lahore electric supply company limited oofice of the … petition... · lahore electric supply...

85
LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE CHIEF EXECUTIVE OFFICER LESCO HEAD OFFICE22-A QUEENS ROAD LAHORE Phone # 99204801 Fax # 99204803 E-MAIL : [email protected] No.3957/FD/LESCO/CPC/Tariff 2013-14 Dated Jul 04, 2013 The Registrar NEPRA 2" Floor OPD Building, G-5/2 Islamabad. Subject: PETITION FOR DETERMINATION OF CONSUMER END TARIFF FOR FY 2013-14 Enclosed please find the Petition for Determination of Revenue Requirement and Consumer End Tariff for FY 2013-14. The Authority is requested in order to recover the revenue requirement in time the proposed tariff be allowed so that the same may be applicable from Jul 01, 2013 subject to an order for refund for the protection of consumers during the pendency of this petition in terms of Sub-Rule 7 of Rule 4 of NEPRA (Tariff Standards and Procedures) Rules, 1998. Regards, Muhamm d Saleem Chief Ex utive Officer LESCO Enclosed Please find: 1. Tariff Petition for FY 2013-14. 2. Standardized Tariff Petition Formats. 3. Demand Draft of Rs:- 7,760 Bearing No. fated

Upload: others

Post on 30-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE CHIEF EXECUTIVE OFFICER

LESCO HEAD OFFICE22-A QUEENS ROAD LAHORE Phone # 99204801 Fax # 99204803

E-MAIL : [email protected]

No.3957/FD/LESCO/CPC/Tariff 2013-14 Dated Jul 04, 2013

The Registrar NEPRA 2" Floor OPD Building, G-5/2 Islamabad.

Subject: PETITION FOR DETERMINATION OF CONSUMER END TARIFF FOR FY

2013-14

Enclosed please find the Petition for Determination of Revenue Requirement and

Consumer End Tariff for FY 2013-14. The Authority is requested in order to recover the revenue

requirement in time the proposed tariff be allowed so that the same may be applicable from Jul 01, 2013

subject to an order for refund for the protection of consumers during the pendency of this petition in terms

of Sub-Rule 7 of Rule 4 of NEPRA (Tariff Standards and Procedures) Rules, 1998.

Regards,

Muhamm d Saleem Chief Ex utive Officer LESCO

Enclosed Please find: 1. Tariff Petition for FY 2013-14. 2. Standardized Tariff Petition Formats. 3. Demand Draft of Rs:- 7,760

Bearing No. fated

Page 2: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

PAKISTAN

AFFIDAVIT

I, Muhammad Saleem, Chief Executive Lahore Electric Supply Company Limited, (Distribution

License # 03/DL/2002 dated April 01,2002) being duly authorized representative/attomey of

Lahore Electric Supply Company Limited, hereby solemnly affirm and declare that the contents of the accompanying petition/application # 3957/FD/LESCO/CPC/Tariff 2013-14 dated July 04, 2013, including all supporting documents are true and correct to the best of my knowledge and

belief and that nothing has been concealed. I also affirm that all further documentation and

information to be provided by me in connection with the accompanying petition shall be true to the best of my knowledge and belief.

DEPONENT

Chief Execu ve cer L 0 Ltd.

E

vluhttm4a Siddlque Advuz.,:tf: high Coun

votary Punic Latina.

Page 3: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

ClE3L UNITED BANK

IIMP-P CASHIER'S CHEQUE ISSUING BRANCH:

1.174-0OFEN2 ROAD LAHORE

Pay against this Cheque

NOT OVER RS.***749760**

CHEQUE No. 6212063

Date 1.5—.11.11..-201.3 CC NO..621.2063

Amount PKR ***749.760.00

sued by new Core Banking System

AYABLE AT ANY UBL BRANCH IN PAKISTAN alid for Six Months from the date of Issue

ay to the order of NEPRA ISLAMABAD

emm f Pak Rupees SEVEN HUNDRED FORTY—NINE THOUSAND SEVEN HU /SIXTY C)

/i. /A,/

41/./.4, NATURE RE

cegt PLEASE DO NOT WRITE BELOW THIS UNE

06 2120630086 L99511:00004 240 L ‘101000,0

i .1.74 -WIFENS 1-- 1.1r,D I .A110R1,

No:12120n)(. ' Date:35-.1111 - 2013 Beneficiary:NE.PRA .AmARAn

Remitter: LESCO TMPRESf A C 1174oWmolew (11.74

Off

Amount Commission Withholding Tax • FED Misc. Charges To I

***749 760. 00 700. 00 37 00 749 992 on

All amounts in Rupees Remitter's copy

Page 4: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Rule # Information / Documents Required

Compliance Remarks Tariff Division's

Observatio ns 3(2)(1) be supported with a summary of evidence

giving brief particulars of the data, facts and evidence in support of the petition.

'Loy. Provided at para 12 (page 13).

3(8)

the same.

Any petition or communication, where in any statement of fact or opinion is made by the petitioner or the communicator, shall be verified by an affidavit, drawn up in the first person stating the full name, age, occupation and address of the deponent and the capacity in which he is signing and indicating that the statement made therein is true to be best of the knowledge of the deponent, information received by the deponent and belief of the deponent, and shall be signed and sworn before a person lawfully authorized to take and receive affidavits, provided that, a communication filed during the course of a hearing may be affirmed in person before the Authority by the person filing

V Affidavit provided

Board Resolution to authorize one or more persons to file a tariff petition with NEPRA and make further correspondence etc.

, Provided

Authority's directive (RM 10-19 dated 13.01.2010)

Detailed investment plan for reducing losses and rehabilitation of . the distribution network at the time of filing a tariff petition in future.

•/ Provided at pages 10-11.

(Lc

Page 5: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Summary / Checklist for Examination of Tariff Petition Received under

NEPRA (Tariff Standards and Procedure) Rules, 1998 * * *

Name of Company: Lahore Electric Supply Company Ltd. Tariff Determination for: Revenue Requirement and Consumer-end Tariff for FY

2013-14. Prepared/Updated on: 19.07.2012

Rule # Information / Documents Required

Compliance Remarks Tariff Division's

Observations 3(1) Any licensee, consumer or person

interested in the tariff may file a petitionwith the Authority by filing it with the Registrar along with such fees as may be determined by the Authority from time to time. The Authority may also initiate proceedings suo moto.

Vff

Tariff Petition filing fee amounting to Rs.749,760/- submitted vide Cheque No. 6212063 dated 15.07.2013.

3(2)(a) state the name and address of the petitioner and the grounds giving rise to the petitioner's interest forming the basis of the petition and, where the petitioner is a licensee, the number and other relevant details of the licence as may be determined by the Authority from time to time.

14../

Mr. Sharafat Ali Sial, Chief Executive Officer, Lahore Electric Supply Company Limited 22-A, Queens Road, Lahore Grounds giving rise to the Petitioner's interest are at para 3 page 5.

3(2)(b) state in a concise manner the grounds and the facts forming the basis of the petition;

V Provided at para 4 pages 5-6

3(2)(c) the relief or determination sought tif Provided at para 13 pages 13-14).

3(2)(d) be accompanied with comparative schedules of charges, costs, units, price and other items comprising the existing tariff and the proposed tariff, or such other details as may be determined from time to time by the Authority for the purpose.

/ Provided at Annex 6(1/2) & (2/2).

3(2)(e) be accompanied with a comparative table of the existing tariff design and the proposed tariff design on the basis of the categories of consumers likely to be affected by a modification of the tariff, their consumption patterns and charges payable by them; and

V Provided at Annex 6(1/2) & (2/2).

C'ontd...P/2

e St

Page 6: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Legal Advis r (LLP) are solicited and satisfacty to file the instant

National Electric Power Regulatory Authority Registrar Office

***

Urgent

No. NEPRA/TRF- 100/P94/ July 19, 2013

Subject: Petition filed by Lahore Electric Supply Company Ltd. (LESCO) for Determination of Consumer-end Tariff Pertaining to the FY 2013-14.

Enclosed please find herewith a copy of subject tariff petition filed by Lahore Electric Supply Company Ltd. vide letter No. 3957/FD/LESCO/CPC/Tariff 2013-14 dated 04.07.2013 (received on 18.07.2013).

2. Attention is drawn to the Minutes of Authority Regulatory Meeting (RM 13-280) held on 16.05.2013 whereby the Authority, interalia, decided as below:

"In . future the lacking requisite information is to be communicated by the Tariff and Legal Divisions clearly mentioning that the required information/documents fall under the list of documents/information required under Rule 3(2 )- (8) of NEPRA (Tariff Standards and Procedure) Rules, 1998."

3. Rule 3(3)(a) of NEPRA (Tariff Standards and Procedure) Rules, 1998 states that no petition shall be returned after the expiry of [fifteen] 15 days of filing thereof with the

Registrar:"

4. The documents/information of the tariff petition, prima facie, have been checked to confirm the compliance 'with the provisions of Rule 3(2) & (8) of NEPRA (Tariff Standards and Procedure) Rules, 1998 an accordingly prepared Checklist/Summary is placed at (F/A).

Lk

5. Comments of D.G. (Technical), D.G. (Tariff) and whether the provided information/documents are sufficient petition of' LESCO for further processing or otherwise.

End: As above

( I likhar All Khan )

1. D.G. (Tech) Deputy Director

2. D.G. (Tariff) 3. Legal Advisor (LLP)

CC:

1. Vice Chairman / Member (Tariff) 2. Member (M&E & Licensing) 3. Member (CA)

Page 7: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

LAHORE ELECTRIC SUPPLY COMPANY LIMITED (LESCO)

22A QUEENS ROAD LAHORE

Tariff Petition FY 2013-14

Tariff Petition for FY 2013-14

Page 1 of 14

Page 8: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

BEFORE

THE NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)

TARIFF PETITION

PETITION UNDER RULE 3 AND SUB-RULE 7 OF RULE 4 OF NEPRA (TARIFF

STANDARDS AND PROCEDURE) RULES, 1998 READ WITH SECTION 7(3)(a) AND

SECTION 31 OF THE REGULATION OF GENERATION, TRANSMISSION AND

DISTRIBUTION OF ELECTRIC POWER ACT, .

ON BEHALF OF

LAHORE ELECTRIC SUPPLY COMPANY LIMITED (LESCO)

FOR NEPRA'S APPROVAL OF CONSUMER YEAR END TARIFF FOR FISCAL YEAR 2013-

2014 FOR LAHORE ELECTRIC SUPPLY COMPANY LIMITED

DATED: 04 July, 2013

LAHORE ELECTRIC SUPPLY COMPANY LIMITED (LESCO)

ADDRESS : LESCO Head Office 22A Queens Road Lahore PHONE : 92-42-99204802. FAX : 92-42-99204803.

