lao people’s democratic republic - world bank people’s democratic republic ... e95, v.39. table...

17
LAO PEOPLE’S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY ___________________________________________________________________________________________________________ ELECTRICITE DU LAO SPRE II Environmental Management Plan (EMP) Sub-project Utumphone 2 District, Savannakhet Province 2005 BANFAI, NONGBONE ROAD, P.O. BOX 309, VIENTIANE, LAO PDR. TEL: (856-21) 451521, 31-171, 172, TLX: 4311 EDL VTE LS, FAX: (856-21) 415039 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: buidang

Post on 03-May-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

LAO PEOPLE’S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY

MINISTRY OF INDUSTRY AND HANDICRAFTS

ELECTRICITE DU LAOS BolikhamsayProvince

___________________________________________________________________________________________________________ ELECTRICITE DU LAO

SPRE II Environmental Management Plan (EMP)

Sub-project Utumphone 2 District, Savannakhet Province

2005

BANFAI, NONGBONE ROAD, P.O. BOX 309, VIENTIANE, LAO PDR. TEL: (856-21) 451521, 31-171, 172, TLX: 4311 EDL VTE LS, FAX: (856-21) 415039

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Administrator
E95, v.39

Table of Contents Environment Part

1. Objective of the EMP 2. Sub-Project 3. Mitigation 4. Monitoring 5. Institution Arrangement

a. Instutional Responsible and Capacity b. Environment Information Flow

6. Consultation with Local and Affected Groups 7. Schedule

Social Part

8. Property affected datasheet

1

1. Objective of the EMP

The objective of this EMP to assist Savannakhet EDL brand staff responsible and carry out environmental and social management associated with construction of transmission lines to the village. 2. Sub-project Description

This sub-project will be electricfied to 7 villages belong to Outhoumphone District, Savannakhet Province. For this Sub-Project is not passing Industry area. This will be passed through the degradation forest and some will passed rice paddy field and some of them will be at the road side. For line route delection was full consultated with local people with aim of avoiding the properties damages and to avoid village repected area. In the case, that some trees should be removed from the line. EdL explained to villagers about the needs. Villagers are welcome to the project and not requested for any compensation. • Technical Description of the sub[project

Medium Voltage Low Voltage Village House

Hold 22 kV

Line (m) Number of Concrete

Pole

Number of Transfor- Mers

0.4 kV Line (m)

Number of Concrete

Pole Tampha 50 15 1 1,909 40 Nakealeck 74 2,470 37 1 2,130 60 Nadeua 40 15 1 1,343 25 Houaymao 104 2,300 34 1 3,964 105 Khudkhae 115 2,175 32 1 1,195 34 Nongkhung 43 5,180 52 1 1,285 32 Nongahongnoy

90 2,520 37 1 2,115 58

Nonsavang 102 25 1 1,260 34

3. Mitigation Plan

This construction of this transmnission line project. There is not a major impact because this line route will be passed through some degradation forest and some rice paddy field. Some area will be passed small stream with cross by exsting road. There is novillage respected area therefore no damage to an environment. Phase

Issues Mitigation Measure Responsible

Construct

ion

Diminished ecological and social values due to the improper disposal of construction debris and wastes

- Main waste should be a small amount of scrub debris from rights-of-way clearing activities which should be stacked and burned on-site

Contractor

2

Injury and sickness of workers

- Monitoring workers’s health and safety periodically.

- Must have midicine in site and - Should have safety wear such as: hat,

shoes and advise each person have for working.

Contractor

Cutting the trees out of the way of medium and low voltage.

- Before survey have to remark and cutting the trees if nesseccery avoiding effective as least as possible.

EDL & Contractor

Uncontrol erosion and sedimment ation.

- Construction work must be in the dry season this to avoid flooding and lead to erosion in some area. Transportation of the materials for constuction woks should use of existing road.

Noise pollution - Construction would only take place during daytime, if village holiday but EDL is required to work, would first be consulted sufficiently in advance villagers.

Operation

Clearing and cutting the trees by the way of the construction

- Be careful of cutting the trees and do not burn the trees under the power line.

EDL branch

Transformer leaks - Monitoring transformer oil leaking. If any leaking fix it or change a new one.

EDL

4. Monitoring Plan

Phase What

Parameter is to be monitored

Where Is the parameter to be monitored/type of monitoring equipment?

How Is the parameter to be monitored/type of monitoring equipment?

When Is the parameter to be monitored frequency of measurement or continuous?

Responsibility

Construction

Health and safety of workers and local people

Sub-project 22kV and 0,4 kV

− Monitoring the workers and local people’s health and safety.

