lars andersson non-conventional abb switzerland · pdf fileiec 61850-9-2/8-1 (goose, sav, mms)...
TRANSCRIPT
![Page 1: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/1.jpg)
© C
opyr
ight
200
4 AB
B.Al
l rig
hts
rese
rved
. -1
-06
/06/
2005
Non-conventional Instrument Transformers: CP3
Lars Andersson
ABB Switzerland
Summer Workshop of Swiss Chapter of IEEE PES, 05-06-02
![Page 2: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/2.jpg)
© C
opyr
ight
200
4 AB
B -2
-
ELK 3 GIS
Um = 550 kVIn = 4000 A
BIL = 1550 kV63 kA Breaking
current
![Page 3: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/3.jpg)
© C
opyr
ight
200
4 AB
B -3
-
Voltage Transformer ELK PI3
![Page 4: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/4.jpg)
© C
opyr
ight
200
4 AB
B -4
-
Current Transformer ELK CB3
![Page 5: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/5.jpg)
© C
opyr
ight
200
4 AB
B -5
-
Why Non-conventional Instrument Transformers?
Only one multi-purpose ECT/EVT for all applicationsFeeder and station protectionRevenue metering
Wide dynamic range No project specific dimensioning and manufacturing
Cost reductionLower costNo CT/VT specific engineering cost
Higher availability of the primary equipmentHigher safety
![Page 6: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/6.jpg)
© C
opyr
ight
200
4 AB
B -6
-
ELK-CP3
Combined electronic voltage and current transducer (EVT/ECT) according to IEC 60044-7 and IEC 60044-8. Two fully independent measurement systems, each with protection and metering data.
Current: 100A – 4000A 0.2S / 5P TPE
Voltage: 330 ... 550 kV/√30.2 / 3P
BW: 1000 Hz (-3 dB), fulfillsIEC 60044-8 power metering
![Page 7: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/7.jpg)
© C
opyr
ight
200
4 AB
B -7
-
ELK-CP3 componentsELK-CP3 consists of 3 main components
A single phase primary convertercontaining two independent sets of voltage sensors and Rogowski coilsTwo redundant secondary convertersmounted directly on the primary converter, containing signal acquisition, signal processing and digital transmission circuits.Merging units to merge and time correlate the data from 3 / 9 sensor units. Output interface on Ethernet link, according to IEC61850-9-1 / 9-2. (Separate devices for Metering and Control & Protection applications)
![Page 8: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/8.jpg)
© C
opyr
ight
200
4 AB
B -8
-
Metering System
One CP3 per phase
MeteringMerging Unit
LA
LB
LC
IEC 61850-9-1to the Meters
Two independent measurement
chains
![Page 9: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/9.jpg)
© C
opyr
ight
200
4 AB
B -9
-
Protection System
Protection Merging Unit
LA
LB
LC
IEC 61850-9-2to Control andProtection
One CP3 per phaseTwo
independent measurement
chains
![Page 10: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/10.jpg)
© C
opyr
ight
200
4 AB
B -1
0 -
Protection layout example
BZ11
BZ12
BZ32
BZ22
BZ21
BZ31
Q01
Q02
Q03BZ23
ShR, SVC, ShCTertBranch
ShR
YY∆
BZ13
BZ2
I-BZ1
BZ51
BZ61
BZ1
TR-OpS
BZ2
I-BZ1
YY
TR-Neut
∆
TR-NeutOpSShR
TR-3rdW
CT positioning old layouts
Example: 1½ Breaker, 6 CTs per DiameterCost-optimized Layout
I-BZ13
I-BZ13
CP replacing CT and VT
CP
CP
Example: DBB, 2 CTs per BreakerCost-optimized Layout
CP
CP
CT positioning old layouts
![Page 11: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/11.jpg)
© C
opyr
ight
200
4 AB
B -1
1 -
Reliability
ABB has installed since 1998 about 350 combined voltage and current sensors, mainly in hybrid GIS (PASS) substations in Australia (Powerlink Queensland)No primary converter failuresMTBF (Major Failures) >1400 service device-years
Substation Braemar,90 Combined current and voltage sensorsRedundant busbar and feeder protection with digital optical inputsCommissioning date 2000-08-30
![Page 12: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/12.jpg)
© C
opyr
ight
200
4 AB
B -1
2 -
Example of Actuator: Motor Breaker Drive
One moving part only
Controlled Motion => Lower Mechanical Stress
Self supervision
Micro-motion: Built in function test
