lcls personnel protection system and beam containment system

14
E. Michael Saleski PPS and BCS [email protected]. edu April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski PPS and BCS Systems Manager

Upload: melanie-rosales

Post on 30-Dec-2015

25 views

Category:

Documents


0 download

DESCRIPTION

LCLS Personnel Protection System and Beam Containment System. E. Michael Saleski PPS and BCS Systems Manager. PPS and BCS Overview. Roles of Personnel Systems Scope Present Status Path forward for design, review, and approval. Personnel Roles. PPS Scope. Mixture of: New PPS Systems - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

LCLSPersonnel Protection System and Beam

Containment System

E. Michael Saleski

PPS and BCS Systems Manager

Page 2: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

PPS and BCS Overview

Roles of Personnel

Systems Scope

Present Status

Path forward for design, review, and approval

Page 3: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

Personnel RolesManagement Responsibilities for

System Development through Operations

System Development and Commissioning Operations

Sa

fety

A

ssu

ran

ce

Sa

fety

A

ssu

ran

ce

De

sig

n,

Imp

lem

en

tatio

n,

Ma

inte

na

nce

, T

est

ing

De

sig

n,

Imp

lem

en

tatio

n,

Ma

inte

na

nce

, T

est

ing

Op

era

tion

al

Ove

rsig

ht

Op

era

tion

al

Ove

rsig

ht

Ove

rall

Re

spo

nsi

bili

ty,

Re

sou

rce

A

lloca

tion

Ove

rall

Re

spo

nsi

bili

ty,

Re

sou

rce

A

lloca

tion

LCLS Controls Manager

CPE Controls Manager

LCLS PPS Systems Manager

CPE Safety Systems

Review Officer

PPS Group Leader

Accelerator Systems Division

Safety Officer

Page 4: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

PPS Scope

Mixture of: New PPS Systems

Existing PPS Systems with minor modifications

Hutch Protection Systems (HPS)

Plan to utilize PLC architectureNew at SLAC, increases review burden

Page 5: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

PPS Scope

LINAC

20-21

26-27

24-25

28-29

22-23

Muon Shield

Undulator Hall

Sector 30+ BSY

Shield Wall

Injector

LTUElectronDump

Enclosure

LTU to BSYEmergency

exit

Equipment Access & Emergency Exit

D2 Dump

BAS IIDump

Backward Beam

Stopper

Barrier Gate at BSY/RY Boundary

FEEShieldWall

ShieldWall

NearHall

X-RayTransport

FarHall

Page 6: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

LCLS Injector Vault PPS Layout

Up

Backward Beam

StopperEO

EO

EO

EO

Pr

Down

EO

SR

Laser Room

Laser Light Barrier

EO

Pr

SR

Emergency Off Button

Search Preset Button

Search Reset Button

Keybank

BSOIC

BCS PIC

Annunciator

PPS Equipment Door

Entry Module

DL1 Bend BX01/02

Dump

Linac Injector Spectrometer

Penetration

W

WVideo Camera

Equipment Drop with Removable Decking

Page 7: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

PPS Status for Nov 2006 Injector Commissioning

Injector Software development complete

Hardware drawings, wiring diagrams are complete

LCLS Injector PPS FDR is next week (4-27)

Installation is set to begin in June

Begin detailed design of downstream systems in Summer 2006

Page 8: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

PPS Review Path

PPS Global SCR: Nov 18, 2005

Injector (linac+BSY) Informal PDR: Feb ’06

Injector (linac+BSY) FDR: April 27th

RSC subcommittee: Functional Requirements Review: March 29th

RSC subcommittee: Safety Lifecycle Review: April 14th

RSC subcommittee: Technical Review: May

RSC full committee: June

Page 9: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

BCS Scope

Prevents radiation from ‘escaping’ the shielding enclosure

Direct measurements of radiation or beam loss

Protection of safety-critical collimators and stoppers

Entirely new LCLS BCS neededNew gun = new shut-off mechanisms

Support two simultaneous programs (LCLS & PEP) = new set of shut-off paths

Reduce mutual interference of programs as much as possible = targeted shut-offs

Page 10: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

BCS Modes

CID

NDR

SDR

PRL

LE Bypass

HE Bypass

LCLSInj

NARC

SARC

A-Line

BTH

HENIT

LESIT

D2

CID

NDR

SDR

PRL

LE Bypass

HE Bypass

LCLSInj

BAS II

NARC

SARC

A-Line

BTH

HENIT

LESIT

Accelerator in LCLS Mode

Accelerator in Linac Mode

Beamlines that shut-off CID

Beamlines that shut-off LCLS

Page 11: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

BCS System ArchitectureNIT/SIT BCS Summary and

Bypass Chassis

LCLS BCS Summary and

Bypass Chassis

ESA BCS Summary and

Bypass Chassis

LINAC

Zone 3

BCS Summary

and Shut-Off Chassis

LCLSZone

BCS Summary, Shut-Off,

and Local Mode

Chassis

LCLS/LINAC Switching Logic

To LCLS Shut-Off

Mechanisms

LINAC

Zone 2

BCS Summary

and Shut-Off Chassis

LINAC

Zone 1

BCS Summary

and Shut-Off Chassis

To CID Shut-Off

MechanismsBSY PICs BCS Summary and

Bypass Chassis

119B PICs

119D PICs

119C PICs

PIC CrateST950ST960

ST950 &ST960

Flow Switches

Sector 29 and E+ BCS Inputs

Sector 4,Sector 10,

Damping Rings,And CID

BCS Inputs

LCLS LocalBCS Inputs

CIDLocal Mode

Chassis

PEP ACMs (5113)

BSY ACMs (5112, 5150)

MCC Meter Relays

DC Detect

BCS Trigger Timing Watchdog

Page 12: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

BCS Status

System Concept Review completed (2-24)System design and PDR series are progressing towards a June FDRNew LCLS BCS device requirements for Injector-through-BSY operation is determinedNew BCS device compliment for downstream systems is currently being specifiedBCS Engineering Specifications Document is currently being generated (95% complete for commissioning-relevant content)

Page 13: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

BCS Review Path

System Concept Review: Feb 24th

PDR series is underway (April-June)

FDR is on track for June

RSC System Review is needed; not scheduled

RSC Review of BCS device compliment for Injector through BSY operations is needed; not scheduled:

Page 14: LCLS Personnel Protection System and Beam Containment System

E. Michael Saleski

PPS and BCS [email protected]

April 20, 2006

Summary

PPS: heavy review schedule, but expect readiness for Fall Commissioning