− Advice for avoiding sickness

Review of health and safety of contractor’s workers before starting the construction and monitoring periodly

EdL; and Independent Third Party Monitor

3

Operation

Transformer insulating and cooling oils leaks to contaminate water courses or soils

Transformer installed area

− 6 months inspection on leaking of the transformer, clean out and disposal of any spilled insulating/ cooling oils

As per EdL substation systems inspection schedule

EDL and population report

5. Institutional Arrangement 5.1 Institutional Responsibility and Capacity Environmental and social unit will make sure all conditions of the environment will be incorperated into environemental management plan and complile with government regualation. This environmental and social unit is under Construction and Instalation Department and under management of EdL Savannakhet Branch. There also recommendation of the establishment of the Environmental Coordination Committee to work with this subproject. 5.2 Environmental Information Flow Environment unit will report directly to the head of construction ang installation Division, Director of EdL Savannakhet Branch after that will make copy to ESU in Development Department and reporting need to be send to the concerning District for mitigation the issues in the project. 6. Consultation with Local People and Project Affected Groups

4

Consultation • Date/venue of consultation meeting Date: 16.01.2004 Venue: Tampha Village No. Participants Name Responsibility Impsct On

1 Mr. Ludsamy Head of village Land 2 Mr. Khamphong Deputy head of village Stay set 3 Mr. Nong Elderty of village Stay set 4 Mr. Seng Security of village Land 5 Mr. Sao Trade Union Cutting tree 6 Mr. Say Local army Land 7 Mr. Ayong Villager Stay set 8 Mr. Nusone Soldier Land 9 Mr. Bounsou Soldier Cutting tree 10 Mr. Bounna Villager Stay set 11 Mr. Sone Villager Land 12 Mr. Phouva Villager Stay set 13 Mr. Phuth Villager Land 14 Mr. Bounpheng Soldier Land 15 Mr. Leng Local army Land 16 Mr. Phuck Elderty of village Stay set 17 Mr. Seu Villager Land 18 Mr. Chankhieng Villager Stay set 19 Mr. Chankhone Villager Stay set 20 Mr. Sinoun Villager Cutting tree 21 Mr. Phon Villager Stay set 22 Mr. Khamtoh Security of village Stay set 23 Mr. Hom Villager Stay set 24 Mr. Phetsamone Villager Land 25 Mr. Phonsay Villager Stay set

Agenda: 1. Discussion about planning to electrify to village 2. For the impact from erection concrete pole in the land. All villageres agreed and village

will responsible for that.

Summary minute of meeting, comment, question and response by presenter. 1. Villagers are welcome the project because they are expecting to electrify village for a long time. 2. For impact on cutting trees and the other impact. Village will all together solve it

without asking for any compensation.

Sealed and signed Signed Signed Signed Latchamee Nong Toum Savat Thongkhoun Village head Village elderly Women union EdL staff

5

Consultation

• Date/venue of consultation meeting No Date: 16.01.2004 Venue: Nakhealeck Village

Participants Name Responsibility Impact 1 Mr. Teu 1 Villager Paddy Land 2 Mr. Buam Villager Land 3 Mr. Mun Villager Land 4 Mr. Teu 2 Villager Land 5 Mr. Bounteuan Villager Land 6 Mr. Kongta Villager Land 7 Mr. Siengdy Villager Land 8 Ms. Keo Villager Pote and cutting tree 9 Mr. Khamsa Villager Pote Land 10 Mr. Somboun Local army Pote Land 11 Mr. Some Villager Pote and cutting tree 12 Mr. Siengma Villager Pote and cutting tree 13 Mr. Vieng Teacher Pote and cutting tree 14 Mr. Buan Villager Pote and cutting tree 15 Mr. Khamsay Teacher Pote and cutting tree 16 Mr. Lerth Head of village Pote and cutting tree 17 Mr. Teu 3 Villager Pote and cutting tree 18 Mr. Dam Villager Pote and cutting tree 19 Mr. Ky Deputy head of village Pote and cutting tree 20 Mr. Kam Villager Pote and cutting tree 21 Mr. Jampha Villager Pote and cutting tree 22 Mr. An Villager Pote and cutting tree 23 Mr. Sor Villager Pote and cutting tree 24 Mr. Tarn Villager Pote and cutting tree 25 Mr. Khambai Villager Pote and cutting tree 26 Mr. Nor Villager Pote and cutting tree 27 Mr. Phuck Deputy head of village Pote and cutting tree 28 Mr. Teu 4 Elderly of village Pote and cutting tree

Agenda: 1. Discussion about planning to electrify to village 2. For the impact from erection concrete pole in the land. All villageres agreed and village

will responsible for that.

