lc gate l section

Upload: ravi-krishnan-sahi

Post on 08-Feb-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/22/2019 Lc Gate l Section

    1/1

    6248

    6380

    3500

    1500

    3750

    3750

    1500

    CLINE

    OFROAD

    15000

    SPEEDBREAKER

    AT15MFROM

    GATEPOST

    GATE POST

    WARNINGBOARD

    FORSPEEDBREAKER

    AT30MFROM

    C/LOFTRACK

    SIGNALBOARD

    AT100MFROM

    C/LOFTRACK

    CLINE OF RAIL

    GATE POST

    LIFTINGBARRIER

    SIGNAL BOARDAT100MFROMC/L OFTRACK

    CAUTIONBOARDAT200MFROMC/L OFTRACK

    6000

    6000

    WHISTLE BOARD

    AT 600MFROM

    C/LOF ROAD

    WL

    WHISTLE BOARD

    AT 600MFROM

    C/LOF ROAD

    W L

    LODGEGATE

    C OF TRACK

    L

    GATE POST IN3.5m FROM C/L

    OFTHE RAIL

    15000

    L - SECTION ALONG ROAD

    1:200

    CAUTIONBOARD

    AT 200m FROM

    C/LOFTRACK SPEED BREAKER IN15mFROMGATEPOST

    BLACKTOPPING

    STONESOLING

    WBMI

    II

    1676

    GATE POST IN3.5m FROM C/LOF THE RAIL

    15000

    CAUTION BOARD

    AT 200mF ROMC/L

    OF TRACK

    III

    3500

    SIGNALBOARD

    AT 100m

    FROMC/LOF

    TRACK

    WARNINGBOARD

    FOR SPEED

    BREAKER AT 30m

    FROMC/LOF TRACKSPEED BREAKER IN

    15mFROMGATEPOST

    WARNINGBOARD

    FOR SPEED

    BREAKER AT 30m

    FROMC/LOF TRACK

    SIGNALBOARD

    AT 100mFROM

    C/LOFTRACK

    C OF TRACKL

    1676

    6380

    C OF TRACKL

    1676

    RAIL LEVEL

    113.458m

    6248

    C OF TRACKL

    1676

    61083500

    TO KUSHLIKHERA VILLAGE

    6248

    6380

    3500

    1500

    3750

    3750

    1500

    15000

    6000

    6000

    Rev. No. CheckedDescription by Approved Date

    SPECIAL NOTE :-

    1. AS PER IRPWM CROSSING ANGLE BETWEEN C/L OF ROAD AND TRACK

    NOTES :-

    1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE SPECIFIED.

    2. PARALLEL TO ROAD AND ALONG THE RLY.BOUNDARY UPTO CERTAIN

    DISTANCE TO PREVENT ENCROACHMENTS,IN THE VISINITY OF THE MANNED

    L-XING AND THE SPACE SO ENCLOSED MAY BE UTILISED FOR THE RLY.

    PURPOSE LIKE STACKING OF P-WAY MATERIAL.

    3. IN THE CASE OF SKEW CROSSING THE LENGTH OF CHECK RAIL WILL BE = L / sinA,

    WHERE L = LENGTH MEASURED AT RIGHT ANGLE & A = ANGLE BETWEEN C/L OF

    ROAD AND RAIL TRACK.

    4. PAVED AREA UPTO RAILWAY CORRIDOR.

    5. THERE SHOULD BE PROVISION FOR ROAD USERS TO OBSERVE RED LIGHT WHEN

    GATE IS CLOSED AGAINST TRAFFIC AND WHITE WHEN OPEN TO ROAD, WHEN

    GATE LAMPS ARE PROVIDED.

    6. INDICATION BOARDS ON BOTH SIDE OF THE ROAD TO BE PROVIDED.

    7. W/L BOARDS 600m ON EITHER SIDE OF THE TRACK TO BE PROVIDED.

    CEE

    COM

    CTE

    CSTE

    DEE (G)

    DRM

    SR. DOM

    SR. DSTE

    SR. DEN(L)

    SR. DSO

    SIGNATUREDESIGNATION

    H.Q OFFICER'S APPROVALDIVN. OFFICER'S APPROVAL

    SIGNATUREDESIGNATION

    SR. DEN(CO-ORD)

    CSO

    KEY PLAN

    (NTS)

    CLIENT:

    PROJECT :

    CONSULTANTS:

    RAE BARELI- UTRAITIA

    LUCKNOWDIVISION:

    SECTION:

    TITLE:

    DRG.NO.

    SCALE : ISSUED Dt:

    SHEET No.

    M/S.AARVEE ASSOCIATES ARCHITECTS

    ENGINEERS & CONSULTANTS PVT LTD

    M/s.RELIANCE CEMENTATION

    CLIENT

    PRIVATE LIMITED

    &

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRODUCED

    BYAN

    AUTODESK

    EDUCATIONALPRODUCT

    PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT

    PRODUCED

    BYAN

    AUTODESK

    EDUCATIONALPRODUCT