsolidated rock fragments that have a general particle

size range and include size classes from granule- to cobble-sized fragments. Gravels is sub-

categorized by the Udden-Wentworth scale into granular Gravels (>2 to 4 mm or 0.079 to

0.16 in) and pebble Gravels (>4 to 64 mm or 0.2 to 2.5 in). One cubic yard of Gravels

typically weighs about 3000 pounds (or a cubic meter is about 1,800 kilograms).

The applicant intends to desilt Gravel for storage capacity of the tank (Aivathankulam

BDO tank).

Page 9: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

3

1.0 GENERAL INFORMATION

1.1 a) Name of the Applicant Thiru. G.Dhanabalan,

b) Address of the Applicant

(with phone No. & e-mail)

Address : S/o. Gurunathan,

378, Pokkuvarathu Nagar,

PTC Post, Perungudi,

District : Madurai

Cell : 98426 56465

c) Status of the Applicant

(Individual / Company /

Firm)

The Applicant is an Individual.

1.2 a) Mineral which the

Applicant intend to mine

The Applicant intends to quarry Gravel only.

b) Precise area

communication letter

details received from the

Government

The District collector, Madurai passed an order

vide Rc.No.509/2015-Mines, Dated:26.05.2017 to

obtain an approved mining plan and

Environmental Clearance from the appropriate

authority, Tamil Nadu.

c) Period of permission /

lease to be granted

The Applicant has applied for permission for the

period of Three Months.

d) Name and address of the

RQP / Authorized person

preparing the mining plan

Name : A.Jagannathan, B.E., F.C.C., M.M.E.A.,

Qualified Person

Address : Old.No.260-B, New No: 17,

Advaitha Ashram Road,

Alagapuram, Salem – 636 004.

Mobile : 94433 56539.

Tele Fax : 0427- 2431989

Registration No : RQP/MAS/019/87/A

Valid up to : 17.11.2021

Email : [email protected]

Page 10: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

4

2.0 LOCATION

a) Details of the area (with

location map)

The quarry lease applied area falls in the

in Ayanpappakudi Village.

Aivathankulam BDO tank is located 1.5km

Northern side of Perungudi Village.

i) District, Taluk and

village

Madurai District, Madurai South Taluk,

Ayanpappakudi Village.

ii) Survey Number 162 (Part)

iii) Extent(in hectares)

Area recommended for quarry 3.00.0Ha out of

60.45.5 Ha

b) Classification of the area

(Ryotwari/ Poramboke /

others)

Government Poramboke Land

c) Ownership / Occupancy of

the applied area (surface

right)

It’s a Government Poramboke Land. Its maintained

By BDO, Thiruparangundram.

d) Toposheet No. with

latitude and longitude

Topo sheet No - 58- K/01

Latitude 09°51'46.98"N to 09°51'57.06"N

Longitude 78°05'53.06"E to 78°06'01.00"E

e) Existence of public road /

Railway line, if any nearby

and approximate distance

The Metal road is available on the Northeastern

side of the area these roads lead Connecting to

Perungudi State highway road at a distance of

170m.

The panchayat road is available from the main

road to quarry site no patta land roads are

encountered for the haulage of Gravel.

The Nearest Railway line is Madurai –

Virudhunagar which is about 3.5km on the

Northwestern side of the area.

Page 11: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

5

PART – A

3. 0 GEOLOGY AND MINERAL RESERVES

3.1 Brief description of the

Topography and general Geology

of the area (with plans)

The Topography of the land is slightly

undulated terrain. It s a tank, only used for

storing the water in the rainy season. The Gravel

formation is accumulated in the tank. The Gravel

is formed by the erosion and transportation of

rock particles. The altitude of the area is 125m

(Maximum) from MSL.

The slope of the area is gentle towards northern

side. Please refer the Topography, Geological plan

and sections (Plate No –II)

3.2 Details of exploration already

carried out if any

No exploration was carried out. The Gravel

formation is found right from the surface and

proposed to excavate upto a depth of 1.0m only.

3.3 Estimation of reserves The Geological plans demarcating the

commercially viable Gravel body have been

prepared in 1:1000 scales (Plate No.II).

