PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 1 of 20
PREQUALIFICATION EVALUATION REPORT
1.1 Introduction
M/s Lahore Waste Management Company (LWMC) is a public sector company, which has
been established under section 42 of the Companies Ordinance 1984. After the formation
of company, LWMC and City District Government Lahore have signed Services and Asset
Management Agreement (SAMA). According to this agreement, all the functions and assets
of SWM department of CDGL and the TMAs has been entrusted to LWMC.
The Lahore Waste Management Company (LWMC) invites applications for the Pre-
Qualification from well reputed firms registered with tax departments for LWMC Workshop
for the calendar year 2017 for the following categories.
i. Fabrication Work (for material for fabrication of vehicles, containers, handcarts, koorgans, waste bins, litter traps, motorcycle garbage trolleys etc.).
ii. Supply of Parts (for vehicle, machinery, electrical material etc.). iii. Repair & Maintenance of Fleet (light duty vehicles, heavy duty vehicles and motorcycle
etc.).
1.2 An invitation for PRE-QUALIFICATION OF FIRMS FOR LWMC WORKSHOP FOR
CALENDAR YEAR 2017 was advertised in national print media on November 12th, 2016 in
“Daily Times” and “Daily Jang” uploaded on PPRA website November 14th, 2016. (Copy of
advertisement is annexed).
1.3 In response of advertisement in newspapers and on PPRA website for Prequalification
(Invitation for Pre-Qualification) following potential Applicants purchased the
Prequalification Document.
Sr. No. Firm / Contractor Categories
1 M/s Nadeem Traders
Fabrication Work Supply of Parts R&M of Fleet
2 M/s S.J. Enterprises
Fabrication Work Supply of Parts R&M of Fleet
3 M/s Azan Enterprises
Fabrication Work Supply of Parts R&M of Fleet
4 M/s Habib-ur-Rehman
Fabrication Work Supply of Parts R&M of Fleet
5 M/s S.A Enterprises
Fabrication Work Supply of Parts R&M of Fleet
6 M/s A & M Associates
Fabrication Work Supply of Parts R&M of Fleet
7 M/s Usman Traders
Fabrication Work Supply of Parts R&M of Fleet
8 M/s A&A Associates
Fabrication Work Supply of Parts R&M of Fleet
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 2 of 20
9 M/S Mian Muhammad Jehangir
Fabrication Work Supply of Parts R&M of Fleet
10 M/s Wyne
Fabrication Work Supply of Parts R&M of Fleet
11 M/s Moeed Traders
Fabrication Work Supply of Parts R&M of Fleet
12 M/s Webog Global
Fabrication Work Supply of Parts R&M of Fleet
13 M/s Manzoor Ahmad & Sons
Supply of Parts R&M of Fleet
14 M/s Wali & Sons
Supply of Parts R&M of Fleet
15 M/s Al Nasir Brothers
Supply of Parts R&M of Fleet
16 M/s Munawar Shaiq Enterprises
Supply of Parts R&M of Fleet
17 M/s A.S Enterprises
Supply of Parts R&M of Fleet
18 M/s K.M Engineering
Supply of Parts R&M of Fleet
19 M/s Muhammad Yasin
Supply of Parts R&M of Fleet
20 M/s Data Quick Solutions
Supply of Parts R&M of Fleet
21 M/s S.J Gas Co.
Supply of Parts R&M of Fleet
22 M/s Al Murtaza Traders
Supply of Parts R&M of Fleet
23 M/s Noor-ul-Qamar
Supply of Parts R&M of Fleet
24 M/s M. Gulraz Butt
Supply of Parts R&M of Fleet
25 M/s Riaz &Company R&M of Fleet
26 M/s Rafiq & Company Supply of Parts
27 M/s Habibullah & Sons R&M of Fleet
28 M/s Dar Traders R&M of Fleet
29 M/s Subhan Construction Co. Fabrication Work
30 M/s Diyan Hassan International Trading and Contracting (Pvt.) Limited
Fabrication Work
31 M/s Amin Traders Supply of Parts
32 M/s Muhammad Nazar & Sons R&M of Fleet
33 M/s Waleed Brothers Supply of Parts
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 3 of 20
34 M/s Wasif Traders Supply of Parts
35 M/s Majid Engineering Works Fabrication Work
36 Waste Busters
Fabrication Work Supply of Parts R&M of Fleet
Following applicants submitted the prequalification application before at 1500 hours on
December 05th, 2016.
