leading m&e brand€¦ · vung tau long an h city ien giang phu quoc island hung bac ninh ha...

69
LEADING M&E BRAND OUR EXPERIENCE DRIVES US FORWARD

Upload: others

Post on 04-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

LEADING M&E BRAND

OUR EXPERIENCE DRIVES US FORWARD

Page 2: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

REMEECOOver the years, COTECCONS GROUP has been known as a leader in the field of construction in Vietnam. We create different values and build sustainable belief and prestige based on a strong financial foundation together with the qualified, experienced and dedicated human resources and especially, the flexibility in mobilizing resources from member companies such as Unicons, Ricons, and FDC.Each member company of COTECCONS GROUP has its own M&E division to take part in the Group’s general contractor projects. Our M&E products are always fully trusted and highly appreciated by the investors. This has been shown in a number of large-scale projects such as the Grand Ho Tram, Masteri Thao Dien, Novotel, Hyatt Regency, etc. REMEECO brand was formed from the association of 4 M&E divisions of 4 member companies. This association has created comprehensive strength, helping REMECO with competitive advantages in large-scale projects that require high standards in technique, quality and progress. M&E operation contributes averagely 25% to 30% of total annual revenues of the Group. Particularly, in 2017, revenue from M&E activities reached more than 6,500 billion. M&E achievements in the past 15 years have proven the prestige and outstanding performance of REMEECO. That is considered a momentum for REMEECO to continue improving our capacity in all aspects to affirm the position as a leading M&E brand in Vietnam, ready to compete with international M&E contractors.

WHO IS ?

Page 3: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

To become a trustworthy partner of investors in M&E consultancy, design and construction.

Provide best products with highest safety, quality and schedule satisfaction, contributing to the sustainable development of society.

VISION, MISSION AND CORE VALUES

Vision

Core values

To become a leading brand in professional M&E consultancy, design and

construction, meeting regional and international prestige and quality.

Mission

TransparencyTransparency is well-focused in every activity, from management, cooperation to end user’s benefit.

CreativityREMEECO puts a strong emphasis on non-stop creation and improvement of quality control system in response to increasingly high demand from clients.

Quality commitmentREMEECO is committed to constantly bringing highest quality and actively giving solutions to do better than commitment.

PioneerAlways to be the pioneer in applying improvement to bring customers best efficiency.

DisciplineSelf-discipline, commitment to the responsibility of each individual with the Company, with the partner and with ourselves.

Safety For health, safety and a green environment.

OVERVIEW Vision, mission and core valuesEstablishment and experience Scope of operationOrganizational structureKey personnelImpressive figures Competitive advantagesCommitment to quality and safety

0506081012182022

SUPPLY SERVICE Electrical systemWater systemACMV systemFire firefighting and prevention system

Housing projectsSchool and hospital projects Commercial center and office projectsResort and hotel projectsIndustrial projects

40505456

6074808898

2628323436

OPERATIONAL CAPABILITY

Construction improvementBIM applicationSupply chain of REMEECOHuman resourcesFinancial capacity

TYPICAL PROJECTS

CUSTOMERS & PARTNERS

Customers & partnersCustomer’s assessmemt

List of completed projectsList of on-going projects

110114

118129

M&E SECTORCONTENTS

4 5Remeeco profile Remeeco profile

Page 4: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

PROJECTS

ANNUAL REVENUE INCREASE

LEADING M&E GENERAL

CONTRACTOR IN VIETNAM

ESTABLISHMENT AND EXPERIENCE

With strong foundation from 15 years of experience of COTECCONS GROUP’s M&E Division and right strategic orientations, REMEECO brings new energy and contributes to affirming the leading position of COTECCONS GROUP in the M&E market in Vietnam.

REASON for REMEECO establishment

PREDECESSOR of REMEECO

With the strong development of M&E sector,

COTECCONS GROUP decided to establish REMEECO in 2017. This brand represents M&E design

and construction of the whole Group, in order to: • Attach M&E operation of member companies of

COTECCONS GROUP together; • Standardize and synchronize construction process,

ensuring consistent construction quality of Mega projects according to international technical

standards. • Enhance competitiveness and expand M&E

system of COTECCONS GROUP, meeting the increasing demand

of customers.

Established in 2004 together with Coteccons, M&E

Division under Technical Department of COTECCONS GROUP had more than 10 members. Up to now, after nearly 15 years of operation, the Division has grown up to more than 870 employees, implementing more than 100 commercial, industrial, civil and infrastructure M&E projects in Vietnam and Southeast Asia (Laos, Cambodia). In 2017, the revenue from COTECCONS GROUP’s M&E Division reached VND6,627 billion. At present, more

than 40 large-scale M&E projects are being deployed across the country, promising

to bring breakthrough results to COTECCONS GROUP.

6 7Remeeco profile Remeeco profile

Page 5: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

CHINA

LAOS

THAILAND

CAMBODIA

Vientiane

Phnom Penh

LAO CAI

QUANG NINH

THAI NGUYEN

HAI PHONGHA NOI

NGHE AN

QUANG NAM

BINH DINH

QUANG NGAI

DA NANG

Nha trang

DONGNAI

TAYNINH

BINHDUONG

BA RIA -VUNG TAU

HO CHI MINH CITY

LONG AN

KIENGIANG

PHU QUOC ISLAND

Hung

Bac Ninh

Ha Nam

Yen

CON DAOISLAND

HOANG SA ISLANDS

TRUONG SA ISLANDS

After nearly 15 years of development and implementation of M&E works meeting international standards, REMEECO has stepped into new journey with new opportunities and challenges. REMEECO continues to mobilize resources, expand market and maximally exploit potential advantages to be ready to conquer the goal to become one of the leading M&E brands in Vietnam.

Promote foundation - Continue to go further

SCOPE OF OPERATION

OPERATING IN

COUNTRIES IN THE WORLD03• Vietnam• Laos: Essilor factory, Vientiane Province• Cambodia: Siemreap Province,

Phnom Penh City

Areas REMEECO operates

In the North:• Ha Noi• Bac Ninh• Hung Yen• Thai Nguyen• Ha Nam• Hai Phong• Quang Ninh• Lao Cai• Nghe An

In the Central:• Da Nang• Quang Nam• Quang Ngai• Binh Dinh• Khanh Hoa

In the South:• Ho Chi Minh City• Binh Duong• Dong Nai• Long An• Tay Ninh• Ba Ria – Vung Tau• Kien Giang

8 9Remeeco profile Remeeco profile

Page 6: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

BOARD OF MANAGEMENT

DIRECTOR OF M&E DIVISION

M&E TECHNICAL - PRODUCTION DIRECTOR

M&E DIVISION ECONOMIC DIRECTOR

M&E BIDDING CONSULTING DEPARTMENT

M&E PRICE CONTROL DEPARTMENT

M&E TECHNICAL DEPARTMENT

M&E CONSTRUCTION

DIRECTOR

CONSULTING TEAM (experts and specialists)

ORGANIZATIONAL STRUCTURE

M&E QUALITY CONTROL DEPARTMENT

HUMAN RESOURCES DEPARTMENT

CONSTRUCTION MANAGEMENT UNIT M&E BIM UNIT

M&E TRAINING - TECHNICAL UNIT

T&C - O&M

PRODUCTION R&D UNIT

QUANTITY CONTROL TEAM

PRICE CONTROL TEAM

PROCUREMENT CONTRACT TEAM

PROJECT TEAM

M&E D&B UNIT

M&E BIDDING UNIT

PROJECT DIRECTORS

SITE MANAGEMENT BOARD

10 11Remeeco profile Remeeco profile

Page 7: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

KEY PERSONNEL

FOUNDERS

Mr. NGUYEN BA DUONG Chairman

He is the “Chief Architect” of Coteccons in particular and COTECCONS GROUP in general. He is determined, assertive and visionary. In business, he always attached importance to credit. Over than 30 years of experience in construction business management, he has trained and developed the qualified and prominent staff. He combines clever knowledge and soft skills in management. He made ultimate decision on the establishment of REMEECO.

