Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August 24 - 25, 2010

Upload: linette-douglas

Post on 17-Jan-2018

219 views

Category:

Documents


0 download

DESCRIPTION

© Det Norske Veritas AS. All rights reserved. Barents 2020 Phase 4 - Working group RN02 03 August Objective and scope of RN02 work in Phase 4  Objective: Provide guidance and recommendations for design of stationary floating installations in the Barents Sea against ice loads, to fill the gaps identified in the 2010 edition of the coming ISO Standard.  Scope of work: - Task 1 – Workshop on ISO series, with emphasis on ISO Objective: To harmonize understanding between Russian and Norwegian engineers with respect to reliability and probabilistic vs. deterministic design. - Task 2 – Develop Guidance for design of stationary floating structures against ice loads. Objective: Develop a Guidance Document that may serve as a common Russian-Norwegian Supplement to ISO19906 for use in the Barents Sea that fills identified gaps in ISO19906 with respect to ice loads against and the response of stationary floating structures. The Guidance will be based on state-of-the-art. Preparation of a detailed and final Scope of Work for this task can only be made after the working group has been formally established with Russian and Norwegian experts.

TRANSCRIPT

Page 1: Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August 24 - 25, 2010

Lars Ingolf Eide 03 August 2010

Barents 2020 Phase 4 - Working group RN02

Kick-off meeting Moscow August 24 - 25, 2010

Page 2: Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August 24 - 25, 2010

© Det Norske Veritas AS. All rights reserved.

Barents 2020 Phase 4 - Working group RN02

03 August 2010

2

Barents 2020 Phase 4 – Working Group 2 Members

Russian team Norwegian/OGP team

Marat N. Mansurov, VNIIGAZ, Coordinator

Marina M. Karulina, Krylov Shipbuilding Res. Inst

Irina A. Surikova, Russian Maritime Register of Shipping, TK 318

Sergei D. Kim, VNIIGAZ

Pavel Liferov, Shtokman Development AG

Nina Krupina, Arctic and Antarctic Res. Inst.

Yury Nemenko, Giprospetsgaz

Vakhtang M. Glonti, Gazprom

S.I Zibakin, Gazprom Shelf Production

Gleb Churkin, Agency of researches of industrial risks (observer)

Valery P. Nekrasov, Ministry of Emergency Measures of the Russian Federation (observer)

Vladimir A. Pestryaev, Sakhlinnipimorneft

Rod Allan, Transocean

Arne Gürtner, Statoil

Hans Martin Sand, Moss Maritime

Jean-Marc Cholley, Total/OGP

Graham Thomas, BP/OGP

Mike Orr, Cairn Energy/OGP

Guido Kuiper, Shell/OGP

DNV:

Per Olav Moslet,

Lars Ingolf Eide, Coordinator

Invited experts ??

Page 3: Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August 24 - 25, 2010

© Det Norske Veritas AS. All rights reserved.

Barents 2020 Phase 4 - Working group RN02

03 August 2010

3

Objective and scope of RN02 work in Phase 4 Objective: Provide guidance and recommendations for design of stationary floating

installations in the Barents Sea against ice loads, to fill the gaps identified in the 2010 edition of the coming ISO 19906 Standard.

Scope of work: - Task 1 – Workshop on ISO 19900-series, with emphasis on ISO19906.

Objective: To harmonize understanding between Russian and Norwegian engineers with respect to reliability and probabilistic vs. deterministic design.

- Task 2 – Develop Guidance for design of stationary floating structures against ice loads.

Objective: Develop a Guidance Document that may serve as a common Russian-Norwegian Supplement to ISO19906 for use in the Barents Sea that fills identified gaps in ISO19906 with respect to ice loads against and the response of stationary floating structures. The Guidance will be based on state-of-the-art.

Preparation of a detailed and final Scope of Work for this task can only be made after the working group has been formally established with Russian and Norwegian experts.

Page 4: Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August 24 - 25, 2010

© Det Norske Veritas AS. All rights reserved.

Barents 2020 Phase 4 - Working group RN02

03 August 2010

4

Key issues and challenges Finalize scope to focus on the right topics

Obtain sufficient commitment from group members

Find the optimal “mode of operation”

Produce a useful deliverable

Page 5: Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August 24 - 25, 2010

© Det Norske Veritas AS. All rights reserved.

Barents 2020 Phase 4 - Working group RN02

03 August 2010

5

Decisions to be made at kick-off Decide details of Scope and Work Plan for 2010

Decide on workshop on ISO19906

Outline of Work Plan for 2011

Decide how we will work

Distribute assignments

Degree of involvement and choice of external verifiers

Page 6: Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August 24 - 25, 2010

© Det Norske Veritas AS. All rights reserved.

Barents 2020 Phase 4 - Working group RN02

03 August 2010

6

Safeguarding life, property and the environment

www.dnv.com

ISBN 92-9169-122-4