Totally two sections have been drawn, one

section is drawn along the Length wise as (X-Y)

another section is drawn the Width wise as (A-B) to

choose the maximum area cover under the lease in

the Horizontal 1:1000 and Vertical 1: 100 (please

refer Plate No- II).

The cross sectional area for the proved

depth persistence of 1.0m has been worked out for

the section. The cross sectional area multiplied by

its length of influence on the longer axis gives the

volume (insitu) in the cross sectional area.

The sum total of the insitu reserves available within

the individual cross sectional area gives the

geological resources of the lease applied area.

As the recoverable of Gravel in the terms of

cubic meter. The Geological Resources, Mineable

Reserves are given only in terms of Cubic meter.

The Details of estimation of Geological

Resources and Mineable Reserves with reference to

Topography, Geological Plan and Section shown in

(Plate No. II).

Page 12: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

6

a) Geological reserves with

geological sections on a scale of

1:1000.

The Geological Resources upto a depth of

1.0m. Availability of Resources is given below.

Geological Resources

(Please refer Plate No-II)

Section L (m) W (m) D (m)

(Avg)

Volume

(m3)

ROM

(m3)

XY-AB 300 100 1.0 30000 30000

Total 30000

Total ROM = 30,000m3

Total Geological Resource upto a depth of 1.0m

= 30,000m3

b) Recoverable reserves There is no wastages anticipated hence the

Geological Resources are calculated as Mineable

Reserves.

Mineable (Recoverable) Reserves

(Please refer Plate No-II)

Section L (m) W (m) D (m)

(Avg)

Volume

(m3)

ROM

(m3)

XY-AB 300 100 1.0 30000 30000

Total 30000

Total Mineable Reserves are calculated upto a

depth of 1.0m below the ground level

= 30,000m3 for a period of three months.

4.0 MINING

4.1 Method of mining (opencast /

underground)

Opencast method of shallow mining

is proposed, Machineries like excavator are proposed

for quarrying Gravel 1.0m depth.

No drilling or blasting is proposed for this type

of Gravel quarrying, it is a conventional eco

friendly quarrying operation.

The Gravel will be loaded directly to the

trucks / Lorries for transportation to the needy

customers site for filling and leveling of low lying

areas.

4.2 Mode of working (mechanized,

semi mechanized, manual)

It’s a conventional opencast quarrying operation

without drilling and blasting.

4.3 Proposed bench height 1.0m height.

Page 13: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

7

4.4 Indicate the overburden /

mineral production expected pit

wise as detailed below

(composite plan and section

showing pit layout, dumps,

disposal of waste if any etc.)

There is no overburden and the Gravel is to exploit

only to a depth of 1.0m right from the surface, and

proposed to excavate for a period of Three

Months.

Year wise Production Table

Months Pit

No.(s)

Overburden ROM ore/

Mineral

Saleable ore /

Mineral

Sub grade

ore / mineral

Mineral

rejects

Ore to

overburden ratio

Three months

I Nil 30,000m3 30,000m3 Nil Nil Nil

Fourth

The applicant has obtain permission to quarry Gravel for a period of Three Months only. Fifth

Sixth

Seventh

The applicant proposed to quarry 30,000m3 of Gravel upto a depth of 1.0m from the

existing profile of tank.

4.5 Machineries used

a) For mining Excavator 110-150 of 0.90m3 capacity, Diesel Drive.

b) Loading equipment Excavator 110-150 of 0.90m3 capacity, Diesel Drive.

c) Transportation (includes

within the mine and mine to

destination

Hired Tippers 10/20Ts capacity. Diesel Drive. (Only

from quarry to needy customers site)

4.6 Disposal of overburden /

waste

There is no wastage is anticipated during the

quarrying operation the entire Gravel will directly

loaded into tippers for filling and leveling of low lying

areas for agriculture and other infrastructure

development work in and around the area.

4.7 Brief note on conceptual

mining plan for the entire

lease period base on the

geological, mining and

environmental considerations

Conceptual mining plan is prepared based upon

Topography, Geological plan and section with an

object of Three Months of systematic development of

lay outs, selection of ultimate pit limit etc.,

The ultimate pit size is designed based on certain

practical parameters such as economical depth of

quarrying & permissible area etc., The ultimate pit

dimensions of the quarry are given below.