Sr. No. Firm / Contractor Documents Purchased
For
1 M/s Nadeem Traders
Fabrication Work Supply of Parts R&M of Fleet
2 M/s S.J. Enterprises
Fabrication Work Supply of Parts R&M of Fleet
3 M/s Azan Enterprises
Fabrication Work Supply of Parts R&M of Fleet
4 M/s Habib-ur-Rehman
Fabrication Work Supply of Parts R&M of Fleet
5 M/s S.A Enterprises
Fabrication Work Supply of Parts R&M of Fleet
6 M/s A & M Associates
Fabrication Work Supply of Parts R&M of Fleet
7 M/s Usman Traders
Fabrication Work Supply of Parts R&M of Fleet
8 M/s A&A Associates
Fabrication Work Supply of Parts R&M of Fleet
9 M/S Mian Muhammad Jehangir
Fabrication Work Supply of Parts R&M of Fleet
10 M/s Wyne
Fabrication Work Supply of Parts R&M of Fleet
11 M/s Moeed Traders
Fabrication Work Supply of Parts R&M of Fleet
12 M/s Webog Global
Fabrication Work Supply of Parts R&M of Fleet
13 M/s Manzoor Ahmad & Sons
Supply of Parts R&M of Fleet
14 M/s Wali & Sons
Supply of Parts R&M of Fleet
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 4 of 20
15 M/s Al Nasir Brothers
Supply of Parts R&M of Fleet
16 M/s Munawar Shaiq Enterprises
Supply of Parts R&M of Fleet
17 M/s A.S Enterprises
Supply of Parts R&M of Fleet
18 M/s K.M Engineering
Supply of Parts R&M of Fleet
19 M/s Muhammad Yasin
Supply of Parts R&M of Fleet
20 M/s Data Quick Solutions
Supply of Parts R&M of Fleet
21 M/s S.J Gas Co.
Supply of Parts R&M of Fleet
22 M/s Al Murtaza Traders
Supply of Parts R&M of Fleet
23 M/s Noor-ul-Qamar
Supply of Parts R&M of Fleet
24 M/s M. Gulraz Butt
Supply of Parts R&M of Fleet
25 M/s Riaz &Company R&M of Fleet
26 M/s Rafiq & Company Supply of Parts
27 M/s Habibullah & Sons R&M of Fleet
28 M/s Dar Traders R&M of Fleet
29 M/s Subhan Construction Co. Fabrication Work
30 M/s Diyan Hassan International Trading and Contracting (Pvt.) Limited
Fabrication Work
31 M/s Amin Traders Supply of Parts
32 M/s Muhammad Nazar & Sons R&M of Fleet
33 M/s Waleed Brothers Supply of Parts
34 M/s Wasif Traders Supply of Parts
35 M/s Majid Engineering Works Fabrication Work
1.4 A very through in house quality based evaluation process has been employed for
scrutiny/short listing of firms. Following is detail of evaluation process along with detailed
evaluation data.
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 5 of 20
CRITERIA FOR FABRICATION WORK AND REPAIR AND MAINTENANCE OF FLEET
Criteria for Selection/Range of Procurement Budget
Financial Limit
From 0.1
Million to 2
Million
From 2.01
Million to 10
Million
From 10.01
Million to 20
Million
Ma
nd
ato
ry
Registration with Income Tax Authorities R R R
Taxpayer Status for the last ‘X’ Years 1 2 3
Income Tax Returns for Duration Corresponding with Taxpayer
Status NR R R
Registration with Sales Tax Authorities (If Applicable) R (PRA) R (PRA) R (PRA)
Registration with Registrar of Firms (Certified copy of
Partnership Deed, along with Form C/D) OR SECP along with
latest certified copy of Form 29 and A
NR R R
Affidavit on Legal Paper that firm is not blacklisted by any
Govt. Agency / Firm R R R
Qu
ali
fica
tio
n Experience of ‘X’ Relevant Projects/Assignments (Copy of
evidence e.g. Experience Letter, Letter of Appointment etc.) 1 2 2
Audited Financial Statements for the Last ‘X’ Years NR 1 2
Bank Statement showing Financial Soundness NR R R
CRITERIA FOR SUPPLY OF PARTS
Criteria for Selection/Range of Procurement Budget
Financial Limit
From 0.1
Million to 2
Million
From 2.01
Million to 10
Million
From 10.01
Million to 20
Million
Ma
nd
ato
ry
Registration with Income Tax Authorities R R R
Taxpayer Status for the last ‘X’ Years 1 2 3
Income Tax Returns for Duration Corresponding with Taxpayer
Status NR R R
Registration with Sales Tax Authorities (If Applicable) R R R
Registration with Registrar of Firms (Certified copy of
Partnership Deed, along with Form C/D) OR SECP along with
latest certified copy of Form 29 and A
NR NR R
Affidavit on Legal Paper that firm is not blacklisted by any
Govt. Agency / Firm R R R
Qu
ali
fica
tio
n Experience of ‘X’ Relevant Projects/Assignments (Copy of
evidence e.g. Experience Letter, Letter of Appointment etc.) NR NR 2
Audited Financial Statements for the Last ‘X’ Years NR NR NR
Bank Statement showing Financial Soundness NR R R
2. EVALUATION CRITERION
2.1 Following is brief description of the evaluation criteria being employed in the prequalified
documents for prequalification of the firms. Firms are evaluated for being recommended to
the criteria specified for each Financial Limit prescribed. Firms complying with all the
requirements specified in each category are evaluated as qualified for that financial limit.