Tariff Petition for FY 2013-14 Page 2 of 14

Page 9: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Compartv Limited

1. DETAILS OF THE PETITIONER

1.1 Name And Address:-

Lahore Electric Supply Company Limited LESCO Head Office 22A Queens Road, Lahore

1.2 Petitioner Details:-

Lahore Electric Supply Company Limited (LESCO) is an ex-WAPDA DISCO owned by the Government of Pakistan. As a result of structural reforms introduced by the Government in the Power Sector, LESCO was incorporated as a Public Limited Company having Registration No. L-09415 of 1997-98 (old) and 0038810 (new) and Certificate of Incorporation No. JRL-6278 dated February 18, 1998 under Companies Ordinance 1984. Accordingly, LESCO has been granted a Distribution License bearing No. 03/DL/2002 by the National Electric Power Regulatory Authority (NEPRA) on April 01, 2002. LESCO is providing a public utility service of distribution and supply of electricity within the territories as defined in its License.

1.3 Representatives of LESCO

1. Mr. Muhammad Saleem Chief Executive Officer 2. Mr. Basharat Ali Chief Financial Officer 3. Mr. Muhammad Saleem Technical Director 4. Mr. Muhammad Mehbob Ali Operation Director 5. Mr. Khalid Mahmood Customer Services Director 6. Mr. Saghir Ahmad Human Resource & Admin Director 7. Mr. Sayyed Mubashar Masood Legal Director 8. Mr. Imtiaz Ahamd Butt D.G. (I.T.)

2. COMPLIANCE WITH DIRECTIONS

2.1 Installation of TOU Meters.

The Authority vide its determination dated Jan 10, 2012 has extended the target date (30-06-2012) for installation of TOU meters for the consumers having load 5kW & above. Keeping in view the performance of petitioner in FY 2011-12, Authority has further extended the date for installation of TOU meters up-to 31-03- 2013. It is enlightened to the Authority regarding the installation of TOU meters, LESCO has floated following tenders for TOU meters which is still in process.:-

Tender # Qty. 1205 25000 1257 4000 1286 4000 1297 4000

However, it is ensured that as soon as the material is received all the meters, would be installed.

Tariff Petition for FY 2013-14

Page 3 of 14

Page 10: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

2.2 Study of T&D losses to 11KV and below line.

Upon direction of Authority, the matter has been taken up with Power Planner International (Pvt.). But due to large network, it is not possible for the company to get study completed within given timeline. So the report will be submitted to the authority on completion of study.

2.3 Submit Auditor's Report with respect to excessive billing.

The activity in process and soon auditor report will be submitted to the authority.

2.4 To complete the creation of Independent Post Retirement Benefit Fund.

The Authority in its determination pertaining to the FY 2011-12, directed LESCO to create a separate fund before 30th June 2012, which is allowed by IAS -19. And again authority in its determination pertaining to FY 2012-13, directed LESCO to complete the creation of independent Post-Retirement benefit funds at the earliest and further allowed only expenses to the tune of actual payment made instead of provisions for Post-Retirement benefits.

Draft Trust Deed and Pension Rules have been approved by the Board and soon the same will be filed before the FBR for Registration.

It is ensured to the authority that LESCO would be establish its separate Post Retirement fund till the end of July-2013 and the petitioner is of the view that after creation of Post Retirement fund, the authority may be allowed post retirement expenses in this petition as prior year adjustment against the reduction made by the Authority in the 0 & M Expenses claimed for FY 2012-13.

2.5 To get the reported figure of additional recruitments verified by its Auditor and if it plans to carryout replacement hiring , a certificate from the Auditor certifying that the recruitment is done as replacement hiring with no additional / incremental cost impact.

As per the direction of respected authority the case has been forwarded to M/S KPMG and soon said certificate will be provided to the authority.

2.6 WAPDA and Others (including Petitioner) to come up clearly on the settlement modality of accumulated costs in this regard till 30th June 2012 and a way forward for the future payments of these retired employees not later than 30th June, 2013.

LESCO vide its tariff petition dated June 16, 2011 for the FY '2011-12 took up the matter of Post-Retirement benefits of WAPDA employees prior to its incorporation with NEPRA and sought its decision on the same on merit. In response, NEPRA in its determination dated Jan 10, 2012, decided to hold separate meeting on the subject whereby the arguments of LESCO and WAPDA could be heard in light of available evidences but in this regard no meeting held. Again NEPRA in its Tariff Determination for FY 2013-14 dated 28-02-2013 directed to resolve the matter by DISCOs and WAPDA itself.

The matter is under consideration and taken up with WAPDA in line with direction of Authority.

Tariff Petition for FY 2013-14 Page 4 of 14

Page 11: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

2.7 Working Capital Requirement.

Description 2010-11 2011-12 2012-2013 Total Electricity Cost (including GST) 140,245 188,045 189,074 517,364 0 & M Expenses 11,134 13,363 15,935 40,431 Total 151,379 201,407 205,009 557,795

Average 2 Months Cost (total 36 months) 30,989

Note: Working Capital is worked out based on 2 month average of Power Purchase Price and O&M Expenses of last 3 years (FY 2011, 12 & 13).

2.8 Compliance to point regarding comments on draft PSA, Concrete recovery plan, Comments on TOU meters & Changing terms and conditions of Lifeline consumers has been conveyed to the authority vide letter # 3789-90/LESCO/FD/Tar i ff dated April 25 2013.

3. GROUNDS GIVING RISE TO THE TARIFF PETITIONER'S INTEREST

3.1 That NEPRA, Under the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (hereinafter NEPRA Act), is responsible for regulating the electricity sector in Pakistan which includes determining the revenue requirement, tariffs and other terms and conditions for the supply of electricity by the generation, transmission and distribution companies and to recommend the same to the Federal Government for notification. For this purpose NEPRA has laid down certain guidelines and procedures under the NEPRA Tariff Standards and Procedures Rules, 1998.

3.2 That LESCO, being a bona fide power distribution licensee, requires adequate revenue in order to perform its obligatory duties prescribed by NEPRA under the NEPRA Act, NEPRA Performance Standards (Distribution) Rules 2005, NEPRA Consumer Eligibility Criteria, 2003, Distribution License of LESCO and other obligations as determined by NEPRA from time to time. The main sources of funding available to the petitioner for its revenue requirements are;

(i) Generation of adequate revenue through tariff and (ii) Borrowings.

3.3 That in order to fulfill and perform its obligatory duties as mentioned above and to ensure financial viability of LESCO by timely recovery of its prudently incurred costs and reasonable return, in order to upkeep and maintain its existing distribution services/network and to support the future investments for expansion of distribution services/network, this petition is being filed for FY 2013-14 through its Chief Executive Officer Mr. Muhammad Saleem, who has been duly authorized to sign and file this petition by the Board of Directors of LESCO vide its resolution passed in the Board meeting held on 28-06-2013 An extract of this resolution is attached as Annex-I.

4. GROUNDS AND FACTS FORMING THE BASIS OF THIS PETITION

4.1 The Distribution Margin determined by the Authority in its decision dated 28-02-2013 for determination of consumer end tariff for FY 2012-13, still to be notified by the Government of Pakistan "GoP", was not sufficient to meet with LESCO's proposed revenue

Tariff Petition for FY 2013-14 Page 5 of 14

Page 12: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

requirements for FY 2012-13 on account of increase in the asset base, the inflationary trend, replacement hiring cost, repair and maintenance etc.

The Authority in its determination dated 28-02-2013 again disallowed O&M expenses by Rs. 5,074 million. Major expense disallowed was Provision against Post Retirement benefits.

The petitioner is of the view that after creation of Post Retirement fund, the reduction made by the Authority in the 0 & M Expenses claimed for FY 2012-13 will be allowed in the FY 2013-14 as prior period adjustment.

The aforementioned position necessitates revision in tariff for FY 2012-13. This petition is, therefore, being filed in accordance with the NEPRA Tariff Standards and Procedure Rules 1998 Part 11 Section-3 and with the intent that tariff for FY 2013-14 be determined. notified and made effective from the very first day of the FY 2013-14 in terms of Sub-Rule 7 of Rule 4 of Tariff (Standards and Procedure) Rules, 1998.

5. OBJECTIVES OF THE PETITION

The aim of this petition is to obtain approval for the timely implementation of cost reflective tariffs to yield LESCO's required revenues for FY 2013-14 and its recovery from consumer.

The implementation of cost reflective tariffs will benefit consumers and LESCO, as it will;

i) Enable LESCO to improve service quality and reliability. ii) Provide adequate funds for the operation, maintenance and expansion of distribution

network. iii) Ensure the financial sustainability of LESCO.

6. LESCO'S REVENUE REQUIREMENT

6.1 Power Purchase Price

6.2 Distribution Margin 6.3 Prior Period Adjustment

The detail of each component of the revenue requirement is discussed below:

6.1 Power Purchase Price

As a matter of fact, the cost of electricity purchased is a "pass through item," to be recovered from the consumer through the tariff, without affecting LESCO's Distribution Margin. The cost of electricity purchased is adjusted with the allowed T&D losses.

The power purchase cost determined for FY 2012-13 has been taken for FY 2013-14. The power purchase cost, projected for FY 2012-13, has been worked out on the basis of actual data up to March, 2013 and estimated power purchase cost for next three months at the rate determined by NEPRA for the respective month vide its determination dated Feb 28, 2013. With this methodology, average power purchase rate comes to Rs.10.42/kWh (un-adjusted) for FY 2012-13. The quantitative data along with assumptions used to reach the estimated power purchase cost in comparison with last years' actual / provisional numbers is as under:

TariffPetition for FY 2013-14 Page 6 of 14

Page 13: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

Table-1

Description 2009-10 12010-11 12011-12 2012-13 2013-14

Actual Prov./Est. Projected Sales (GWh) 13,881 14,741 14,467 14,262 14,476 Growth (%) 5.42 6.19 -1.86 -1.42 1.50 Purchases (GWh) 16,100 16,986 16,727 16,207 16,450 T & D Losses (%) 13.78 13.22 13.51 12.00 12.00 Power Purchase Cost (Mtn Rs.) 113,478 125,219 167,897 168,816 175,516 Power Purchase Cost (Rs./kWh)(Un-Adj.) 7.05 7.37 10.04 10.42 10.67 Power Purchase Cost (Rs./kWh) (Adjusted) 8.18 8.49 11.61 11.84 12.12

6.2 Distribution Margin

The distribution margin covers LESCO's O&M costs, depreciation, other income and return on regulatory asset base. In the tariff petition for FY 2013-14, distribution margin has been worked out on the basis of audited figures of FY 2009-10, 2010-11, 2011-12 and provisional figures for FY 2012-13. The detail of distribution margin is as follows:

i. 0 & M Expenses:

It includes salary, house acquisition, employees' retirement benefits, repair & maintenance and other operating costs related to LESCO's electricity distribution and supply business. The detail of which is as under:-

a. Salary: Salary, including employee benefits, is the major component of 0 & M expenses. Since the petitioner was incorporated as a company in compliance with the power sector reform policy of the Government of Pakistan (GOP), and the WAPDA employees working in the Lahore Area Electricity Board gradually became employees of the petitioner in terms of the Manpower Transition Plan, therefore LESCO had to maintain the GOP pay scales and the terms of employment for the employees which were prevalent in WAPDA. LESCO for the purpose of this petition has assumed increase in basic pay @15% of running basic pay, along with the effect of annual increments which is 5% from December, 2013 onwards. On these assumptions the working of salary & employee benefits comes out to be Rs.7,796 million. A comparative view of previous years is shown in the table below:-