Summary minute of meeting, comment, question and response by presenter. 1. Villagers are welcome the project because they are expecting to electrify village for a long time. 2. For impact on cutting trees and the other impact. Village will all together solve it

without asking for any compensation.

Sealed and signed Signed Signed Signed Khamkeng SOUNSAMOOT Teu Lichanh Savat Thongkhoun Village head Village elderly Women union EdL staff

6

Consultation

• Date/venue of consultation meeting No Date: 16.01.2004 Venue: Nadeua Village

Participants Name Responsibility Impact 1 Mr. Sieng lomh Villager pote 2 Mr. Khamsa Local army Tree 3 Mr. Jum 1 Villager Pote 4 Mr. Sieng tane Villager 2 Pote 5 Mr. Keng Villager Pote 6 Mr. Mar 1 Villager Pote 7 Mr. Lar Villager Tree 8 Mr. Temple Villager Pote and Stay set 9 Mr. Boualy Villager Pote and Tree 10 Mr. Mar 2 Villager Pote 11 Mr. Vieng Villager Pote and tay set 12 Mr. Pherng Villager Pote 13 Mr. Unh Villager Pote 14 Mr. Phome Villager Pote and stay set 15 Mr. Khamlah Teacher Pote and stay set 16 Mr. Mar 3 Villager Pote and stay set 17 Mr. Jum 2 Villager Tree 18 Mr. Nor Villager Tree 19 Mr. Hung Head of village Tree 20 Mr. Tongdy Villager Tree 21 Mr. Sith Villager Tree

Agenda: 1. Discussion about EDL and villages recommend all such as: want to electric for help to

environmental . 2. Discussion in the meetting to garee for electrify to village. Summary minute of meeting, comment, question and response by presenter. 1. In summary from the meetting, all villagers and village authority asking EdL to come to electrify

village as soon as possible. Sealed and signed Signed Signed Signed Hangsisoulin Sino Thoun Savat thongkhoun Village head Village elderly Women union EdL staff Sealed and signe District governor

7

Consultation

• Date/venue of consultation meeting No Date: 16.01.2004 Venue: HuayMao Village

Participants Name Responsibility 1 Mr. Phong Villager 2 Mr. Phieng Villager 3 Mr. Sothar Villager 4 Mr. Pharn Villager 5 Mr. Te Villager 6 Mr. Phome Villager 7 Mr. Phoo Villager 8 Mr. In Villager 9 Mr. Yuh Villager 10 Mr. Luanh Villager 11 Mr. Kao Villager 12 Ms. Mar Villager 13 Ms. Phady Villager 14 Mr. Ly Villager 15 Mr. Khong Villager 16 Mr. Phieng Villager 17 Mr. Sudy Head of local army 18 Mr. Pheng Local army 19 Mr. Khamsaileuam Villager 20 Mr. Dy Villager 21 Mr. Chienglay Villager 22 Ms. Vane Villager 23 Mr. Phong Villager 24 Mr. Air Villager 25 Mr. Pong Villager 26 Ms. Mieng Villager 27 Ms. Pheua Villager 28 Mr. Ong Villager 29 Ms. Lamh Villager 30 Ms. Khamdy Villager 31 Ms. Sor Villager 32 Mr. Vontar Elderly of village 33 Ms. Kuang Villager 34 Mr. Mee Villager 35 Mr. Mong Local army 36 Mr. Chom Villager 37 Mr. Khan Villager 38 Mr. Teng Villager 39 Mr. Deuan Villager 40 Mr. Manh Villager 41 Ms. Mai Villager 42 Ms. Boua Villager 43 Mr. Charb Local army 44 Mr. Sun Head of village 45 Mr. Mou Villager