Description L (m) W (m) D (m)

Conceptual 300 100 1.0

It is a Conventional Eco friendly Quarrying

operation without drilling and Blasting.

Page 14: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

8

5.0 BLASTING

5.1 Blasting pattern

It’s a Conventional Eco friendly quarrying proposed

without drilling and blasting.

5.2 Type of explosives to be used

5.3 Measures proposed to

minimize ground vibration due

to blasting

5.4 Storage and safety measures

to be taken while blasting

6.0 MINE DRAINAGE

6.1 Depth of water table (based on

nearby wells and water bodies)

The water table in the area is 30m BGL in summer

season and 25m in Rainy season which is observed

from the nearby wells and the data obtained from

existing private bore well.

Table-4

S.No Type Distance &

Direction

Location

1. Bore well 240m SE 09°51'42.64"N

78°06'01.78"E

Hence the ground water will not be affected in

any manner due to the quarrying operation during

the entire life period.

6.2 Arrangements and places

where the mine water is finally

proposed to be discharged

There is no such type of activities anticipated in

this quarrying operation.

7.0 OTHER PERMANENT STRUCTURES (also shown in the map)

7.1 Habitations / village natham No houses are located within the radius of 300m.

7.2 Power lines (HT/ LT) There is no LT/ HT line within the radius of 50m from

the proposed quarry site.

7.3 Water bodies (river, Pond,

lake, odai, channel etc.)

The lease applied area lies in Aivathankulam BDO

tank. There are no other major water bodies like

river, Channel etc., within the radius of 500m.

7.4 Archaeological / historical

monuments

There is no Archaeological / historical monuments

within 500m radius from the area.

7.5 Road (NH, SH others) The Nearest National Highway (NH-45B) Madurai –

Thoothukudi is about 2.5Km on the Southeastern side

of the area.

The State Highway (SH-32) Madurai – Perungudi is

about 170m on the Eastern side of the area.

Page 15: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

9

7.6 Places of worship There is no place of worships within the Radius of

500m.

7.7 Reserved forest / forest /

social forest / wild life

sanctuary etc.

There are no Reserved forest / social forest / wild life

sanctuary within 500m radius.

S.

No.

Salient Futures

Present around site

Prescribed

safety distance

Actual Distance from the site

1. Railways, Highways,

Reservoirs or Canal

50m Railway line –

3.5Km (Madurai – Virudhunagar) Northwestern

side.

Highways-

National Highway (NH-45B) Madurai–

Thoothukudi is about 2.5Km on the

Southeastern side of the area.

Reservoir – No reservoir within the radius of

1Km.

Canal- There is no canal in the area.

2. Village Road 10m village road is present 500m away from the

Northern side of the area.

3. Habitation / Village 300m No habitations within the radius of 300m,

Actual distance are clearly marked in the Plate

No I-B

S.No Name of the Village

Approximate distance

& Direction from lease applied area

1. JP Nagar 2.0km - NE

2. Perungudi 1.5km - S

3. Mullakulam 1.5Km - SW

4. Pamban Nagar Colony 2.0Km - NW

4. Adjacent Patta Land 7.5m The area applied for lease is Government land,

no patta lands adjacent to the pits proposed for

quarrying operation.

5. Housing area, EB

line

(HT & LT Line)

50m No Housing areas within the radius of 300m.

HT Line - No HT line within the radius of 50m.

LT Line – No LT line within the radius of 50m

6. Boundaries of the

permitted area

7.5m &

10m

The boundaries of the permitted areas are as

follows. Direction S.F.No Classification

North 162 (Part) Government

Poramboke land

(Aivathankulam

BDO tank)

East 162 (Part) South 162 (Part) West 162 (Part)

7. Reserve forest /

protected area / ECO

sensitive area

10Km There is no reserved forest/Protected area/Eco

sensitive area within the radius of 10Km.

