LCFI CollaborationStatus Report

LCUK Meeting

Oxford, 29/1/2004

Joel Goldstein

for the LCFI Collaboration

Bristol, Lancaster, Liverpool, Oxford, QMUL, RAL

Page 2: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 2

LCFI Research Programme

R&D for a vertex detector at NLC or TESLA

1. Physics Studies• Algorithm development and implementation

• Detector optimisation

2. Mechanical Development• Ultra low-mass ladders

• FEA/physical models

3. Detector Development• Fast CCD technology (50 MHz for TESLA)

• Custom CMOS readout chips

Page 3: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 3

LC Vertex Detector

• 800 Mchannels of 2020 m pixels in 5 layers

• Optimisation:– Inner radius (1.5 cm?)

– Readout time (50 s?)

– Ladder thickness (0.1% X0?)

Page 4: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 4

Physics Studies

• Preparing framework

• Many different options

– Short term: SGV

– Long term: JAS3

• ZVTOP (SLD)

• Benchmarking starting

1. Implement flavour tagging algorithms in LC software

2. Quantify physics impact of different configurations

Page 5: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 5

Mechanical Options

Target of 0.1% X0 per layer

(100m silicon equivalent)

1. Unsupported Silicon– Longitudinal tensioning provides stiffness– No lateral stability– Not believed to be promising

2. Semi-supported Ultra-thin Silicon– Detector thinned to epitaxial layer (20m)– Silicon glued to low mass substrate for lateral stability– Beryllium has best specific stiffness– Composites, ceramics, foams...

3. Novel Structures

Page 6: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 6

Mechanical Studies of Be-Si

FEA Simulations Physical Prototyping• Laser survey system

Thinned CCD ( 20 μm)

Beryllium substrate (250 μm)

Adhesive

0.2mm

~160 μm ripples at -60°C

• Good qualitative agreement

Page 7: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 7

New Approaches

• Be-Si unstable when cooled due to CTE mismatch

• Choose substrate with closer CTE match– 100 μm carbon fibre – ceramic foam

• Micromechanical techniques....

Microstages

replace glue pillars

Sandwich

UV lithography on dummy

Page 8: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 8

Column Parallel CCD

N+1

Column Parallel CCDReadout time = (N+1)/Fout

• Separate amplifier and readout for each column

Page 9: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 9

Prototype CP CCD

CPC1 produced by E2V

• Two phase operation

• Metal strapping for clock

• 2 different gate shapes

• 3 different types of output

• 2 different implant levels

Clock with highest frequency at lowest voltage

Page 10: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 10

CPC1 Results

• Noise ~ 100 electrons

• Minimum clock ~1.9 V

• Maximum frequency ~ 10 MHz– inherent clock asymmetry

Page 11: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 11

CP Readout ASIC

CPR1 designed by RAL ME Group

• IBM 0.25 μm process

• 250 parallel channels with 20μm pitch

• Designed for 50 MHz

• Data multiplexed out through 2 pads

Page 12: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 12

CPR1 Testing

• Flash ADCs tested

• Voltage and charge amplifiers tested

• Voltage gain ~40

• Very sensitive to timing and bias values

• Outstanding digital problems

Voltage injection into ADC

Page 13: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 13

Wirebonded Combination

Page 14: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 14

Last Tuesday: Success!

4 channels with test signal

4 channelswirebonded to CCD

Single channel histogrammed over 200 frames

Page 15: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 15

Wirebonded Results

• Noise ~130 electrons

• Noise from preamps negligible

• Direct connections will be tested next

Page 16: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 16

Future Plans

• Bump Bonding– Currently underway with VTT– Expect assemblies in March/April

• Test Programme– Radiation effects on fast CCDs (Liverpool/Lancaster)– High frequency clock propagation (Oxford)

• Next Generation ASIC– Cluster finding logic– Design work almost finished– Waiting for CPR1 results and final review

• Next Generation CCD– Design work starting in next few weeks– Detector scale device

Page 17: LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,

Joel Goldstein, RAL LCUK 29/1/04 17

Summary

• LCFI is on schedule and making good progress– Physics tools ready for detector optimisation

– Semi-supported option studied in detail

– New mechanical ideas discussed

– CCD+ASIC operation achieved

• CP CCDs are viable technology for linear collider

• Next generation will be full-scale prototype CCDs

• Accelerator technology choice will determine path