lean six sigma academy practical assessment project template date:- project title: organization:...
TRANSCRIPT
Lean Six Sigma Academy
P R AC T I C A L A S S ES S M E N T P ROJ EC T T E M P L AT EDATE: -
Project title: <title of the project>
Organization: <name of your organization>
Project leader: <your name>
Belt level: <Black or Green Belt>
Revision date: <e.g. 28-09-2015>
© LSSA 2015 2
DMAICIntroducti on for th is template
Objectives of this presentation:
1. Certification by LSSA2. Project summary for your organization
Guidelines:
• Methodology and logic understandable, for a Six Sigma trained external colleague
• Clear conclusions on each sheet
• Target for certification is max. 25 sheets (no limit for internal use)
• No back-up sheets
• Delete the (Italic) notes for the user, upon need
• Delete this slide before handing in.
© LSSA 2015 3
DMAICProcess improvement roadmap
DMAIC roadmap
• Define 1 Define and Scope project2 Define defect and CTQs3 Plan and document project
• Measure 4 Evaluate measurement system5 Establish baseline6 Set improvement goals
• Analyze 7 Map process and identify inputs8 Isolate key inputs9 Develop Y=f(X) function
• Improve 10 Determine optimum settings11 Implement proposed improvement12 Validate proposed improvement
• Control 13 Implement control strategy14 Close out project
© LSSA 2015 4
DEFINE1 – Defi ne and scope project
Problem Description:
Objectives:
What is wrong, how does it affect the customer, what is the pain for the organization? Is it a priority, so in line with top-down priorities?
Add picture or drawing to explain(If ready, delete this textbox)
What do we want to achieve?Helicopter view description.(delete this textbox)
© LSSA 2015 5
DEFINE1 – Defi ne and scope project
In Scope
Out of Scope:
Deliverables:
Soft Benefits:
Hard Benefits:
Target: Describe the quantified, measurable result (not the solution!).What is the required timing?
What are the boundaries of the process to analyze; what are you allowed to change?
What not . . . ?
What evidence to put at the table to show that targets metrics are met?This is the key element in the agreement with the champion
Summarize the calculation to shows that this is a ‘major cost saving or cost avoidance, in keuro/year. Upon need add a separate sheet
Any nice additional benefits, like customer satisfaction, learning Six Sigma
© LSSA 2015 6
DEFINE2 - Defi ne defects and CTQs
CTQ ext
Start from customer perspective
Variable: ……… Conditions: …… Target: ………… CTQ int
CTQ extVariable: ……… Target: ………… Specifications: ……
‘OK for customer’
Customer specification
Internal specification
Describe the measurable variable and specifications as defined in own organisation. Can be different from the CTQext, but must have a known/proven relation with CTQext.
Describe the measurable variable and specifications as required by the customer.
This can be a vague description of the critical variable
High level, describe until highest level measurable CTQ int. (the project target)
Legend: solid line: proven relationdotted line: relation tbd.grey box: out of scopewhite box: potential CTQ, or group of CTQs
© LSSA 2015 7
DEFINE3 – Plan and document project
Project TeamSupplier: Champion: User: MBB:
Project leader (Belt):
Name: Role: Responsibility:
who provides resources driving for success will benefit from the results coach for methodology
Actively involved members in team meetings
© LSSA 2015 8
DEFINE3 – Plan and document project
SIPOC Process MapOutputs: Customers:
Supplier: Inputs:
‘Process’
Output variablesMain noises
Standard Operating Procedures
Controllable variables + specs
Process:
Step 1 Step 2 Step 3 Step 4 Step 5
If helpful show below detailed steps on the process
SIPOC is mandatory for process improvementFor design improvement: visualize product problem area
© LSSA 2015 9
DEFINEAssessment
Self Assessment
LSSA Assessor Feedback
Missing
Incorrec
tCorrect N/A
Define
1 Project addresses a clear problem or business opportunity (€20,000.- p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been defined clearly. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been involved and informed. 7 Belt has shown to be able to manage the project adequately. 8 Project has been completed within time and budget.
Missing
Incorrec
tCorrect N/A
Define
1 Project addresses a clear problem or business opportunity (€20,000.- p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been defined clearly. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been involved and informed. 7 Belt has shown to be able to manage the project adequately. 8 Project has been completed within time and budget.
© LSSA 2015 10
MEASURE4 – Evaluate measurement system
For Target internal CTQ’sEvaluate whether measurement error for the CTQ int, described in the target is good enough for this project.
e.g. reference data, GR&R, bias, attribute agreement, etc.
Conclusion:
CTQ int Measurement error
© LSSA 2015 11
MEASURE5 – Establ ish basel ine
Conclusion:
How is the situation on the CTQ’s in the beginning of the project? (measured with the known error)e.g. results of capability & performance study
If historical measurement error is unknown, add a note.Visualize if possible, for instance in time.
© LSSA 2015 12
MEASURE6 – Set improvement goals
Final Target
Conclusion:
Evaluate whether the original target(s) are realistic. If necessary describe the rational why the targets are being adjusted.
© LSSA 2015 13
MEASUREAssessment
Self Assessment
LSSA Assessor Feedback
Missing
Incorrec
tCorrect N/A
Measure
1 Relevant KPI's have been selected / CTQ-flowdown has been constructed. 2 High level process description has been made (e.g. SIPOC). 3 Data has been collected / selected properly. 4 The collected data has been proven to be representative for the project. 5 Quality of the data has been verified in an appropriate way (GR&R if applicable). 6 Historical data has been used to visualize performance over time (e.g. Time series). 7 Variation in the process has been considered (common cause or special cause). 8 Short term versus long term performance has been considered. 9 Performance against requirements has been checked (Ppk if applicable).
