Find wastes

13.4.17

2

3Lean Six Sigma • Green BeltPwC

DMAIC project roadmap

DefineD

Measure

Analyzuj

Improve

Control

M

A

I

C

Define the improvement opportunities

Identify the Key Performance Indicators (KPIs)

Identify specific problems

Identify potential solutions

Determine the control plan

Develop the project plan

Develop a data collection plan

Identify and validate the root causes

Select right improvement solution

Detect the abnormal variations

Develop the project team

Validate the measurement system

Identify y = f (x)

Test and validate optimal solutions

Evaluate results of the changes

Define the processes (high level)

Define the baseline process performance

Develop a change management approach

Document the process changes

Identify critical customers requirements (CCR’s).

Deploy and execute solutions

Close project, communicate the know-how

1 2 3 4 5

1 2 3 4 5

1 2 3 4 5

1 2 3 4

1 2 3

4Lean Six Sigma • Green BeltPwCPwC

What will you learn today how to...

• Develop solutions by focusing on the identified causes• Determine the evaluation criteria for the process improvement• Use the various criteria for the selection of the solutions • Execute the chosen solutions in the pilot testing and tailor when necessary• Deploy the solution and make improvements

13.4.17

3

5Lean Six Sigma • Green BeltPwC

Sources of solutions

Generateimprovement

ideas

Best practices

Root causes

Project goals

Six thinkinghats technique

“Discoveries”during analysis

Benchmarkideas

Ideas from otherprojects

Brainstorming

Mind mapping

Performancetargets

6Lean Six Sigma • Green BeltPwC

Rules for brainstorming

DO‘s• capture everything• encourage participants• ask clarifying questions

DON‘Ts• evaluate anything• force participants or sequence• ask judging questions

Ø Choose a facilitator - to scribe, involve and operate rulesØ Define the problem/concern - write it downØ Focus on quantity

Ø Select best solution

13.4.17

4

7Lean Six Sigma • Green BeltPwCPwC

Brainstorming exercise

8Lean Six Sigma • Green BeltPwC

Best solution selection

Potential solutions Screen out

Acceptable solutions Shortlist

Likely solutions

Nominal Group Criterial evaluation

Best solution

- Low pay off- „Must“ criteria

- Voting- N/2

13.4.17

5

9Lean Six Sigma • Green BeltPwC

How to eliminate low payoff solutions

Ø A payoff matrix looks at the relationship of benefit and effort to reduce the numbers of solutions to address

Benefit

HighLow

High

Low

Quick Wins Eliminate all• Low effort/ low payoff• High effort/ low payoff

Effort

Challenge

WasteNot worth

10Lean Six Sigma • Green BeltPwCPwC

“Musts” Criteria - Examples

“Deal breakers” are the minimum requirements that must be met.If a solution does not meet “must” criteria, it should be eliminated from further consideration.

Examples:• Laws• Company policy• Customer “must be” requirements• Business “must be” requirements (e.g. resource constraints like money, time, people)

13.4.17

6

11Lean Six Sigma • Green BeltPwCPwC

How to shortlist likely solutions

• Voting– Each person chooses best three ideas– Record number of times each idea is chosen to identify most popular ideas

• N/2- This technique need only be applied if the previous step generated a large

number of solution options.- N/2 is accomplished through a series of votes, each cutting the list in half.

12Lean Six Sigma • Green BeltPwCPwC

Evaluate the best solution

• Nominal group technique− quick method to prioritize− based on opinions, lacks of objective criteria− each team member assigns a rank to each solution (highest number to the

most important solution and vice versa)

• Multi-criterial evaluation− based on previously identified criteria− opportunity to weight criteria− objective comparisons of solutions− requiring more time for discussion

