  • Trac Impact Study for J.W Marriot Hotel - Qatar

    01

    PROJECTS

    Business Trading Company has assigned Seero to complete the full traffic impact study for the new JW Marriot Hotel in Qatar to satisfy MMUP requirements. The TIS of the development will require traffic demand distributions, traffic analysis, site development review plans, and the final traffic impact report. The development is located in the towers zone at the diplomatic street in Doha.

    Status: Ongoing

    PROJECTSWe have worked in various transportation engineering and planning projects such as:

    Consultant:Owner: 397400

    397450

    397500

    2317

    00

    2317

    50

    2318

    00

    2318

    50

    2319

    00

    2319

    50

    2320

    00

    397550

    397600

    J

    K

    L

    MN

    O

    7

    8

    9

    10

    11

    12

    13

    14

    I

    PQ

    J

    K

    L

    MN

    O

    I

    PQ

    R

    R

    2

    4

    5

    6

    1

    H'

    H'

    H

    H

    G

    G

    F

    F

    E

    E

    D

    D

    C

    CB

    A

    A

    A"

    A"

    B

    A

    A

    B

    43

    2

    1a

    3

    7

    8

    PLOT LIMIT

    PLO

    T LI

    MIT

    PLOT LIMIT

    PLO

    T LI

    MIT

    PLO

    T LI

    MIT

    PLOT LIMIT

    PLOT LIMIT

    PLO

    T LI

    MIT

    PLO

    T LI

    MIT

    C

    OUTIN

    ENTRY

    EXIT

    ENTRY

    B U

    S

    P

    A

    R

    K

    I

    N

    G

    INOUT

    DNTO B1

    IN

    EXIT

    OUT

    INOUT

    GROUND FLOOR LEVELNos. of Parking: 78 NOS.

    LANDSCAPE / GREEN AREA

    LANDSCAPE /GREEN AREA

    T A X I P A R K I N

    G

    STAI

    R-08

    P

    A

    R

    K

    I

    N

    G

    P A R K I

    N G

    PLOT LIMIT

    PLOT LIMIT

    PLOT

    LIMI

    T

    PLOT

    LIMI

    T

    PLOT LIMIT

    PLOT LIMIT

    PLOT LIMIT

    PLOT LIMIT

    DNTO B1

    APARTMEN

    SHAFTS(OPEN BELOW)

    ACCESS TO TX

    GAS TANKBELOW

    J

    K

    L

    MN

    O

    7

    8

    9

    10

    11

    12

    13

    14

    I

    PQ

    J

    K

    L

    MN

    O

    I

    PQ

    R

    R

    DR

    OP O

    FF

    AREA

    V I P P A R K I N G

    V I P P A R K I N

    G

    DR

    OP O

    FF

    AREA

    Landscape /Water feature

    GOV'T. OWNED PLOT4464.97 M

    P A R K I N

    G

    SLA

    BLI

    MI T

    SLAB

    LIM

    IT A

    BOVE

    ASSEMBLY A

    ASSEMBLY AREA

    SHAFTS(OPEN BELOW) SHAFTS

    (OPEN BELOW)

    SHAFTS

    (OPEN BELOW)

    RETURN AIR VENTS

    SHAFTS(OPEN BELOW)

    RETURN AIR VENTS

    SHAFTS(OPEN BELOW)

    SUPPLY AIR VENTS

    SHAFTS(OPEN BELOW)

    RETURN AIR VENTS

    STAIR-07

    GAS TANKBELOW

    Landscape /Water feature

    Landscape /Water feature

    A

    2

    3

    4

    5

    6

    1

    H'

    H'

    H

    H

    G

    G

    F

    F

    E

    E

    D

    D

    C

    CB

    A

    A

    A"

    A"

