LANDSCAPING MANAGEMENT PLAN
1. OBJECTIVES
This Management Plan aims to implement the appropriate on-site
Landscaping plan for the Hawkesdale wind farm project site.
2. REQUIREMENTS
This Landscaping Management Plan has been prepared in accordance with
Condition 4 of Permit 20060221 for the Hawkesdale Wind Energy Facility.
Landscape / Visual Amenity
4. Before the development starts, on on-site landscape plan to the satisfaction of the Minister for Planning must be submitted to and approved by the Minister for Planning. When approved, the plan will be endorsed and will then form part of this permit. The plan must show:
a) landscaping to screen the substation, switchyard and associated buildings other than the turbines;
b) details of the plant species proposed to be used in the landscaping, including height and spread at maturity;
c) a timetable for implementation of all landscaping works; and
d) a maintenance and monitoring program;
ABN 74 130 542 031
Suit 4.03, 68 York Street Sydney NSW 2000 Telephone: 02 8297 8700 Fax: 02 9279 2265
Hawkesdale, Landscaping Management Plan v2 Page 2 of 4
3. MANAGEMENT PLAN
Landscaping to Screen Infrastructure
As per the revised Hawkesdale “Landscape Plan for Substation and Switchyard” prepared by ERM Pty Ltd on 17-Feb-2012, also shown in figure-1.
Figure-1
ABN 74 130 542 031
Suit 4.03, 68 York Street Sydney NSW 2000 Telephone: 02 8297 8700 Fax: 02 9279 2265
Hawkesdale, Landscaping Management Plan v2 Page 3 of 4
Details of Plant Species
As per the revised Hawkesdale “Landscape Plan for Substation and Switchyard” prepared by ERM Pty Ltd on 17-Feb-2012, also shown in figure-1.
Figure-2
ABN 74 130 542 031
Suit 4.03, 68 York Street Sydney NSW 2000 Telephone: 02 8297 8700 Fax: 02 9279 2265
Hawkesdale, Landscaping Management Plan v2 Page 4 of 4
Timetable for Implementation
All landscaping works will commence once the substation equipment have
been delivered and installed and the security fencing has been installed. The
substation commissioning is one of the last items in the construction phase
as the High Voltage power transformers are usually the longest lead items.
This late commencement of the landscaping is due to the disturbance that
the cranage can cause during the delivery and installation of the large
substation equipment.
It is estimated that the timetable for the implementation of the landscaping
would be approximately 6 months, and can commence in the areas that have
been commissioned or no further heavy installation works will be carried out
that could disturb the vegetation.
Maintenance & Monitoring Program
It is important to ensure that the planted vegetation as part of the
landscaping program be maintained and monitored to allow the screening to
develop to its desired height and spread and be as effective as it was
designed for in this project.
We are proposing that the monitoring be on a quarterly basis for the first 12
months after completion of the landscaping implementation, and then the
inspections be performed bi-annually for the years 2 to 5, and then annually
thereafter.
The rehabilitation of the planted landscaping will be carried out with
consultation with the relevant landowner and the Moyne council.
The inspections for this monitoring program must be carried out by a
qualified and experienced person in this field, where he/she would produce a
report with results of the inspection and recommendations for any remedial
action(s).
Weed control measures are as per the Weed Management Plan in the
Environmental Management Plan for the project.
Responsibilities
The Site Manager is responsible for the implementation of the Landscaping
Management Plan.
133
132
131
134
40m
11.2M
50m
27M
10M
15M
15M
5M15
M
10m 15m
12M
12M
0 5 10 15 25
Meters
132KV POWER LINE
ACCESSAREA
MICROWAVE TOWER
OVERHEAD GANTRY
CAR PARK
SWITCHYARDCAR PARK
CODE BOTANICAL NAME COMMON NAME HEIGHT SPREAD INSTALL SIZE
Evergreen TreesAM Acacia melanoxylon Blackwood 10-15m 8-12m tubestockEO Eucalyptus obliqua Messmate 8-15m 8-10m tubestockEOV Eucalyptus ovata Swamp Gum 8-15m 8-10m tubestockEV Eucalyptus viminalis subsp. viminalis Manna Gum 8-20m 8-10m tubestock
Large ShrubsAPA Acacia paradoxa Hedge Wattle 2-4m 2-5m tubestockMSQ Melaleuca squarrosa Scented Paperbark 3-5m 3-5m tubestockBMA Banksia marginata Silver Banksia 1-2m 1-2m tubestockBSS Bursaria spinosa subsp. Spinosa Sweet Bursaria 2-6m 2-3m tubestockCLO Cassinia longifolia Shiny Cassinia 2-4m 2-3m tubestockLCO Leptospermum continentale Prickly Tea Tree 1-4m 1-2m tubestock
INDICATIVE PLANTING SCHEDULE
Eucalyptus ovata
Acacia melanoxolyn
Eucalyptus obliqua Eucalyptus viminalis
Bursaria marginata Acacia paradoxa
Banksia marginata
Cassinia longifolia
Leptospermum continentale
PROPOSED POWER LINE EASEMENTSSITE BOUNDARY
PROPOSED SCREENPLANTING
PROPOSED ACCESS ROAD
LEGEND
PROPOSED 132kV POWER LINE
10 m
10 m
APA (4), BMA (4)BSS (4), CLO (4)LCO (4), MSQ (4)
AM (2) EO (2)EOV (1) EV (1)Revegetation with tubestock - 2500 sqm (approx)
450MM X 400MM‘SURE GRO’ STANDARDPLANT GUARD OR SIMILAR APPROVED EQUIVALENT
25 X 25 X 750MM LONG HARDWOOD STAKES (QTY 3)
ROOTBALL
PROPOSED SCREEN PLANTING
HAWKESDALE WIND FARM
Ls2
17/02/2012
Drawn by: ML
0105123 Drawing No:
Drawing size:
Reviewed by: AW
Level 3, Tower 3World Trade Centre18-38 Siddeley StreetDocklands Vic 3005Telephone 61-3 9696 8011Facsimile 61-3 9696 [email protected]
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA PTY LTD
Landscape Architecture & Urban Design
Date:
Project No:
A1
Melaleuca squarrosa
Landscape Plan for Substation and Switchyard
MULCH
Tubestock Planting
PLANT DETAIL
Planting density30 plants per 100sqm
PROPOSED GARDEN FENCEPROPOSED OVERHEAD LINES
HAWKESDALE WIND FARM SITE
Pen
sh
urs
t -
Warr
nam
bo
ol
Nardoo Road
Cam
ero
ns
Ro
ad
Bromfields Road
Ro
ad
0 1km
Scale
Site boundary
Sealed road
Unsealed road
Wind turbine
Main road
Legend
Proposed 132kV power line
Substation
Access tracks
Existing 220kV power line
WIND FARM LAYOUT
HAWKESDALE
Fire fighting tank
SubstationConcretebatching plant
Site compound
Fire fighting tank
Heywood -Woolsthorpe Road