Mr. NGUYEN SY CONG General Director

Mr. PHAN HUY VINH Deputy General Director

He graduated from Hanoi Construction University. After years working in the construction industry, he joined Coteccons in 2002 as a Project Director. He has held key positions at Coteccons and its subsidiaries such as BOD Member - Chairman of Ricons Construction Joint Stock Company; BOD Member cum CEO of Unicons Construction Investment Limited Company. With his experience, qualification and knowledge in M&E of the whole Group, together with the Chairman, he has given important policies in development orientation of REMEECO in new stage.

With a keen interest in learning, he has constantly researched more knowledge in consultancy, design and construction management of M&E projects from factories to modern high-rise buildings requiring high quality and timely construction progress. He has connected M&E sector with many potential customers and made considerable contributions in affirming position of COTECCONS GROUP in Vietnam’s M&E market.

MANAGEMENT PERSONNEL

Mr. DINH MINH HOANGDirector of M&E Division

Having joined Coteccons since the beginning, graduated in M&E major from one of the most prestigious universities in Vietnam, he is cautious, humble and brave. With 22 years of experience, he has worked in various positions such as Commander, Technical Specialist, and Bidding Manager and now is the Director of M&E Division. He has been building REMEECO to develop stronger and stronger.

MR. NGUYEN TAN TIENM&E Construction Director

His hard work, perseverance and loyalty have helped him to complete many important projects in various fields. Moreover, thanks to the experiences in more than 20 years working in human resource management and development, he has successfully built human resources of REMEECO. The strong human resources of REMEECO currently are resulted from his significant contributions. In the future, under his direction and management, the human resources of REMEECO will get more development and bring prominent achievements in M&E sector for the Group.

MR. QUAN NGUYEN CHI CUONGM&E Division Economic Director

He has more than 22 years of experience holding M&E management positions inside and outside the country from Site Manager, Bidding and Cost Manager to Design Manager. His management capability together with his easy-going and sociable manners have helped him build an effective team with high qualification and enthusiasm, marking success in a series of large-scale Design & Build projects across the country. That is the reason why he was assigned to be responsible for REMEECO’s Business Division.

12 13Remeeco profile Remeeco profile

Page 8: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

MANAGEMENT PERSONNEL (cont.)

Mr. LU NGUYEN HAIDirector of Ricons M&E Division

Mr. NGUYEN SI QUOCDirector of FDC M&E Division

Mr. NGUYEN XUAN BINHM&E Construction Director

He has more than 15 years of experience in M&E field, managing many important projects as the role of Project Director. He is dynamic and brave, always wants to move forward and does not stop learning. With the motto “Win to Win”, he has managed and completed many projects and thereby, gaining success in image and finance, step-by-step building and developing REMEECO to become a prestigious and quality brand in the eyes of partners inside and outside the country.

With the motto “Well leading self and helping other lead themselves”, he increasingly perfects himself as well as accelerating and facilitating staff to work with highest performance and thereby, strongly develop REMEECO collective and brand to become a trustworthy and prestigious partner in providing M&E solutions for many projects in Vietnam.

With the experiences in many large-scale projects such as Liberty 6, Hyatt Regency Danang Resort and Spa, Diamond Island, etc., he is a qualified M&E manager and always motivates staff to learn, improve and apply advanced technologies in construction to enhance performance efficiency. Heading in right development orientation, he has led M&E Division to become one of the strongest divisions of FDC.

Mr. NGUYEN VAN THANHDirector of Unicons M&E Division

He is energetic, assertive and has wide vision. With more than 25 years of experience in M&E field together with the characteristics of keen-on-learning and endless passion, he has been researching new technical improvements, human resource management, and construction quality to build - develop a strong REMEECO team in both quality and quantity.

Mr. VO THANH CANGM&E Technical - Production Director

With more than 15 years of experience in M&E field, he is a good leader and is always trusted by colleagues and partners not only because of his steady qualification but also thanks to his enthusiasm in work. Graduated from University of Technology in Heat and Refrigeration Engineering major and joining many projects as various roles such as Technical Supervisor, Vice Commander, Commander, Deputy Manager of Bidding Dept., Project Director and current is M&E Technical - Production Director, he is trusted by Chairman and assigned to be responsible for Technical – Production of REMEECO.

KEY PERSONNEL

14 15Remeeco profile Remeeco profile

Page 9: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

EXPATRIATE EXPERTS

Mr. KIM VALDBJORN JENSENMR. WAYNE J. HARRIS

With more than 16 years of experience in M&E design and build and holding key positions in many companies, for examples, Electrical Project Director - MTH Contractor (Denmark), MEP Deputy Director - Ramboll Oil & Gas (Denmark, Dubai, Qatar), E&I Director – IMCC Group (UAE), MEP Manager - Royal Haskoning Vietnam, etc., he has contributed to completing M&E design and build projects in Denmark, Spain, Middle East, North Africa, Macau, Vietnam, etc. Joining Coteccons in 2017, he has played an important role in researching and improving design and construction solutions as well as training engineer team in REMEECO, meeting the increasing demand of investors.

As a senior expert in HSE with more than 34 years of experience working in multicultural environment in many senior positions, he has a wide and deep knowledge in occupational health and safety, quality control and risk management in construction. He used to hold the position of Director of World Safety Organization (WSO) and now is the Chairman of International Safety Quality Environment Management Association (ISQEM). He has gained great successes in occupational safety management at Coteccons.

Mr. GEORGE WOOD Mr. MARTIN J F HURD

As an experienced project manager, he has joined many complicated international construction projects and iconic architectures, such as Marriott Hotel – London (England), Liberation Tower – Kuwait, Burj Al Alam Tower - Dubai (UAE), Jumeirah Hotel - Dubai (UAE), Garden City Shopping Centre - Perth (Australia), etc. With his rich experience, he has made significant contributions in enhancing efficiency of Coteccons’ projects.

Thanks to the experiences in more than 30 years undertaking the key positions in construction management of infrastructures, 5-star hotels, hospitals, office building, stadiums, etc. in the Philippines, Vietnam, Thailand, Hong Kong, Macau, Dubai and Britain, he has successfully completed project management at Coteccons.

KEY PERSONNEL

16 17Remeeco profile Remeeco profile

Page 10: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

0 2,0001,000 4,000 5,000 6,000 7,000 8,0003,000

4,458

2,528

2,305

2,187 2013

2014

2015

2016

20176,627

IMPRESSIVE FIGURES

Revenue growth over the years

VND BILLION

Dedication to customers, excellent design and construction capacity as well as construction quality and schedule assurance are the factors creating great growth of REMEECO and showing the increasing development of REMEECO over the years.

REVENUE OF 2017

TOTAL PROJECTS IMPLEMENTED IN 2017

VND BILLION

PROJECTS

In 2017, with more than 40 projects done, REMEECO earned approximately VND6,627 billion of revenue, proving our outstanding professional capacity and commitment in M&E design and build.