Page 16: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

10

8.0 EMPLOYMENT POTENTIAL & WELFARE MEASURES

8.1 Employment potential

(skilled, semi skilled,

unskilled)

The following man power is proposed for the Gravel

quarrying to carry out the day-to-day quarrying

activities, aimed at the proposed production target and

also to comply with the statutory provisions of the

Government norms.

Skilled :

1. Mines foreman : 1

2. Supervisors : 1

Total : 2 Nos.

Semi-skilled:

Excavators Operators : 1

Co operator : 1

Total : 2 Nos

Un -Skilled:

Watchman : 1

Unskilled – helpers : 2

Total : 3 Nos

Grand Total : 7 Nos

Allowing for 10% absenteeism, the No. of men of roll

will be around 6.

The above manpower is adequate to meet out

the production schedule and the machinery strength

envisaged in the mining plan and to comply with the

statutory provisions of the Mines Safety Regulations.

It is been ensured that the labour will not be deployed

less than 21 years, no child labour will engaged or

entertained for any kind of quarrying operations. All the

labours engaged for quarrying operations will be insured

during the quarry lease period.

8.2 Welfare measures

a) Drinking water Packaged Drinking water will be brought from the

authorized water suppliers in the Perungudi which is

about 1.5km on the Southern side of the area.

b) Sanitary facilities Hygienic Sanitary facilities will be constructed with in

the quarrying area as semi permanent structure.

c) First Aid facility First aid kits are kept in Mines office room if any

accident happens first aid will be given at site and the

injured person will be taken to the hospital immediately,

Hospital is available at Perungudi is about 1.5km on the

Southern of the area. The competent statutory foreman

will be in charge of first aid.

Page 17: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

11

d) Labours Health In the conventional Eco friendly opencast quarrying

operation No drilling or blasting is involved only

excavators are used, hence labours health may not

affect in any manner however periodically medical

checkup will be conducted to all the workers in applicant

own cost.

e) Precautionary safety

measures to the labourers

All the quarry workers will be provided with

safety helmets, Mine Goggles, Ear plugs, ear muffs,

Dust mask, reflector jackets and Safety Shoes as

personal protective device as per the specification of

Director of Mine Safety. Besides also conducting

periodically medical checkup for all workers for any

mine health related problems, proper training and

induction will be given to quarrying personal to create

awareness of conventional Eco friendly quarrying

operations.

PART – B

9.0 ENVIRONMENT MANAGEMENT PLAN

9.1 Existing landuse pattern The land is specifically used for collecting the water

during the rainy season.

9.2 Water Regime Ground water is about 30mt depth from ground level.

The quarrying is restricted up to 1.0m from existing

ground profile Government Poramboke land

(Aivathankulam BDO tank), hence the quarry

operation will not be affected by the ground water.

9.3 Flora and fauna The main trees are Julia Flora, Neem, etc., There is no

wild life, bird sanctuary, reserve or social forest near

the area applied for quarrying lease. No flora of

botanical interest nor fauna of zoological interest

Noticed.

9.4 Climatic conditions Both the North East and South West monsoon occurs

here and the summer are hot and winter are cools.

During April and May the temperature may shoot upto

40°C and during winter the temperature does not fall

below 25°C. The annual rainfall is around 900mm.

Page 18: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

12

9.5 Human settlement

There are few villages located in 5Km radius from the

lease applied area the details of the areas are given

below.

S.No Name of the village Distance in

Km

Approximate

population

1. JP Nagar 2.0km - NE 850

2. Perungudi 1.5km - S 1250

3. Mullakulam 1.5Km - SW 750

4. Pamban Nagar Colony 2.0Km - NW 850

9.6 Plan for air, dust suppression In this conventional Eco friendly quarrying operation

only Excavator are proposed without drilling and

blasting, hence the air quality will not affect due to

the quarrying operation, water will be sprinkled in the

haul roads periodically to suppress dust Ambient Air

Quality monitoring will be carried out to check the

Quality of Air in and around the Quarry. Water for dust

suppression will be extract from the nearby borewells.

9.7 Plan for noise level control This Conventional Eco Friendly quarrying

operation does not involve any blasting and drilling

methods, hence noise will be minimal and this is only

due to the movement of Excavators and Trucks.