Table-2

Description 2009-10 I 2010-11 I 2011-12 2012-13 2013-14

Actual Prov. Estimated Basic Pay & Adhoc Relief 1,786 1,738 2,862 2,945 3,031 Employee Benefits 1,922 3,111 2,865 4,296 4,323 Ad-Hoc Relief 2013 - - - - 442

Total 3,707 4,848 5,726 7,241 7,796 % Change 13 31 18 26 8

Replacement hiring within sanctioned yardstick

The Authority is further apprised that to cope up with the shortage of man power in different functional areas, LESCO has planned to initiate the hiring against the vacant seats with reference to sanctioned strength based on best utility practices. In this phase, LESCO has advertised the jobs against 2,202 vacant posts in different categories of functional areas. The

Tariff Petition for FY 2013-14 Page 7 of 14

Page 14: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

annual financial impact of these advertised jobs would be Rs.542 million approximately (Annex-2)

Establishment of New Circle/Divisions/Sub-Divisions

Further, for smooth operations and facilitation of the consumers, LESCO has planned to establish one (1) new Grid System Operations Circle and one (1) Operation Circle comprising of three (3) Operation Divisions, three (3) Customer Services and eighteen (18) Sub-Divisions. The total estimated cost for the establishment of these offices is Rs.529 million consisting of Rs.443 million as annual expenses of recurring nature and Rs.86 million for expenditure of capital nature. As, the motive behind these structural changes is the consumer facilitation, sustainable supply and improved maintenance of system, the Authority is requested to allow the same for the FY 2013-14 (Annex-3).

b. House Acquisition: It is apprised that GOP has increased the House Acquisition @25% effective from July 01,

2011. The impact of this increase has reflected the financial results for FY 2011-12 and also reflects the result for FY 2012-13 tremendously, a minimal increase of 05% is assumed on account of persons expected to be further entitled to the hOuse acquisition due to their transfer from area where this is not allowed. The comparative figures for house acquisition are shown in the table below:-

Description _ _ —

2009-10 I 2010-11 I 2011-12 2012-13 kmulion its.)

2013-14 Actual Provisional Projected

796 House Acquisition 498 520 606 758 % Change 5% 4% 17% 25% 5%

c. Employee's Retirement Benefits: -

i. Pension: - The increase in this head has been assumed @10% and applied on the provisional figures of FY 2012-13. The Authority is requested to actualize the increase under this head after notification of increase in Pension from the Govt. of Pakistan.

ii. Medical: - LESCO has assumed increase in Medical Expenses for FY 2013-14 @10% which is based on past trend.

iii. Utility Allowance: - It is assumed that this head will increase @ 10%. The reason of this assumption is based on the proposed increase in tariff during FY 2013-14.

iv. Leave Encashment: - The increase in this head is assumed in line with the increase in salaries i.e. Pension 10%.

By applying the above assumptions on the provisional figures of FY 2012-13 the head of employee retirement benefits for FY 2013-14 comes out to be Rs.5,791 million. The year wise comparison of employee retirement benefits is as under: -

Description 2009-10 - ----

2010-11 -

2011-12 2012-13 kmiiiion Ks.)

2013-14 Pension 2,440 2,317 2,919 3,211 3,532 Medical 291 380 650 715 786 Utility Expense 518 565 962 1,059 1,165 Leave Encashment 92 101 255 280 308 Total 3,341 3,364 4,786 5,265 5,791 % Change 7% 1% 42% 10% 10%

Tariff Petition for FY 2013-14 Page 8 of 14

Page 15: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

d. Repair & Maintenance: An increase of 10% has been assumed under the head of R & M expenses which comes out to be Rs.1,167 million.

e. Other Operating Expenses:- Include rent rates & taxes, utility expenses, communications, office supplies, traveling expenses, professional fees, auditor remunerations, outsourced services, management fees, vehicle running & maintenance, electricity bill collection expenses, and directors' fees. The comparative other operating expenses are tabulated below:

Account Heads 2009-10 - —. — 2010-11 2011-12 2012-13

(minion its.)

2013-14 Rent, Rates and Taxes 32 35 40 40 42 Utility expenses 41 46 52 58 64 Communication 53 37 43 54 59 Office supplies and other exp. 95 • 20 33 120 132 Travelling Expenses 133 178 171 212 234 Professional fees 67 80 68 72 76 Auditors' remuneration 1 1 1 1 2 Outsourced Services 2 3 5 6 7 Management fees 14 84 51 108 119 Miscellaneous Expenses 59 89 3 96 106

Sub Total 495 573 467 767 839 % Change 8% 15.67% -18.42% 64.18% 9.27% Vehicle Running 256 289 315 376 451 NEPRA Fee 21 23 27 27 30 Elec. bills Collection exp. 235 309 292 337 352 Director's Fees 1 1 2 2 4 Advertisement, 164 98 176 100 100 Total ' 1,171 1,292 . 1,280 1,611 1,775

Except for the Vehicle Running, NEPRA fee and electricity bill collection expenses, directors' fees all other operating expenses have been worked out based on the average of the annual increase in the last three audited years.

ii. Depreciation:

The depreciation for FY 2013-14 is calculated on the basis of: (i) the value of existing assets; plus (ii) addition in assets during FY 2012-13. The assets will be depreciated on a straight-line method as per utility practice i.e. land @ 0%, buildings & civil works @ 2%, plant and machinery @ 3.5%, office equipment @ 10%, mobile plant & equipment @ 10% and other assets @ 10%. Based upon these assumptions, the figures for depreciation works out to be Rs 2,604 million.

iii. Return on Rate Base (RORB):

In line with the best financial management practices, LESCO has built financing cost of this working capital requirement into its rate base. Further, from some of the previous determinations made by the Authority, it is evident that NEPRA has been approving working capital requirement financing cost to different companies. The calculation of Rate Base is given as under: -

RORB = Rate Base x WACC

Tariff Petition for FY 2013-14 Page 9 of 14

Page 16: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

Where:

Rate Base = Regulatory Asset Base + Average Two Months Cost as Working Capital Requirement

Regulatory Asset Base = Net Fixed Assets in Operations + Additions during the year -Deferred Credits (assets not financed by LESCO)

WACC = Weighted Average Cost of Capital has been taken as determined by NEPRA in its determination dated 28-02-2013 i.e. 11.57% (post tax).

The working of Rate Base is tabulated below:

Description 2010-11 ........--,,

2011-12 2012-13 (Million Ks)

2013-14 Opening Gross Fixed Assets (GFA) 43,121 49,385 55,387 62,816 Add: Transferred during the year 6,264 6,002 7,428 10,920 Closing GFA 49,385 55,387 62,816 73,735 Less: Accumulated Depreciation 14,814 16,604 18,827 21,431 Net Fixed Assets in Operation 34,571 38,783 43,988 52,304 Add: Capital WIP (Closing) 2,887 3,540 3,511 5,161 Total Fixed Assets 37,458 42,323 47,499 57,465 Less: Deferred Credits (assets not financed by LESCO) 23,008 26,210 28,255 30,789 Total Assets Base 14,450 16,114 19,245 26,676 Regulatory Assets Base 12,967 15,282 17,679 22,960 Working Capital Requirement 27,212 30,989 Regulatory Asset Base 44,891 53,949

The average two months working capital requirement is calculated as under: -

Description -.- ,

2010-11 2011-12 2012-2013 (Million Ks)

Total Electricity Cost (including GST) 140,245 188,045 189,074 517,364 0 & M Expenses 11,134 13,363 15,935 40,431 Total 151,379

(total 36 201,407

months) 205,009 557,795

30,989 Average 2 Months Cost

iv. Development / Investment plan:

LESCO intends to execute its development / investment plan for FY 2013-14 in the areas of development of power (DOP), energy loss-reduction (ELR), secondary transmission and grid (STG) and others, the amounts whereof are Rs.650 million (own resources), Rs.850 million (own resources), Rs.6,859 million and Rs.716 million respectively. The summary whereof is as under:

# Description

_.-

2010-11 I 2011-12 2012-13 (minion KS)

2013-14 A ctual Prov. Proj.

1 Development Of Power: (DOP) -Own Resources 325 283 650 650 -Consumer Financing 2519

1

2825 1

2926 I

3495 2 Energy Loss Reduction: (ELR) A -Own Resources 264 I (310) 650 I 850

And

Tariff Petition for FY 2013-14 Page 10 of 14

Page 17: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

B -World Bank loan /ADB - 740 - - 3 STG: A -Own Resources 1,203 1,871 2,084 3,825 B -World Bank loan 364 644 333 1896 C -Asian Dev. Bank loan 1160 -434 200 1138 4 TOU Meters 421 487 150 0 Others 170 128 406 716

Total 6,426 6,233 7,399 12,570

As the replacement of TOU meters will continue in next year also, therefore, approval of Rs.150 million is sought from the Authority over & above the investment plan given in table-8 above.

v. Other Income:

This includes markup on bank deposits, late payment surcharge, amortization of deferred credits and income from other sources, the detail whereof has been shown in the table below. Due to declining KIBOR rates during the FY 2011-12 and 2012-13, there is sharp decline in Profit on Bank Deposits. Similarly, due to rising prices of material the income from Non-Utility Operations is also declining sharply. Therefore, in these heads no increase in assumed in these two heads. For Late Payment Surcharge and Meter & Service Rental, LESCO has assumed 10% increase for the FY 2013-14 on the provisional figures for FY 2012-13. Therefore, Other Income estimated on the assumptions discussed above is mentioned hereunder:

Description

-.-

2009-10 I 2010-11 2011-12 2012-13 (million Ms.)

2013-14 Actual Provisional Projected

960 Amortization of Deferred Credits 626 658 752 881

Late Payment Surcharge 1,311 1,433 1,786 1,965 2,161 Profit on bank deposit 1,150 1,385 938 938 938 Scrap Sales 13 - - - - Non-utility operations 375 274 384 384 384 Service fee for collection of TV Fee 117 129 132 136 141 Meter & Service Rent 148 164 166 183 201 Reversal of Prov. For Bad Debts 150 - _ _ . Miscellaneous 22 112 49 49 49

Total 3,913 4,155 4,208 4,536 4,834

The sum total of O&M cost, Depreciation, RORB and Other Income results in LESCO's distribution margin. Dividing this sum total by the total units to be sold (estimated 14,476 GWh) yields the average distribution margin per kWh. Accordingly, the distribution margin for year 2013-14 comes at Rs. 21,880 Million or Rs.1.51/kWh. The summary of total distribution margin required is as under:

Table-10 Description 2012-13

Estimated

, ....... .....s.,,

2013-14 Projected

0 & M Expenses 15,935 17,867 Depreciation 2,223 2,604 RORB 5,195 6,243 Other Income -4,536 -4,834 Total D. M. 18,817 21,880

Tariff Petition for FY 2013-14 Page I I of 14

Page 18: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Sunply Company Limited

7. Transmission & Distribution Losses

LESCO in its tariff petition for FY 2012-13 informed the Authority that for the purpose of that petition, LESCO assumed T & D Losses @ 12% on the plea that the same shall be adjusted according to decision of Authority on the report on Transmission Losses from third party Consultant.

