launch readiness review
DESCRIPTION
Launch Readiness Review. University/Institution Team Members Date. User Notes. Please follow this template as closely as possible This presentation is critical for maintaining your flight spot and is required to fly! - PowerPoint PPT PresentationTRANSCRIPT
RockSat-C 2013
LRR
Launch Readiness Review
University/InstitutionTeam Members
Date
RockSat-C 2013
LRR
User Notes
• Please follow this template as closely as possible
• This presentation is critical for maintaining your flight spot and is required to fly!
• Although it seems short, most items will take multiple slides, and please include data and pictures!
RockSat-C 2013
LRR
Final Payload
• Show off your payload!– Pictures of the payload– Pictures of your team with the payload– Pictures of anything else that you love
about your payload (keep in mind the time limit on the presentation )
3
RockSat-C 2013
LRR
User Guide Compliance
4
Requirement Payload Requirement StatusMass allotment: your allotment
Volume allotment: your allotment
The payload’s center of gravity (CG):
In 1”X1”X1” envelope of centroid (or in area designated
for sharing teams?
Activation met under requirement: (either 1.SYS.1 or 1.SYS.2)
Your requirement (1.SYS.1 or 1.SYS.2)
Tested?
Structure mounts: Top and bottom bulkheads. No mounts to sides of cans.
Sharing: Fully developed?
For reference: 1.SYS.1 is the early activation line1.SYS.2 is the RBF/g-switch activation line
RockSat-C 2013
LRR
Integration Plan and Procedure
• How is your integration plan?– What did you learn from your mission
sims about integrating?• Is your procedure complete and
written?– This is important; integration at Wallops
can be stressful so avoid relying on memory to connect everything in the payload
– Do you have any concerns? What will you do to mitigate these? 5
RockSat-C 2013
LRR
Testing Results
• Any updates on testing?– Pictures/plots etc (not required unless
you had to do more tests between the delta FMSTR and now)
• Does you payload activate properly?• Does your payload fulfill the mission
requirements?
6
RockSat-C 2013
LRR
Level of Readiness
• This is the most important part of the presentation!
• Are you ready?• What is ready?• Is anything not ready?
– Why? How will you make them ready?
7
RockSat-C 2013
LRR
Level of Readiness
• Action items between now and June 15th?– Hopefully there is nothing on this slide!– What will you do with the things that
aren’t ready?
8
RockSat-C 2013
LRR
Check-In Inspections
• Are there any remaining questions about check-in?
• Have you tried it yet? – Were there any issues?
9
RockSat-C 2013
LRR
Final Questions
• Do you have any questions about how this week will go?– Any environmental test day questions?– Any integration day questions?– Any launch day questions?– Food questions?– Pony questions?– Bill’s questions?
10
RockSat-C 2013
LRR
Discussion
• Final Report• Presentation to Workshop• Check-in procedure• Extra people
11