ENERGY SYSTEMS FOR THE INTELLIGENT USE OF BIOMASS FUELS

LEADING SUPPLIER OF ENERGY SOLUTIONS

Ing. Peter URBAS

Page 2: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

Einleitung /Überblick

2

URBAS Maschinenfabrik gegründed

G.m.b.h 1929

Mitarbeiter ca. 450

Firmenareal 35 000 m2

Geschäftsbereiche Energietechnik Stahlbau Stahl-Wasserbau Stalltechnik

Page 3: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

Innovation meets energy

Page 4: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

Slide 4

URBAS und Holzgas…

Aktuell/geschichtlich Forschung und Entwicklung seit 2001

70kWel + 150kWth

Erste Kundenanlage 2008

2x 120 kWel + 560 kWth

Derzeit angebotene Anlagengrößen

100 kWel – 450kWel

Zukünftig… Erschließung neuer Märkte

Exportrate derzeit ca. 100%

Skalierung Anlagengrößen,

Optimierung Gesamtkonzept,

Brennstofferweiterung…

Page 5: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

5

Modulbauweise

Page 6: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

6

Gesamtanlage

… Brennstofffluss…

Page 7: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

Aufbauvarianten

Page 8: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

Der Betrieb

Page 9: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

Betriebsverfügbarkeit Holzgas KWK

Betrieb ~93%

Reaktionszeit Störfälle (~4%)

(für Kalkulation)

Page 10: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

• Umwelt-/Emissionssicherheit und Anlagensicherheit

• Wirtschaftlichkeit

Slide 10

• Technologie mit garantierter Funktionalität

Holzgas KWK - Kundenanlage Neukirchen 2012 bis 2016

Inbetriebnahme

Anlagenumbau (4 Monate)

Betriebsverfügbarkeit Holzgas KWK

8677 Betriebsstunden

pro Jahr (2016 Summe – 8784 Stunden)

Page 11: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

11

24 Kundenanlagen

5 in Umsetzung

Referenzen Holzgas KWK Anlagen

Tokushima (Japan)

Page 12: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

12

Referenzen Holzgas KWK Anlagen

Wood

chips

Off-

cuts

1

Demonstration Plant

URBAS

A - 9113 Ruden

Development since 2001 93725Ing. Peter Urbas

DI Wolfgang Felsberger

150 kWel +300 kWth +

Boiler

CHP – Process heat,

internal heating

supplies

x xDevelopment and

Demonstration plant

2

Fernwärme Neumarkt

Ges.m.b.H. & Co KG

A - 8820 Neumarkt

August 0858825

59815

Herbert Ofner

[email protected]

+ 43 664 4501564

2 x 120 kWel +

580 kWthCHP - district heating x heat-guided operation

3

Friedrich Wahl GmbH &

Co. KG

D - 74429 Sulzbach Laufen

October 09 42769

Sabine [email protected]

+49 7976 9858 40

1 x 130 kWel +

280 kWth

CHP – Process heat,

internal heating

supplies

x heat-guided operation

4

Holzstrom GmbH

A - 5145 Neukirchen an

der Enknach

July 11

49660

46353

(Upgrade in 2015)

Johann [email protected]

+ 43 664 2425408

2 x 175 kWel +

2 x 300 KWthCHP - district heating x

world record of 8588

operating hours in 2013

(98,04% duty cycle)

5

Stadtwerke Konstanz

GmbH

D - 78467 Konstanz

January 12 25767

DI Olaf Westerhoff

[email protected]

+49 7531 803 266

1 x 140 kWel +

300 kWthCHP - district heating x heat-guided operation

6

Biowärme Mallnitz

Gmbh

A - 9822 Mallnitz

November 13 31170

Anton [email protected]

+ 43 664 156 78 58

1 x 250 kWel +

540 kWthCHP - district heating x Full operation

7Rau GmbH

D - 72336 BalingenDecember 13 24067

Joahim Rau

[email protected]

+ 49 7433 9882 14

1 x 150 kWel +

280 kWthCHP -Process heat x x

no permission to release

earlier data than 2016

8

Energieversorgung Vals

GmbH

I - 39037 Mühlbach

January 15 18709

Kurt Bacher

[email protected]

+ 39 0472 979042

1 x 296 kWel +

550 kWthCHP - district heating x only partial operation

9

Azienda Agricola Isca di

Calvello

I - 85010 Calvello

January 15 18201

Gianfranco Misuriello

[email protected]

+39 3334711383

1 x 199 kWel +

340 kWthCHP -Process heat x only partial operation

10Biowärme Eberndorf

A - 9141 Eberndorf

L1: March 15

L2: Installed since 06

12525

62033

Ing. Peter Urbas

[email protected]

+ 43 664 1235923

1 x 130 kWel +

250 kWth; 1 x 300

kWel + 600 kWth

CHP - district heating x

heat-guided operation;

highest total operating

hours since comissioning

on one engine

11Green Power GmbH

A - 8230 HartbergJuly 15 17599

Andreas [email protected]

+43 3176 8127 0

1 x 200 kWel +

320 kWthCHP - district heating x Full operation

12Energia Uno

I - 05100 TerniAugust 15 no permission

Francesco Niri

[email protected]