Accordingly, in line with directions of the Authority and above mentioned exercise, LESCO for this petition also, has assumed the T & D Losses @ 12% on the clear understanding that the same shall be adjusted according to the determination of the Authority after considering the report on T&D losses to lIKV and below line. The report on distribution losses will be submitted to the Authority as Additional Information to this petition after getting approval of TORs from the Authority.

8. Prior Year Adjustment

It is apprised that the Authority in its determination for FY 2012-13 dated 29-02-2013 determined average tariff of Rs.14.003/kWh for the FY 2012-13 which is still not notified by the Govt. of Pakistan, the tariff lastly notified i.e. Rs.11.0475/kWh through SRO 487 dated May 09, 2012 is still effective.

On the other hand, the monthly fuel price adjustment and quarterly adjustments for capacity charges and transmission charges have also not been determined and notified therefore these costs also stand unrecovered during FY 2012-13. Due to above facts the unrecovered cost for the FY 2012-13 stands Rs.47,764 million (Annex-5). The unrecovered cost is evaluated as

Table- Mln. Rs. Description 2012-13

Notified Ref Price During FY 2012-13 Assessed Distribution Margin FY 2012-13 PYA for FY 2011-12 Adjustments Q1 Q2

Q3 Q4 Total Recoverable Less Recovered Regulatory PPP expected to recover Regulated DM expected to recover Regulated PYA expected recovery

PYA Add: Net impact of actual assessed other income Mix Variance(Up-to April)

182,199 18,817 25,740

(1,944) (4,221) (8,634) (3,149) 208,807

147,188 9,984 4,279

161,450 47,358

406 Net PYA 47,764

As regards Prior Year Adjustment, the Authority is requested to review the same in light of expected notifications of annual, quarterly and monthly adjustments.

Tariff Petition for FY 2013-14 Page 12 of 14

under: -

Page 19: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

9. Loan Financing of Rs.160 billion: - It is apprised to the Authority that to cope up with the circular debt of power sector, Ministry of Finance has arranged a loan of Rs.160 billion, out of which Rs.136 billion has been disbursed by the lending institutions to Power Holding (Pvt.) Ltd. (PHL) for onward payment to CPPA to pay off the obligations towards generation companies and oil companies. Out of this disbursed amount, Rs.9.3 billion have been allocated to LESCO. As per information from the media, it is further apprised that Economic Coordination Committee (ECC) has decided that NEPRA, in its next tariff determination, will allow the repayment and financing cost relating to this loan for recovery from consumers.

Lahore Electric Supply Company Limited

10. Summary is summarized

of revenue requirement: - The revenue requirement as explained in detail in the table below:-

Table-14

above

Description Min. Rs. Rs./kWh

Distribution Margin 21,880 1.51 Power Purchase Cost 175,516 12.12

Prior Period Adjustment 47,764 3.30

Total 245,159 16.94

11. In compliance of clauses (d) & (e) of Sub-Rule 2 of Rule 3 of NEPRA (Tariff Standards & Procedures) Rules, 1998 the comparative tables of existing and proposed charges, costs etc and tariff design on the basis of categories of consumers likely to be affected by such modification is attached as Annex-6.

12. According to clause (f) of Sub-Rule 2 of Rule 3 of NEPRA (Tariff Standards & Procedures) Rules, 1998 the summary giving brief particulars of data, facts and evidence in support of the petition is annexed as under and forms an integral part hereof:-

A. Copy of Resolution of Board of Directors LESCO (Annex-1) B. Revenue Requirement for FY 2013-14 (Annex-7) C. Standardized Tariff Petition Formats

13. That in view of the grounds and facts mentioned above, it is respectfully prayed that while admitting and allowing this petition, the tariff of LESCO for the FY 2013-14 may very graciously be determined as estimated hereinabove by allowing the following reliefs:-

a. Proposed tariff be allowed and made applicable immediately upon admission of this petition subject to an order for refund for the protection of consumers during the pendency of this petition in terms of Sub-Rule 7 of Rule 4 of NEPRA (Tariff Standards and Procedure) Rules, 1998;

b. Distribution Margin amounting to Rs.21,880 million be determined and allowed; c. Investment plan of Rs. 12,570 million including consumer contribution of Rs.3,495

million be approved; d. Prior year adjustment of Rs.47,764 million for FY 2012-13 including Annual,

Quarterly & Monthly adjustments and impact of delayed notification, be determined and allowed.

e. T & D losses target be considered @ 12% provisionally for FY 2013-14 subject to its final fixation after considering the study by independent expert under the directions of the Authority given through its determination dated 28-02-2013;

f. Redefining the baseline for determination of target of T&D losses by taking a realistic approach in view of the study to be submitted by LESCO;

g. Fixing of the target of T&D losses according to the re-defined baseline;

Tariff Petition for FY 2013-14 Page 13 of 14

Page 20: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

h. Allow the new hiring cost of Rs.542 million over & above the Salaries, Wages & Benefits requested above.

i. Allow the cost for creation of new Circles, Divisions, Sub-divisions and Customer Services as mentioned above.

j. Allow financing cost for FY 2013-14 on the loan obtained by Power Sector for meeting the obligations towards the generation companies and oil companies.

k. To resolve the issue of Post-Retirement Benefits pertaining to employees retired before June 30, 1998

1. Financial viability of the petitioner for the reliable supply of electricity to its 3.7 million consumers be ensured;

m. Allow Rs. 150 million for TOU meters for FY 2013-14 over & above the investment plan as explained in Table-8 above.

n. Any other relief.

Dated: 04-June-2013

, 7 PETITIO The Lahor ectric Supply Company Ltd.

Through: Muhammad Saleem

Chief Executive Officer LESCO

Tariff Petition for FY 2013-14 Page 14 of 14

Page 21: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

LAHORE ELECTRIC SUPPLY COMPANY LIMITED OFFICE OF THE COMPANY SECRETARY

22-A QUEENS ROAD LAHORE • Phone # 042-99204806 Fax # 042-36312310

E-mail: companysectlesco.gov.pk

SUBJECT: EXTRACT OF RESOLUTION PASSED BY THE BOARD OF DIRECTORS IN ITS 141ST MEETING HELD ON 28-06-2013

"Resolved that approval of the following:-

1- To file Company's annual Tariff Petition FY 2013-14 for determination of revenue requirement and consumer end tariff for various categories of consumers before National Electric Power Regulatory Authority (NEPRA).

2- To authorize following officers:-

i. Chief Executive Officer LESCO ii. Chief Financial Officer iiL Operation Director iv. Technical Director v. Customer Services Director vL Human Resource Director vii. Legal Director viii. DG (II)

a) To sign individually or jointly the necessary documents for filing of tariff petition for FY 2013-14.

b) To file subsequent review petition after the determination on the said application of FY 2013-14, if any.

c) To pay the necessary tariff petition filing fees.

d) To appear before the Authority as needed, and do all acts necessary for completion and processing of the applications.

is hereby accorded."

Certified True Copy

Mian Muhammad Afzaly_ez /3

Company Secretary LESCO

Page 22: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

RECRUITMENT 2009-10 IN LESCO

S# Post BPS NOs. Financial

Implication 2012-13

1 Junior Engineer 17 37 28,416,888 2 Security inspector 15 7 3,247,692 3 C/ Assistant 14 94 40,899,024 4 A/ Assistant 14 21 9,137,016 5 Cashier 14 12 5,221,152 6 LS-I 13 1 388,128 7 DEO 12 12 4,408,128 8 Data Coder 12 11 4,040,784 9 LS-II 11 39 13,626,288 10 UDC 9 3 864,396 11 Security Sergeant 8 60 16,606,080 12 Meter Reader 7 90 23,902,560 13 LDC 7 12 3,187,008 14 Lorry Driver 7 55 14,607,120 15 Security Guard 6 529 124,078,008 16 ASSA 5 78 17,427,384 17 Bill Distributor 3 113 22,944,876 18 ALM 3 1014 205,894,728 19 Lorry Cleaner 3 6 1,218,312 20 Naib Qasid 1 8 1,384,704

Grand Total

2,202

541,500,276

Iv

Page 23: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Jul-11 11 11 Se •-11 Oct-11 Nov-11 Dec-11 an-12 Feb-12 Mar 12 A r-12 Ma -12 Jun-12 Total

Units Purchased Standard Losses Units Sold

Atual PPP Energy Capactiy UOS

NMI]

pdkWhI [MkWhJ

1,293 1,330

,964 12,947 13,607 130,822

11,091 2,942

362 14.395

11,899 3,132

338 15 170

8,888 3,848

394 11 Ill

10,564 3,323

372 1.1 ,10

7,704 3,687

341 II 7nn

8,598 3,594

355

10,567 3,777

304 .......

8,227 3,530

282

11,152 3,441

277

12,672 2,941

270

11,843 2,762

283

10,513 3,324

297

123,720 40,302 3,876

Actual Power Purchase Price Energy Capacity UOS

3,217 5,450 3,046 ' 4,094 1,968 1,128 2,225 986 242 2,545 1,783 (520) 26,166 725 862 1,500 961 1,326 1,179 1,062 782 799 392 150 1,006 10,745 24 3.966

(25) 6/RR

68 ctAlc

54 o Inn

46 , .1.4n

64 n .......

(25) .....-,..

(60) (13) (18) 8 41 165 . --- 1,940 527 37,075

3,077 3,755 1,772 2,141 884 658 1,429 443 1,377 1,682 1,462 237 18,918

889 2,533 2,842 2,968 2,456 1,714 1,833 1,265 (349) 1,237 478 291 18,157 6,264 7,137 2,749 2,007

''' r.' " 1Z 883 14,887 14,134 167,897

7,874 2,217

338.00 10.429

6,449 2,270

363.00 9 nR9

5,842 2,348

326.00 a S IA

6,470 2,362

318.00 a 1 cn

5,736 2,361

295.00 o ,nn

7,470 2,415

291.00

8,342 2,715

329.00 .. ...,..,

7,241 2,748

342.00 .- --.

