Launch Readiness Review. University/Institution Team Members Date. User Notes. Please follow this template as closely as possible This presentation is critical for maintaining your flight spot and is required to fly! - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Launch Readiness Review

RockSat-C 2013

LRR

Launch Readiness Review

University/InstitutionTeam Members

Date

Page 2: Launch Readiness Review

RockSat-C 2013

LRR

User Notes

• Please follow this template as closely as possible

• This presentation is critical for maintaining your flight spot and is required to fly!

• Although it seems short, most items will take multiple slides, and please include data and pictures!

Page 3: Launch Readiness Review

RockSat-C 2013

LRR

Final Payload

• Show off your payload!– Pictures of the payload– Pictures of your team with the payload– Pictures of anything else that you love

about your payload (keep in mind the time limit on the presentation )

3

Page 4: Launch Readiness Review

RockSat-C 2013

LRR

User Guide Compliance

4

Requirement Payload Requirement StatusMass allotment: your allotment

Volume allotment: your allotment

The payload’s center of gravity (CG):

In 1”X1”X1” envelope of centroid (or in area designated

for sharing teams?

Activation met under requirement: (either 1.SYS.1 or 1.SYS.2)

Your requirement (1.SYS.1 or 1.SYS.2)

Tested?

Structure mounts: Top and bottom bulkheads. No mounts to sides of cans.

Sharing: Fully developed?

For reference: 1.SYS.1 is the early activation line1.SYS.2 is the RBF/g-switch activation line

Page 5: Launch Readiness Review

RockSat-C 2013

LRR

Integration Plan and Procedure

• How is your integration plan?– What did you learn from your mission

sims about integrating?• Is your procedure complete and

written?– This is important; integration at Wallops

can be stressful so avoid relying on memory to connect everything in the payload

– Do you have any concerns? What will you do to mitigate these? 5

Page 6: Launch Readiness Review

RockSat-C 2013

LRR

Testing Results

• Any updates on testing?– Pictures/plots etc (not required unless

you had to do more tests between the delta FMSTR and now)

• Does you payload activate properly?• Does your payload fulfill the mission

requirements?

6

Page 7: Launch Readiness Review

RockSat-C 2013

LRR

Level of Readiness

• This is the most important part of the presentation!

• Are you ready?• What is ready?• Is anything not ready?

– Why? How will you make them ready?

7

Page 8: Launch Readiness Review

RockSat-C 2013

LRR

Level of Readiness

• Action items between now and June 15th?– Hopefully there is nothing on this slide!– What will you do with the things that

aren’t ready?

8

Page 9: Launch Readiness Review

RockSat-C 2013

LRR

Check-In Inspections

• Are there any remaining questions about check-in?

• Have you tried it yet? – Were there any issues?

9

Page 10: Launch Readiness Review

RockSat-C 2013

LRR

Final Questions

• Do you have any questions about how this week will go?– Any environmental test day questions?– Any integration day questions?– Any launch day questions?– Food questions?– Pony questions?– Bill’s questions?

10

Page 11: Launch Readiness Review

RockSat-C 2013

LRR

Discussion

• Final Report• Presentation to Workshop• Check-in procedure• Extra people