6,62740+

18 19Remeeco profile Remeeco profile

Page 11: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

COMPETITIVE ADVANTAGES

ADVANCED PROJECT MANAGEMENT PRACTICES

STRONG HUMAN RESOURCES

STRONG FINANCIAL FOUNDATION

The perfect combination between design and construction in an M&E package in charge by REMEECO will help optimize construction progress and bring benefits to investors.

• Maximally save project implementation time, shortening construction progress.

• Responsibility of contractor is clarified in both construction and M&E.

• Maximally save customer’s finance: optimize Prelim cost, streamline management structure for investors, considerable shorten project completion time and thereby, reducing project costs.

Design management center

REMEECO has a Design Management Center to provide design solutions that meet the technical requirements and have quick implementation and reasonable price for investors. At the same time, the application of M&E improvements in construction delivers good quality and cost savings for investors and customers.

BIM application

REMEECO is the pioneer in applying Building Information Model (BIM) in M&E design and build, bringing excellent effectiveness when the simulation of design and construction process is clearly observed, thereby timely remedying conflicts and mistakes.

With BIM, REMEECO can easily evaluate different design plans quickly and exactly to create quality and aesthetic products, shorten construction time and minimize costs for customers.

With more than 870 members including expatriate experts, specialists, masters, engineers, etc., who have international qualification, creativity and deep knowledge in M&E field, together with the skillful construction workforce from 4 member companies of COTECCONS GROUP, REMEECO is always ready for large-scale projects with appropriate and impressive designs at a reasonable price.

As a brand of Coteccons Group – the leader in Vietnam’s construction industry, REMEECO operates based on a firm financial foundation and strong human resources. In addition, REMEECO always has advantages in smooth coordination between construction and M&E works to create exceptional products for investors and customers.

PERFECT COMBINATION BETWEEN DESIGN AND CONSTRUCTION

Mark the difference with outstanding quality

With the team of expatriate experts, masters and engineers, who are qualified, experienced, determined and dedicated, the support from Design Center as well as successfully applying BIM model in M&E design and build, REMEECO is completely confident in competition with foreign contractors and international standard contractors.

20 21Remeeco profile Remeeco profile

Page 12: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

COMMITMENT TO QUALITY AND SAFETY

Each work is a commitment on quality

REMEECO uses an effective and comprehensive management system that meets the international standards and ISO 9001:2015, ISO 14001:2015 & OHSAS 18001:2007 certificate verification.

Each project has its own type, features and functions that require different management and construction models. Quality control system of REMEECO is assessed and improved continuously to be suitable to the requirements of each project. This quality control system is applied throughout from the stage of ideal design, bidding, contract preparation and review, construction to completion and warranty in order to save costs and ensure best results for customers. In addition, we provide consulting opinions to the investors on the time, quality and budget of the project as well as evaluating and selecting the best subcontractors and suppliers for the project.

Our internal training programs ensure all employees have full knowledge about REMEECO’s management system so as to apply and maintain the system’s requirements for all projects. Customer satisfaction is the evaluation criteria upon project completion. REMEECO also conducts an internal assessment on the success of the project based on the criteria of progress, quality, occupational safety and economic efficiency of construction workforce. At the same time, we highly appreciate objective assessment from customers and partners on REMEECO’s design and construction capability.

Safety first

REMEECO always applies the occupational safety management system which is set up and developed by Coteccons to ensure absolute safety. The Group’s Safety Board always provides improvements to create the best working environment for employees as well as enhancing productivity and efficiency. Occupational safety force is continuously strengthened by REMEECO in both quantity and quality. Internal training is focused through international training courses provided by expatriate experts to improve skills in guiding, controlling, identifying and evaluating risks to give the safest solutions for employees.

One of the factors making the brand and position of the No.1 construction contractor in Vietnam is the ability to ensure absolute safety. As a brand under COTECCONS Group, REMEECO is not an exception.

22 23Remeeco profile Remeeco profile

Page 13: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

Operational capability

CONSTRUCTION IMPROVEMENT

SUPPLY CHAIN OF REMEECO

BIM APPLICATIONHUMAN

RESOURCES

FINANCIAL CAPACITY

BIM

24 25Remeeco profile Remeeco profile

Page 14: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

CONSTRUCTION IMPROVEMENT

Together with the development of Coteccons, REMEECO has been researching and developing new materials for application and improving construction methods for cost savings, better coordination with construction and shortening construction duration. This affirms professional and scientific work style of REMEECO.

90% of ceiling MEP works is constructed first.

Air duct installation after removing floor formworks.

Easy for checking and acceptance with subcontractors, consultants and investors.

Good overall image as constructing M&E first.

IMPROVEMENT TOPICS ARE SUCCESSFULLY APPLIED16+

Construct wall sleeve first.Sample construction to guide supervisors, subcontractors and workers.

Previously, M&E packages were contracted by the investors after the construction was completed; therefore, M&E construction faced many difficulties not only in progress but also quality. Understanding these obstacles, the Board of Management has instructed REMEECO’s R&D Unit to study new construction measures to meet the needs of investors/customers. At present, REMEECO has developed and applied successfully 16 improvement topics such as installing slab joints in structural stage, sleeve for technical box of apartments, duct sleeve, etc. and constructing 90% of M&E works before constructing walls, etc. This has not only helped meet the construction progress but also made customers satisfied with M&E products. We (REMEECO) continuously improve and give new solutions to satisfy high expectations of customers and investors by COTECCONS GROUP’s D&B.

THESE IMPROVEMENTS HELP REMEECO OPTIMIZE CONSTRUCTION PROGRESS AND QUALITY OF THE PROJECT AND THEREBY, BRINGNG ECONOMIC EFFICIENCY TO INVESTORS AND HIGHEST CUSTOMER SATISFACTION.

CRITERIA

PROGRESS

QUALITY ECONOMIC EFFICIENCY

28 29Remeeco profile Remeeco profile

Page 15: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

CONSTRUCTION IMPROVEMENT

Together with the develop-ment of Coteccons, REMEE-CO has been researching and developing new materials for application and improv-ing construction methods for cost savings, better coordi-nation with construction and shortening construction dura-tion. This affirms profession-al and scientific work style of REMEECO.

90% of ceiling MEP works is constructed first.

Air duct installation after removing floor formworks.

Easy for checking and acceptance with subcontractors, consultants and investors.

Good overall image as constructing M&E first.

IMPROVEMENT TOPICS ARE SUCCESSFULLY APPLIED16+

Construct wall sleeve first.Sample construction to guide supervisors, subcontractors and workers.

Previously, M&E packages were contracted by the investors after the construction was completed; therefore, M&E construction faced many difficulties not only in progress but also quality. Understanding these obstacles, the Board of Management has instructed REMEECO’s R&D Unit to study new construction measures to meet the needs of investors/customers. At present, REMEECO has developed and applied successfully 16 improvement topics such as installing slab joints in structural stage, sleeve for technical box of apartments, duct sleeve, etc. and constructing 90% of M&E works before constructing walls, etc. This has not only helped meet the construction progress but also made customers satisfied with M&E products. We (REMEECO) continuously improve and give new solutions to satisfy high expectations of customers and investors by COTECCONS GROUP’s D&B.

THESE IMPROVEMENTS HELP REMEECO OPTIMIZE CONSTRUCTION PROGRESS AND QUALITY OF THE PROJECT AND THEREBY, BRINGNG ECONOMIC EFFICIENCY TO INVESTORS AND HIGHEST CUSTOMER SATISFACTION.

CRITERIA

PROGRESS

QUALITY ECONOMIC EFFICIENCY

30 31Remeeco profile Remeeco profile

Page 16: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

CONSTRUCTION IMPROVEMENT

Together with the development of Coteccons, REMEECO has been researching and developing new materials for application and improving construction methods for cost savings, better coordination with construction and shortening construction duration. This affirms professional and scientific work style of REMEECO.

90% of ceiling MEP works is constructed first.

Air duct installation after removing floor formworks.

Easy for checking and acceptance with subcontractors, consultants and investors.

Good overall image as constructing M&E first.

IMPROVEMENT TOPICS ARE SUCCESSFULLY APPLIED16+

Construct wall sleeve first.Sample construction to guide supervisors, subcontractors and workers.

Previously, M&E packages were contracted by the investors after the construction was completed; therefore, M&E construction faced many difficulties not only in progress but also quality. Understanding these obstacles, the Board of Management has instructed REMEECO’s R&D Unit to study new construction measures to meet the needs of investors/customers. At present, REMEECO has developed and applied successfully 16 improvement topics such as installing slab joints in structural stage, sleeve for technical box of apartments, duct sleeve, etc. and constructing 90% of M&E works before constructing walls, etc. This has not only helped meet the construction progress but also made customers satisfied with M&E products. We (REMEECO) continuously improve and give new solutions to satisfy high expectations of customers and investors by COTECCONS GROUP’s D&B.

THESE IMPROVEMENTS HELP REMEECO OPTIMIZE CONSTRUCTION PROGRESS AND QUALITY OF THE PROJECT AND THEREBY, BRINGNG ECONOMIC EFFICIENCY TO INVESTORS AND HIGHEST CUSTOMER SATISFACTION.

CRITERIA

PROGRESS

QUALITY ECONOMIC EFFICIENCY

26 27Remeeco profile Remeeco profile

Page 17: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

BIM APPLICATION

Apply information technology in construction market

Catching up the trend of IT application in construction industry, REMEECO has soon deployed BIM in design and construction management for all kinds of project from high-rise buildings to factories.

KẾT CẤU

TỪ CÁC REPORT THẢO LUẬN ĐỂ ĐƯA RA PHƯƠNG ÁNKHẮC PHỤC SAI SÓT ĐỂ CHỈNH SỬA MÔ HÌNH

TỪ ĐÓ XUẤT RA CÁC REPORT SAI SÓT

BIM KẾT HỢP 03 MÔN KẾT CẤU, KIẾN TRÚC VÀ CƠ ĐIỆN, XEM XÉT THIẾU SÓT

CƠ ĐIỆN

KIẾN TRÚC

REPORT

Together with architectural and structural subjects, REMEECO’s BIM team has worked with passion to apply BIM in design and construction management. As a result, REMEECO is able to combine information from the design stage among the subjects to minimize mistakes, ensure high feasibility upon construction, and improve quality throughout the life cycle of project. BIM provides an overall and clear view that helps the parties make right decisions, reducing risk and improving performance efficiency. BIM not only closely combines three subjects i.e. structure, architecture, and M&E in construction process but also helps timely meet the changes of site and improve cost calculation, limit expenses arisen and speed up construction progress. BIM will continue to be upgraded by REMEECO to meet the demand on quality management of complicated projects.

Application

BIM Benefits

Combine three subjects i.e. structure,

architecture, and M&E in construction

process.

Support visual design, helping optimize design,

preventing risks.

Control construction progress and

construction costs.

Investor

Enhance effectiveness of design options, easy to respond design consultant to meet the investor’s requirements. Quickly assess different options, making it easier to review and make decisions more accurately.

Project consultant/management

Minimize design mistakes and easily control construction. Make it easy to review and approve drawings. Integrate information in a model for easier management.

Contractor

Early detect “conflicts” and provide prior solutions to avoid risks arisen during the construction. Optimize the contractor’s resources. Deliver high quality products, ensuring schedule.

STRUCTURE M&E

ARCHITECTURE

REPORT

COMBINE THREE SUBJECTS STRUCTURE, ARCHITECTURE, AND M&E.

REVIEW MISTAKES

BASED ON THE REPORTS, DISCUSS TO FIND SOLUTIONS

THEREBY EXTRACT MISTAKE REPORTS

Manage assets and plan strategy for

easier operation and maintenance.

BIM

32 33Remeeco profile Remeeco profile

Page 18: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

BIM application coordinates technical shaft to prevent mistakes.

BIM application in Sleeve coordination helps construct quickly and accurately.

Level of Development (LOD 350) ensures high accuracy and practicality.

Government Office project site

BIM APPLICATION

BIM application in developing SD construction drawings for Vinhomes Central Park 3.

34 35Remeeco profile Remeeco profile

Page 19: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

Maximize benefits for partners

HUMAN RESOURCE OUTSOURCING PROVIDERS

100+LOCAL AND OVERSEAS SUPPLIERS OF

MATERIALS AND EQUIPMENT

400+

In addition to management capacity, construction experience and highly qualified human resources, we have a supply chain with more than 100 human resource outsourcing providers and more than 400 local and overseas suppliers of materials and equipment with quality assurance and reasonable price to bring the best benefit to customers.

SUPPLY CHAIN OF REMEECO

SOME SUPPLIERS OF REMEECO

Electrical system

Schneider, ABB, Siemen, Hager, Mitsubishi, Legrand, LS, Kohler, Cummins Generation, FG Wilson, Bosch, GE, Panasonic, Johnson control, Honeywell, KMC control, Philip, Simon, Thorn, SJ lite, Sunlight, Hai Nam, PowerWell, QTC, Truong Giang, 3C, Asia, VietStar.Taisin, Taihan, Taya, Thinh Phat, Cadivi.

Mechanical system

Trane, York, Carrier, Daikin, Toshiba, Climaveneta, Panasonic, Mitsubishi, Samsung, LG, Grundfos, Wilo Salmson, ITT Gould, Ebara, Mono flow, KSB, Wolter, Kruger, M&Y, Fantech, ToTo, Inax, Grohe, American Standard.Maflex, Aeroflex, Kflex, Trox, Asli, Kobelco, Hitachi, Ingersoll-rand, Atlas copco, Kohler, Moen, Tecofi, Danfoss, Rinco, KVS, Kitz, Toyo, Showa, TA, Herz, Oventrop, Seah, Hoa Phat, Kelen, Aquatherm, GF, Vesbo, Snow, Palling, Binh Minh, De Nhat, Tien Phong Plastic.

Elevator

Mitsubishi, Hitachi, Fuji, Otis, Kone, Thyssenkrupp, Schindler, Hyundai.

36 37Remeeco profile Remeeco profile

Page 20: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

HUMAN RESOURCES

TRAINING

To improve the quality of human resources and performance efficiency, COTECCONS GROUP’s Training Center (CTA) is training all M&E personnel. Therefore, qualification and capability of REMEECO’s staff will be continuously improved and upgraded to finish the job in the best way. In addition, REMEECO regularly rotates staff among member companies for training and recruits more experts inside and outside the country to meet our development demand.

People are the key to success

REMEECO STAFF870

Human potential is a critical factor for the development of REMEECO. It is the innovation and creativity of the staff that is the key to the success of REMEECO.

WORKFORCE

Along with revenue growth, M&E workforce grows strongly in each project. At present, REMEECO has 870 employees, in which the age from 25 to 35 accounted for over 50%, mainly including engineers, architects, and bachelors from the most prestigious universities in the country. This shows that the youth and quality are the outstanding features of REMEECO’s human resources.

REMEECO’S HUMAN RESOURCE STRUCTURE

BY AGE BY QUALIFICATION

11%

57%32%

79%

17%

4%

From 25 to 35 years of ageFrom 35 to 45 years of ageFrom 45 to 60 years of age

CollegeUniversityMaster

38 39Remeeco profile Remeeco profile

Page 21: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

FINANCIAL CAPACITY

ANNUAL REVENUE INCREASE

25-30%

Strong financial foundation from COTECCONS GROUP and outstanding design and construction capacity have helped REMEECO get trust from the big investors and win the large projects. Revenue from M&E operation averagely accounts for 25% -30% of total annual revenues of the Group.

Revenue from M&E operation gained a stable growth in three consecutive years i.e. 2013, 2014 and 2015, to be specific, VND2,178 billion (2013), VND2,305 billion (2014) and VND2,528 billion (2015). The year 2016 witnessed the breakthrough of M&E operation when its revenue reached VND4,458 billion - an impressive figure compared to other local M&E companies – increasing by 76.34% from 2015.

The highlight of the year 2017 was M&E general contractor contracts for large-scale projects from the big investors such as Vingroup, Masteri, TNR, etc., especially M&E package of Casino Hoi An with the value up to nearly VND 2,000 billion.

Based on that development momentum, REMEECO continues to make strong improvements to further perfect Design & Build model in M&E, boosting R&D activities to position itself in the M&E market.

M&E story of COTECCONS GROUP will be continued by REMEECO thanks to excellent construction capacity, financial strength, and the outstanding successes ahead, promising to go further in the M&E market in Vietnam and in the world.

Steady momentum to reach further

40 41Remeeco profile Remeeco profile

Page 22: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

Supply service

WATER SYSTEMELECTRICAL SYSTEM

FIRE FIREFIGHTING AND PREVENTION

SYSTEM

ACMV SYSTEM

Page 23: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

ELECTRICAL SYSTEM

Medium voltage system and transformer stations

Electrical cabinet system

44 45Remeeco profile Remeeco profile

Page 24: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

Low voltage system

Lighting system

ELECTRICAL SYSTEM

CCTV system

CCTV CameraTV monitorNotebook

Internet

GPRS, Edge, 3G internet

Mobile phone

Notebook Wireless Camera PC IP Camera

CMS

Wireless

Wireless

Switch/hub

DVR

46 47Remeeco profile Remeeco profile

Page 25: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

Generation system

ELECTRICAL SYSTEM

48 49Remeeco profile Remeeco profile

Page 26: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

MÔ HÌNH KẾT NỐI

Telephone/Internet/Television system

ELECTRICAL SYSTEM

Door phone system

Access control system

Smart parking system

Sound system

50 51Remeeco profile Remeeco profile

Page 27: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

Elevator system

ELECTRICAL SYSTEM

52 53Remeeco profile Remeeco profile

Page 28: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

Water supply and drainage system

WATER SYSTEM

Waste water treatment system

Swimming pool system

54 55Remeeco profile Remeeco profile

Page 29: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

Compressed gas system

Kitchen and sanitary appliances

WATER SYSTEM

56 57Remeeco profile Remeeco profile

Page 30: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

ACMV SYSTEM

Air conditioning system

Ventilation system

58 59Remeeco profile Remeeco profile

Page 31: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

FIRE FIREFIGHTING AND PREVENTION SYSTEM

Fire alarm system

Fire firefighting system

60 61Remeeco profile Remeeco profile

Page 32: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

HOUSING PROJECTS

SCHOOL AND HOSPITAL PROJECTS

RESORT AND HOTEL PROJECTS

COMMERCIAL CENTER AND OFFICE PROJECTS

INDUSTRIAL PROJECTS

Typical projects

Page 33: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

PROJECTSHOUSING THE GOLDVIEW

Investor : May - Diem Saigon JSC.

Address : 346 Ben Van Don, Ward 1, District 4, HCMC.

Scale :

01 27-floor tower and 03 33-floor towers, 1,896 apartments02 basements: 21,000 m2 of area 04 commercial center floors: 26,510 m2 of area

Completion time : 30 months

Project value : VND775 billion

Package : D&B

775PROJECT VALUE

30MONTHS

COMPLETION TIME

VND BILLION

65Remeeco profile64 Remeeco profile

Page 34: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

HOUSING PROJECTS

MASTERI THAO DIENInvestor : Thao Dien Investment JSC.

Address : 159 Hanoi Highway, Thao Dien, District 2, HCMC.

Scale :5 towers, 39-45 floors, 4,000 apartmentsArea: 1800x(41+42+43+45+47) m2

02 basements, 02 Podium floor and 08 43-floor blocks

Completion time : 24 months

Project value : VND1,100 billion

Package : D&B

1,100VND BILLION

PROJECT VALUE

24MONTHS

COMPLETION TIME

66 67Remeeco profile Remeeco profile

Page 35: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

D’CAPITALEInvestor : Tan Hoang Minh Group

Address : 1 Tran Duy Hung, Cau Giay, Ha Noi

Scale :Planning area: 50,000 m2

6 towers of 40-45 floors; Total floor area: 358,000 m2

03 interconnecting basements; total basement area 98,000m2

Completion time : 24 months

Project value : VND1,157 billion

Package : D&B

HOUSING PROJECTS

1,157 24VND BILLION MONTHS

PROJECT VALUE COMPLETION TIME

68 69Remeeco profile Remeeco profile

Page 36: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

DIAMOND ISLAND

Investor : Kusto Home

Address : No.1- Street No.104 – BTT, Quarter 3, Binh Trung Tay Ward, District 2, HCMC.

Scale :2-floor Podium, 40,500 m2 of area and 5 towers of 23-29 floors with total floor area of 148,000 m2

Completion time : 30 months

Project value : VND780 billion

Package : D&B

HOUSING PROJECTS

780VND BILLION

PROJECT VALUE

30MONTHS

COMPLETION TIME

70 71Remeeco profile Remeeco profile

Page 37: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

VINHOMES GOLDEN RIVERInvestor : Thanh Pho Ho Chi Minh Investment Service Trading JSC.

Address : 2 Ton Duc Thang, Ben Nghe Ward, District 1, HCMC.

Scale :Tower A1: 51 floors, 81,600 m2 – Tower A2: 51 floors, 65,000 m2

Tower A3: 41 floors, 53,000 m2 – Tower A4: 36 floors, 50,000 m2

Completion time : 18 months

Project value : VND700 billion

700VND BILLION

PROJECT VALUE

18MONTHS

COMPLETION TIME

HOUSING PROJECTS

72 73Remeeco profile Remeeco profile

Page 38: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

HOUSING PROJECTS

VINHOMES THANG LONG

Investor : Vingroup

Address : Nam An Khanh Urban Area, An Khanh, Hoai Duc, Hanoi

Quy mô :Total floor area is 205,897m2.The project includes 798 units of townhouses, shop houses, detached villas and duplex villas.

Completion time : 14 months

Project value : VND571 billion

571VND BILLION

PROJECT VALUE

14MONTHS

COMPLETION TIME

74 75Remeeco profile Remeeco profile

Page 39: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

FLAMINGO DAI LAI

Investor : Flamingo Dai Lai JSC.

Address : Ngoc Quang, Ngoc Thanh, Phuc Yen, Vinh Phuc

Scale : 123 hectares

Completion time : 18 months

Project value : VND160 billion

HOUSING PROJECTS

160 18VND BILLION MONTHS

PROJECT VALUE COMPLETION TIME

76 77Remeeco profile Remeeco profile

Page 40: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

SCHOOL AND HOSPITAL PROJECTS

Investor : PIC JSC.

Address : New Urban Area C2, Gamuda Garden, Hoang Mai, Hanoi

Scale : 23,000 m2

Completion time : 07 months

Project value : VND27 billion

27PROJECT VALUE

07MONTHS

COMPLETION TIME

VND BILLION

SINGAPORE INTERNATIONAL SCHOOL (SIS)

79Remeeco profile78 Remeeco profile

Page 41: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

SCHOOL AND HOSPITAL PROJECTS

RENAISSANCE INTERNATIONAL SCHOOL SAIGON

Investor : Khai Sang JSC.

Address : 74 Nguyen Thi Thap, Binh Thuan Ward, District 7, HCMC.

Scale : 9,400 m29,400

M2

SCALE

80 81Remeeco profile Remeeco profile

Page 42: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

Investor : Vingroup

Address : 30/4 Street, Residence No.4 Nguyen Tri Phuong, Hoa Cuong Bac Ward, Hai Chau District, Da Nang City.

Scale : Area: 37.000 m2 – Number of block: 1Number of floor: 9 floors and 1 basement - 222 beds

Completion time : 08 months

Project value : VND90 billion

90VND BILLION

PROJECT VALUE

08MONTHS

COMPLETION TIME

VINMEC DA NANG INTERNATIONAL HOSPITAL

SCHOOL AND HOSPITAL PROJECTS

82 83Remeeco profile Remeeco profile

Page 43: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

COMMERCIAL CENTER AND OFFICE PROJECTS

HOCHIMINH STOCK EXCHANGE - HOSE

Investor : Hochiminh Stock Exchange (Hose)

Address : 16 Vo Van Kiet Street, District 1, HCMC.

Scale : Area: 1,479 m2 – 2 basements and 12 floors

Completion time : 19 months

Project value : VND99 billion99VND BILLION

PROJECT VALUE

19MONTHS

COMPLETION TIME

85Remeeco profile84 Remeeco profile

Page 44: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

COMMERCIAL CENTER AND OFFICE PROJECTS

SC VIVOCITY SC VIVOCITY

Investor : Vietsin Commercial Complex Development JSC.

Address :1058 Nguyen Van Linh Boulevard, Quarter 1, Tan Phong Ward, District 7, HCMC.

Scale : Area: 10,000 m2 – 5 floors and 1.5 basements

Completion time : 18 months

Project value : VND545 billion

545VND BILLION

PROJECT VALUE

18MONTHS

COMPLETION TIME

86 87Remeeco profile Remeeco profile

Page 45: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

TAN SON NHAT INTERNATIONAL AIRPORT TERMINAL - AIR CARGO

Investor : SCSC

Address : Tan Son Nhat Airport

Scale : Area: 13,700 m2 – 01 25-meter-height warehouse and 4-floor office building

Completion time : 11 months

Project value : VND143 billion

11MONTHS

COMPLETION TIME

143PROJECT VALUE

VND BILLION

COMMERCIAL CENTER AND OFFICE PROJECTS

88 89Remeeco profile Remeeco profile

Page 46: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

COMMERCIAL CENTER AND OFFICE PROJECTS

LIM TOWER II

Investor : Mai Thanh Service Co., Ltd. -Techcombank

Address : 9 – 10 Ton Duc Thang, District 1, HCMC.

Scale : 2 basements – 34 floors

Completion time : 14 months

Project value : VND112 billion

14MONTHS

COMPLETION TIME

112PROJECT VALUE

VND BILLION

90 91Remeeco profile Remeeco profile

Page 47: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

RESORT AND HOTEL PROJECTS HO TRAM STRIP PHASE I

1,459PROJECT VALUE

24MONTHS

COMPLETION TIME Investor : Ho Tram Project Co., Ltd.

Address :Seaside, Phuoc Thuan, Xuyen Moc, Ba Ria – Vung Tau

Scale :Area of 164 hectares, including 541 5-star hotel rooms, international restaurants, conference hall, golf court, and Casino.

Completion time : 24 months

Project value : VND1,459 billion

VND BILLION

93Remeeco profile92 Remeeco profile

Page 48: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

HYATT REGENCY DA NANG

Investor : Marble Mountain Beach Resort J.S.C

Address : Truong Sa Street, Hoa Hai Ward, Ngu Hanh Son District, Danang City.

Scale :Area: 96,000 m2 – 09 hotel blocks (2F-4F), 03 Condotel towers (5F-11F)Main Pool (2600m2), Regency club, Spa-Fitness, Conference, Pool bar, Camp.

Completion time : 30 months

Project value : VND393 billion

RESORT AND HOTEL PROJECTS

393 30VND BILLION MONTHS

PROJECT VALUE COMPLETION TIME

94 95Remeeco profile Remeeco profile

Page 49: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

RESORT AND HOTEL PROJECTS

SOL BEACH HOUSE RESORT

Investor : Duc Viet Co., Ltd.

Address :Zone 1, Bai Truong Complex, Duong To Commune, Phu Quoc Island, Kien Giang Province.

Scale :Area: 13,542.5m2 - Hotel: 8 floors, 190 rooms, Low-rise: 2 3-floor buildings, 94 rooms

Completion time : 20 months

Project value : VND156 billion

156VND BILLION

PROJECT VALUE

20MONTHS

COMPLETION TIME

96 97Remeeco profile Remeeco profile

Page 50: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

RESORT AND HOTEL PROJECTS

CASINO HOI AN

Investor : Vina Capital, Chow-Tai-Fook & The SunCity Group

Address : South Hoi An, Quang Nam

Scale : 1,000 hectares

Completion time : 19 months

Project value : VND1,990 billion

1,990VND BILLION

PROJECT VALUE

19MONTHS

COMPLETION TIME

98 99Remeeco profile Remeeco profile

Page 51: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

Investor : C.E.O Investment JSC. – a member of CEO Group

Address : Bai Truong Complex, Duong To Commune, Phu Quoc Island, Kien Giang Province.

Scale : Total floor area of the villa is 10,000 m2. Total floor area of the hotel is 28,200 m2

Completion time : 15 months

Project value : VND220 billion

NOVOTEL

RESORT AND HOTEL PROJECTS

220 15VND BILLION MONTHS

PROJECT VALUE COMPLETION TIME

100 101Remeeco profile Remeeco profile

Page 52: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

INDUSTRIAL PROJECTS

GENTHERM VIETNAM

Investor : Gentherm Vietnam Co., Ltd.

Address :Dong Van II Industrial Zone, Duy Tien District, Ha Nam Province

Scale : Plant of 20,000m2 of area and 1 Office Building

Completion time : 10 months

Project value : VND87 billion 87VND BILLION

PROJECT VALUE

10MONTHS

COMPLETION TIME

103Remeeco profile102 Remeeco profile

Page 53: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

INDUSTRIAL PROJECTS

REGINA FACTORY

Investor : Regina Miracle International Vietnam Co., Ltd.

Address : VSIP Haiphong Township, Industrial & Service Park.

Scale : 7.4 hectares – in which, 03 hectares for workshops, offices, infrastructure and auxiliary items.

Completion time (phase 1, 2, 3, 4)

: 40 months

Project value : VND539 billion

539 40VND BILLION MONTHS

PROJECT VALUE COMPLETION TIME

104 105Remeeco profile Remeeco profile

Page 54: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

PEPSICO FACTORY

Investor : Pepsico Vietnam

Address : No.88, Huu Nghi Street, VSIP - Phu Chan, Tu Son, Bac Ninh.

Scale : 12 hectares

Completion time : 07 months

Project value : VND180 billion

INDUSTRIAL PROJECTS

180 07VND BILLION MONTHS

PROJECT VALUE COMPLETION TIME

106 107Remeeco profile Remeeco profile

Page 55: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

BROTEX 1.2.3.4.

Investor : Brotex -China Co., Ltd.

Address : Phuoc Dong - Tay Ninh Industrial Zone

Scale : 155 hectares

Completion time : 30 months

Project value : VND350 billion

350VND BILLION

PROJECT VALUE

30MONHTS

COMPLETION TIME

INDUSTRIAL PROJECTS

108 109Remeeco profile Remeeco profile

Page 56: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

INDUSTRIAL PROJECTS

FANG BROTHERS KNITTING

Investor : ZhaoFeng Vietnam Co., Ltd.

Address : Phuoc Dong Industrial Zone, Go Dau District, Tay Ninh Province

Scale : 56,000 m2

Completion time : 12 months

Project value : VND90 billion

90VND BILLION

PROJECT VALUE

12MONTHS

COMPLETION TIME

110 111Remeeco profile Remeeco profile

Page 57: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

Customer & Partner

Page 58: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

CUSTOMER & PARTNER

114 115Remeeco profile Remeeco profile

Page 59: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

CUSTOMER & PARTNER

116 117Remeeco profile Remeeco profile

Page 60: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

CUSTOMER’S ASSESSMEMT

118 119Remeeco profile Remeeco profile

Page 61: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

CUSTOMER’S ASSESSMEMT

120 121Remeeco profile Remeeco profile

Page 62: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

1Vinhomes Central Park - Park 2,3,4

Tan Lien Phat Construction Investment Corp.

Vincom Construction and Consultant Co., Ltd.

2016 2017 VND425 billion

2 The Everrich Infinity Phat Dat Real Estate Development Corp.

CPE 2015 2017 VND200 billion

3Sarica Dai Quang Minh

Dai Quang Minh Corp.

Artelia 01/2016 11/2017 VND198 billion

4 Paihong Paihong VN Co., Ltd. 02/2017 11/2017 VND110 billion

5 Vifon Vifon Apave 03/2017 11/2017 VND99 billion

6 An Gia StarAn Gia Real Estate Development and Investment Corp.

05/2015 04/2017 VND68 billion

7 An Gia RiversideAn Gia Real Estate Development and Investment Corp.

05/2015 06/2017 VND57 billion

8 An Gia SkylineAn Gia Real Estate Development and Investment Corp.

05/2015 11/2017 VND112 billion

9 VHCP- Landmark 2 VinGroupMeinhardt Consultant Co., Ltd.

04/2016 05/2017 VND158 billion

LIST OF COMPLETED PROJECTS

2017NO. PROJECT INVESTOR CONSULTANT

CONSTRUCTION TIME CONTRACT VALUE IMAGES

Starting Ending

10Vinschool CC2 Primary School Vingroup Artelia 06/2016 03/2017 VND21 billion

11Fang Brothers Knitting

Fang Brothers Kitting Vietnam Co., Ltd.

ICIC 06/2017 12/2017 VND90 billion

12 M-One Tan Kieng Thao Dien Investment JSC.

Artelia 10/2015 11/2017 VND210 billion

13Park City Hanoi Phase 2

VietNam International Township JSC

Coninco-3C 10/2016 05/2017 VND115 billion

14Park Hill Times City - P1, P2, P3, P5 Vingroup Artelia 10/2015 2/2017 VND563 billion

15Vinmec Da Nang International Hospital

VingroupVietnam Institute of Architecture

10/2016 05/2017 VND76 billion

16 Masteri Villas Techcom Developer Artelia 2/2016 4/2017 VND571 billion

17Vinhomes Golden River Aqua 1,2,3,4

Thanh Pho Ho Chi Minh Investment Service Trading JSC.

Vincom Construction and Consultant Co., Ltd.

08/2015 06/2017 VND700 billion

18 Diamond Lotus ASC Sai Gon Apave 4/2016 12/2017 VND268 billion

122 123Remeeco profile Remeeco profile

Page 63: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

1 Sol Beach House Duc Viet Co., Ltd. Apave 12/2015 10/2016 VND156 billion

2 Masteri Thao Dien Thao Dien Investment JSC.

Artelia 10/2014 10/2016 VND1100 billion

3Gamuda CT3 high rise Apartment

Gamuda Land Vietnam Co., Ltd.

- 08/2014 10/2016 VND145 billion

4Luithai Textile Factory Luithai VN Co., Ltd. - 10/2015 02/2016 VND22 billion

5YoungBo Vina Bac Ninh

Shenzhou International Group

- 04/2015 09/2016 VND40 billion

6Daeyeong Vina Factory

Daeyeong Vina Co., Ltd.

- 06/2015 01/2016 VND36 billion

7 Brotex 3 Brotex Vietnam ICIC 2015 2016 VND57.2 billion

8 Lexington Residence Nova Lexington Real Estate JSC.

Nova Land Investment Group Corp.

2015 2016 VND182 billion

2016

LIST OF COMPLETED PROJECTS (cont.)

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

9Dorco Vina Ha Nam Factory Phase 2 Dorco Vina Co., Ltd. B.B.Dai Minh 06/2015 02/2016 VND57 billion

10 VHCP- Central 3 VinGroupMeinhardt Consultant Co., Ltd.

8/2015 10/2016 VND144 billion

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

1 Icon D3 Hieu Duc JSC. Archetype 2014 2015 VND85 billion

2 Pepsi Dong Nai Pepsico InternationalCPE Chan Phuong

02/2014 01/2015 VND180 billion

3 Camoplast Solideal Campoplast Solideal Haskoning 06/2014 06/2015 VND72 billion

4 Diana Unicharm Campoplast Solideal Haskoning 06/2014 06/2015 VND72 billion

5 Caye Serano Jen Tuan Chau Co., Ltd.

WT Partnership 09/2014 06/2015 VND10 billion

2015

124 125Remeeco profile Remeeco profile

Page 64: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

6Vo Van Kiet – Kien Giang School

Department of Education and Training - Kien Giang Province

11/2014 03/2015 VND5 billion

7Singapore International School (SIS)

PIC JSC. 11/2014 04/2015 VND26 billion

8 Gentherm Ha Nam Gentherm VN Tebodin 11/2014 10/2015 VND93 billion

2014

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

1Café Tran Quang II Factory

Café Tran Quang Co., Ltd.

Atelier 11/2013 03/2014 VND15 billion

2 Vivo CityVietsin Commercial Complex Development JSC.

Apave VN 07/2013 11/2014 VND545 billion

3 Mc Donald’s Go Vap Good Day Hospitality JSC.

TTAD 2014 2014 VND30 billion

2015

LIST OF COMPLETED PROJECTS (cont.)

2013

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

1 Marigot Factory SwarovskiHaskoning Vietnam

09/2012 05/2013 VND132 billion

2Crown New Can Da Nang

Crown Beverage Cans Danang Co., Ltd.

- 09/2012 05/2013 VND47 billion

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

4 Gain Lucky 1&2Shenzhou International Group Holdings Limited

IDCo 2013 2014 VND186 billion

5 Brotex 1&2 Brotex Vietnam Co., Ltd.

ICIC 2013 2014 VND201 billion

6DongSung Vina Thai Nguyen

DongSung Vina Co., Ltd.

- 03/2014 08/2014 VND14 billion

7 Formosa Ha Tinh Formosa Ha Tinh Steel Corp.

- 06/2013 06/2014 VND38 billion

8 Magic Vina Magic Vina Co., Ltd. - 06/2014 12/2014 VND49 billion

126 127Remeeco profile Remeeco profile

Page 65: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

3Industrielle Beteiligung Building

Industrielle Beteiligung Co., Ltd.

- 06/2012 01/2013 VND24 billion

4PCC1 Trade Center and Housing Apartment

Power Construction No.1 JSC

IBST 05/2012 11/2013 VND44 billion

5 Ho Tram Strip Phase 1

Ho Tram Project Co., Ltd.Asian Coast Development, Ltd.(ACDL)

Meinhardt Singapore

2011 2013VND1,459

billion

6 Viet Luan Factory Viet Luan Co., Ltd. 2012 2013 VND49 billion

7 Texhong Ngan Long Texhong Textile JSC. ICIC 2012 2013 VND55 billion

8 Essilor Factory Essilor (France) Archetype 2013 2013 VND66 billion

9 Eximbank Ky Dong Eximbank 2013 2013 VND27 billion

10 Viglacera Tower Viglacera Corp.AIC Management

2011 2013 VND121 billion

11120 Gamuda Gardens

Gamuda Land Vietnam Co., Ltd.

G&P 12/2012 12/2013 VND50 billion

2013

LIST OF COMPLETED PROJECTS (cont.)

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

1 Nestle Route 66 Nestlé Vietnam Co., Ltd.

Haskoning Vietnam

09/2011 08/2012 VND220 billion

2 City Garden Phase 1City Garden Apartments Vietnam Co., Ltd.

Mace VN 08/2010 10/2012 VND280 billion

3Diamond Island Phase 1 Kusto Home

Turner & Coninco

08/2009 12/2012 VND324 billion

4Hyatt Regency Da Nang

Marble Mountain Beach Resort J.S.C

ICE(Indochine Engineering Ltd Co.)

2010 2012 VND393 billion

5 President Place Refico Mace VN 05/2011 08/2012 VND68 billion

6 LIM Tower Mai Thanh Service Co., Ltd.

Apave VNCoteba (France)

04/2011 06/2012

7 Salinda Phu Quoc An Cuong Co., Ltd. Qcons 01/2012 08/2012 VND64 billion

8Hochiminh Stock Exchange (HOSE)

Hochiminh Stock Exchange (HOSE)

- 2012 2012 VND99 billion

2012

128 129Remeeco profile Remeeco profile

Page 66: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

2012

2011

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

9 Novotel Phu Quoc C.E.O Investment JSC.

2012 2012 VND220 billion

10 Ocean Villas Vinacapital Vina Project 12/2010 02/2012 VND215 billion

11 Dielac Factory Vinamilk IDCo 10/2011 10/2012 VND25 billion

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

1 Saigon PavillonPhu Hung Gia Investment Construction JSC.

Phu Hung Gia Investment Construction JSC.

07/2010 10/2011 VND54 billion

2 Pepsi Bac Ninh Pepsico InternationalHaskoning Vietnam

02/2011 09/2011 VND202 billion

LIST OF COMPLETED PROJECTS (cont.)

2010

2009NO. PROJECT INVESTOR CONSULTANT

CONSTRUCTION TIME CONTRACT VALUE IMAGES

Starting Ending

1 Vinamilk Bac Ninh VinamilkFCC Control and Fumigation JSC.

2009 2009 VND2.5 billion

2 ODIM Factory ODIM Factory Coteccons 07/2008 09/2009 VND80 billion

3 Sanctuary Ho Tram

Hai Vuong Tourism JSC. and Nha Le Vu Development And Business JSC.

03/2008 04/2009 VND76 billion

4 Liberty 6 Hotel Liberty Corp. UPCC 12/2008 01/2009

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

1Tan Son Nhat International Airport Terminal - Air Cargo

SCSC

JACDelta Investment Construction JSC.

08/2009 09/2010 VND143 billion

2 Coteccons Building Coteccons 05/2009 06/2010 VND45 billion

130 131Remeeco profile Remeeco profile

Page 67: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

2008

2007

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

1 Dutch Lady Dutch Lady VN Haskoning 2007 2008 VND85 billion

2 Sabeco Cu Chi SABECO Haskoning 2007 2008 VND80 billion

3 Centre Point Tower ReficoHBP Project Management.

2008 2008 VND126 billion

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

1 FOSTER Foster Electric Co.,LtdICIC & BB Dai Minh

2006 2007 VND105 billion

LIST OF COMPLETED PROJECTS (cont.)

LIST OF ON-GOING PROJECTS

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

1 Vincom Tay Ninh VingroupVingroup Management Board

11/2016 11/2018 VND110 billion

2 Shaeffler Shaeffler VN Co., Ltd. 01/2018 11/2018 VND160 billion

3

Project of improving head office of the Government and Government Office

Vincom Construction and Consultant Co., Ltd.

Apave 2017 2018 VND111 billion

4Ho Tram Strip Phase 2

Ho Tram Project Co., Ltd.

APP 2017 2018 VND500 billion

5Vinhomes Metropolis Vietnam INCO., JSC.

Vincom Construction and Consultant Co., Ltd.

2017 2018 VND650 billion

6 Vinhomes Imperia VinGroup

Vincom Construction and Consultant Co., Ltd.

12/2017 04/2019 VND151 billion

7 City Garden Phase II City Garden Apartments Vietnam

TTAD 2016 2018 VND316.2 billion

132 133Remeeco profile Remeeco profile

Page 68: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

8 D’capitale Tan Hoang Minh Texo 2016 2018 VND1,157 billion

9 Masteri Millennium Vinh Hoi Artelia 2016 2018 VND365 billion

10 Vincom Bac Ninh Vingroup BQL Vingroup 01/2017 09/2018 VND160 billion

11 A&B Nha Trang A&B Group Artelia 02/2017 10/2018 VND181 billion

12 Preche Thao Dien Investment JSC.

Artelia 05/2016 09/2018 VND270 billion

13 Diamond Island 2 Binh Thien An Property JSC.

Artelia 07/2016 2018 VND780 billion

14 CityLand CityLand BQL CityLand 08/2017 11/2018 VND220 billion

LIST OF ON-GOING PROJECTS (cont.)

NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT

VALUE IMAGESStarting Ending

15 Flamingo Dai Lai Flamingo Dai Lai JSC. 09/2016 05/2018 VND160 billion

16 Casino Hoi AnVina Capital, Chow-Tai-Fook & The SunCity Group

09/2017 06/2018 VND1,900 billion

17Khu Cao ốc VP - TM - DV lô 5.5 khu IIA Dai Quang Minh Apave 10/2017 04/2018 VND309 billion

18 The Goldview May - Diem Saigon JSC.

Artelia 2015 I/2018 VND775 billion

134 135Remeeco profile Remeeco profile

Page 69: LEADING M&E BRAND€¦ · VUNG TAU LONG AN H CITY IEN GIANG PHU QUOC ISLAND Hung Bac Ninh Ha Nam Yen CON DAO ISLAND HOANG SA ISLANDS TRUONG SA ISLANDS After nearly 15 years of development

236/6 Dien Bien Phu Street, Ward 17, Binh Thanh District, HCMC.Tel: (84.28) 3514 2255 - 3514 2266Fax: (84.28) 3514 2277Email: [email protected]: www.coteccons.vn - www.remeeco.vn

Representative Office5th Floor, Star City Tower, 81 Le Van Luong Street, Nhan Chinh, Thanh Xuan, HanoiTel: (84.24) 3783 4851 - (84.24) 3783 4850

M&E SECTOR