![Page 1: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/1.jpg)
Large-scale PV Demonstration Projects in Japan
Satoshi Morozumi, Yasuyuki Arashiro and Nobuyoshi InoueNew Energy and Industrial Technology Development Organization, Japan
New Energy Technology Development Department
2nd International Symposium for Distributed Electricity Generation and Smart Grids
17th – 18th October 2007TECHbase Vienna – arsenal research
![Page 2: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/2.jpg)
2
Table of Contents
1. Background- PV introduction- NEDO’s projects
2. PV projects- Demonstrative Project on Grid-interconnection of Clustered Photovoltaic
Power Generation Systems- Verification of Grid Stabilization with Large Scale PV Power Generation
Systems
3. Summary
![Page 3: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/3.jpg)
3
Promoting renewable energy is essential.
Renewable energy resources are increasing in electric power system.
Power quality issues
BackgroundSecurity of energy supply
(Oil-alternative energy)Harmony with environment
(Lowering CO2 emission)
New energy introduction targetex. PV: 4.82GW (FY2010)
102GW (FY2030)
![Page 4: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/4.jpg)
4
Introduction of PV
Data Source: NEF
Price of PV system (104 Yen/kW)
Installed PV capacity (104 kW)
Installation cost / kW
Generation cost / kWhTotal Installation
Total InstallationFor Residential
260yen/kWh
120
8272 71
65
140
58 5246yen/kWh4849
![Page 5: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/5.jpg)
5
What is NEDO?The New Energy and Industrial Technology Development Organization (NEDO) is Japan’s largest public R&D management organization for promoting the development of advanced industrial, environmental, new energy and energy conservation technologies.
![Page 6: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/6.jpg)
6
Development and Demonstration of new energy-related grid-connecting technology
One of the important objectives of NEDO’s R&D is solving problems that arise when distributed and renewable resources are connected to power grids.
These issues arise because the power output from most renewable energy resources fluctuates with weather conditions and connecting them to traditional power grids may create power quality issues.
1) Frequency Stabilization2) Voltage Control3) Protection4) Other Power Quality Issues5) Technology Development
![Page 7: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/7.jpg)
7
Grid-Connection related Projects in NEDOVoltage control technology for clustered PV systems
Control of supply system with several new energy and dispersed generators
Voltage control technologies for distribution system when many DGs are connectedDevelopment of supply system with different power quality
Demonstrative Project on Grid-interconnection of Clustered Photovoltaic Power Generation Systems
(FY2002-2007)
Wind Power Stabilization Technology Development Project
(FY2003-2007)
Demonstrative Project of Regional Power Grids with Various New Energies
(FY2003-2007)
Demonstrative Project on New Power Network Systems
(FY2004-2007)
Verification of Grid Stabilization with Large Scale PV Power Generation Systems
(FY2006-2010)
FY2006FY2005 and Before
Power Control Technology for wind farm
Interconnection technology for large scale PV generation system
Energy storage system for new energy
Development of an Electric Energy Storage System for Grid-connection with New Energy Resources (FY2006-2010)
FY2007 FY2008 and After
![Page 8: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/8.jpg)
8
Demonstrative Project on Grid-interconnection of clustered Photovoltaic Power Generation (FY2002-2007)
Clustered installationof Photovoltaic on the distribution network is expected.
There are tangible problems, such as voltage swell by output from PV systems .
- Development of thetechnology to avoid
restriction of PV system output.
-Development of functionto prevent unintentional
islanding.
-Development of applied simulation technologies.
-553 PV systems were installed.-Effect of battery for avoidingrestriction of PV output was examined.- Possibility of interferencesamong the equipments for preventing islanding weredetected.-New equipment, which canavoid such interferencesis now being developing.
Background Objects Results
![Page 9: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/9.jpg)
9
Outline of the project
External Storage Box
(PCS, Storage battery)
Purpose of the projectDevelopment of the technology to avoid restriction of PV system
output.Development of function to prevent unintentional islanding.Development of applied simulation technologies.
![Page 10: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/10.jpg)
10
Demonstration sites
Tokyo
Location of Ota city
Demonstration site in Ota city
Research facility in Maebashi city
![Page 11: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/11.jpg)
11
Demonstrative project site
Installed PV :553Total PV Capacity :2,129kWAverage PV Capacity : 3.85kW
![Page 12: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/12.jpg)
12
History of installation
0
100
200
300
400
500
600
2003/12
2004/01
2004/02
2004/03
2004/04
2004/05
2004/06
2004/07
2004/08
2004/09
2004/10
2004/11
2004/12
2005/01
2005/02
2005/03
2005/04
2005/05
2005/06
2005/07
2005/08
2005/09
2005/10
2005/11
2005/12
2006/01
2006/02
2006/03
2006/04
2006/05
2006/06
2006/07
連系軒数(軒
)
0
50
100
150
200
250
300
350
400
PV発
電量
、負荷電力量、逆潮流量(M
Wh)
月間PV発電量(M W h)
月間負荷電力量(M W h)
月間逆潮流電力量(M W h)
PV連系軒数(月末時点)
蓄電池連系軒数(月末時点)
最終連系軒数
553
Num
ber o
f hou
ses
Gen
erat
ed e
nerg
y, C
onsu
med
ene
rgy
an
d R
ever
se fl
ow e
nerg
y (M
Wh/
Mon
th)
Monthly generated energy(MWh)
Monthly consumed energy(MWh)
Monthly reversed flow energy(MWh)
Number of installed PV system
Number of installed battery system
Final Number of installed PV system
![Page 13: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/13.jpg)
13
A system of battery management system
A type of system which Battery and PCS for battery system are added to market base PV system.
Pole Tr
PCS-A
Pole Tr
PV Alley
PCS
20MVA
VCB
Distribution Sub-Station
66kV/6.6kV
PCS-B
Battery
C/S
High voltage Distribution Line
Low Voltage Distribution Line
Load
(Residential)
C/S
PCS- □
Developed technology
Central controller
Inverter
Communication Line
Power flow
Market base PV system
Central Controller
C/S
A type of system which has one PCS for PV and battery system.
Remotely controlling each external battery box
(2) All in One Type
(1)Separate Type
(3) Central Controller
④ ④
(4)New Type islanding protection equipment
New type of islanding protection which can detect islanding rapidly when clustered PV systems are installed
(4704Ah)
Load
(Residential)
PV AlleyBattery
![Page 14: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/14.jpg)
14
External battery box
Inverter(4kVA)
Lead-Acid battery(4,704Ah・cell)
Ventilation fan
Control terminal
External Battery BOX
![Page 15: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/15.jpg)
15
Development of technology to avoid restriction of PV system output
The voltages in distribution line sometimes becomes higher than the maximum nominal voltage of 107V or 222V because too much power injection from PV system.
Output of PV is restricted to keep line voltage within operational range (101±6V,202±20V).
Various suppressions of the PV output are analyzed, and then several battery operation modes to reduce such suppressions are developed in this project.
![Page 16: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/16.jpg)
16
A sample of voltage control operation
-4
-2
0
2
4
6
8
0:00 3:00 6:00 9:00 12:00 15:00 18:00 21:00 0:00
電力
(kW)
86
90
94
98
102
106
110
電圧
(V)
P Vアレイ出力(kW )負荷電力(kW )
受電点電力(kW )
蓄電池充放電電力(KW )PCS交流側電圧1相(V)整定値(104.5V)
Volta
ge (V
)
Pow
er (k
W)
PV output (KW)Demand (KW)Received power (KW)Battery output (KW)
PCS AC voltage (V)Target line voltage (V)
If line voltage violate upper limit of operation voltage, then battery started charging.
![Page 17: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/17.jpg)
17
Development of function to prevent unintentional islanding
A function to prevent islanding operation disconnects the PV system from the power grid in the case of service interruptions. Interferences among the equipments for preventing islanding are induced when the clustered PV systems are installed.Methods to avoid mis-actuations of such function in the clustered PV systems are developed, the methods will be verified through demonstration.
Developing new islanding detection method.
Testing this method at the test facility in Maebashi City.
Installing field-test equipment at the demonstrative site in Ota city
Installing quality improved facility at the demonstrative site in Ota city Test facility in
Maebashi
![Page 18: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/18.jpg)
18
New method of prevent islanding
Reactive power from PCS
Time
Reactive Pow
er
+
+
Reactive Pow
er
Time
Time
Time
All of PCSs output an active signal synchronously by Wave clock signal.
Reactive Pow
er
Reactive Pow
er
Wave clock signal
![Page 19: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/19.jpg)
19
Verification of Grid Stabilization with large-scale PV Power Generation Systems (FY2006-2010)
If PV becomes popular infuture, large scale (MW level)PV power station will be introduced to power system. (1) Technology for reduction of fluctuation of
voltage and frequency using battery storage will bedemonstrated. Also, countermeasure of harmonic will be developed and demonstrated.
(2) Developing simulation method related technologies mentioned above.
It is possible that such large scale PV power station may influence voltage and frequencyin the utility system.
Background Objects
![Page 20: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/20.jpg)
20
Demonstrative projects site
Tokyo
Wakkanai Site completion forecast figure
The first Japanese Mega-Solar
Hokuto Site completion forecast figure
![Page 21: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/21.jpg)
21
Comparative table
Wakkanai City Hokuto CityPV capacity ~5MW ~2MWModule type crystal type advanced typeEnergy storage NaS :1.5MW - 11.8MWh
EDLC :1.5MW - 25kWh-
PCS 250kW(commercialized product)
400kW(developing )
Grid connection 33kV transmission line 66kV transmission lineForcast solar radiation forecast -
![Page 22: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/22.jpg)
22
Schedule
F Y 2006 2007 2008 2009 2010
P V capacity(M W ) M ar.
80kW
N ov. 1.7M W
O ct.
4.0M W O ct.
5.0M W
N aS battery (M W ) N ov.
0.5M W
O ct.
1.5M W
E D L C (M W ) O ct.
0.5M W
O ct.
1.5M W
G rid connection M ar.
6.6kV N ov.
33kV
F Y 2006 2007 2008 2009 2010
P V capacity(M W )
F eb.
0.6M W N ov.
2.0M W
G rid connection F eb.
6.6kV
N ov.
33kV
Wakkanai site
Hokuto site
![Page 23: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/23.jpg)
23
Configuration of Wakkanai site
太陽光
インバータ
高圧母線
系統電力(特別高圧)
特高トランス
大規模太陽光発電システム
気象予測
系統監視発電制御
需給制御
NAS 電池 キャパシタ太陽光
インバータ
特高トランス
大規模太陽光発電システム
系統監視発電制御
需給制御
制御室
太陽光
インバータ
高圧母線
系統電力(特別高圧)
特高トランス
大規模太陽光発電システム
気象予測
系統監視発電制御
需給制御
NAS 電池NAS 電池 キャパシタ太陽光
インバータ
特高トランス
大規模太陽光発電システム
系統監視発電制御
需給制御
制御室
大規模太陽光発電システムの構成Reforming output from PV by battery storage
Comparison of several types of PV cell
Establishing extra-high voltage grid connection technologies
Transformer
Inverter
High voltage bus
Extra high voltage bus
PVLarge scale PV plant
Weather forecast
Control system
Monitoring & Control
battery Capacitor
Large scale PV plant system structure
![Page 24: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/24.jpg)
24
How battery system operatesOutput from Mega-solar Plant
Smoothing by battery
Planned transmission by battery
![Page 25: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/25.jpg)
25
Wakkanai site PV systemunder construction
(’07 Mar.) PV 80kW
稚内PV発電電力量
0
10
20
30
40
50
60
70
80
90
2007/3/16 2007/3/17 2007/3/18 2007/3/19 2007/3/20 2007/3/21 2007/3/22 2007/3/23日付
kWkW
(’07 Mar.) PV 80kW
Typical output pattern in a week
![Page 26: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/26.jpg)
26
Wakkanai site PV systemunder construction
2007 July
(PV: 80kW)
2009 October
(PV: 5MW)
![Page 27: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/27.jpg)
27
FY2007
PCS 210V/6.6kV
FY2008-2009
Development of large-scale PCS
PV : 0.4MW PCS400kW 420V/6.6kV
Monitoringsystem
PV : 0.6MW
FY2009
PCSPV : 0.1MW
6.6kV/66kV
FY20076.6kV
210V/6.6kV
FY200966kV
PV : 0.4MW
PV : 0.4MW
PCS400kW
PCS400kW
Configuration of Hokuto site
Output Power: 400kWFunction : to suppress voltage fluctuation
by controlling reactive powerto have voltage sag ride-through capabilityto have suppressed harmonic function
![Page 28: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/28.jpg)
28
2007 October
Hokuto siteunder land forming
2009 November
(PV ~2MW)
![Page 29: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/29.jpg)
29
PV application in micro-grid projectHachinohe project
Structure of supply system with local private Grid.
Battery100kw
The Sewage plant
Hachinohe city hall (360kw)
Steam boilerWooden waste
Digestion ChamberDigestion gas tank
Steam boiler
Gas engine170kW*3
PV 50kW
PV 10kW PV 10kw
PV 10kW
Wind turbine 2kW*2
CB
Hachinohe city hall new building
Utility line
Hachinohe regional watersupply authority (50kw)
Wind turbine 8kW Wind turbine 8kW
Junior high school (60kw)
Junior high school (53kw)
Elementary school (46kw)
Elementary school (46kw)
Private distribution line (5.4km)
![Page 30: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/30.jpg)
30
Compensating imbalance of three phase by PV power conditioner in Hachinohe
GEUtility
Network
3×170kW
A C
D C
Schools
City Office
CB7 CB4 CB3
5 0 k W
Inverter
Control System
50kW
Inverter
![Page 31: Large-scale PV Demonstration Projects in Japan€¦ · Tokyo Wakkanai Site completion forecast figure The first Japanese Mega-Solar Hokuto Site completion forecast figure . 21 Comparative](https://reader034.vdocuments.site/reader034/viewer/2022052616/60aad8653e78be114e61210a/html5/thumbnails/31.jpg)
31
Summary
- PV has potential to change electric power system.
- To achieve such a paradigm shift, solving grid-connection issues is necessary.
- NEDO thinks such technology development shown in our presentation is very important.