lean six sigma green belt training module 4...13.4.17 6 11 lean six sigma • green belt pwc howto...
TRANSCRIPT
13.4.17
1
Lean Six SigmaGreen Belt TrainingModule 4
April 2017Roman Bauer
www.pwc.com
2Lean Six Sigma • Green BeltPwCPwC
Find wastes
13.4.17
2
3Lean Six Sigma • Green BeltPwC
DMAIC project roadmap
DefineD
Measure
Analyzuj
Improve
Control
M
A
I
C
Define the improvement opportunities
Identify the Key Performance Indicators (KPIs)
Identify specific problems
Identify potential solutions
Determine the control plan
Develop the project plan
Develop a data collection plan
Identify and validate the root causes
Select right improvement solution
Detect the abnormal variations
Develop the project team
Validate the measurement system
Identify y = f (x)
Test and validate optimal solutions
Evaluate results of the changes
Define the processes (high level)
Define the baseline process performance
Develop a change management approach
Document the process changes
Identify critical customers requirements (CCR’s).
Deploy and execute solutions
Close project, communicate the know-how
1 2 3 4 5
1 2 3 4 5
1 2 3 4 5
1 2 3 4
1 2 3
4Lean Six Sigma • Green BeltPwCPwC
What will you learn today how to...
• Develop solutions by focusing on the identified causes• Determine the evaluation criteria for the process improvement• Use the various criteria for the selection of the solutions • Execute the chosen solutions in the pilot testing and tailor when necessary• Deploy the solution and make improvements
13.4.17
3
5Lean Six Sigma • Green BeltPwC
Sources of solutions
Generateimprovement
ideas
Best practices
Root causes
Project goals
Six thinkinghats technique
“Discoveries”during analysis
Benchmarkideas
Ideas from otherprojects
Brainstorming
Mind mapping
Performancetargets
6Lean Six Sigma • Green BeltPwC
Rules for brainstorming
DO‘s• capture everything• encourage participants• ask clarifying questions
DON‘Ts• evaluate anything• force participants or sequence• ask judging questions
Ø Choose a facilitator - to scribe, involve and operate rulesØ Define the problem/concern - write it downØ Focus on quantity
Ø Select best solution
13.4.17
4
7Lean Six Sigma • Green BeltPwCPwC
Brainstorming exercise
8Lean Six Sigma • Green BeltPwC
Best solution selection
Potential solutions Screen out
Acceptable solutions Shortlist
Likely solutions
Nominal Group Criterial evaluation
Best solution
- Low pay off- „Must“ criteria
- Voting- N/2
13.4.17
5
9Lean Six Sigma • Green BeltPwC
How to eliminate low payoff solutions
Ø A payoff matrix looks at the relationship of benefit and effort to reduce the numbers of solutions to address
Benefit
HighLow
High
Low
Quick Wins Eliminate all• Low effort/ low payoff• High effort/ low payoff
Effort
Challenge
WasteNot worth
10Lean Six Sigma • Green BeltPwCPwC
“Musts” Criteria - Examples
“Deal breakers” are the minimum requirements that must be met.If a solution does not meet “must” criteria, it should be eliminated from further consideration.
Examples:• Laws• Company policy• Customer “must be” requirements• Business “must be” requirements (e.g. resource constraints like money, time, people)
13.4.17
6
11Lean Six Sigma • Green BeltPwCPwC
How to shortlist likely solutions
• Voting– Each person chooses best three ideas– Record number of times each idea is chosen to identify most popular ideas
• N/2- This technique need only be applied if the previous step generated a large
number of solution options.- N/2 is accomplished through a series of votes, each cutting the list in half.