![Page 13: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/13.jpg)
© C
opyr
ight
200
4 AB
B -1
3 -
Trends and Vision
Facts: Today we have some sensors and actuators with a mix of standardised and proprietary connections to the protection and control devices
Trends: Tomorrow we will have an increasing amount of sensors and actuators with standardised links to protection and control based on IEC61850
Vision: In the future we will have yet more sensors and actuators, connected to the protection and control via an IEC61850 based network
![Page 14: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/14.jpg)
ABB
![Page 15: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/15.jpg)
© C
opyr
ight
200
4 AB
B -1
5 -
Spare slides
![Page 16: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/16.jpg)
© C
opyr
ight
200
4 AB
B -1
6 -
ELK-CP3 Sectional View
Secondary Converter
Voltage SensorElectrode
Rogowski Coil
![Page 17: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/17.jpg)
© C
opyr
ight
200
4 AB
B -1
7 -
Key DataCP 3 is a combined electronic voltage and current transducer (EVT/ECT) according to IEC 60044-7 and IEC 60044-8.Current transducer
Accuracy class 0.2S / 5TPE (120 ms)Nominal current 100 A ... 4000 A
Voltage transducerAccuracy class 0.2 / 3PNominal Voltage 330 ... 550 kV/√3
Bandwidth 1000 Hz (-3 dB), fulfillsIEC 60044-8 power
meteringAmbient temperatureprimary/secondary converter -40°C ... +40°CAmbient temperaturemerging unit -5°C ... +55°C
![Page 18: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/18.jpg)
© C
opyr
ight
200
4 AB
B -1
8 -
IEC 61850: More than a Protocol (1)
IEC 61850 defines communication requirements that all devices have to comply with
IEC 68150 defines Conformance Tests and Engineering support
IEC 61850 defines general device requirements, e.g. environmental requirements
IEC 61850 defines strong extension rules
![Page 19: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/19.jpg)
© C
opyr
ight
200
4 AB
B -1
9 -
Digital Interfaces IEC 61850-9-2LE
Ethernet Interface 100BaseFxSimultaneous transmission of two data streams
80 * fr: 4000 Hz (fr= 50 Hz); 4800 Hz (fr= 60 Hz) for Metering20 * fr: 1000 Hz (fr= 50 Hz); 1200 Hz (fr= 60 Hz) for Protection256 * fr: for power quality metering
Variable delay time (max. 3 ms), additional PPS signal where requiredCan be transmitted on process busses carrying other IEC 61850-8-1 telegrams.
![Page 20: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/20.jpg)
© C
opyr
ight
200
4 AB
B -2
0 -
Router IEC 61850-8-1
Ethernet Ring with Switches
MU withNCITs
Relay Y
MU withNCITs
Relay Y
System Architecture with IEC 61850-9-2Control Center HMI Engineering
Relay X1
Bay Controller
Conventional Switchgear
MU X withNCITs
Relay X2
Relay X1
Bay Controller
Conventional Switchgear
MU X withNCITs
Relay X2
IEC 61850-9-2
![Page 21: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/21.jpg)
© C
opyr
ight
200
4 AB
B -2
1 -
Main ZProtection
Merging Unit
ArevaSensor
Bay Controller
Main Y Protection
Main X Protection
Trips
Merging Unit
3rd Fibre
IEC 61850-9-2/8-1(GOOSE, SAV, MMS)
IEC 61850-8-1 (GOOSE)
IEC 61850-8-1(MMS, GOOSE)
IEC 61850-9-2 (SAV)
IEC 61850-9-2 (SAV)
IEC 61850-9-2 (SAV)
Ethernet Switch
Simulator
IEC 61850-8IEC 61850-9
Cigré 2004
![Page 22: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/22.jpg)
© C
opyr
ight
200
4 AB
B -2
2 -
ELK 3 GIS
VT
CT
![Page 23: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/23.jpg)
© C
opyr
ight
200
4 AB
B -2
3 -
Voltage Sensor
Principle Equivalent circuitEnclosure(Ground)
Kapton foil
Sensor electrode
SF6
High voltageconductor
C1
C2 R1
R1
u2
SF6 gas capacitor
Foil capacitor
u2
u1
u1
Precision resistorVISHAY
VH202 (Z-Foil)
dtduRCu 1
12 =22
1RC
fπ
<<for
C1
C2
![Page 24: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/24.jpg)
© C
opyr
ight
200
4 AB
B -2
4 -
Current SensorThe current sensor consists of a toroidal Rogowski coil, wound on an epoxy core. The coil is completely enclosed in an epoxy cast and electrically shielded by the enclosure.