Periodically Noise level monitoring will be carried out

to check the Noise level in and around the Quarry.

The drivers will be strictly instructed to move

the vehicle during the transportation not exceed

40 km per hour. Sentries with flags & whistle will

posted in village junction and populated area to

control and regulate traffic.

9.8 Environmental impact

assessment statement

describing impact of mining

on the next five years

The life span of the quarry is proposed for the period

of three months only; the Proposed quarrying for a

small production of Gravel does not involve any drilling

and blasting. Such limited mining activity is not likely

to cause any impact adversely on environment as far

as pollution of air, water and noise is concerned.

9.9 Proposal for waste

management

There are no wastages anticipated during the

quarrying operation. The entire Gravel will be

transported to the needy customer’s site.

Page 19: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

13

9.10 Proposal for reclamation of

land affected during mining

activities and at the end of

mining (refilling / fencing

etc.)

The quarry operation is up to a depth of 1.0m, after

removing the Gravel there is no proposal for backfilling

or reclamation. The land will be leveled and only used

for facilitate the storage capacity of tank, the leveling

cost would be around Rs.20,000/-

9.11 Program of afforestation

(indicate extend, number,

name of species to be

afforested)

After the completion of the quarrying operation, the

land will be enhancing the Capacity of the BDO Tank.

The applicant ensures to plant native species like

pungam, neem, causirina on the periphery of the tank

bund or nearby villages and village road after

consultation with the panchayat authorities. It is

proposed to plant around 10 trees. The cost estimate

for afforestation is around Rs. 5,000/-

9.12 Proposed financial estimate /

budget for (EMP)

environment management:

The proposed financial estimate budget for EMP is

around Rs. 14,000/- for the period of Three Months

only.

Page 20: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

14

Project cost / investment

i) Land cost It is a Government Land hence no cost is involved.

ii) Machinery to be used The excavators of 0.90m3 bucket capacity and

tippers of 10/20Ts capacity will be used.

The quantity of Diesel consumption is based on the

working hours of Excavators (Filling Factor and loading

Cycling), in the open cast quarry project Excavators

are proposed to quarry Gravel. Average Diesel

consumption of Hitachi Excavator model EX 110-150 is

16Ltrs/ Hr.

Total number of Excavator used

for quarrying Gravel = 1No

Average Diesel consumption

Tata Hitachi (Model Ex-110-150) = 16Ltr/Hr

Diesel Prize around = Rs. 60 (At present scenario)

Total Excavator running hours for the project

One excavator will excavate 60m3/Hour

= 30000 /60m3

= 500 Excavator hours

One Excavator will consume 16Ltrs/ hour

Hence 500 X16 = 8000 Ltrs of HSD will be

utilized for the entire project life.

The hired vehicle charges per hour inclusive of diesel

around Rupees 1200/hour

Total running hours = 500hours

= 500hours x Rs.1200

= Rs 6,00,000/- for the entire project life.

A. Operational Cost

For excavation = Rs. 6,00,000/-

Temporary rest shelter= Rs. 20,000/-

Sanitary facilities = Rs. 50,000/-

Drinking Water = Rs. 3,000/-

Sanitary arrangement = Rs. 3,000/-

Safety kits = Rs. 10,000/-

Leveling after quarrying = Rs 20,000/-

Total operational cost = Rs. 7,06,000/-

Page 21: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

15

iii) Refilling / Fencing There is no proposal for Refilling, hence no cost is

involved.

iv) Labourers shed Manual labours are proposed for quarrying Gravel.

The labours are from nearby local villages, hence no

cost is involved. Rest shelter will be constructed as

semi permanent structure at the cost of

Rs.20,000/-

v) Sanitary facility Sanitary facility will be constructed as semi-

permanent structure, the cost will be around

Rs.50,000/-

vi) Others items Leveling after quarrying = Rs. 20,000/-

The applicant ensures to involve the corporate social

responsibilities likes providing note books to nearby

schools, participate the local festival activities, and

provide drinking water facilities to the nearby

villages the cost would be around Rs. 20,000/-

(a) Expenditure

i) Drinking water facility for

the labourers

7 labours at the rate of Rs 1,000/ month for a period

of Three Months, the cost will be around Rs.3,000/-

ii) Sanitary arrangement, Sanitary maintenance at the cost of Rs 1,000/ month

the cost will be around Rs.3,000/- for a period of

Three Months.