10,910 2,642

290.00

10,127 2,549

288.00

10,060 2,612

275.00

11,033 2,318

256.00

97,554 29,557 3,711

Notified Refrence Price Energy Capacity UOS

1,726 207

1,786 1,566 1,519 1,219 1,183 1,139 1,145 1,157 1,307 1,469 1,511 16,727

1.519 214

L572 188

1 37g 182

1 '117 146

1 n701 142

1 nwl 137

1 ....,,, 137

. -- 139 157 176 181 2,007

14,720

6.4271 1.7050

6.6618 5.6744 6.9541 6.3226 7.2693 9.2812 7.1862 9.6394 9.6932 8.0608 6.9567 1.7537 2.4566 2.1876 3.0261 3.0386 3.3172 3.0837 2.9741 2.2493 1.8799 2.1996 0.2098 0.1895 0.2518 0.2447 0.2795 0.3003 0.2670 0.2467 0.2397 0.2066 0.1924 0.1964

Qtr Adjustment Energy Capacity UOS Total

Less FPA

Qtr Adj

Page 24: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company FPA Calculation

FY 2011-12

Particulars Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Total Actual Units Purchased 1,726 1,786 1,566 1,519 1,219 1,183 1,139 1,145 1,157 1,307 1,469 1,511 16,727 Standard Units sold (at 12% loss) 1,519 1,572 1,378 1,337 1,072 1,041 1,002 1,007 1,018 1,150 1,293 1,330 14,720 Stand Life Line Units 12 26 9 13 17 20 28 28 26 21 18 16 235 Units>50<=350 - 308 310 317 300 260 210 228 223 281 307 299 3,042 Units Applicable for FPA 1,506 1,238 1,060 1,007 756 761 764 752 769 848 968 1,014 14,485 FPA Rate Rs/Kwh 2.043 3.033 _ 1.673 2.127 1.170 0.865 1.872 0.589 1.792 1.983 1.510 0.233

884

658

1 429

443

1 377

1 682

1 462

237

18 918 moun 3 1 2

Page 25: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

STANDARD PETITION FORMATS FOR DISTRIBUTION COMPANIES

INDEX

FORM NO. DESCRIPTION

1 Company Statistics

2 Profit & Loss Statement

3 Profit & Loss Statement ( Month wise )

4 Balance Sheet

5 Cash Flow Statement

6 Power Purchase (FY 2012-13)

7 Line Losses Statement

8 DISCO load factors

9 Average Rate per Unit Purchased and Sold

10 DEMAND (Actual and Calculated) and Number of Customers

11 Sold Energy Evaluation and Setting up Sold Energy Average

12 Load Growth Evaluation and Setting up Load Average

13 Asset Register

14 Aging of Accounts Receivables

15 Sales Growth with Distribution losses

16 Operating Cost

17 Distribution Margin Comparison

18 Financial Charges

19 RORB Calculation

20 Revenue Requirement

21 Investment

22 Interest on Development Loans

23 Development Loan

24 BONDS

25 Domestic Consumer's Analysis

26 Provision for Tax

27 Existing & Proposed Tariff Statement

28 Revenue & Subsidy Statement

29 Proposed Revenue & Subsidy Statement

Page 26: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited :Company Statistics

,2012-13 2013-14; Prov. Projected

Peak demand during FY 4,788 5,171 Number of Consumers 3,581,642 3,728,160 Area 19,064 19,064 Circles 12 14 Divisions 33 36 Sub Divisions 164 182 Length of Feeders 26,280 26,780 Average Length of Feeders 19.07 19.07 Maximum Length of Feeder 186.00 Minimum Length of Feeder 0.50 Target for new connections 130,571 154,783

Length of High Voltage Transmission lines (132 kV) 2,033 239 Length of STG lines (66 kV) 487 24 Length of Low Voltage Distribution lines (400 V) 14,631 14,871

Number of HV transformers 219 239 Number of STG transformers 24 24 Number of burned down HV transformers 1 Number of burned down STG transformers Number of LV transformers 91,206 94,206 Number of burned down LV transformers 1,156 1,100

Number of Employees A- Qualified Professionals Engineers Others

B- Staff Technical Clerical Non Technical

Strength (Nos.) Cost (Mln. Rs.)

FY 2012-13 FY 2013-14 Prov. Projected

305 398

184 200

13,797 16,812

2,394 2,941

3,981 6,091

FY 2012-13 FY 2013-14 Prov. Projected

248.4 347.8

161 175

3,635 4,431

646 789

1,223 1,855

Page 27: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Profit & Loss Statement

Power Balances

6127.1 Determined

FY01.2-13 Provisional

FY *13711(ii, Projected

Units Received [MkWh] 17,076 16,207 16,450 Units Lost [MkWh] 2,049 1,945 1,974 Units Lost [%age] 12.00% 12.00% 12.00% Units Sold [MkWh] 15,027 14,262 14,476

Revenue

Sales Revenue [Min Rs] 210,417 140,367 197,395 Subsidy [Mln Rs] 26,296 Fuel Price Adjustment [Mln Rs]

Total Sales Revenue [Mln Rs] 210,417 166,663 197,395 Rental & Service Income [min Rs] 183 201 Amortization of Def Credits [Mln Rs] 4,594 881 960 Other Income [Mln Rs] 3,472 3,673 Total Revenue [Mln Rs] 215,011 171,199 202,230

Operating Cost

Power Purchase Cost [Mln Rs] 182,198 168,816 175,516 O&M Expenses [Mln Rs] 10,386 15,935 17,867 Depreciation [Mln Rs] 2,015 2,223 2,604 Amortization [Mln Rs]

Provision for Bad Debt [Mln Rs]

Total Operating Cost [Min Rs] 194,599 186,974 195,987

EBIT [Mln Rs] 20,412 (15,775) 6,243 Financial Charges [Mln Rs] - 797 1,244 EBT Win Rs] 20,412 (16,573) 4,999 Tax [Mln Rs]

EAT [Min Rs] 20,412 (16,573) 4,999 WPPF [Mln Rs] -

Profit for the period [Mln Rs] 20,412 (16,573) 4,999

)2,

Page 28: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

NEPRA PETITON —BIFURCATION/ CREATION OF 17 SUBDIVISIONS, GSO AND CITY OPERATION CIRCLE.

The break- up of expenditure of the proposed creation of offices is given below as desire.

1. Proposed Creation of new GSO Circle of LESCO a. Recurring Expenses = 36.83 million b. Non-Recurring Expenses = 11.17 million

2. Proposed Creation of new City Operation Circle LESCO a. Recurring Expenses = 27.94 million b. Non-Recurring Expenses = 9.90 million

3. Bifurcation of Operation Sub Divisions LESCO a. Recurring Expenses = 378.25 million b. Non-Recurring Expenses = 64.60 million

Quantification of perceived benefits from the bifurcation are placed as F/A.

Yardstick of furniture approved by BOD LESCO is placed at F/B.

The requirement of vehicles is as per yardstick which is produced as under:-

a. Vehicles required for GSO Circle & M&T Division is as under;- 1. Hilux Pickup (double Cabin) 01 For Manager (GSO) Circle 2. Gimney Jeeps 02 For DM(Tech) & DM (P&I) 3. Hilux Pickup (Single cabin) 02 For A.M (P&I) & A.M (Tech) 4. Mehran Car 01 For A.M (HR)

b. Vehicles required for SS&T Bhai Pheru & SKP Divisions LESCO is as under;- 1. Gimney jeeps 02 For DM(SS&T) 2. Hilux Pickup (Single cabin) 02 For AM (SS&T)

c. Vehicles required for City Operation is as under;- 1. Hilux pickup (double cabin) 01 For Manager (Op) City Circle 2. Toyota Pickup with M&T equipment 01 For M&T and staff 3. Mehran Cars 06 For DM (M&T) /DM (Tech) / DCM / AMCS

/ AM(M&T) d. Vehicles required for bifurcation of Sub divisions:-

1. Hyundai Pickup 17 For each sub Division 2. Suzuki Jeep

17 For each Sub Division e. Yardstick of WAPDA Vehicles approved by BOD LESCO is as under:-

Name of Post Vehicles approved as per Yardstick

Nos.

Manager Pajero 03- doors 2500 CC 01 DCM Suzuki Van/Car 1000 CC 01 M&T Staff Toyota Pick Fitted With M&T

equipment 01

Op Sub Divisions Ladder mounted pickup Suzuki Jeep 1300 CC

01 for Staff 01 For AM

Page 29: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Criteria —1 (No. of Consumers): When the number of consumers exceeds 18000 in urban area and 15000 in rural area.

Present No of Connections Proposed No of Connections Urban 16000-24000 Urban 12000-18000

Rural 12000-18000 Rural 10000-15000

Existing After bifurcation Sr. No.

S/Div Name No of consumers S/Div Name No of consumers

1 Bedian Rd Bedian Rd 18440

39899 * Air Port 21459

2 Amer Sicihu Amer Sidhu 13988

31103 * Sitara Colony ' 17115

3 Gulberg Liberty

G Gulberg 15801 24515

Liberty 17390 25033

* Naseer Abad 16357

4 A.I.Town

Canal Road

21818

20607

A.I.Town 13174

Canal Road 12392

* Clifton Colony 16859

5 Niaz Baig

Chung

• 28784

22697

Niaz Baig 17634

Chung 17827

* Shahpur 16020

6 Lullyani 23941 Lullyani 13835

* Lakhney Key 10106

7 Bulley Shah

Civil Area

19699.

23936

Bulley Shah 16522 .

Civil Area rea C 15171

* Kot Ghulam Muhammad 11912

8

Niaz Nagar

Rural Area

Bhadar Pura

14329

16789

17298

Niaz Nagar 11797

Rural Area 12318

Bhadar Pura 12920

* Kama! Chishti 11381

9 Khudian West

Noor Pur

26791

21230

Khudian West 11894

Noor Pur 13553

*Dhing Shah 11247

* Dhollan 11327

10

Chunian City

Chunian Rural

Changa Manga

18441

14849

18634

Chunian City 15652

Chunian Rural 12143

Changa Manga 13836

* Hujra Road 10293

11 Ellah Abad 24574 Ellah Abad 12085

* Ellah Abad Rural 12489

12 Kangan Pur 21989 Kangan Pur 11179

* Sham Kot 10810

13

Sarfraz Nagar

Phool Nagar

Jambar

16041

19185

18041

Sarfraz Nagar 12421

Phool Nagar 15118

Jambar 14586

* Sural Mughal 11142

14 Pattoki City

Pattoki Rural

22690

21966

Pattoki City 14076

Pattoki Rural 14453

* Halla 16127

15 KRK-1

KRK-2 Raja Jang

20791 17434 17183,

KRK-1 K 13337

KRK-2 13250

Raja Jang 15320

* Hunddal 13506

16 Atta Abad 24710 Atta Abad 12259

* Qila Sattar Shah 12451

17 Kharian Wala 26312 Kharian Wala 13096

* Bhikhi 13216

Page 30: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Criteria - 3 (Average Revenue):

Revenue of the sub division is 10% more than the average revenue calculated for each sub division of the

company excluding the assessment of C2, C3 and B3, B4 connections.

Sr. No. Average Revenue in Million Rs.