Missing
Incorrec
tCorrect N/A
Measure
1 Relevant KPI's have been selected / CTQ-flowdown has been constructed. 2 High level process description has been made (e.g. SIPOC). 3 Data has been collected / selected properly. 4 The collected data has been proven to be representative for the project. 5 Quality of the data has been verified in an appropriate way (GR&R if applicable). 6 Historical data has been used to visualize performance over time (e.g. Time series). 7 Variation in the process has been considered (common cause or special cause). 8 Short term versus long term performance has been considered. 9 Performance against requirements has been checked (Ppk if applicable).
© LSSA 2015 14
ANALYZE7 – Map process and identi fy inputs
Process Map
Conclusion:
(process step 1)
….
….
(process step x)
Output variable 1Output variable 2Output variable 3.............
Input variable 1 Input variable 2.............
Input variable 1Input variable 2.............
Input variable 1Input variable 2.............
Input variable 1Input variable 2.............
Use this format for process improvementFor design improvement use Boundary Diagram or Parameter Diagram , for the applicable function(s)
These should be the CTQ’s
© LSSA 2015 15
ANALYZE7 - Map process and identi fy inputs
Ishikawa Diagram
Defect
Measurement Machine Men
Methods Environment Materials
Advice: use Xmind or Freemind
Conclusion:
Create this diagram to complete and categorize the list of inputs
© LSSA 2015 16
ANALYZE8 – Isolate key inputs
Conclusion:
If a large number of inputs is identified, it is important to limit the analysis to a small set of important (key)inputs.
Tools include: Cause & effect matrix, screening (DOE), FMEA
© LSSA 2015 17
ANALYZE9 – Develop Y=f(X) functi on
Conclusion:
Tools: Anova, Regression, DOE, simulation, etc
© LSSA 2015 18
ANALYZEAssessment
Self Assessment
LSSA Assessor Feedback
Missing
Incorrec
tCorrect N/A
Analyze
1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential root causes have been identified properly. 3 Data has been collected and analyzed correctly. 4 Graphical and statistical techniques have been applied to investigate root causes. 5 Major root causes have been identified. 6 Conclusions have demonstrated strong evidence / statistically valid.
Missing
Incorrec
tCorrect N/A
Analyze
1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential root causes have been identified properly. 3 Data has been collected and analyzed correctly. 4 Graphical and statistical techniques have been applied to investigate root causes. 5 Major root causes have been identified. 6 Conclusions have demonstrated strong evidence / statistically valid.
© LSSA 2015 19
IMPROVE10 – Determine opti mum setti ngs
Conclusion:
DOE, simulation, etc
© LSSA 2015 20
IMPROVE11 – Implement proposed improvement
Conclusion:
Show a list of implemented improvements
© LSSA 2015 21
IMPROVE12 – Val idate proposed improvement
Conclusion:
Show the verification run compared to baseline that the Define conditions will be met.
© LSSA 2015 22
IMPROVEAssessment
Self Assessment
LSSA Assessor Feedback
Missing
Incorrec
tCorrect N/A
Improve
1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome / Risks have been mitigated. 4 Internal and external customers have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable).
Missing
Incorrec
tCorrect N/A
Improve
1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome / Risks have been mitigated. 4 Internal and external customers have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable).
© LSSA 2015 23
CONTROL13 – Implement control strategy
Conclusion:
Show the verification run compared to baseline that the Define conditions will be met.
© LSSA 2015 24
CONTROL13 – Implement control strategy
Open actions• ….• ….
Documentation • Component drawings• Manufacturing specifications• Control plan• Engineering reports• FMEA• ..
Roles & responsibilities• ..
How is assured that all information is well documented for future success
What are the key roles & responsibilities to assure continued success
Actions and owners necessary to finish this project
© LSSA 2015 25
CONTROL14 – Close out project
Conclusions • ….
Recommendations• ….• ….
Lessons learned• ….• ….
For follow-up, next steps, or next projects
For colleagues, others
Relate this to the project objective, targets and deliverables
© LSSA 2015 26
CONTROL14 – Close out project
The realized benefits of this projects are:
Controller:Date, Name & Signature
-
Champion:Date, Name & Signature
-
LSSA MBB:Date, Name & Signature
-
Summarize final total savings, average per year
© LSSA 2015 27
CONTROLAssessment
Self Assessment
LSSA Assessor Feedback
Missing
Incorrec
tCorrect N/A
Control
1 Evidence of 'In-Control situation' available and sufficient. 2 Measures have been put in place to monitor process performance. 3 Documentation has been updated (pFMEA, CP, SOP's). 4 Training has been performed for the new process. 5 Improvements have proven to be sustainable. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 8 Controller signed that project savings / benefits have been achieved.
Missing
Incorrec
tCorrect N/A
Control
1 Evidence of 'In-Control situation' available and sufficient. 2 Measures have been put in place to monitor process performance. 3 Documentation has been updated (pFMEA, CP, SOP's). 4 Training has been performed for the new process. 5 Improvements have proven to be sustainable. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 8 Controller signed that project savings / benefits have been achieved.
© LSSA 2015 28
M: [email protected]: www.lssa.eu