8

46 Mr. Vong Security of village 47 Mr. Khong Local army 48 Mr. Nao Villager 49 Mr. Phan Villager 50 Mr. Kheuan Villager 51 Mr. Munh Villager 52 Mr. Keo Villager 53 Temple Public land 54 Ms. Tai Villager 55 Ms. Yan Villager 56 Ms. Neuan Villager 57 Ms. Phouck Villager 58 Ms. Phoun Villager 59 Mr. Vingsay Villager 60 Ms. Tan Villager 61 Mr. Tar Villager 62 Mr. Phong Villager 63 Ms. Dy Villager 64 Ms. Vantong Villager 65 Ms. Len Villager 66 Ms. Mick Villager 67 Mr. Teuh Villager 68 Mr. Lia Villager 69 Mr. Pharn Villager 70 Mr. Luiy Villager 71 Mr. Bai Villager 72 Mr. Phone Villager 73 Mr. Sith Villager 74 Mr.Vongnoy Villager 75 Mr. Tonh Villager 76 Mr.Phod Villager 77 School Public land 78 Mr. Khambai Villager 79 Mr. Larb Villager 80 Mr. Phom Villager 81 Mr. Chiengmun Villager 82 Mr.Yeua Villager 83 Mr. Long Villager 84 Mr. Teao Villager 85 Ms. Bouakeo Villager 86 Ms. May Villager 87 Ms. Dong Villager 88 Mr. Soth Villager 89 Ms. Houh Villager 90 Temple Public land 91 Mr. Khamphan Villager 92 Mr. Phune Villager 93 Mr. Phang Villager 94 Mr. Jonh Villager 95 Mr. Dom Villager

9

96 Mr. Pharn Villager 97 Mr. Kham Villager

Agenda: 1. In the HuayMao village to opinion and garee with about concrete pole will be on the land and cutting some trees. Is it not problem and no compensation needed to the affected property.

Summary minute of meeting, comment, question and response by presenter. 1. The impacted person will not ask for compensation. Mainly to have electricity in the village. 2. Village will provide labour to assisst durng construction work and cutting the tree, paddy,

Villagers will not require for any compensation . Sealed and signed Signed Signed Signed Bounlan ChanKom Phong Savat Thongkhoun Village head Village elderly Women union EdL staff

10

Consultation

• Date/venue of consultation meeting No Date: 16.01.2004 Venue: Khudkae

Village

Participants Name Responsibility Impact 1 Ms. Bang Villager Land 2 Mr. Khan Villager Land 3 Mr. Luanh Villager Land 4 Mr. Chanlah Villager Land 5 Mr. Phia Head of village Land 6 Mr. Tee Villager Land 7 Ms. Nuan Villager Land 8 Mr. Bar Villager Land 9 Mr. Kar Villager Land 10 Mr. Tar Villager Land 11 Mr. Lemay Villager Land 12 Mr. Lepay Villager Land 13 Mr. Khamsone Teacher Land 14 Mr. Hom Deputy head of village Land 15 Mr. Beao Security of village Land 16 Mr. Don Villager Land 17 Mr. Mon Villager Land 18 Ms. Kong Villager Land 19 Mr. Keophan Villager Land 20 Mr. Tar Villager Land 21 Mr. Loy Villager Land 22 Ms. Shoo Villager Land 23 Ms. Leab Villager Land 24 Mr. Mae Villager Land 25 Ms. Phamy Villager Land 26 Mr. Yan Villager Land 27 Ms. Kheum Villager Land 28 Temple Villager Land 29 Mr. Phiene Villager Land 30 Mr. Sae Villager Land 31 Ms. Pharn Villager Land 32 Mr. Mar Villager Land 33 Mr. Tom Head of youth union Land 34 Mr. Lae Villager Land 35 Mr. Suny Villager Land 36 Ms. Khamkong Villager Land 37 Mr. Tuang Villager Land 38 Mr. Sing Villager Land 39 Ms. Tang Villager Land 40 Mr. Say Villager Land

Agenda:

11

1. Discussion about compensation if concrete pole will be set on the land and cutting some trees.

2. Discussion in case of the line will be passing the house and rice storage.

Summary minute of meeting, comment, question and response by presenter. 1. If any probrems happened village will together solve it 2. Villagers will not require for any compensation. 3. In case of the the line passing the house or rice storage village will together relocate them. 4. Village will provide labour to assisst durng construction work. Sealed and signed Signed Signed Signed Pea Bai Kongpheng Savat Thpongkhoun Village head Village elderly Women union EdL staff

12

Consultation

• Date/venue of consultation meeting No Date: 16.01.2004 Venue: Nonkung Village

Participants Name Responsibility Impact 1 Mr. Phone Villager Tree 2 Mr. Vantong Villager Pote land and tree 3 Mr. Sibouaban Villager Pote land and tree 4 Mr. Chanpang Villager Tree 5 Mr. Sy Villager Tree 6 Mr. Keuankeo Head of villager Tree 7 Mr. Khamphan Villager Tree 8 Mr. Tow Villager Tree 9 Mr. Kaophone Head of local army Tree 10 Ms. Lay Elderly of village Tree 11 Mr. Puam Villager Tree 12 Ms. Lien Teacher Tree 13 Mr. Bouphar Deputy head of village Tree 14 Mr. Suan Villager Tree 15 Mr. Chankun Villager Tree 16 Mr. Pay Head security of village Tree 17 Mr. Phong Villager Tree 18 Mr. Vane Local army Pote 19 Mr. Thai Villager Pote 20 Mr. Bouachan Villager Pote

Agenda: 1. Discussion about compensation if concrete pole will be set on the land and cutting some

trees. 2. Discussion in case of the line will be passing the house and rice storage.