2.2 Following is the summary of the evaluation. Details are annexed.
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 6 of 20
2.3 FABRICATION WORK
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for
the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable)
Experience of 'X' Relevant
Projects/Assignments (Copy of evidence e.g.
Experience Letter, Letter of Appointment
etc.
Affidavit on Legal Paper That Firm is
Not Blacklisted
by Any Govt. Agency /
Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Registration with Registrar of Firms (Certified Copy of Partnership Deed along with Form
C/D) OR SECP Along with latest certified copy of
Form 29 & A
Audited Report
Bank Statement Showing Financial
Soundness
Recommendation
Criteria for Selection / Range of Procurement of Budget
0.1 Million to 2.0 Million 2.01 Million to 10.0 Million & 10.01 Million to 20 Million
1 M/s Nadeem
Traders Complied Complied
Complied Two Years Attached
Complied Complied
Ten Attached Complied
Complied Two Years Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for Fabrication Work Upto Limit 10 Million
2 M/s S.J. Enterprises Complied Complied Complied Two Years Attached
Complied Complied
One Attached Complied
Complied Two Years Attached
Complied (AOP)
Complied One Year Attached
Complied Recommended
for Fabrication Work Upto Limit 2 Million
3 M/s Azan
Enterprises Complied Complied
Complied Three Years
Attached
Complied Complied
Three Attached Complied
Complied Three Years
Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for Fabrication Work Upto Limit 20 Million
4 M/s Habib-ur-
Rehman Complied Complied
Complied Two Years Attached
Complied Complied
Two Attached Complied
Complied Two Years Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for Fabrication Work Upto Limit 10 Million
5 M/s S.A Enterprises Complied Complied Complied Two Years Attached
Complied Complied
One Attached Complied
Complied Two Years Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for Fabrication Work Upto Limit 2 Million
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 7 of 20
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for
the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable)
Experience of 'X' Relevant
Projects/Assignments (Copy of evidence e.g.
Experience Letter, Letter of Appointment
etc.
Affidavit on Legal Paper That Firm is
Not Blacklisted
by Any Govt. Agency /
Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Registration with Registrar of Firms (Certified Copy of Partnership Deed along with Form
C/D) OR SECP Along with latest certified copy of
Form 29 & A
Audited Report
Bank Statement Showing Financial
Soundness
Recommendation
6 M/s A & M Associates
Complied Complied
Complied Three Years
Attached
Complied Not Complied Complied Complied
Three Years Attached
Complied (AOP)
Complied Two Years Attached
Complied Disqualified Due to Non
Relevant Experience
7 M/s Usman Traders Complied Complied Complied Two Years Attached
Complied Complied
Three Attached Complied
Complied Two Years Attached
Complied (AOP)
Complied One Year Attached
Complied Recommended
for Fabrication Work Upto Limit 10 Million
8 M/s A&A
Associates Complied Complied
Complied Three Years
Attached
Complied Complied
Two Attached Complied
Complied Three Years
Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for Fabrication Work Upto Limit 20 Million
9 M/S Mian
Muhammad Jehangir
Complied Complied Complied Two Years Attached
Complied Complied
Four Attached Complied
Complied Two Years Attached
Complied (AOP)
Complied One Year Attached
Complied Recommended
for Fabrication Work Upto Limit 10 Million
10 M/s Wyne Complied Complied Complied Two Years Attached
Complied Complied
Two Attached Complied
Complied Two Years Attached
Complied (AOP)
Complied One Year Attached
Complied Recommended
for Fabrication Work Upto Limit 10 Million
11 M/s Moeed Traders Complied Complied Complied Two Years Attached
Complied Complied
One Attached Complied
Complied Two Years Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for Fabrication Work Upto Limit 2 Million
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 8 of 20
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for
the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable)
Experience of 'X' Relevant
Projects/Assignments (Copy of evidence e.g.