13.4.17

7

13Lean Six Sigma • Green BeltPwCPwC

Criteria-based comparison

1. Record a final list of solutions

2. Create a list of criteria3. Weight the list of criteria4. Compare the list of solutions

to the weighted criteria5. Tally and discuss total

scores for each solution

Example

14Lean Six Sigma • Green BeltPwCPwC

PUGH selection matrix

• List ideas/solutions and critical features• Rank each solution against a standard or datum

PUGH Matrix - Evaluating and Synthesizing Concepts

Concept/project/idea

Features 1 2 3 4 5 6 7 8 9 10Customer impact W B W W WSavings potential D W B W W WLow investment A W B B W WStrategic alignment T S S W B WSpeed of delivery U W S S W STeam availability M S S W W WProbability of success W S W B W

Sum of B's 0 3 1 2 0 0 0 0 0Sum of W's 5 0 5 5 6 0 0 0 0Sum of S's 2 4 1 0 1 0 0 0 0

B = Better, W = Worse, S = Same as Datum

13.4.17

8

15Lean Six Sigma • Green BeltPwCPwC

Cost/Benefit Analysis (1)

• verifying whether improvement benefits outweigh the costs, and by how much; providing a basis for comparing projects/solutionsQuantitative benefits (Tangibles)v Cost reduction (hard savings), cost avoidance (soft savings)v Quality improvementv Performance improvement (productivity, lead time, service level)Qualitative benefits (Intagibles)v Customer satifactionv Employee satisfactionv Brand enhancement

16Lean Six Sigma • Green BeltPwCPwC

Cost/Benefit Analysis (1)

• Verification whether benefits outweigh the costs, and by how much• Basis for comparing projects

Procedure:1. Brainstorm costs and benefits associated with the project2. Assign a monetary value to the costs3. Assign a monetary value to the benefits4. Compare cost and benefits

13.4.17

9

17Lean Six Sigma • Green BeltPwC

Cost/Benefit Analysis (2)

Quantitative benefits (Tangibles)v Cost reduction (hard savings), cost

avoidance (soft savings)v Quality improvementv Performance improvement

(productivity, lead time, servicelevel)

Qualitative benefits (Intangibles)v Customer satifactionv Employee satisfactionv Brand enhancement

Cost§ direct, indirect§ one time, ongoing

Analaysis preffered measuresü Payback-------------ü Net present value (NPV)ü Economic value added (EVA)ü Cash flow ROI

18Lean Six Sigma • Green BeltPwCPwC

Cost/Benefit Analysis

EXAMPLEBrainstorm costs and benefits for the case

(groupes, 5 min)

13.4.17

10

19Lean Six Sigma • Green BeltPwC

Cost/Benefit Analysis Example

20Lean Six Sigma • Green BeltPwC

August 2013Lean Six Sigma • Black Belt Training Week 2PwC

Verification of selected solution

13.4.17

11

21Lean Six Sigma • Green BeltPwCPwC

Pilot

• What is pilot?− testing implementation of selected solution

in a small part or scope• What are benefits of piloting?

− Better understanding of the impacts of the designed solutions.

− Experience with taking a solution design from paper to real operations.

− “Reality test” of a design’s integrity.− Opportunity to improve the design before

implementation on a larger scale.− Minimizing risks associated with cost and

potential problems.

Act

Plan

Do

Check

22Lean Six Sigma • Green BeltPwCPwC

6 steps of piloting

1. Define the objectives and the criteria for evaluating the solution on an experimental (pilot) basis,

2. Determine where the proposed solution will first be tested in the business,

3. Develop a comprehensive plan for conducting and evaluating the pilot,

4. Implement the solution on an experimental basis per the pilot plan,

5. Evaluate the pilot and determine next steps based on verified pilot results,

6. Build experience and lessons learned to support a broader deployment of the solution.

13.4.17

12

23Lean Six Sigma • Green BeltPwC

Test – Cardboard Design

24Lean Six Sigma • Green BeltPwCPwC

FMEA - Failure Modes & Effects Analysis

• Evaluates failure modes and their effects in design and in processes.• Identifies concerns and eliminates known or potential failures and problems

early in the development of a process or design.