S/Div Name Assessment Average Difference in %age

1 Bedian Rd 1650.89 617.50 167.30

2 Amer Sidhu 906.15 617.50 46.74

3 Gulberg

' 1899.42

617.50 207.60

Liberty 1984.82 221.43

4 A.I.Town

Canal Road 830.45

617.50 34.49

828.91 34.24

5 Niaz Baig

Chung 1659.26

1160.26 617.50

168.71

87.90

6 Lullyani 675.10 617.50 9.33

7 Bulley Shah

Civil Area 673.41

673.21 617.50

9.05

9.02

Niaz Nagar

8 Rural Area 675.01 617.50

9.31

Bhadar Pura 690.20 11.77

Khudian West 672.40 8.89 9 Moor Pur 673.20

617.50 9.02

Chunian City 674.1 9.17

10 Chunian Rural 675.2 617.50 9.34 Changa Manga 673.3 9.04

11 Ellah Abad 759.83 617.50 23.05

12 Kangan Pur 674.20 617.50 9.18

Sarfraz Nagar 673.10 9.00 13 Phool Nagar 673.40 617.50 9.05

Jambar 684.23 10.81

14 Pattoki City Pattoki Rural

688.86 617.50

11.56

681.10 10.30

KRK-1 673.31 9.04 15 KRK-2 674.50 617.50 9.23

Raja Jang 675.60 9.41

16 Atta Abad 2652.24 617.50 329.51

17 Kharian Wala 2616.45 617.50 323.72

Page 31: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Criteria - 2 (Line Losses):

Line Losses %age of the sub division is 05% more than that of the overall average line losses of the company.

Sr. No. S/Div Name Line Losses in

%age In S/Divn

Overall Average Line Losses in %age in LESCO

Difference in %age

1 Bedian Rd 19.4 13.1 6.3

2 Amer Sidhu 21.6 13.1 8.5

3 Gulberg

Liberty 5.3

7.1 13.1

- 7.8

- 6.0

A.I.Town 4 Canal Road 17.02 13.1 3.92

Niaz Baig 5 Chung 17.9 13.1 6.8

6 Lullyani 18.5 13.1 5.4

Builey Shah 18.1 5 Civil Area 22.1 13.1

9

Niaz Nagar

8 Rural Area 23.6 13.1

10.5

Bhadar Pura 15.7 2.6

9 Khudian West Noor Pur

29.3

27.4 .4 13.1

16.2 14.3

Chunian City • 20.9 7.8 10 Chunian Rural 19.5 13.1 6.4

Changa Manga 21.2 8.1

11 Ellah Abad 25.4 13.1 12.3

12 Kangan Pur 28.7 • 13.1 15.6

Sarfraz Nagar 8.2 - 4.9 13 Phool Nagar

Jambar .3 23.3

19.7

13.1 10.2

6.6

14 Pattoki City

Pattoki Rural 13.7

21.8 13.1

0.6

8.7

KRK-1 23.1 10.0

15. KRK-2 21.6 13.1 08.5 Raja Jang 27.6 14.5

16 Atta Abad 19.0 13.1 5.9

17 Kharian Wala 19.0 13.1 5.9

Page 32: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

An nex-E Criteria — 4 (Area):

Unmanageable area of jurisdiction of existing Sub Division.

Most of the rural sub divisions comprises of large number of domestic connections, tubewell

connections as well as B-1, B-2 connections scattered in wide area in zigzag manner having remote

end for variety of consumers. Proper maintenance service, continuity of power supply, prompt

redressal of consumer complaints and recovery of arrear / revenue collection is not possible with the existing staff.

Page 33: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

D /71-Y-ej'

,l'agicea)Pcore

APPROVED BY BOB

2006

HR & Admin Directorate

Worked by: SAADAT SARFARAZ Page No. 1 Commercial Assistant

,3=VITUelltentl,4241CRIAM., .n.r.

Page 34: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

—0 • Worked by: SAAD/Ir Sit RFA RAZ

Commercial Assistant Page No. 2

SCALE OF OFFICE FURNITURE FOR LESCO STAFF

Sr. No.

• Article of Furniture Chief

Executive Project

Mannaer Executive Director

Deputy Mana,,er

Assistant Mannocr

1 2 3 • 4 5 6 7 1 Secretariat Table

6'x4'x3' (Sketch-1) I 1 I

1

_ -

7 ...

2 High Llack office Chair (Sketch-2,3)

1 1

3 Office Chair Ordinary (Sketch-13,14)

4 4 4 9

4 Sofa Set 4 pieces (Sketch-10,11)

1 1 1 - -

Sofa Set Aimless 2 pieces (Sketch-12)

1 1 1 1 -

6 Duree (room size) 1 1 1 - - 7 Rug (Pakistani)

10' x 8' 1

_ _ . _ -

8 Split AC 1 1 1 - - 9 Heater 1 1 1

10 Curtains As reqd As read As reqd - - 11 Large Drawing Table 1 1 1 - 12 Side Table (Sketch-8) 2 2 - - 13 Tea Table

(Sketch-5,6,7) 1 1 1 - -

14 File Rack (Sketch-25) 15 Officer's Table 5' x 3'

(Sketch-19,20) - - - 1 1

16 Clerk's Table 5' (Sketch-19) _

17 Easy Chair - - - - - 13 Foot Rest 19 Computer's Table

(Sketch-9) 1 1 1 - -

20 Wall Clock 2 1 1 21 Time Piece 1 1 1 - - 22 Foot Pads 1 1 1 - - 23 Confidential Box

(Steel) (Sketch-27) 2 ? 2 1 1

24 Dak Trays 2 2 2 - -

Page 35: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

SCALE OF OFFICE FURNITURE FOR LESCO STAFF

Sr No

Article of Furniture

Asstt. Mgr

Junior Officer

Senior Asstt.

Junior Asstt.

Steno Steno Typist

Chief and

Circle D'man

D' man and

Asstt. fi' inn::

1 2 3 .4 5 6 7 8 9 1(1 Secretarial Table 6' x 4'

_ . .

- - - - 2 High Back/net

office Chair (Sketch-18)

1 1 -

3 Office Chair Ordinary (Sketch-21,22)

2 2 1 1 2 2 2 I

4 (Sketch-12) Sofa Set 2-Pcs

5 !Duree (R-size) - - - - - - 6 !Rug (Pak)

10' x 8' - - - • • - _ _ - _

7 ' Cooler I I - - - - - -

8 Heater 1 1 - - - - - - 9 Curtains - - - - - - - -

10 Large Drawing Table

- - - - • - -

11 Side Table - - .- - - - - 12 Tea Table - - - - - 13 File Rack

(Sketch-24) 1 1 1 1 1 1 1 -

14 Officer's Table :5' x 3' (Sketch-19,20)

1 1 - - - 1 -

15 : Clerk's Table 5' x 3' (Sketch-20)

- 1 1 1 - - - I

16 Easy Chair - - - - - - - - 17 Foot Rest I I - - - - - - 18 Computer's

Table (Skh-9) 1 1 1 1 1 1 - -

19 . Wall Clock I I - - - - 1 - 20 Time Piece - - - - - - - - 21 Foot Pads - - - - - - 1 - 22 Confidential Box

(Steel) (Skh-27) 1 1 - - 1 1 I -

23 Dak Trays - - - - - -

0 Worked by: SAADATSAMIRAZ

Commercial Assisiam

Page No. 3

f•

Page 36: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

SCALE OF OFFICF, FURNITURE FOR OFFECERES OF LESCO

Sr No Article of furniture

C.Ex and officers of equivalent

status

Dir. Ex officers of equivalent ManareL

1

_ I

Dy.Manager and officers of equivalent

status

CSkekt, Krs. 41

-

Officers BPS-17

and BPS-16

1(a)

(b)

Executive I ligh Back Tilt , Swivel (sketch - 2 & 3 ) Revolving Chair caned (Sketch - 17 )

1

2 Officer Chair (Sketch- - - Visitor Chair for officers (sketch - 22 ) - 2 -

4 Office Table (Sketch - 1 ) 1 1 - - 5 Office Table (Sketch - 20) 1 1 - 6 Credenza (Sketch- ) I 1 - - 7 Sofa Set armleSs 2 pieces - - - 8 Carpet As Requ. As Requ. - - 9 Wall Clock 1 1 - -

10 Desert Cooler 0 0 0 1 P/room 11 Curtains / Blinds - As requ. -. -

Note: CEO, Ex.Dir. of the company will be entitled for the furniture items as per their actual requirements.

Worked by: Set.1DAT SARFARAZ Commercial Assistant

Page No. 4

Page 37: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

SCALE OF OFFICE FURNITURE FOR WAPDA STAFF (FOR OFFICIALS)

Sr No

Article of furniture Junior Officer

Assistant Clerk Steno Chief Circle D'man

Wpm: Asr,tt.

D' nun

1 Office Chair (Sketch-9) I I 1

-

1 ....__...

_

._.. 1

I

1

2 Drafting Table (Sketch-11)

3 File Rack 1 1 1 1 1 i

4 Office Table (Sketch-18) 1 1 1 1 I

5 Confidential Box (Steel) 1 - - - - -

6 Dak Trays - - - - - -

7 Bench for Naib Qasids (Sketch-14)

' As Required

8 Desert Cooler One per Room

9 Visitors Chair for officials (Sketch-13)

2 -) - - - -

e Worked by: SAADATSARNIMZ

Page No. 5

Commercial Assistant

Page 38: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

ABSTRACT CAPITAL WORKS REVISED BUDGET FOR THE YEAR 2013-14

IN RESPECT OF P.D.GSC LESCO LAHORE

Sr.# Description Source of financing

Rs in Million

Material Crop

Compensation / Land

Labour Overhead Civil Works

Others Consultan

Cy Total

Electrical Civil Division

ON GOING WORKS

1 ON GOING GRID STATIONS LESCO 587.500 50.000 2.300 60.200 127.000 141.000 73.700 5.600 1,047.300

2 ON GOING TRANSMISSION LINES LESCO 1,353.500 172.200 1.550 88.800 324.000 24.000 105.800 - 2,069.850

NEW WORKS

3 NEW GRID STATIONS LESCO 115.000 - 0.400 14.500 16.500 10.000 11.000 - 167.400

4 NEW TRANSMISSION LINES LESCO 63.000 9.000 1.150 7.500 8.000 3.000 10.000 0.500 102.150

SUB TOTAL - A (1+2+3+4) 2,119.000 231.200 5.400 171.000 475.500 178.000 200.500 6.100 3,386.700

5 COUNTER PART FUNDING WORLD BANK LESCO - 4.300 1.390 27.010 101.800 65.800 56.860 23.150 280.310

6 COUNTER PART FUNDING ADB LESCO 10.000 0.800 30.000 4.000 73.100 40.500 - 158.400

SUB TOTAL - B (5+6) - 14.300 2.190 57.010 105.800 138.900 97.360 23.150 438.710

GRAND TOTAL FOR LESCO FINANCING (A+B)