12Lean Six Sigma • Green BeltPwCPwC
Evaluate the best solution
• Nominal group technique− quick method to prioritize− based on opinions, lacks of objective criteria− each team member assigns a rank to each solution (highest number to the
most important solution and vice versa)
• Multi-criterial evaluation− based on previously identified criteria− opportunity to weight criteria− objective comparisons of solutions− requiring more time for discussion
13.4.17
7
13Lean Six Sigma • Green BeltPwCPwC
Criteria-based comparison
1. Record a final list of solutions
2. Create a list of criteria3. Weight the list of criteria4. Compare the list of solutions
to the weighted criteria5. Tally and discuss total
scores for each solution
Example
14Lean Six Sigma • Green BeltPwCPwC
PUGH selection matrix
• List ideas/solutions and critical features• Rank each solution against a standard or datum
PUGH Matrix - Evaluating and Synthesizing Concepts
Concept/project/idea
Features 1 2 3 4 5 6 7 8 9 10Customer impact W B W W WSavings potential D W B W W WLow investment A W B B W WStrategic alignment T S S W B WSpeed of delivery U W S S W STeam availability M S S W W WProbability of success W S W B W
Sum of B's 0 3 1 2 0 0 0 0 0Sum of W's 5 0 5 5 6 0 0 0 0Sum of S's 2 4 1 0 1 0 0 0 0
B = Better, W = Worse, S = Same as Datum
13.4.17
8
15Lean Six Sigma • Green BeltPwCPwC
Cost/Benefit Analysis (1)
• verifying whether improvement benefits outweigh the costs, and by how much; providing a basis for comparing projects/solutionsQuantitative benefits (Tangibles)v Cost reduction (hard savings), cost avoidance (soft savings)v Quality improvementv Performance improvement (productivity, lead time, service level)Qualitative benefits (Intagibles)v Customer satifactionv Employee satisfactionv Brand enhancement
16Lean Six Sigma • Green BeltPwCPwC
Cost/Benefit Analysis (1)
• Verification whether benefits outweigh the costs, and by how much• Basis for comparing projects
Procedure:1. Brainstorm costs and benefits associated with the project2. Assign a monetary value to the costs3. Assign a monetary value to the benefits4. Compare cost and benefits
13.4.17
9
17Lean Six Sigma • Green BeltPwC
Cost/Benefit Analysis (2)
Quantitative benefits (Tangibles)v Cost reduction (hard savings), cost
avoidance (soft savings)v Quality improvementv Performance improvement
(productivity, lead time, servicelevel)
Qualitative benefits (Intangibles)v Customer satifactionv Employee satisfactionv Brand enhancement
Cost§ direct, indirect§ one time, ongoing
Analaysis preffered measuresü Payback-------------ü Net present value (NPV)ü Economic value added (EVA)ü Cash flow ROI
18Lean Six Sigma • Green BeltPwCPwC
Cost/Benefit Analysis
EXAMPLEBrainstorm costs and benefits for the case
(groupes, 5 min)
13.4.17
10
19Lean Six Sigma • Green BeltPwC
Cost/Benefit Analysis Example
20Lean Six Sigma • Green BeltPwC
August 2013Lean Six Sigma • Black Belt Training Week 2PwC
Verification of selected solution
13.4.17
11
21Lean Six Sigma • Green BeltPwCPwC
Pilot
• What is pilot?− testing implementation of selected solution
in a small part or scope• What are benefits of piloting?
− Better understanding of the impacts of the designed solutions.
− Experience with taking a solution design from paper to real operations.
− “Reality test” of a design’s integrity.− Opportunity to improve the design before
implementation on a larger scale.− Minimizing risks associated with cost and
potential problems.
Act
Plan
Do
Check
22Lean Six Sigma • Green BeltPwCPwC
6 steps of piloting
1. Define the objectives and the criteria for evaluating the solution on an experimental (pilot) basis,
2. Determine where the proposed solution will first be tested in the business,
3. Develop a comprehensive plan for conducting and evaluating the pilot,
4. Implement the solution on an experimental basis per the pilot plan,
5. Evaluate the pilot and determine next steps based on verified pilot results,
6. Build experience and lessons learned to support a broader deployment of the solution.
13.4.17
12
23Lean Six Sigma • Green BeltPwC
Test – Cardboard Design
24Lean Six Sigma • Green BeltPwCPwC
FMEA - Failure Modes & Effects Analysis
• Evaluates failure modes and their effects in design and in processes.• Identifies concerns and eliminates known or potential failures and problems
early in the development of a process or design.