+39 3938 9474 08

1 x 199 kWel +

340 kWthCHP -Process heat x

Owner has no permission

to start the plant

13Cogen

I - 05100 TerniAugust 15 3210

Paolo Maserelli

[email protected]

+39 335 399851

1 x 199 kWel +

340 kWthCHP -Process heat x only partial operation

14Lamprecht GmbH

I - 3902 KastelbellJanuary 16 13864

Oskar Pfeifer

[email protected]

+ 39 0473 624131

1 x 199 kWel +

320 kWthCHP -Process heat x Full operation

15Azienda. Agri. S.A.B.I

I - 47010 GaleataJanuary 16 13814

Luca [email protected]

+ 39 0543 981793

1 x 199 kWel +

320 kWthCHP - district heating x Full operation

NoteFuel

Project Year of commissioning Contact Power UtilizationTotal operating

hours since

commissioning

Page 13: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

13

Referenzen Holzgas KWK Anlagen

16Toplana AD Prijedor

BIH - 79101 PrijedorFebruary 16 6075

Zoran [email protected]

+38 765 845 232

1 x 250 kWel +

530 kWthCHP - district heating x only partial operation

17FHW Mals

I - 39024 MalsFebruary 16

10513

10854

Dr. Mag. Ulrich [email protected]

+ 39 349 5707 171

2 x 149 kWel +

2 x 280 kWthCHP - district heating x Full operation

18Chetra SK s.r.o.

SK - 06801 Medzilaborce no permission no permission

Olga Hethy

[email protected]

+49 1637227525

3 x 150 kWel +

3 x 280 kWthCHP -Process heat x

Owner has no permission

to start the plant

19Biofire srl.

I - 06083 Bastia UmbriaJune 2017 2025

Andrea Paoloni

[email protected]

+39 3487411604

1 x 199 kWel +

340 kWthCHP -Process heat x Full Operation

20Luna srl.

I - 06083 Bastia UmbriaMarch 17 1931

Andrea Paoloni

[email protected]

+39 3487411604

1 x 199 kWel +

340 kWthCHP -Process heat x Full operation

21Sole srl.

I - 06083 Bastia UmbriaEnd of 2017 no start up

Cucchi Dario

[email protected]

+39 3939436418

1 x 199 kWel +

340 kWthCHP -Process heat x

Plant is in

planning/installing phase

22Genboku

JP - 773-0007 TokushimaEnd of 2017 no start up

CORRENS CORPORATION

[email protected]

+81 351140740

1 x 250 kWel +

530 kWthCHP -Process heat x

Plant is in

planning/installing phase

23Stubenberg

A - 8223 StubenbergJune 2017 2511

Hannes Windhaberhannes.windhaber@maschinenring

.at

+43 664 4219950

1 x 220 kWel +

340 kWthCHP -district heating x Full Operation

24Ligna Calor

I-39030 La Villa in Badia July 2017 257

Luigi Frenadametz

[email protected]

+39 335 5772247

1 x 300 kWel +

580 kWthCHP -Process heat x Full operation

25Lamprecht GmbH

I - 3902 KastelbellEnd of 2017 no start up

Oskar Pfeifer

[email protected]

+ 39 0473 624131

1 x 400 kWel +

650 kWthCHP -Process heat x

Plant is in

planning/installing phase

26Marchesi Frescobaldi

I-50065 PontassieveEnd of 2017 no start up

Daniele Settesoldi

daniele.settesoldi@frescobald

i.it

+39 348 6543094

1 x 199 kWel +

320 kWthCHP -Process heat x

Plant is in

planning/installing phase

27

Fernwärme Neumarkt

Ges.m.b.H. & Co KG

A - 8820 Neumarkt

End of 2017 no start up

Herbert Ofner

[email protected]

+ 43 664 4501564

1 x 150 kWel +

280 kWthCHP - district heating x

Plant is in

planning/installing phase

28

Brana Energana

Virovitica

HR - 33000 Virovitica

Beginning of 2018 no start up

Mag. Tanja Herceg

[email protected]

+385 95 864 4869

1 x 450kWel +

765kWth CHP - Process heat x

Plant is in

planning/installing phase

29

Brana Energana

Daruvar

HR - 43500 Daruvar

Beginning of 2018 no start up

Mag. Tanja Herceg

[email protected]

+385 95 864 4869

1 x 450kWel +

765kWth CHP - Process heat x

Plant is in

planning/installing phase

qualifying date: 27.09.2017 (09:00 a.m.)

Page 14: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

Impressionen

14

Page 15: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

15

Impressionen

Page 16: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

16

Impressionen

Page 17: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

17

Impressionen

Page 18: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

18

Impressionen

Page 19: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

19

Impressionen

Page 20: LEADING SUPPLIER OF ENERGY SOLUTIONS ENERGY SYSTEMS …

URBAS Maschinenfabrik GmbH Th.-Billroth-Strasse 7 A 9100 Völkermarkt Telefon: +43 (0) 4232/2521-0 Telefax: +43 (0) 4232/2521-55 e-mail: [email protected]

http://www.urbas.at

Wir können das, was sie brauchen