Failure Mode Specific Cause Effect of Failure Likeliness of Failure

Detectability of Failure

Severity of Failure

Risk Priority

Gas will not shut off

Spring broke preventing valve from closing

Explosion resulting in property damage and/or serious injury

3 5 10 150

Likeliness of Failure 1-10 with 10 representing most likelyDetectability of Failure 1-10 with 10 representing most difficultSeverity of Failure 1-10 with 10 representing most severeRisk Priority = (Likeliness of Failure) X (Detectability of Failure)

X (Severity of Failure)

©©©©

13.4.17

13

25Lean Six Sigma • Green BeltPwCPwC

Steps for completing a FMEA

• Describe process and determine the function of each step to meet customer‘srequirements

• Identify potential failure modes (defined as a malfunction)• Determine potential effects for each failure• Assign a severity ranking to the effects• Identify potential causes for each failure• Assign a likelyhood of occurrence for each potential cause

Ø Set measures to limit the occurence• Assign likelihood of detection for each potential cause or failure

Ø Set preventive or detective measures• Calculate a Risk Priority Number by multiplying Severity times Occurrence

times Detectability

26Lean Six Sigma • Green BeltPwC

FMEA Form

Identify failure modes and their

effects

Identify causes of the failure modesand controls

Prioritize Determine and assess actions

13.4.17

14

27Lean Six Sigma • Green BeltPwC

De Bono’s Six Hats

WhiteNeutral, objective thinking, concerned with facts

RedEmotional, intuitive thinking

BlackNegative, critical thinking

Green Creative, innovative thinking, finding solutions

YellowPositive, optimistic thinking

BlueOrganised, summarised thinking

28Lean Six Sigma • Green BeltPwC

August 2013Lean Six Sigma • Black Belt Training Week 2PwC

Deploy solutionMake Improvement

13.4.17

15

29Lean Six Sigma • Green BeltPwC

30Lean Six Sigma • Green BeltPwC

August 2013Lean Six Sigma • Black Belt Training Week 2PwC

Improvement tools

5S

13.4.17

16

31Lean Six Sigma • Green BeltPwC

Why is workplace organization important?

In Czech, “5u” is used sometimes instead:

Utřídit.

Uspořádat Uklidit Ustanovit Udržet

32Lean Six Sigma • Green BeltPwC

S1 - SortProcedure

13.4.17

17

33Lean Six Sigma • Green BeltPwC

S1 - SortRed tag process (1)

Finditem

Fill in thered tag

Record in log book

Move in quarantine

Worker WorkerWorker Supervisor

34Lean Six Sigma • Green BeltPwC

S1 - SortRed tag process (2)