Experience Letter, Letter of Appointment
etc.
Affidavit on Legal Paper That Firm is
Not Blacklisted
by Any Govt. Agency /
Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Registration with Registrar of Firms (Certified Copy of Partnership Deed along with Form
C/D) OR SECP Along with latest certified copy of
Form 29 & A
Audited Report
Bank Statement Showing Financial
Soundness
Recommendation
12 M/s Webog Global Complied Complied Complied One Year Attached
Complied Not Complied
Relevant Experience Complied
Complied One Year Attached
Complied (AOP)
Not Complied
Complied Disqualified Due to Non Compliance of Relevant
Experience
13 M/s Subhan
Construction Co. Complied Complied
Complied One Year Attached
Not Complied PRA Non
Active
Not Complied Relevant Experience
Complied Complied One Year Attached
NR NR NR Disqualified Due to Non Active PRA & Relevant
Experience
14
M/s Diyan Hassan International Trading and
Contracting (Pvt.) Limited
Complied Complied Complied One Year Attached
Complied Complied
Two Attached Complied
Complied One Year Attached
Complied (SECP)
Not Complied
Complied Recommended
for Fabrication Work Upto Limit 2 Million
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 9 of 20
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for
the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable)
Experience of 'X' Relevant
Projects/Assignments (Copy of evidence e.g.
Experience Letter, Letter of Appointment
etc.
Affidavit on Legal Paper That Firm is
Not Blacklisted
by Any Govt. Agency /
Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Registration with Registrar of Firms (Certified Copy of Partnership Deed along with Form
C/D) OR SECP Along with latest certified copy of
Form 29 & A
Audited Report
Bank Statement Showing Financial
Soundness
Recommendation
15 M/s Majid
Engineering Works Complied Complied
Complied Two Years Attached
Not Complied (Individual)
PRA Not Registered
Complied Twenty Attached
Complied Complied Two Years Attached
NR NR Attached Disqualified Due to Not
Registered with PRA
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 10 of 20
2.4 SUPPLY OF PARTS
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable)
Affidavit on Legal Paper That Firm
is Not Blacklisted by Any Govt. Agency / Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Bank Statement Showing Financial
Soundness
Registration with Registrar
of Firms (Certified Copy of Partnership
Deed along with Form C/D) OR
SECP Along with latest certified
copy of Form 29 & A
Experience of 'X' Relevant
Projects/Assignments (Copy of evidence e.g. Experience
Letter, Letter of Appointment
etc.
Recommendation
Criteria for Selection / Range of Procurement of Budget
0.1 Million to 2.0 Million 2.01 Million to 10.0 Million 10.01 Million to 20 Million
1 M/s Nadeem Traders Complied Complied Complied Two Years Attached
Complied Complied Complied Two Years Attached
Complied Complied
(AOP) Complied
Three Attached
Recommended for Supply of Parts
Upto Limit 10 Million
2 M/s S.J. Enterprises Complied Complied Complied Two Years Attached
Complied Complied Complied Two Years Attached
Complied Complied
(AOP) Complied
One Attached
Recommended for Supply of Parts
Upto Limit 10 Million
3 M/s Azan Enterprises Complied Complied Complied
Three Years Attached
Complied Complied Complied
Three Years Attached
Complied Complied
(AOP) Complied
Seven Attached
Recommended for Supply of Parts
Upto Limit 20 Million
4 M/s Habib-ur-
Rehman Complied Complied
Complied Two Years Attached
Complied Complied Complied Two Years Attached
Complied Complied
(AOP) Complied
One Attached
Recommended for Supply of Parts
Upto Limit 10 Million
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 11 of 20
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable)
Affidavit on Legal Paper That Firm
is Not Blacklisted by Any Govt. Agency / Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Bank Statement Showing Financial
Soundness
Registration with Registrar
of Firms (Certified Copy of Partnership
Deed along with Form C/D) OR
SECP Along with latest certified
copy of Form 29 & A
Experience of 'X' Relevant
Projects/Assignments (Copy of evidence e.g. Experience
Letter, Letter of Appointment
etc.