2,119.000 245.500 7.590 228.010 581300 316.900 297.860 29.250 3,825.4

7 ASIAN DEVELOPMENT BANK ADB 1,137.500 - - - - - - 1,137.50

8 WORLD BANK World Bank 1,896.000 - - - - _

- - 1,896.00

GRAND TOTAL (LESCO+A.D.B+W.BANK) 5,152.500 245.500 7.590 228.010 581300 316.900 297.860 29.250 6,858.9

Page 39: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

ESTIMATED BUDGET DURING FY-2013-14 F

Sri/ Particular of Work Type SCOPE OF WORK Source of financing

Rs in Million

Material Land Labour Overhead Civil Works

Others Consultancy Total Electrical Civil Division

(A) GRID STATIONS WORKS (On Going Works)

1 132KV G/S Muridkay (Fatehpuri) N 2x132/I I KV,26MVA,T/B+2LB+I PT/Bay LESCO 5.000 0.050 3.000 5.000 20.000 5.000 38.050

2 132KV G/S Sheranwala Gate N 2x132/11KV,40MVA,T/B+2LB+IPT/Ilay LESCO 30.000 0.000 2.000 2.000 20.000 4.00 58.000

3 132KV G/S A.W.T E ix 132/11 kV, 26 MVA TRF/ Bay LESCO 1.000 0.000 0.500 1.000 0.000 1.000 3.500

4 132KV G/S Mandl Ahmadabad N 2x132/IIKV,26MVA,T/B+2LB+IFT/Iiay LESCO 25.000 0.050 2.000 20.000 20.000 4.000 71.050

5 132KV G/S Jandiala Sher Khan N 2x132/11KV,26MVA,T/B+2LB+IPT/Bay LESCO 50.000 0.500 5.000 20.000 15.000 5.000 95.500

6 132KV G/S Mandl UsmanWala N 2x132/I I KV,26MVA,T/B+2LB+I PT/Bay LESCO .50.000 0.000 1.000 1.000 1.000 53.000

7 132KV G/S Punjab University Town N 2x132/I I KV,26MVA,T/B+2LB+I PT/Bay LESCO 80.000 0.050 5.000 20.000 0.000 2.000 107.050

S 132KV G/S ICI (P) (T-3) E ix 132/11kV. 26 MVA TRF/ Bay LESCO 2.00 0.000 0.50 1.00 1.00 4.500

9 132KV G/S Kahna Nou (T-3) E lx 132/11kV, 26 MVA TRF/ Bay LESCO 0.000 0.000 0.000 0.000 0.000 0.000

10 132kV Lahore Cantt (T-3) E Ix 132/1IkV, 26 MVA T/Bay LESCO 20.000 0.050 1.000 0.500 1.000 22.550

11 132kV Manga Mandl (T-4) E Ix 132/11kV, 26 MVA T/Bay LESCO 20.000 0.050 1.000 2.000 1.000 24.050

12 132kV Okara City I (T-3) E Ix 132/11kV, 26 MVA T/Bay LESCO 20.000 0.050 1.000 0.500 2.500 24.050

13 132kV Pattoki (T-3) E 1 x 132/11kV, 26 MVA T/Bay LESCO 8.000 0.050 1.000 2.000 2.000 13.050

14 132kV Ellahbad (Shifting of 132/66 kV PTRF from WRR)

E 1xT/Bay LESCO 15.000 0.050 2.000 0.500 2.500 20.050

15 132KV G/S DHA Phase V E 2x 'Aar LESCO 20.00 0.050 1.00 1.00 0.70 22.750

16 132KV G/S Chunain E 2x 1JBays LESCO 16.00 0.050 1.00 6.00 1.50 24.550

17 132kV Sharaqpur Road SKP E 2x1/Bay LESCO 1.000 0.000 0.500 1.000 0.500 3.000

Page 40: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

ESTIMATED BUDGET DURING FY-2013-14

FOR 6th STG Under Own Resources, W 18 132kV Sarfraz Nagar E 2x 132kV L/Bay LESCO 8.000 0.050 1.000 0.500 1.000 10.550

19 132kV Attabad E 2x 132kV LIElays ( Emco & Rustam ) LESCO 20.000 0.050 0.600 2.000 1.500 24.150

20 132kV Rustam E 2xUBays for attabad LESCO 8.000 0.050 1.000 0.500 0.500 10.050

21 132kV Nankana E 20.../Bays LESCO 15.000 0.050 1.500 1.000 1.500 19.050

22 132kV Bucheyki E 2xUBays ( Minima & Thatha Ismael) LESCO 20.000 0.050 1.500 2.000 0.000 1.500 25.050

23 132kV Shahkot E 1xL/Bay for Sangla Hill LESCO 4.000 0.050 0.500 0.500 2.000 7.050

24 132kV Ellahbad (1 L/B each for kasur, khuddian, Pattoki, Chunnian, 'Hindi

Ahmadabad & 2 L/B for Hujra) E

7xUBays (I UB each for kasw, Ichuddian, Pattoki, Chimnian, Mardi Ahmadabad & 2 UB for Hujra)

LESCO 30.000 0.050 2.000 1.000 2.500 35.550

25 132kV IChuddian E 2x1/Bays (IL/Bay for Kasur & Ellahabad LESCO 15.000 0.050 1.000 0.500 1.000 17.550

26 132kV Kasur E I xUBay for Ellahabad LESCO 10.000 0.050 0.500 0.500 0.500 11.550

27 132kV Pattoki E 2xUBay ( IL/Bay for Okara City-1 & Ellahabad)

LESCO 6.000 0.050 1.000 1.000 1.000 9.050

28 132 kV Hujra E 3x1/Bay (2 L/Bay for Ellahabad, I L/B for Depalpur)

LESCO 15.000 0.050 1.000 0.500 0.500 17.050

29 132kV Okara City 1 E 1 UBay for Panoki LESCO 1.000 0.050 1.000 0.800 1.500 4.350

30 132kV Sharaqpur E 2 L/Bays LESCO 0.500 0.000 1.000 0.500 1.000 3.000

31 132kV Sangla Hill C lx2 T/BAY, IX2 UBAY LESCO 5.000 0.050 2.000 2.000 2.000 11.050

32 132kV Emco C 1x2 T/BAY, I X2 UBAY LESCO 10.000 0.050 3.000 1.000 2.000 16.050

33 132KV G/S TOWN SHIP E Switch Room Ext. And I IKV Trench - LESCO 0.000 0.050 0.200 2.000 0.500 2.750

34 66KV G/S MalikPur E Switch Room Ext And I IKV Trench LESCO 0.000 0.000 0.000 0.000 0.000 0.000

35 132KV G/S Bhoggiwal E Upgradation of 132KV Bus Bar With Twin Conductor

LESCO 0.000 0.000 0.000 0.000 0.000 0.000

36 132KV G/S la E CUpgradation of 132KV Bus Bar With Twin LESCO 3.000 0.050 0.500 0.000 1.000 4.550

37 132KV G/S Chung E '''

Upgradation of I 32KV Bus Bar With Twin Conductor

LESCO 3.000 0.050 0.500 0.500 1.000 5.050

38 132KV G/S Ghazi New E Upgradation of 132KV Bus Bar With Twin Conductor

LESCO 5.000 0.050 0.100 0.500 2.000 7.650

39 132KV G/S Said Pur E Upgradance of 132KV Bus Bar With Twin Conductor

LESCO 5.000 0.050 0.100 1.000 2.000 8.150

40 132KV G/S BbaiPhent E Upgradation of 132KV Bus Bar With Twin Conductor

LESCO 5.000 0.050 0.100 1.000 3.000 9.150

41 132KV G/S Garden Town E CUpg:;adation of 132KV Bus Bar With Twin

uctor LESCO 0.000 0.000 0.000 0.000 0.000 0.000

42 132KV G/S HIS C 2x 132/1 I kV, 26 MVA , rUBays LESCO 5.000 0.050 0.100 0.500 0.500 6.150

Page 41: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

ESTIMATED BUDGET DURING FY-2013-14 •

43 I32KV G/S Green View E

• •

axuBay, ,

- ................... ....v.

LESCO

v. v a •sa araa

8.000

an AFIL au. a-sznau LOG • 11.1./P111C/11

0.050

ILIbilllik

1.000 5.000 0.500 14.550

44 132KV G/S Deepalpur E 2xL/Bay LESCO 16.000 0.050 0.500 0.500 0.500 17.550

45 132KV G/S Haven Lakha E 2xL/Bay LESCO 16.000 0.050 0.500 1.000 0.500 18.050

46 132KV G/S Lallyani E lx132KV,26MVA T/BAY (3rd) LESCO 1.000 0.050 0.500 0.200 1.500 3.250

47 132KV G/S Johar Town-2 E Site Store for Electrical panne!, security Romm/Watch Towr LESCO 0.000 1.000 1.000 15.000 0.500 17.500

48 132KV G/S LEFO E 1X132KV 20/26MVA T/F LESCO 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

49 132KV G/S Shamkay E LESCO 20.000 0.050 1.000 2.000 0.500 23.550

50 132KV G/S Recitals E 3rd T/Bay, LESCO 0.000 0.000 0.000 0.000 0.000

51 Consultancy Charges for Capacity Building of Short Circuit, Reactive Power, Stability, SCADA studies

LESCO 5.600 5.600

52

Misceileneous/ Emergency Breakdowns/Boundary Walla for different Grid Stations/any unforeseen expenditures-UP GRADATION OF BUS BAILS of Existing Grid Stations AND AMR/MODAMSREST HOUSE IN CLUB Premises

20.000 8.000 15.000 50.000 .5.000 98.000

Sub- TOTAL (A) 587.500 50.00 2300 60.200 127.000 141.000 73.700 5.60 1047300

Page 42: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

ESTIMATED BUDGET DURING FY-2013-14

FOR 6th STG Under Own Resources, World Bank and Asian Development Bank (B) GRID STATIONS WORKS (NEW Works)

Sri* Particular of Work Type SCOPE OF WORK Source of financing

Rs in Million

Material Land Labour Overhead

Civil Works

Consultancy Total Electrical Civil Division

Others

1 132KV G/S Okara Cantt (T-2) E lx 132/11 kV, 26 MVA 7RF/ Bay LESCO 30.00 0.050 1.00 5.00 5.00 2.00 43.050 2 132kV Shalamar II E 2 Cable Bays for 220kV Shalamar-Shalamar-11

(132kV Underground Cable) LESCO 20.000 0.050 2.000 5.000 2.000 1.000 30.050

3 132kV Skp Industrial A a 132/1IkV, 26 MVA TRF/ Bey LESCO 10.00 0.050 2.00 1.00 1.00 14.050

4 132KV G/S Shandra Scarp A 2x 132/I IkV, 26 MVA TRF/ Bay LESCO 10.00 0.050 1.00 2.00 1.00 14.050

5 132KV G/S Kasur (1 L/Bay for ICaaur New)

E Ix UBay LESCO 10.00 0.050 1.00 2.00 1.00 14.050

6 132KV G/S Raiwind (In & Out Chak-65-T Pack-Kasur cct) E 2x UBays LESCO 10.00 0.050 2.00 0.50 1.00 13.550