B1
i1
R
ParamagneticalCore
Rc Lc
Rdi1dtM
dtdiMuind 1=
![Page 25: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/25.jpg)
© A
BB G
roup
-1
-6-
Jun-
05
ABB FOCSFiber-Optic CurrentSensor
Klaus Bohnertcontribution presented by
Hubert BrändleABB Switzerland
Summer Workshop of Swiss Chapter of IEEE PES, 05-06-02
![Page 26: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/26.jpg)
© A
BB G
roup
-2
-6-
Jun-
05
ABB FOCS - Fiber-optic current sensor
FOCS for high-voltagesubstations
FOCS for electrochemicalindustry
![Page 27: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/27.jpg)
© A
BB G
roup
-3
-6-
Jun-
05
No magnetic saturation
Small size and low weight
Integration into circuit breakers, bushings, etc
Smaller installation costs
High accuracy, large dynamic range
High bandwidth
Substation electronics isolated from high voltage
No risk of catastrophic failure (explosion)
Optical Current Sensor in HV Substations
Merits
![Page 28: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/28.jpg)
© A
BB G
roup
-4
-6-
Jun-
05
Fiber-Optic Current Sensor (FOCS)
Sensing fiber coil
retarder
Currentconductor
Left and right circular light waves
xy
xy
Fiber
Orthogonal linear light waves
Light source, detection, signal processor
Reflector
∆φ∆φF
out
Current-induced phase shift: ∫ •=∆ dsHNVF 4φ
∆φF = 4 V N I
![Page 29: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/29.jpg)
© A
BB G
roup
-5
-6-
Jun-
05
Fiber Quarterwave Retarder
45°
linear polarization
circularpolarization
LB/4
elliptical- core fiber λ/4 retarder
fiber core
~ 1.5 mm
elliptical-core fiber
sensing fiber
λ/4
45° splice
![Page 30: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/30.jpg)
© A
BB G
roup
-6
-6-
Jun-
05
80 90 1001.00
1.01
1.02
1.03
1.04
-40°C
Nor
mal
ized
Sca
le F
acto
r
Retardation (deg)
Reflective current sensor
90°C
-40 -20 0 20 40 60 80
1.00
1.01
1.02
(1/V) δV/δT = 0.7x10-4 °C-1
effect of temperature dependent retarder, ρ = 100.4°
with (1/ρ) δρ/δT = -2.2x10-4°C-1
combined contributions
contribution from temperature-dependent Verdet constant
Nor
mal
ized
Sca
le F
acto
r
Temperature (°C)
Temperature Compensation of Faraday Effectretardation ρ
![Page 31: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/31.jpg)
© A
BB G
roup
-7
-6-
Jun-
05
Output
Optical fiber coil
Current conductor
Light source & signal processor
Output
Optical fiber coil
Current conductorCurrent
conductor
Light source & signal processor Fiber cable
FOCS for HV Circuit Breaker
![Page 32: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/32.jpg)
© A
BB G
roup
-8
-6-
Jun-
05
FOCS for HV Circuit Breaker
Fiber cable
Current
SF6 gas Circuit breaker
Sensor electronics
Sensing fiber coil
Fiber cable
Current
SF6 gas Circuit breaker
Sensor electronics
Sensing fiber coil
Conventional currentmeasurement
Circuit breakers
![Page 33: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/33.jpg)
© A
BB G
roup
-9
-6-
Jun-
05
FOCS for HV Circuit BreakerConventional 170 kV current
transformersSensor installationin 170 kV breaker
Current sensor
![Page 34: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/34.jpg)
© A
BB G
roup
-10
-6-
Jun-
05
FOCS for Electrochemical Industry Aluminum smelting (Hall-Heroult
process)- Al2O3 is dissolved in molten cryolite (Na3AlF6)
- Pure Al is produced by electrolysis:
2Al2O3 + 3C ---> 4Al + 3CO2
Total smelter current: up to 500 kA
Energy use: 15.7 kWh / kg Al
World production in 2002: 21.2 Million tons
(110 smelters)
Carbon anodes
![Page 35: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/35.jpg)
© A
BB G
roup
-11
-6-
Jun-
05
Hall Effect Based DC Current Transformers
400 kA
![Page 36: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/36.jpg)
© A
BB G
roup
-12
-6-
Jun-
05
Fiber-Optic Current Sensor
current
![Page 37: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/37.jpg)
© A
BB G
roup
-13
-6-
Jun-
05
Fiber-Optic Current Sensor
![Page 38: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/38.jpg)
© A
BB G
roup
-14
-6-
Jun-
05
FOCS for Power Rectifier
![Page 39: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/39.jpg)
© A
BB G
roup
-15
-6-
Jun-
05
Signal vs Current
10 100
10
100
Sig
nal (
kA)
Current (kA)
-2
-1
0
1
2
Relative error (%
)±1%
![Page 40: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/40.jpg)
© A
BB G
roup
-16
-6-
Jun-
05
experiment
theory
Sensor Signal vs Fiber Coil Temperature
-20 0 20 40 60 800.992
0.996
1.000
1.004
1.008Constant current
Sign
al (n
orm
aliz
ed)
Coil temperature (°C)
±0.1%
![Page 41: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/41.jpg)
© A
BB G
roup
-17
-6-
Jun-
05
0 6 12 18 240.996
0.998
1.000
1.002
1.004
Sign
al (n
orm
aliz
ed)
Time (hours)
Signal vs Time
Signal at constant current
24 h period 50 day period
0 10 20 30 40 500.996
0.998
1.000
1.002
1.004
Sign
al (n
orm
aliz
ed)
Time (days)
±0.1 % ±0.1 %I = 7693 A DC, 1 fiber loop
Data points with 1s averaging
![Page 42: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/42.jpg)
© A
BB G
roup
-18
-6-
Jun-
05
Signal vs Conductor Position
Fiber coil
±0.1 %
I = const
0.0 0.2 0.4 0.6 0.8 1.00.998
0.999
1.000
1.001
1.002Si
gnal
(nor
mal
ized
)
Conductor position
Conductor
![Page 43: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/43.jpg)
© A
BB G
roup
-19
-6-
Jun-
05
FOCS Calibration
Reproducibility at repeated sensor head assembly and disassembly
1 2 3 40.998
0.999
1.000
1.001
1.002Constant current
+/-0.1%
Nor
mal
ized
sig
nal
Repetition number
![Page 44: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/44.jpg)
© A
BB G
roup
-20
-6-
Jun-
05
Sensor Insensitive to Vibration
0 2 4 6 8 10
0
5
10
15
coilhousing
vibration direction :
vibration frequency = 50 HzSi
gnal
in te
rms
of e
quiv
alen
t cur
rent
(Arm
s)
Acceleration (g)
Vibration-induced signal versus acceleration
Sensor for high-voltage substation
Vibration
Coil housing
![Page 45: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/45.jpg)
© A
BB G
roup
-21
-6-
Jun-
05
ABB Fiber-Optic Current Sensor
Nominated for Swiss Technology Award 2005, Hermes Award 2005
![Page 46: Lars Andersson Non-conventional ABB Switzerland · PDF fileiec 61850-9-2/8-1 (goose, sav, mms) iec 61850-8-1 (goose) iec 61850-8-1 (mms, goose) iec 61850-9-2 (sav) iec 61850-9-2 (sav)](https://reader030.vdocuments.site/reader030/viewer/2022012304/5a78bb1b7f8b9a4f1b8b5e47/html5/thumbnails/46.jpg)