    B

    2

    3

    4

    5

    6

    1

    B

    A

    A

    B

    4 3

    2

    1a

    7

    8

    CC

    7

    8

    PLOT LIMIT

    PLO

    T LI

    MIT

    PLOT LIMIT

    PLO

    T LI

    MIT

    PLO

    T LI

    MIT

    PLOT LIMIT

    PLOT LIMIT

    PLOT LIMIT

    PLO

    T LI

    MIT

    PLO

    T LI

    MIT

    1a

    LEVEL 33 FLOOR LINE

    TOWER ROOF APEX LINE

    SWIMMING POOL@ 33RD FLOOR DECK

    P E R G O L A P E R G O L A P E R G O L A

    SLOPE

    SLOPE

    SLOPE

    SLOPE

    SLOPE SLOPE

    SLOPE

    R O A D

    SLOPE

    CANOPY BELOW

    F PERGOLA ABOVE

    DN

    7.50mSETBACK

    7.50

    mSETBACK

    9.0m

    4.85

    1.90

    m

    10.0mSETBA

    CK

    7.50mSETBA

    CK

    3.50m

    7.60

    m

    5.35m

    10.70m

    8.95m

    5.95m

    2.70

    m

    Landscape /Water feature

    SITE PLAN

    A-0001

    LOCATION PLAN

    SITE PLANScale:1:300

    1

    Issue Purpose

    Date Started

    Scale

    DISCIPLINE, AREA CODE & SHEET NUMBER

    REVISION NUMBERSTAGEPHASEPROJECT NO

    Date Issued

    Drawn

    CheckedApproved

    REV DESCRIPTION DATE

    Format

    THIS DRAWING IS THE PROPERTY OF M.Z. & PARTNERS AND SHALLNOT BE COPIED OR REPRODUCED IN ANY MANNER WITHOUT

    THE WRITTEN CONSENT OF MZ & PARTNERS.

    ARCHITECTURAL

    W L LTEL:44 363813-4 P.O.B: 5785-QATAR , 44 360764-5 FAX:44 363812

    STRUCTURALMECHANICAL

    SUPERVISIONELECTRICAL

    A-1AS SHOWN

    NJJSP/SMA

    NSG/PBJ/MER/AVB17 APRIL 2013

    APRIL 2012DC-1

    03DC-11

    HEIGHT: 0+215.30 M.PIN NO. 61070120 WEST BAY, DOHA, QATAR

    (3B+G+51)JW MARRIOT HOTEL TOWER

    00 ISSUED FOR DC-1 MAY 2012 01 RE- ISSUED FOR DC-1 JUNE2012 02 RE- ISSUED FOR DC-1 JULY2012

    UP

    SLOPE

    SLOPE

    SLOPE

    B

    A

    A

    B

    4 3

    2

    SLOPE

    SLOPE

    SLOPE

    SLOPE

    GF-ST-07

    STAIR-078.16 m

    GF-ST-08

    STAIR-0812.21 m

    OUTIN

    ENTRY

    EXIT

    IN GROUND FLOOR LEVELNos. of Parking: 72 NOS.

    T A X I P A R K I N

    G

    P

    A

    R

    K

    I

    N

    G

    P A R K I

    N G

    GOV'T. OWNED PLOT4464.97 M

    PLOT LIMIT

    PLOT

    LIMI

    T

    PLOT

    LIMI

    T

    PLOT LIMIT

    PLOT LIMIT

    SHAFTS

    (OPEN BELOW)

    RETURN AIR VENTS

    GAS TANKBELOW

    V I P P A R K I N G

    P A R K I N

    G

    GAS TANKBELOW

    Landscape /Water feature

    GUARDHOUSE

    B U

    S

    P

    A

    R

    K

    I

    N

    G

    Landscape /Water feature

    L

    MN

    O

    7

    8

    9

    10

    11

    12

    13

    14

    PQ

    J

    K

    L

    MN

    O

    PQ

    R

    R

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DU

    CED

    BY

    AN

    AU

    TOD

    ESK

    ED

    UC

    ATI

    ON

    AL

    PRO

    DU

    CT

    PRO

    DU

    CED

    BY A

    N A

    UTO

    DESK

    EDU

    CA

    TION

    AL PR

    OD

    UC

    T

  • Trac Impact Study for J.W Marriot Hotel- Bahrain

    02

    PROJECTS

    Seero has also been assigned to conduct the full traffic impact study for the new JW Marriot Hotel in Bahrain in order to satisfy Urban Planning Affairs requirements in MMA. The TIS of the development will require traffic demand distributions, traffic analysis, site development review plans, and the final traffic impact report. The development is located in the plot F02.1 Bahrain Bay in Manama.