Summary minute of meeting, comment, question and response by presenter. 1. If any probrems happened village will together solve it 2. Villagers will not require for any compensation. 3. In case of the the line passing the house or rice storage village will together relocate them. 4. Village will provide labour to assisst durng construction work.

Sealed and signed Signed Signed Signed Keuamkeo Khammy Sonexay Savat Thongkhoun Village head Village elderly Women union EdL staff

13

Consultation

• Date/venue of consultation meeting No Date: 27.02.2004 Venue: NongAhongNoy Village

Participants Name Responsibility Impact on 1 Mr. Bounnom Head of village 2 Mr. Souban Deputy head of village 3 Mr. Khamsone Head elderly of village 4 Mr. Mane Deputy head elderly of village 5 Mr. Tang Security of village 6 Mr. Mong Local army 7 Mr. Harn Elderly of village 8 Mr. Ke Businessman 9 Mr. Boh Youth union 10 Ms. Phao Women union 11 Mr. Yod Villager 12 Mr. Pheng Villager 13 Mr. Pheua Villager 14 Mr. Phumy Villager 15 Mr. Lai Villager 16 Mr. Narn Villager 17 Mr. Tong Villager 18 Mr. Sealar Soldier 19 Mr. Khamphai Villager 20 Mr. Keo Villager 21 Mr. Khack Soldier 22 Mr. Jarm Elderly of village 23 Mr. Seakar Villager 24 Mr. Sid Head of unit 25 Mr. Sang Deputy head of unit 26 Mr. Uy Villager 27 Mr.Boud Villager 28 Mr. Heo Villager 29 Mr. Bai Villager 30 Mr. Chane Villager 31 Mr. Pho Villager 32 Mr. Tongmeuan Villager 33 Mr. Phien Villager 34 Mr. Boua Villager 35 Mr. Mytongman Villager 36 Mr. Ki Villager 37 Mr. Chiengkam Villager 38 Mr. Sydar Villager 39 Mr. Phommar Villager 40 Mr. Lieng Local army 41 Ms. Sone Villager 42 Mr. Tone Villager 43 Ms. Vong Villager 44 Ms. Noy Villager 45 Mr. Joy Villager

14

46 Temple Public land 47 Mr. Teang Villager 48 Mr. Keuang Villager 49 Mr. Thong Villager 50 Mr. Bai Head of unit 51 Ms. Manh Villager 52 Ms. Dar Villager 53 Mr. Lerd Villager 54 Mr. Bounyang Teacher 55 Mr. Nam Villager 56 Mr. Phim Villager 57 Mr. Bounjong Villager

Agenda: 1. Discussion about compensation if concrete pole will be set on the land and cutting some

trees. 2. Discussion in case of the line will be passing the house and rice storage.

Summary minute of meeting, comment, question and response by presenter. 1. If any probrems happened village will together solve it 2. Villagers will not require for any compensation. 3. In case of the the line passing the house or rice storage village will together relocate them. 4. Village will provide labour to assisst durng construction work.

Sealed and signed Signed Signed Signed Bounnoy Chom Phao Savat Thongkhoun Village head Village elderly Women union EdL staff

15

7. Schedule Sub-project

Utumphon 2 Dist. Savannakhet Prov.

Construction (day)

Operation

22kV 0,4kV 22kV 0,4kV Transformer

Village Pole erection

Line Stringing

Pole erection

Line Stringing

Tampha 6 5

Nakealeck 7 6 7 6

Nadeua 6 5

Houaymao 6 6 13 12

Kudkae 6 6 6 5

Nongkung 9 7 6 5

NongAhongNoy 7 6 6 5

Nonsavang 6 5

2 Time/Year Regulary Monitoring

Based on those above schedule for the mitigation and monitoring could be:

Sub-project Utumphon 2 Dist. Savannakhet Prov.

Survey Design Approval Pre-Construction Construction Operation

Tampha Nakealeck Nadeua Houaymao Kudkae Nongkung NongAhongNoy

Mitigation Monitoring

16