Recommendation
5 M/s S.A Enterprises Complied Complied Complied Two Years Attached
Complied Complied Complied Two Years Attached
Complied Complied
(AOP) Complied
Two Attached
Recommended for Supply of Parts
Upto Limit 10 Million
6 M/s A & M Associates Complied Complied Complied
Three Years Attached
Complied Complied Complied
Three Years Attached
Complied Complied
(AOP) Complied
Two Attached
Recommended for Supply of Parts
Upto Limit 20 Million
7 M/s Usman Traders Complied Complied Complied Two Years Attached
Complied Complied Complied Two Years Attached
Complied Complied
(AOP) Not Complied But Not Req.
Recommended for Supply of Parts
Upto Limit 10 Million
8 M/s A&A Associates Complied Complied Complied
Three Years Attached
Complied Complied Complied
Three Years Attached
Complied Complied
(AOP) Complied
Six Attached
Recommended for Supply of Parts
Upto Limit 20 Million
9 M/S Mian
Muhammad Jehangir Complied Complied
Complied Two Years Attached
Complied Complied Complied Two Years Attached
Complied Complied
(AOP) Not Complied But Not Req.
Recommended for Supply of Parts
Upto Limit 10 Million
10 M/s Wyne Complied Complied Complied Two Years Attached
Complied Complied Complied Two Years Attached
Complied Complied
(AOP) Complied
Three Attached
Recommended for Supply of Parts
Upto Limit 10 Million
11 M/s Moeed Traders Complied Complied Complied Two Years Attached
Complied Complied Complied Two Years Attached
Complied Complied
(AOP) Complied
Six Attached
Recommended for Supply of Parts
Upto Limit 10 Million
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 12 of 20
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable)
Affidavit on Legal Paper That Firm
is Not Blacklisted by Any Govt. Agency / Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Bank Statement Showing Financial
Soundness
Registration with Registrar
of Firms (Certified Copy of Partnership
Deed along with Form C/D) OR
SECP Along with latest certified
copy of Form 29 & A
Experience of 'X' Relevant
Projects/Assignments (Copy of evidence e.g. Experience
Letter, Letter of Appointment
etc.
Recommendation
12 M/s Webog Global Complied Complied Complied One Year Attached
Complied Complied Complied One Year Attached
Complied Complied
(AOP) Not Complied But Not Req.
Recommended for Supply of Parts
Upto Limit 2 Million
13 M/s Manzoor Ahmad
& Sons Complied Complied
Complied Two Years Attached
Complied Complied Complied Two Years Attached
Complied Complied
(AOP) Complied
One Attached
Recommended for Supply of Parts
Upto Limit 10 Million
14 M/s Wali & Sons Complied Complied Complied Five Years Attached
Complied Complied Complied Two Years Attached
Complied Complied
(AOP) Complied
Six Attached
Recommended for Supply of Parts
Upto Limit 10 Million
15 M/s Al Nasir Brothers Complied Complied Complied One Year Attached
Complied Complied Complied One Years Attached
Not Required Complied
(AOP) Complied
Three Attached
Recommended for Supply of Parts
Upto Limit 2 Million
16 M/s Munawar Shaiq
Enterprises Complied Complied
Complied Two Years Attached
Complied Complied Complied One Year Attached
Not Required Complied
(AOP) Not Required
Attached
Recommended for Supply of Parts
Upto Limit 2 Million
17 M/s A.S Enterprises Complied Complied Complied One Year Attached
Complied (Individual)
Complied Complied One Year Attached
Not Required Not Required Not Required Recommended
for Supply of Parts Upto Limit 2 Million
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 13 of 20
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable)
Affidavit on Legal Paper That Firm
is Not Blacklisted by Any Govt. Agency / Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Bank Statement Showing Financial
Soundness
Registration with Registrar
of Firms (Certified Copy of Partnership
Deed along with Form C/D) OR
SECP Along with latest certified
copy of Form 29 & A
Experience of 'X' Relevant
Projects/Assignments (Copy of evidence e.g. Experience
Letter, Letter of Appointment
etc.