Itemclassific. Auction Record in

log bookMove out

quarantine

WorkerSupervisorManagerManager

13.4.17

18

35Lean Six Sigma • Green BeltPwCPwC

S2 – Set in order / StraightenPlace for everything, everything on its place

1. Decide what where to store

2. Find appropriate places for everything

3. Arrange and furnish the places

4. Implement standardization, make it visual

5. Put everything on its place

13 0

3 6 5

36Lean Six Sigma • Green BeltPwC

S2 – Set in order / StraightenExample from daily life

13.4.17

19

37Lean Six Sigma • Green BeltPwC

S2 – Set in order / StraightenExamples of standardization and visualization

38Lean Six Sigma • Green BeltPwC

S2 – Set in order / StraightenExamples of standardization and visualization

13.4.17

20

39Lean Six Sigma • Green BeltPwC

S2 – Set in order / StraightenExamples of standardization and visualization

40Lean Six Sigma • Green BeltPwC

S2 – Set in order / StraightenExamples of standardization and visualization

13.4.17

21

41Lean Six Sigma • Green BeltPwC

S3 – Sweep / ShinePrevent problems in a clean enviroment

42Lean Six Sigma • Green BeltPwC

S3 – Sweep / ShinePrevent problems in a clean enviroment

Clean

Inspect

Lubricate

Repair

1. Plan a big cleaning day

2. Document a current state (what‘s wrong)

3. Execute the cleaning (team)

4. Record problems, abnormalities

5. Plan corrective actions

6. Operate the clean equipment for one shift

7. Clean again and record all problems and abnormalities

8. Implement corrective actions and document a new state

13.4.17

22

43Lean Six Sigma • Green BeltPwC

S3 – Sweep / ShineClean out from top to bottom

44Lean Six Sigma • Green BeltPwC

S3 – Sweep / ShineInspect equipment

Problems are visible on cleanequipment

Dirty coversand indicates

problem

A visibleproblem is theproblem you

can solve

13.4.17

23

45Lean Six Sigma • Green BeltPwC

S3 – Sweep / ShineInspection – link between 5S and TPM

46Lean Six Sigma • Green BeltPwC

S3 – Sweep / ShineLubrication – another link between 5S and TPM

13.4.17

24

47Lean Six Sigma • Green BeltPwC

S3 – Sweep / ShineRepair early

48Lean Six Sigma • Green BeltPwC

S4 – StandardizeEnable “Standard Operations” to work

1

OpDailyDailyDailyDailyDaily5Clean area and empty bag as necessary.

Clean and dust bag not over filled.

Visual & Manual

Dust collector3

2

2

5

Time

OpDailyDailyDailyDailyDailySweep, tidy up, find or replace if missing.

Spill kit complete and orderly.

Visual & Manual

Spill kit4

OpDailyDailyDailyDailyDailyStraighten and position. Dispose of packaging.

Orderly and correctly positioned.

Visual & Manual

Cores & Resin

2

OpDailyDailyDailyDailyDailySweep and Clear UpIs free from, litter, scrap and dust.

Visual & Manual

Floor1

RespFriThuWedTueMonActionCriteriaMethodItemNo

OpDailyDailyDailyDailyDaily5Clean area and empty bag as necessary.

Clean and dust bag not over filled.

Visual & Manual

Dust collector3

2

2

5

Time

OpDailyDailyDailyDailyDailySweep, tidy up, find or replace if missing.

Spill kit complete and orderly.

Visual & Manual

Spill kit4

OpDailyDailyDailyDailyDailyStraighten and position. Dispose of packaging.

Orderly and correctly positioned.

Visual & Manual

Cores & Resin

2

OpDailyDailyDailyDailyDailySweep and Clear UpIs free from, litter, scrap and dust.

Visual & Manual

Floor1

RespFriThuWedTueMonActionCriteriaMethodItemNo

4

Location: B4 D/S Dust CollectorArea Owner: Issue date: 12 July, 2006

5S Area StandardLocation: B4 D/S Dust CollectorArea Owner: Issue date: 12 July, 2006

5S Area Standard

2

3

2

2

2

13.4.17

25

49Lean Six Sigma • Green BeltPwC

S4 – StandardizeEnable “Standard Operations” to work

Tools

Visual explanation

Quality inspection

instructions Instructions for safety

5s instructions

Protection

Common mistakes

Maintenance instructions

Text explanation

Who created, checked and approved it

50Lean Six Sigma • Green BeltPwCPwC

S5 – SustainRegular evaluation and scoring

Ø Identify what should be monitored and control itØ Implement control tools:

Stock taking (quantity, locations)

Photos Check lists Audits

13.4.17

26

51Lean Six Sigma • Green BeltPwC

S5 – SustainRegular evaluation and scoring

Ø Training (material) for your staff

Ø Boards

o Evaluation / Scoringo Pics wrong / righto Benefits

Ø Posters in workplace

52Lean Six Sigma • Green BeltPwCPwC

5S in computersDecluttering your computer

How many messages are in youremail inbox now?

How many of them are clutter?