Failure Mode Specific Cause Effect of Failure Likeliness of Failure
Detectability of Failure
Severity of Failure
Risk Priority
Gas will not shut off
Spring broke preventing valve from closing
Explosion resulting in property damage and/or serious injury
3 5 10 150
Likeliness of Failure 1-10 with 10 representing most likelyDetectability of Failure 1-10 with 10 representing most difficultSeverity of Failure 1-10 with 10 representing most severeRisk Priority = (Likeliness of Failure) X (Detectability of Failure)
X (Severity of Failure)
©©©©
13.4.17
13
25Lean Six Sigma • Green BeltPwCPwC
Steps for completing a FMEA
• Describe process and determine the function of each step to meet customer‘srequirements
• Identify potential failure modes (defined as a malfunction)• Determine potential effects for each failure• Assign a severity ranking to the effects• Identify potential causes for each failure• Assign a likelyhood of occurrence for each potential cause
Ø Set measures to limit the occurence• Assign likelihood of detection for each potential cause or failure
Ø Set preventive or detective measures• Calculate a Risk Priority Number by multiplying Severity times Occurrence
times Detectability
26Lean Six Sigma • Green BeltPwC
FMEA Form
Identify failure modes and their
effects
Identify causes of the failure modesand controls
Prioritize Determine and assess actions
13.4.17
14
27Lean Six Sigma • Green BeltPwC
De Bono’s Six Hats
WhiteNeutral, objective thinking, concerned with facts
RedEmotional, intuitive thinking
BlackNegative, critical thinking
Green Creative, innovative thinking, finding solutions
YellowPositive, optimistic thinking
BlueOrganised, summarised thinking
28Lean Six Sigma • Green BeltPwC
August 2013Lean Six Sigma • Black Belt Training Week 2PwC
Deploy solutionMake Improvement
13.4.17
15
29Lean Six Sigma • Green BeltPwC
30Lean Six Sigma • Green BeltPwC
August 2013Lean Six Sigma • Black Belt Training Week 2PwC
Improvement tools
5S
13.4.17
16
31Lean Six Sigma • Green BeltPwC
Why is workplace organization important?
In Czech, “5u” is used sometimes instead:
Utřídit.
Uspořádat Uklidit Ustanovit Udržet
32Lean Six Sigma • Green BeltPwC
S1 - SortProcedure
13.4.17
17
33Lean Six Sigma • Green BeltPwC
S1 - SortRed tag process (1)
Finditem
Fill in thered tag
Record in log book
Move in quarantine
Worker WorkerWorker Supervisor
34Lean Six Sigma • Green BeltPwC
S1 - SortRed tag process (2)
Itemclassific. Auction Record in
log bookMove out
quarantine
WorkerSupervisorManagerManager
13.4.17
18
35Lean Six Sigma • Green BeltPwCPwC
S2 – Set in order / StraightenPlace for everything, everything on its place
1. Decide what where to store
2. Find appropriate places for everything
3. Arrange and furnish the places
4. Implement standardization, make it visual
5. Put everything on its place
13 0
3 6 5
36Lean Six Sigma • Green BeltPwC
S2 – Set in order / StraightenExample from daily life
13.4.17
19
37Lean Six Sigma • Green BeltPwC
S2 – Set in order / StraightenExamples of standardization and visualization
38Lean Six Sigma • Green BeltPwC
S2 – Set in order / StraightenExamples of standardization and visualization
13.4.17
20
39Lean Six Sigma • Green BeltPwC
S2 – Set in order / StraightenExamples of standardization and visualization
40Lean Six Sigma • Green BeltPwC
S2 – Set in order / StraightenExamples of standardization and visualization
13.4.17
21
41Lean Six Sigma • Green BeltPwC
S3 – Sweep / ShinePrevent problems in a clean enviroment
42Lean Six Sigma • Green BeltPwC
S3 – Sweep / ShinePrevent problems in a clean enviroment
Clean
Inspect
Lubricate
Repair
1. Plan a big cleaning day
2. Document a current state (what‘s wrong)
3. Execute the cleaning (team)
4. Record problems, abnormalities
5. Plan corrective actions
6. Operate the clean equipment for one shift
7. Clean again and record all problems and abnormalities
8. Implement corrective actions and document a new state
13.4.17
22
43Lean Six Sigma • Green BeltPwC
S3 – Sweep / ShineClean out from top to bottom
44Lean Six Sigma • Green BeltPwC
S3 – Sweep / ShineInspect equipment
Problems are visible on cleanequipment
Dirty coversand indicates
problem
A visibleproblem is theproblem you
can solve
13.4.17
23
45Lean Six Sigma • Green BeltPwC
S3 – Sweep / ShineInspection – link between 5S and TPM
46Lean Six Sigma • Green BeltPwC
S3 – Sweep / ShineLubrication – another link between 5S and TPM
13.4.17
24
47Lean Six Sigma • Green BeltPwC
S3 – Sweep / ShineRepair early
48Lean Six Sigma • Green BeltPwC
S4 – StandardizeEnable “Standard Operations” to work
1
OpDailyDailyDailyDailyDaily5Clean area and empty bag as necessary.
Clean and dust bag not over filled.
Visual & Manual
Dust collector3
2
2
5
Time
OpDailyDailyDailyDailyDailySweep, tidy up, find or replace if missing.
Spill kit complete and orderly.
Visual & Manual
Spill kit4
OpDailyDailyDailyDailyDailyStraighten and position. Dispose of packaging.
Orderly and correctly positioned.
Visual & Manual
Cores & Resin
2
OpDailyDailyDailyDailyDailySweep and Clear UpIs free from, litter, scrap and dust.
Visual & Manual
Floor1
RespFriThuWedTueMonActionCriteriaMethodItemNo
OpDailyDailyDailyDailyDaily5Clean area and empty bag as necessary.
Clean and dust bag not over filled.
Visual & Manual
Dust collector3
2
2
5
Time
OpDailyDailyDailyDailyDailySweep, tidy up, find or replace if missing.
Spill kit complete and orderly.
Visual & Manual
Spill kit4
OpDailyDailyDailyDailyDailyStraighten and position. Dispose of packaging.
Orderly and correctly positioned.
Visual & Manual
Cores & Resin
2
OpDailyDailyDailyDailyDailySweep and Clear UpIs free from, litter, scrap and dust.
Visual & Manual
Floor1
RespFriThuWedTueMonActionCriteriaMethodItemNo
4
Location: B4 D/S Dust CollectorArea Owner: Issue date: 12 July, 2006
5S Area StandardLocation: B4 D/S Dust CollectorArea Owner: Issue date: 12 July, 2006
5S Area Standard
2
3
2
2
2
13.4.17
25
49Lean Six Sigma • Green BeltPwC
S4 – StandardizeEnable “Standard Operations” to work
Tools
Visual explanation
Quality inspection
instructions Instructions for safety
5s instructions
Protection
Common mistakes
Maintenance instructions
Text explanation
Who created, checked and approved it
50Lean Six Sigma • Green BeltPwCPwC
S5 – SustainRegular evaluation and scoring
Ø Identify what should be monitored and control itØ Implement control tools:
Stock taking (quantity, locations)
Photos Check lists Audits
13.4.17
26
51Lean Six Sigma • Green BeltPwC
S5 – SustainRegular evaluation and scoring
Ø Training (material) for your staff
Ø Boards
o Evaluation / Scoringo Pics wrong / righto Benefits
Ø Posters in workplace
52Lean Six Sigma • Green BeltPwCPwC
5S in computersDecluttering your computer
How many messages are in youremail inbox now?
How many of them are clutter?
13.4.17
27
53Lean Six Sigma • Green BeltPwCPwC
5S in computersDecluttering your computer
Is your computer cloggedwith old files you don‘tneed anymore?
Can you find all the files / emails you do need?
Do you have a system to backup all your files?
Don‘t forget all yourphotos ! :-D
54Lean Six Sigma • Green BeltPwCPwC
5S in computersDecluttering your computer
How much time do you spend on-line?How much of that time is productive?
13.4.17
28
55Lean Six Sigma • Green BeltPwC
August 2013Lean Six Sigma • Black Belt Training Week 2PwC
Improvement tools
Zero defects
56Lean Six Sigma • Green BeltPwC
What are reasons for errors?
13.4.17
29
57Lean Six Sigma • Green BeltPwC
What is Error Proofing?
„Poka-Yoke“ (in Japanese)• the use of process or design features to prevent errors or theirnegative impct• Inexpensive• Very effective• Based on simplicity and ingenuity
Typical benefitsü defect reduction by 70-90%ü productivity increase by 30-60%ü 75% less injuriesü significant cost reduction
o reduced reworko reduced scrapo reduced waranty costo reduced inspection cost
58Lean Six Sigma • Green BeltPwC
Correcting cost vs. benefits of poka-yoke
1 – 10 – 100 RuleAs a product or servicemoves through the system, the cost of correcting anerror multiplies by 10.At:order entry 1 $billing 10 $customer 100 $
13.4.17
30
59Lean Six Sigma • Green BeltPwC
Levels of error proofing
1. Prevention◦ make it impossible to
make an error◦ make it difficult to
make an error2. Detection
◦ make it obviousanerror has occured
3. No impact◦ make only „no impact“
error
Two types of Poka-Yoke
60Lean Six Sigma • Green BeltPwC
Error proofing solutions- Process barriers
3 Primary methods:• Contact• Calculation• Sequence control
Examples:o Position pinso Limit switcheso Sensors, o Readerso Signals, alarmso Pick by lighto Assistent systemso Camera systems
13.4.17
31
61Lean Six Sigma • Green BeltPwC
Error proofing example- Impossible to make an error
62Lean Six Sigma • Green BeltPwC
Error proofing example- Impossible to make an error
13.4.17
32
63Lean Six Sigma • Green BeltPwC
Error proofing example- Difficult to make an error
64Lean Six Sigma • Green BeltPwC
Error proofing example- Difficult to make an error
13.4.17
33
65Lean Six Sigma • Green BeltPwC
Error example- „No impact“ error
66Lean Six Sigma • Green BeltPwC
Error proofing example- Industry 4.0
Assisted assembly Controlled assembly
13.4.17
34
Lean Six Sigma • Green BeltPwC
67
August 2013Lean Six Sigma • Black Belt Training Week 2PwC
Improvement tools
Problem Solving
Lean Six Sigma • Green BeltPwC
68
A3 thinking
Purpose of A3:§ Problem solving
system (8D, PDCA, DMAIC)
§ Learning standardizedmethod
§ Developing CI culture§ Mean of
communication and documentation
13.4.17
35
Lean Six Sigma • Green BeltPwC
69
Types of A3 charts- A3 Project chart
Lean Six Sigma • Green BeltPwC
70
Types of A3 charts- A3 Problem Solving
13.4.17
36
Lean Six Sigma • Green BeltPwC
71
Types of A3 charts- A3 DMAIC report
Lean Six Sigma • Green BeltPwC
72
Project risk assessment
13.4.17
37
Lean Six Sigma • Green BeltPwC
73
Problem solvingRACI communication matrix
Lean Six Sigma • Green BeltPwC
74
August 2013Lean Six Sigma • Black Belt Training Week 2PwC
Summary
De Bono‘s six hats
13.4.17
38
75Lean Six Sigma • Green BeltPwCPwC
Contact
Roman BauerExperience the joy of work
Lean Manager, Consultant, Trainer
E: [email protected]: (+420) 602 154 168