Recommendation
18 M/s K.M Engineering Complied Complied Complied One Year Attached
Complied Complied Complied One Year Attached
Not Required But Attached
Complied (AOP)
Not Required But Attached
Recommended for Supply of Parts
Upto Limit 2 Million
19 M/s Muhammad
Yasin Complied Complied
Complied Two Years Attached
Complied Complied Complied One Year Attached
Not Required Complied
(AOP) Not Required But Attached
Recommended for Supply of Parts
Upto Limit 2 Million
20 M/s Data Quick
Solutions Complied Complied
Complied Two Years Attached
Complied Complied Not Required Not Required But Attached
Complied (AOP)
Not Required Recommended
for Supply of Parts Upto Limit 2 Million
21 M/s S.J Gas Co. Complied Complied Complied Nine Years Attached
Complied (Individual)
Complied Complied One Year Attached
Not Required Not Required Not Required Recommended
for Supply of Parts Upto Limit 2 Million
22 M/s Al Murtaza
Traders Complied Complied
Complied Three Years
Attached
Complied (Individual)
Complied Complied
Three Years Attached
Not Required But Attached
Not Required Not Required But Attached
Recommended for Supply of Parts
Upto Limit 10 Million
23 M/s Noor-ul-Qamar Complied Complied Complied One Year Attached
Complied (Individual)
Complied Complied One Year Attached
Not Required Not Required Not Required But Attached
Recommended for Supply of Parts
Upto Limit 2 Million
24 M/s M. Gulraz Butt Complied Complied Complied One Year Attached
Complied (Individual)
Complied Complied One Year Attached
Not Required Not Required Not Required But Attached
Recommended for Supply of Parts
Upto Limit 2 Million
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 14 of 20
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable)
Affidavit on Legal Paper That Firm
is Not Blacklisted by Any Govt. Agency / Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Bank Statement Showing Financial
Soundness
Registration with Registrar
of Firms (Certified Copy of Partnership
Deed along with Form C/D) OR
SECP Along with latest certified
copy of Form 29 & A
Experience of 'X' Relevant
Projects/Assignments (Copy of evidence e.g. Experience
Letter, Letter of Appointment
etc.
Recommendation
25 M/s Rafiq & Company Complied Complied Complied
Three Years Attached
Complied Complied Complied
Three Years Attached
Complied Complied
(AOP) Complied
Five Attached
Recommended for Supply of Parts
Upto Limit 20 Million
26 M/s Amin Traders Complied Not
Complied Not Complied Not Complied Complied Not Complied Complied Not Required
Not Required But Attached
Disqualified Due to Non Provision of Income & Sales Tax Registration with AOP
Status.
27 M/s Waleed Brothers Complied Complied Complied One Year Attached
Complied (Individual)
Complied Complied One Year Attached
Not Required But Attached
Not Required Not Required But Attached
Recommended for Supply of Parts
Upto Limit 2 Million
28 M/s Wasif Traders Complied Complied Complied One Year Attached
Complied (Individual)
Complied Complied One Year Attached
Not Required But Attached
Not Required Not Required But Attached
Recommended for Supply of Parts
Upto Limit 2 Million
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 15 of 20
2.4 REPAIR AND MAINTENANCE OF FLEET
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable) FBR & PRA
Experience of 'X'
Relevant Projects/Assignments (Copy of evidence
e.g. Experience
Letter, Letter of
Appointment etc.
Affidavit on Legal Paper That Firm is
Not Blacklisted by
Any Govt. Agency / Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Registration with Registrar of Firms (Certified Copy of Partnership Deed
along with Form C/D) OR SECP Along with
latest certified copy of Form 29 & A
Audited Report
Bank Statement Showing Financial
Soundness
Recommendation
Criteria for Selection / Range of Procurement of Budget
0.1 Million to 2.0 Million 2.01 Million to 10.0 Million & 10.01 Million to 20 Million
1 M/s Nadeem
Traders Complied Complied
Complied Two Years Attached
Complied Complied Thirteen Attached
Complied Complied Two Years Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for R&M of Fleet Upto Limit 10 Million
2 M/s S.J. Enterprises Complied Complied Complied Two Years Attached
Complied Complied
One Attached
Complied Complied Two Years Attached
Complied (AOP)
Complied One Year Attached
Complied Recommended
for R&M of Fleet Upto Limit 10 Million
3 M/s Azan
Enterprises Complied Complied
Complied Three Years
Attached Complied
Complied Four
Attached Complied
Complied Three Years
Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for R&M of Fleet Upto Limit 20 Million
4 M/s Habib-ur-
Rehman Complied Complied
Complied Two Years Attached
Complied Complied
Three Attached
Complied Complied Two Years Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for R&M of Fleet Upto Limit 10 Million
5 M/s S.A Enterprises Complied Complied Complied Two Years Attached
Complied Complied
Two Attached
Complied Complied Two Years Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for R&M of Fleet Upto Limit 2 Million
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 16 of 20
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable) FBR & PRA
Experience of 'X'
Relevant Projects/Assignments (Copy of evidence
e.g. Experience
Letter, Letter of
Appointment etc.
