lars tornberg
DESCRIPTION
TRANSCRIPT
![Page 1: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/1.jpg)
Lars Tornberg
Senior ConsultantProject Management
![Page 2: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/2.jpg)
Project customers and clients
![Page 3: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/3.jpg)
Experience
• System Engineering (PRE) • Contract Management• Project Management• Engineering Management• Quality Management• Site Management• Operation Management• Sales and Marketing
![Page 4: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/4.jpg)
Busniess
• Energy sector• Defence• Construction equipment• Process industry• Minning• Power industry• Manufacturing• Design / development• Electronics• Cable industry• Wind power industry
![Page 5: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/5.jpg)
Reference assignments
• Project Management• Chief Project Manager• Customer: Volvo Construction Equipment• Project: Electronic platform and control
system for new generation of wheel loaders• Project: New cab for compact wheel loaders
![Page 6: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/6.jpg)
Reference assignment No 1
• Site management• Site manager• Client: Vestas Northen Europe • Project: Overall responsible for mechanical
erection electrical installation and commisioning of onshore WTG V-90
![Page 7: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/7.jpg)
Reference assignments No 2
• Contract management / operation management
• Project Manager / Head Site Manager• Client: Exergy / Biowood / Hafslund• Project: Overall responsible for mechnical and
electrical installation, erection of steel structure civil enegeering and installation of control system
![Page 8: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/8.jpg)
Reference assignment No 3
• Project management /system engineering• Kockums submarine• Project: Responsible for project regarding
Design of control system for submarine Archer class submarine Deputy Manager Control system
![Page 9: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/9.jpg)
Referenece assignment No 4
• System Manager• Alstom ECS• Project: Responsible for system engineering of
all process equipemt towards Flue gas cleaning equipment for KK4 LKAB
![Page 10: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/10.jpg)
Reference Project
• No 1
Photo Copyright Vestas
Photo Copyright Vestas
Photo Copyright Vestas
![Page 11: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/11.jpg)
Reference project
• No 2
Photo Copyright TUPhoto Copyright Biowood
Photo Copyright Biowood
![Page 12: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/12.jpg)
Reference Project
• No 3
Photo Copyright Kockums
Photo Copyright Kockums
![Page 13: Lars tornberg](https://reader033.vdocuments.site/reader033/viewer/2022061206/548227adb07959150c8b46ed/html5/thumbnails/13.jpg)
Reference project
• No 4