iii) Safety kits, Rs.10,000 will be spent for the safety kits such as

Helmet, Goggles, Ear plugs, Ear mask, Safety shoes

and Reflector jackets.

iv) Water sprinkling

(if necessary)

Rs.3000/ month will be spent for sprinkling the water

on haul roads for Dust suppression; the cost will be

around Rs.9,000/- for a period of Three months.

Page 22: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

16

v) Afforestation etc. No Afforestation is proposed on periphery within the

lease applied area, plantation will be carried out in

the nearby village and village roads. The cost

estimate is around Rs.5,000/-

B. EMP cost

i. Water Sprinkling = Rs. 9,000/-

ii. Afforestation cost = Rs. 5,000/-

Total = Rs. 14,000/-

A. Operational cost = Rs 7,06,000/-

B. EMP Cost = Rs 14,000/-

Total Project Cost (A+B) = Rs 7,20,000/-

The applicant ensures to involve corporate social

responsibilities (CSR) like providing note books to

nearby school, providing drinking water facilities to

the nearby villages etc., more than 2.5% from the

total project cost the cost would be around

Rs 25,000/-

Total Project cost = Rs. 7,20,000/-

CSR Cost (more than 2.5%) = Rs. 25,000/-

Total cost = Rs. 7,45,000/-

(The Project cost including EMP Cost is seven lakhs

and forty five thousand rupees only)

10. MINE CLOSURE PLAN

10.1 Steps proposed for phased restoration,

reclamation of already mined out

areas

It’s a New quarrying project no quarried

out areas within the lease applied area.

10.2 Measures to be under taken on mine

closure as per Act & Rules

This conventional Eco – Friendly quarrying

for a depth of 1.0m below the ground level

does not require any backfill, Reclamation

and Rehabilitation, the quarried out lands

will be leveled and used for facilitate the

storage capacity of the tank.

10.3 Mitigation measure to be undertaken

for safety and restoration /

reclamation of the already mined out

area

This is a fresh Gravel quarry.

Page 23: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

Mining Plan Ayanpappakudi Gravel Quarry

17

11. ANY OTHER DETAILS INTEND TO FURNISH BY THE APPLICANT

This conventional Eco Friendly quarrying operation does not involve any drilling and

Blasting. Only Excavators are proposed to excavate the Gravel for a period of Three months

only, care will be taken in all steps to prevent any adverse eventualities. This is the B2

category quarry proposed for a short period of Three months only.

STATUTORY PROVISIONS

The mining plan for Gravel is prepared as per the rule 12 (1) and as per amendment

rules 41 & 42 Under Tamilnadu Minor Mineral Concession Rules, 1959. The provisions of the

Mines Act, Rules and Regulations and orders made there under shall be complied with, so

that the safety of the mine, machinery and person will be protected. Permission, relaxation

or exemption wherever required for the safe and scientific quarrying of the deposit will be

obtained from the Consent Departments. Any violation pointed out by the inspecting

authorities shall be rectified as per the guidelines of the Department.

Prepared by

A.Jagannathan, B.E., F.C.C., M.M.E.A.,

RQP/MAS/019/87/A

Place : Salem

Date : 06.06.2017

Page 24: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ED

UC

AT

ION

AL

PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ED

UC

AT

ION

AL

PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Page 25: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ED

UC

AT

ION

AL

PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ED

UC

AT

ION

AL

PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Page 26: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ED

UC

AT

ION

AL

PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ED

UC

AT

ION

AL

PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Page 27: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ED

UC

AT

ION

AL

PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ED

UC

AT

ION

AL

PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Page 28: (Lease Periods = Three Months) LOCATION OF THE QUARRY ...environmentclearance.nic.in/writereaddata/District/... · G.Dhanabalan, b) Address of the Applicant (with phone No. & e-mail)

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ED

UC

AT

ION

AL

PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ED

UC

AT

ION

AL

PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT