    Guayaquil,Julio 28, 2014

    GALOOLI SITE MONITORSYSTEM

    DEMO: MARTHA DE

    ROLDOS

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    2/14

    2

    Antecedentes - Objetivo

    Ante solicitud de Claro, se plantea la instalacin del sistema de monitoreo Galooli con el

    requerimiento indicado para tener un control en tiempo real de ciertos eventos y existamayor seguridad sobre los sistemas de bateras abiertos y generador AC.

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    3/14

    3

    Battery voltageBattery Temp

    CCTV

    AC Energy meter

    Esquema general del sistema

    Triton / Corona

    GPS

    InternetExternal Users

    ZON Control

    Server

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    4/14

    4

    Triton inserted on Corona

    Esquema general del sistema

    Triton inserted on Corona

    ZON Control

    Triton programmer SerVision Multiclient

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    5/14

    5

    Requerimiento

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    6/14

    6

    Requerimiento

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    7/14

    7

    Energa AC

    Requerimiento General

    (General Requirement)

    Requerimiento Especifico

    (Specific Requirement)YES / NO (comply) / Pending confirmation NOTES

    Energa AC

    (AC Energy)

    Registro de voltaje AC

    (AC voltage register) YES EM-24 istalled with 2 CT rings.

    Registro de corriente AC

    (AC current register)YES EM-24 istalled with 2 CT rings.

    Registro factor de potencia

    (Power factor register)To be confirmed EM-24 istalled with 2 CT rings.

    Registro consumo Ah

    (AmpereHour consumption

    register)

    YES EM-24 istalled with 2 CT rings.

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    8/14

    8

    Energa DC

    La solucin no cumple con este requerimiento

    Requerimiento General

    (General Requirement)

    Requerimiento Especifico

    (Specific Requirement)YES / NO (comply) / Pending confirmation NOTES

    Energa DC

    (DC Energy)

    Gestin y monitoreo de planta

    de rectificacin

    (Monitoring and management of

    Power Plant (ELTEK))

    NO

    ELTEK Power Plant provides SmartPackAdvanced functions with SNMP

    compatibility. They want to be able to use

    these functions to monitor and manage the

    equipment remotely.

    Our solution does not offer any connection

    through Power Eltek Advanced functions.

    DC meter not required.

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    9/14

    9

    Bateras estacionarias

    Requerimiento General

    (General Requirement)

    Requerimiento Especifico

    (Specific Requirement)

    YES / NO (comply) / Pending

    confirmationNOTES

    Bateras estacionarias

    (stationary batteries)

    Registro de estado de las bateras

    en tiempo real. Implica conocer

    parmetros de conductancia o

    admitancia de las bateras deforma individual.

    (Real Time monitoring of battery

    state. Conductance, admittance, or

    resistor based methods to monitor

    per battery state)

    YES / PENDING

    Must monitor at least battery voltage per

    battery remotely. Conductance /Admittance measurement is a very desired

    feature.

    Our solution does not offer conductance /

    admittance register.

    At moment with Galooli solution we have 1

    battery temp and 1 battery voltage.

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    10/14

    10

    Generador

    Requerimiento General(General Requirement)

    Requerimiento Especifico(Specific Requirement)

    YES / NO (comply) / Pending confirmation NOTES

    Generador

    (Generator)

    Gestin y monitoreo de la planta

    generatriz

    (Monitor and management of

    GENSet)

    NO

    GENSets on Claros network have specific

    GENSet controlling cards

    They wish to monitor and manage remotely

    all parameters captured by controlling

    cards. They also want to able to turn the

    Generator ON remotely and program

    exercise test periodically remotely.

    Our solutions does not access the

    controlling card information to monitor and

    manage GENSet.

    Customer informed that Fuel Level is no

    required and should only be considered as

    an optional feature. LLS not required.

    La solucin no cumple con este requerimiento

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    11/14

    11

    Video vigilancia

    Requerimiento General

    (General Requirement)

    Requerimiento Especifico

    (Specific Requirement)YES / NO (comply) / Pending confirmation NOTES

    Video camara

    En cada sitio debern existir al menos 2 cmaras

    de video, una interna en el cuarto de equipos y otraexterna.(On each site the must exist at least 2 cameras to

    monitor equipment room and access)

    YES2 outdoor cameras are available. Newcoax cable will be required since providedlength is not enough.

    La resolucin de las cmaras debe permitir la

    identificacin clara de las personas que han

    ingresado a la radiobase.

    (Camera resolution should be good enough to

    identify clearly the person accessing site).

    YES

    Cameras have ok resolution for most of

    he covered area, in case client requires

    better resolution, new camera must be

    accuired.

    Las cmaras deben tener la funcionalidad de iniciar

    la grabacin al detectar movimiento en su zona deoperacin.

    (Cameras must have feature that enables it to

    record when it has detected movement in its viewing

    range).

    YES OK

    La grabacin deber ser enviada al sistema de

    almacenamiento central con un eficiente uso del

    ancho de banda asignado

    (All recording should be sent to a centralized server

    located in customer premises utilizing bandwithefficiently).

    PENDING

    Customer wishes to protect privacy and

    secure their information and govern their

    own equipment.

    I believe SerVision does have a

    centralized solution. as is now, recording

    is done on SerVision gateway on site in

    MicroSD and portions of selected videocan be downloaded to centralized location

    or live streaming can be seen through

    SerVision Multiclient app.

    El medio de transmisin entre la Radiobase y el

    sistema de almacenamiento central ser provisto

    por Conecel.

    (The means of transmission of data between site

    and centralized location will be provided by

    Conecel(Customer)).

    YES / PENDING IMPLEMENTATION

    Customer offers to provide some means

    of transmission of data depending on the

    specifications of our product. Our product

    uses 3G data card, no need for other

    means of transmission.

    3G is a bit slow, but for demo purposes is

    ok.

    3G is not the most reliable connection

    means, for demo purposes OK, betterransmission method must be defined in

    he future.

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    12/14

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    13/14

    13

    Conclusiones

    Solucin parcial, se debe realizar un desarrollo para cumplir al 100% de los

    requerimientos.

    La solucin de video es independiente al sistema de monitoreo Galooli, no existe

    integracin entre ambos sistemas.

    Existen fallas en ZON Control que han sido resueltas y mejoras que ha implementado

    Galooli poco a poco, a destiempo considerando el demo presentado a Claro.

    El medio de TX de la solucion es travs de la red 3G de Claro lo que lo hace un poco lento

    (especialmente la solucion de video) el cliente requiere sea Ethernet.

    PREGUNTAS y COMENTARIOS.

  • 8/10/2019 Leadcom Galooli Demo Marthaderoldos

    14/14

    14

    Gracias