13.4.17

27

53Lean Six Sigma • Green BeltPwCPwC

5S in computersDecluttering your computer

Is your computer cloggedwith old files you don‘tneed anymore?

Can you find all the files / emails you do need?

Do you have a system to backup all your files?

Don‘t forget all yourphotos ! :-D

54Lean Six Sigma • Green BeltPwCPwC

5S in computersDecluttering your computer

How much time do you spend on-line?How much of that time is productive?

13.4.17

28

55Lean Six Sigma • Green BeltPwC

August 2013Lean Six Sigma • Black Belt Training Week 2PwC

Improvement tools

Zero defects

56Lean Six Sigma • Green BeltPwC

What are reasons for errors?

13.4.17

29

57Lean Six Sigma • Green BeltPwC

What is Error Proofing?

„Poka-Yoke“ (in Japanese)• the use of process or design features to prevent errors or theirnegative impct• Inexpensive• Very effective• Based on simplicity and ingenuity

Typical benefitsü defect reduction by 70-90%ü productivity increase by 30-60%ü 75% less injuriesü significant cost reduction

o reduced reworko reduced scrapo reduced waranty costo reduced inspection cost

58Lean Six Sigma • Green BeltPwC

Correcting cost vs. benefits of poka-yoke

1 – 10 – 100 RuleAs a product or servicemoves through the system, the cost of correcting anerror multiplies by 10.At:order entry 1 $billing 10 $customer 100 $

13.4.17

30

59Lean Six Sigma • Green BeltPwC

Levels of error proofing

1. Prevention◦ make it impossible to

make an error◦ make it difficult to

make an error2. Detection

◦ make it obviousanerror has occured

3. No impact◦ make only „no impact“

error

Two types of Poka-Yoke

60Lean Six Sigma • Green BeltPwC

Error proofing solutions- Process barriers

3 Primary methods:• Contact• Calculation• Sequence control

Examples:o Position pinso Limit switcheso Sensors, o Readerso Signals, alarmso Pick by lighto Assistent systemso Camera systems

13.4.17

31

61Lean Six Sigma • Green BeltPwC

Error proofing example- Impossible to make an error

62Lean Six Sigma • Green BeltPwC

Error proofing example- Impossible to make an error

13.4.17

32

63Lean Six Sigma • Green BeltPwC

Error proofing example- Difficult to make an error

64Lean Six Sigma • Green BeltPwC

Error proofing example- Difficult to make an error

13.4.17

33

65Lean Six Sigma • Green BeltPwC

Error example- „No impact“ error

66Lean Six Sigma • Green BeltPwC

Error proofing example- Industry 4.0

Assisted assembly Controlled assembly

13.4.17

34

Lean Six Sigma • Green BeltPwC

67

August 2013Lean Six Sigma • Black Belt Training Week 2PwC

Improvement tools

Problem Solving

Lean Six Sigma • Green BeltPwC

68

A3 thinking

Purpose of A3:§ Problem solving

system (8D, PDCA, DMAIC)

§ Learning standardizedmethod

§ Developing CI culture§ Mean of

communication and documentation

13.4.17

35

Lean Six Sigma • Green BeltPwC

69

Types of A3 charts- A3 Project chart

Lean Six Sigma • Green BeltPwC

70

Types of A3 charts- A3 Problem Solving

13.4.17

36

Lean Six Sigma • Green BeltPwC

71

Types of A3 charts- A3 DMAIC report

Lean Six Sigma • Green BeltPwC

72

Project risk assessment

13.4.17

37

Lean Six Sigma • Green BeltPwC

73

Problem solvingRACI communication matrix

Lean Six Sigma • Green BeltPwC

74

August 2013Lean Six Sigma • Black Belt Training Week 2PwC

Summary

De Bono‘s six hats

13.4.17

38

75Lean Six Sigma • Green BeltPwCPwC

Contact

Roman BauerExperience the joy of work

Lean Manager, Consultant, Trainer

E: [email protected]: (+420) 602 154 168