    Status: OngoingConsultant: Owner: Khalij Capita BSC Yousif Daoud Al Sayegh & Associates

  • 03

    PROJECTS

    Trac Impact Study for Um Ghwilina Commercial and Residential BuildingsSeero has been commissioned to undertake a limited Traffic Impact Study (TIS) for Um-Ghawilina residential and commercial buildings (B+G+7, &B+G+4 respectively). Seero team worked on the analysis and improvements of the parking design,circulation, and building accesses.

    Trac Impact Study for Lexus Showroom & OcesBy following MMUP guidelines and procedures of transport studies, Seero team will improve the circulation of ground and basement areas, improve the pedestrians and cyclist facilities within the project development area, and improve the geometry of the surrounding road network considering the trips generated by the project.

    Status: OngoingOwner: Abdullah AbdulGhani& Bros. Co. Consultant:

    Status: SubmittedOwner: Sh. A. A. A. Consultant:

  • Trac Impact Study for a Commercial Building (B+G+2) on Salwa Expressway

    04

    PROJECTS

    MMUP requires for all new development in Qatar that include any vehicle or traffic interaction to be checked and designed as per their transport guidelines issued May 2011. This project is around 5000 sq.m. on Salwa road and it is required to improve parking design and road connection to the service road in Salwa international expressway.

    Status: CompletedOwner: Consultant:

    PRO

    DU

    CED

    BY

    AN

    AU

    TOD

    ESK

    ED

    UC

    ATI

    ON

    AL

    PRO

    DU

    CT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DU

    CED

    BY A

    N A

    UTO

    DESK

    EDU

    CA

    TION

    AL PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DU

    CED

    BY

    AN

    AU

    TOD

    ESK

    ED

    UC

    ATI

    ON

    AL

    PRO

    DU

    CT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DU

    CED

    BY A

    N A

    UTO

    DESK

    EDU

    CA

    TION

    AL PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PR

    OD

    UC

    ED B

    Y A

    N A

    UTO

    DES

    K E

    DU

    CA

    TIO

    NA

    L PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DU

    CED

    BY A

    N A

    UTO

    DESK

    EDU

    CA

    TION

    AL PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

  • Trac Impact Study for Al-Wakra Commercial Building (B+G+1)

    05

    PROJECTS

    This limited TIS is mainly required by MMUP to check and modify the site developments plans in order to improve traffic circulation, parking design, vulnerable road users. This includes some traffic challenges to improve the swept path analysis for service trucks and their interaction with passengers cars. This type of limited TIS is very helpful for improving the performance of the building future operation.

    Owner: Consultant: Status: Completed

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DU

    CED

    BY A

    N A

    UTO

    DESK

    EDU

    CA

    TION

    AL PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DU

    CED

    BY

    AN

    AU

    TOD

    ESK

    ED

    UC

    ATI

    ON

    AL

    PRO

    DU

    CT

  • 06

    PROJECTS

    Status: Completed

    Trac Impact Study for College of Engineering and College of Pharmacy in Qatar University

    New College of Engineering,

    New College of Pharmacy

    Owner: Consultant:

    This traffic impact study of this project is a study which requires the review of the proposed development drawings for consistency with driveway and access management standards along with the safety analysis for pedestrians and cyclist within the project location. All this analysis are implemented according to the guidelines and procedures for transport studies by MMUP, date May 2011. It includes methodology report, and site development plans and report.

  • 07

    PROJECTS

    For any enquiries, please contact:

    Mr. Haytham Sadeq, BSc. (Hons.), MASc. General Manager | Transportation [email protected]: +974 5582 0688Tel: +974 4486 6821 Fax: +974 4486 6410

  • +974 44866410Fax

    +974 44866821Tel

    +974 55820688Mobile

    201257 Doha, QatarP.O.Box

    [email protected]

    57385C.R.

    Address: Oce no. 5, Al Hedab street 787, Al Garrafa (51) Doha, Qatar

    www.seeroeng.com