Affidavit on Legal Paper That Firm is
Not Blacklisted by
Any Govt. Agency / Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Registration with Registrar of Firms (Certified Copy of Partnership Deed
along with Form C/D) OR SECP Along with
latest certified copy of Form 29 & A
Audited Report
Bank Statement Showing Financial
Soundness
Recommendation
6 M/s A & M Associates
Complied Complied Complied
Three Years Attached
Complied Complied
Two Attached
Complied Complied
Three Years Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for R&M of Fleet Upto Limit 20 Million
7 M/s Usman
Traders Complied Complied
Complied Two Years Attached
Complied Complied
Eight Attached
Complied Complied Two Years Attached
Complied (AOP)
Complied One Year Attached
Complied Recommended
for R&M of Fleet Upto Limit 10 Million
8 M/s A&A
Associates Complied Complied
Complied Three Years
Attached Complied
Complied One
Attached Complied
Complied Three Years
Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for R&M of Fleet Upto Limit 2 Million
9 M/s Mian
Muhammad Jehangir
Complied Complied Complied Two Years Attached
Complied Complied
Four Attached
Complied Complied Two Years Attached
Complied (AOP)
Complied One Year Attached
Complied Recommended
for R&M of Fleet Upto Limit 10 Million
10 M/s Wyne Complied Complied Complied Two Years Attached
Complied Complied
Four Attached
Complied Complied Two Years Attached
Complied (AOP)
Complied One Year Attached
Complied Recommended
for R&M of Fleet Upto Limit 10 Million
11 M/s Moeed
Traders Complied Complied
Complied Two Years Attached
Complied Complied
One Attached
Complied Complied Two Years Attached
Complied (AOP)
Complied Two Years Attached
Complied Recommended
for R&M of Fleet Upto Limit 2 Million
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 17 of 20
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable) FBR & PRA
Experience of 'X'
Relevant Projects/Assignments (Copy of evidence
e.g. Experience
Letter, Letter of
Appointment etc.
Affidavit on Legal Paper That Firm is
Not Blacklisted by
Any Govt. Agency / Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Registration with Registrar of Firms (Certified Copy of Partnership Deed
along with Form C/D) OR SECP Along with
latest certified copy of Form 29 & A
Audited Report
Bank Statement Showing Financial
Soundness
Recommendation
12 M/s Webog Global Complied Complied Complied One Year Attached
Complied
Not Complied Relevant
Experience
Complied Complied One Year Attached
Not Complied (AOP)
Not Complied
Complied
Disqualified Due to Non Compliance of
Relevant Experience & Audited Report
13 M/s Manzoor Ahmad & Sons
Complied Complied Complied Two Years Attached
Complied Complied
One Attached
Complied Complied Two Years Attached
Complied (AOP)
Not Required Complied Recommended
for R&M of Fleet Upto Limit 2 Million
14 M/s Wali & Sons Complied Complied Complied Two Years Attached
Complied Not
Complied Complied
Complied Two Years Attached
Complied (AOP)
Complied One Year Attached
Complied Disqualified Due to Non Compliance of
Relevant Experience
15 M/s Al Nasir
Brothers Complied Complied
Complied One Year Attached
Complied Complied
Two Attached
Complied Complied One Year Attached
Complied (AOP)
Not Required Not
Required
Recommended for R&M of Fleet
Upto Limit 2 Million
16 M/s Munawar
Shaiq Enterprises Complied Complied
Complied One Year Attached
Complied Not
Complied Complied
Complied One Year Attached
Complied (AOP)
Not Required Not
Required
Disqualified Due to Non Compliance of
Relevant Experience
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 18 of 20
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable) FBR & PRA
Experience of 'X'
Relevant Projects/Assignments (Copy of evidence
e.g. Experience
Letter, Letter of
Appointment etc.
Affidavit on Legal Paper That Firm is
Not Blacklisted by
Any Govt. Agency / Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Registration with Registrar of Firms (Certified Copy of Partnership Deed
along with Form C/D) OR SECP Along with
latest certified copy of Form 29 & A
Audited Report
Bank Statement Showing Financial
Soundness
Recommendation
17 M/s A.S Enterprises Complied Complied Complied One Year Attached
Complied (Individual)
Complied One
Attached Complied
Complied One Year Attached
Not Required Not Required Not
Required
Recommended for R&M of Fleet
Upto+ Limit 2 Million
18 M/s K.M
Engineering Complied Complied
Complied One Year Attached
Complied Not
Complied Complied
Complied One Year Attached
Complied (AOP)
Not Required Complied Disqualified Due to Non Compliance of
Relevant Experience
19 M/s Muhammad
Yasin Complied Complied
Complied One Year Attached
Complied Not
Complied Complied
Complied One Year Attached
Complied (AOP)
Not Required Not
Required
Disqualified Due to Non Compliance of
Relevant Experience
20 M/s Data Quick
Solutions Complied Complied Complied Complied
Not Complied
Complied Not Required Complied
(AOP) Not Required Complied
Disqualified Due to Non Compliance of
Relevant Experience
21 M/s S.J Gas Co. Complied Complied Complied One Year Attached
Complied (Individual)
Not Complied
Complied Complied One Year Attached
Not Required Not Required Not
Required
Disqualified Due to Non Compliance of
Relevant Experience
22 M/s Al Murtaza
Traders Complied Complied
Complied Three Years
Attached
Complied (Individual)
Complied One
Attached Complied
Complied Three Years
Attached Not Required Not Required Complied
Recommended for R&M of Fleet
Upto Limit 2 Million
23 M/s Noor-ul-
Qamar Complied Complied
Complied One Year Attached
Complied (Individual)
Not Complied
Complied Complied One Year Attached
Not Required Not Required Not
Required
Disqualified Due to Non Compliance of
Relevant Experience
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 19 of 20
Sr. No.
Firms Detailed Profile
Registration with Income
Tax Authorities
Taxpayer Status for the last 'X' Years
Registration with Sales Tax Authorities (If
Applicable) FBR & PRA
Experience of 'X'
Relevant Projects/Assignments (Copy of evidence
e.g. Experience
Letter, Letter of
Appointment etc.
Affidavit on Legal Paper That Firm is
Not Blacklisted by
Any Govt. Agency / Firm
Income Tax Returns for
Duration Corresponding with Taxpayer
Status
Registration with Registrar of Firms (Certified Copy of Partnership Deed
along with Form C/D) OR SECP Along with
latest certified copy of Form 29 & A
Audited Report
Bank Statement Showing Financial
Soundness
Recommendation
24 M/s M. Gulraz Butt Complied Complied Complied One Year Attached
Complied (Individual)
Not Complied
Complied Complied One Year Attached
Not Required Not Required Not
Required
Disqualified Due to Non Compliance of
Relevant Experience
25 M/s Riaz & Company
Complied Complied Complied
Three Years Attached
Complied (Individual)
Not Complied
Complied Complied
Three Years Attached
Not Required Not Required Not
Required
Disqualified Due to Non Compliance of
Relevant Experience
26 M/s Habibullah &
Sons Complied Complied
Complied Three Years
Attached Complied
Complied One
Attached Complied
Complied Three Years
Attached
Complied (AOP)
Not Complied
Not Required
But Attached
Recommended for R&M of Fleet
Upto Limit 2 Million
27 M/s Dar Traders Complied Complied Complied One Year Attached
Complied (Individual)
Not Complied
Complied Complied One Year Attached
Not Required Not Required
Not Required
But Attached
Disqualified Due to Non Compliance of
Relevant Experience
28 M/s Muhammad
Nazar & Sons Not
Complied Complied Not Complied
Complied (Individual)
Not Complied
Not Complied Not Complied Not Required Not Required Not
Requqired
Disqualified Due to Non Compliance Taxpayer Status,
Relevant Experience & Documents
PREQUALIFICATION OF FIRMS Lahore Waste Management Company Workshop for Calendar Year 2017
Page 20 of 20
3. CONCLUSION AND RECOMMENDATIONS:
Based on the detailed above mentioned evaluation, firms are evaluated as prequalified with
recommendations according to their financial limits against each category after qualifying
the mandatory & qualification criteria for LWMC Workshop for the following categories.
Disqualified firms are also mentioned in the following table due to non-compliance of
mandatory & qualification criteria against respective categories.
Sr.
No. Category Pre-Qualified Firms Disqualified Firms
1 Fabrication Work (for material for fabrication of vehicles, containers, handcarts, koorgans, waste bins, litter traps, motorcycle garbage trolleys etc.).
11 04
2 Supply of Parts (for vehicle, machinery, electrical material etc.).
27 01
3 Repair & Maintenance of Fleet (light duty vehicles, heavy duty vehicles and motorcycle etc.)
16 12
Recommendation Recommended Not Recommended
In the light of above mentioned conclusions and recommendations, the results are
recommended for approval.
In the light of meeting of audit committee dated 20-06-2014 the procurement procedure as per
PPRA rules 2014 was duly fulfilled and documents of the bidder were cross checked and verified.