132KV G/S Hhogiwial (for making In & Out) E 2s UBays LESCO 5.00 0.050 1.50 0.50 1.00 8.050

8 132KV G/S Raissimd New E 1X26/26mva LESCO 20.00 0.050 2.00 0.50 1.00 23.550

9 132KV G/S DarrogeWala N 2x UBaya LESCO 0.000 - - - 0.000

10 132KV G/S Kot Ftadha Kishan A LESCO - 0.000 1.00 1.00 2.000

I I 132KV G/S LDA AVENUE N LESCO - 1.00 3.00 1.00 5.000

12 132KV G/S Lallyani N 2x L/Bays LESCO - - - - 0.000

Sob- TOTAL (5) 115.00 - 0.40 14.50 16.50 10.00 11.00 - 167.40

(C) WORLD BANK WORKS (APL-I) Year - I

Rs in Million

WORLD BANK 1

Material/ duties/taxes/store handling charges

10.00

100.00

150.00

260.00

Sr." Particular of Work Type SCOPE OF WORK Source of financing

1 132kV G/S Inayst Pura/State Life Housing

Society N

2x132/1 I KV, 26MVA T/Bay+2L/B+ 1 PT/Bay do

2 132kV Mominpura G.T Road (Turn Key) N

2x132/11KV, 40MVA ,T/Bay+2L/B+ 1 PT/Bay do

3 132 kV GIS Saggian (Turn Key) N 2x132/11KV, 40MVA ,T/Bay+2UB+ 1 PT/Bay do

Sub- TOTAL (C)

COUNTER PART FUNDING

Land Labour (10%) Overhead (10%) Civil Works

Others/ interest (6%) Consultancy Total

Electrical Civil Division

0.000 2.00 5.00 20.00 5.00 0.83 32.83

0.050 2.00 20.00 7.00 1.34 3039

0.050 3.84 0.20 3.84 1.34 9.27

0.10 7.84 5.00 40.20 15.84 3.51 72.49

Page 43: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

ESTIMATED BUDGET DURING FY-2013-14

FOR 6th STG Under Own Resources, World Bank and Asian Development Bank (D) WORLD BANK WORKS (APL-I) Year -

Sri/ Particular of Work SCOPE OF WORK

Rs a in Million

Source of financing

WORLD BANK ". "--

COUNTER PART FUNDING

Material/ duties/taxes/store handling charges

Land Labour (10%) Overhead (10%) Civil Works

Ot Others/ Consultancy

2.26

Total

40.44

5.44

1.53

Electrical Civil Division interest (6%)

1 132KV AIS G/S Askari - X (Tom Key) 2x132/11KV.40 MVA,T/B+2LB+1PT/Bay World Bank 350.000 0.020 1.16 15.00 20.00 2.000

2 132KV GIS G/S Punjab University (Turn Key)

_J.

2x132/1 I KV,40 MVA,T/B+2LB+ I PT/Bay do 350.000 0.020 1.16 2.000 2.26

3 132kV Attabad 1 x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 0.500 0.48 4 132kV Ayesha 2 x 132/11 kV , 40 MVA TRF do 45.000 0.050 1.00 0.500 0.48 2.03

203 5 132kV Batapur 2 x 132/11 kV , 40 MVA TRF do 45.000 0.050 1.00 0.500 0.48 6 132kV Bbildd A 1 x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 0.500 0.48 1.53 7 132kV Bhogiwal A la 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03 8 132kV Chock -65 A 2x 132/11 kV , 40 MVA TRF do 45.000 0.050 1.00 1.000 0.48 2.53 9 132kV Defence A ix 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03 10 132kV Depalpur A 2 x 132/11 kV , 40 MVA TRF do 45.000 . 0.050 1.00 1.000 0.48 2.53 11 132kV Mango Mandi A 1 x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03 12 132kV Model Town A I x 132/11 kV , 40 MVA TRF do . 45.000 0.050 0.50 1.000 0.48 2.03 13 132kV Okara City-2 A I x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03 14 132kV Rustam A 3 x 132/11 kV , 40 MVA TRF do 45.000 0.050 1.00 1.500 0.48 3.03 15 132kV &humor A 2 x 132/11 kV , 40 MVA TRF do 45.000 0.050 1.00 1.000 0.48 2.53 16 132kV Shadman A 1 x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03 17 1321tv Shamkay A 1 x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 _ 1.500 0.48 2.53 18 132 kV Shalamar A I x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 0.500 0.48 1.53 19 132kV Shabmar-2 A 1 x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 1.320 0.48 235 20 132kV Sunny View A i x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03 21 132kV Wapda Town A I x 132/11 kV AO MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03 22 132KV G/S Johar Town - 11 N 2x132/1 I KV,26MVA,TB+2LB+ I -FT-BAY do 0.000 0.000 1.00 1.00 1.00 1.000 2.00 6.00

Sub- TOTAL (D) 1555.000 - 0.99 15.82 16.00 21.00 22.82 15.64 92.27

Page 44: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

ESTIMATED BUDGET DURING FY-2013-14

FOR 6th STG Under Own Resources, World Bank and Asian Development Bank (E) ADB (Tranche I) Works

Rs in Million

COUNTER PART FUNDING Sra SCOPE OF WORK Particular of Work

Civil Works Source of financing

Type

ADB FINANCIN

Material/ duties/taaes/store handling charges

Land Consultancy Labour (10%) Others/

interest (6%) Total Overhead (10%)

Electrical

Capacitor Installation (Ghazi New, Depalpur) ADB

Sub- TOTAL (E) 17.500 ADB Tranche II Works

Rs in Million

17.500

0.00

0.050

0.05

2.00

2.00

1.00

1.00 0.00

1.00

1.00 0.00

4.05

4.05

Civil Division

13

12

10

9

SrJl

8

7

6

5

4

3

2

Particular of Work

132 DHA Robber (Turn Key)

132kV Jubilee Town (Turn Key)

132kV Central Park (Turn Key)

132kV Press Club (Turn Key)

132kV Doula Chochak (Turn Key)

132 kV Ai Town (T-3)

132kV Garden Town (1-3)

132 kV WAPDA Town T-1

132kV Badami Bagh T-2

132kV Bhatti Gate T-2

132 kV SaidPur (T-3)

132 kV FatehGarh (T-3) A

A

A

Type

A

A

A

A

N

N

N

N

N

Source of financing

ADB

ADS

ADB

ADB

ADB

ADB

ADB

ADB

ADB

ADB

ADB

ADB

ADB FINANCIN COUNTER PART FUNDING

Material/ duties/tasea/store handling charges

Land Labour (10%) Overhead (10%) Civil Works

Others/ Considtancy Total

Electrical Civil Division interest (6%)

100.000 - 0.050 2.00 10.00 1.800 13.85 100.000 - 0.050 2.00 20.00 2.000 24.05 100.000 - 0.050 2.00 20.00 2.000 24.05 100.000 - 0.050 2.00 0.10 2.000 4.15

100.000 - 0.050 1.80 20.00 1.700 23.55

100.000 0.050 1.00 0.10 1.1300 2.15 50.000 0.050 1.00 0.10 1.000 2.15 50.000 0.050 1.00 0.10 1.000 2.15 50.000 0.050 1.00 0.10 0.500 1.65 50.000 0.050 1.00 0.10 0.500 1.65 50.000 0.050 1.00 0.10 1.500 2.65 50.000 0.050 1.00 0.10 1.000 2.15

SCOPE OF WORK

2 x 132/11 kV, 26MVA T/B+2L/B+ 2PT/Bay 2 x 132/11 kV, 26MVA T/B+2UB+ 2FT/Bay 2 x 132/11 kV, 26MVA T/B+2L/B+ 2PT/Bay 2 x 132/11 kV, 26MVA T/B+2L/B+ 2PT/Bav

2 x 132/11 kV, 26MVA T/B+21/13+ 2PT/Bay

I x 132/11 kV 40 MVA PTRF

1 x 132/11 kV 40 MVA PTRF

1 x 132/11 kV 40 MVA PTRF

I x 132/11 kV 40 MVA PTRF

I x 132/11 kV 40 MVA PTRF

1 x 132/11 kV 40 MVA PTRF

I x 132/11 kV 40 MVA PTRF

Page 45: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

ESTIMATED BUDGET DURING FY-2013-14 V VI% men a i ur unuer s_rwn Resources, worm Bank and Asian Development Bank

14 132 kV OKLP (T-3) A t x 132/11 kV 40 MVA PTRF ADB 50.000 0.050 1.00 0.10 1.000 2.15 15 132 kV Rahman Park (T-3) A 1 x 132/11 kV 40 MVA PTRF ADB 50.000 0.050 1.00 0.10 1.000 2.15 17 132 kV Mango Mandi A I x 132/11 kV 40 MVA FIRE ADB 50.000 0.050 1.00 0.10 1.000 2.15 18 132KV G/S Sukh Chain N limier Ground Way ADB 50.000 0.000 0.200 2.00 1.000 3.20 19 LARP's EMMP and capacity Building Programm of Tranche-II 0.000 13.000 13.00

Sub- TOTAL (F) (G) New & Faadinfs 771 ineze fn. Now add C`4.#inn.

1100.000 - 0.75 20.00 - 73.10 33.00 - 126.85

Sr.# Particular of Work Type SCOPE OF WORK Source of financing

Rs in Million

Material ro

Crop Compensation

/ Land Labour Overhead

Civil Works

Others Consultancy Total Electrical Civil Division

I 132KV T/L F/F sbcnnwala Gate (ht & Out from Ravi-FortT/Line) 13/C 0.4 LESCO 10.00 0.050 1.00 0.50 5.00 16.55

2 132kV Depalpur - Haveli Lakha 13/C 36 do 50.00 8.00 0.050 5.00 4.00 2.00 3.00 72.05

3 132KV F/F LDA AVENUE D/C do 1.000 1.00 3.00 1.00 6.00

4 Reconductoring of 132kV Chak-65 - Raiwind-Lullyani-Kasur on Greely Conductor

10/C 40 do 3.00 1.00 0.050 0.50 0.50 1.00 1.00 0.50 7.55

Sub- TOTAL (G)

//41 Res-rnndost-triritin And Maus lAIrtrire- ear 1-............:--.;...... : :.....- ...._.444__, ___ .4.____ 63.00

___ ...,..... ...., 9.00 1.15 7.50 8.00 3.00 10.00 0.50 102.15

Sri! Particular of Work Type Source of SCOPE OF WORK financing

Rs in Million

Material Crop Compensation

/ Land Labour Overhead

Civil Works

Others Consultancy Total Electrical Civil Division

1 132 kV F/F FatehPuri (MDK) (In & Out from 1CSK -ICamoki) D/C 2.5 LESCO 30.000 5.000 0.050 1.000 0.200 1.000 37.250

2 132kV Sarfraz Nagar - Kaaur (Re- Cond) D/C 43.4 LESCO 25.00 10.00 0.050 2.00 12.00 5.000 54.050

3 132 kV Manga Mandi - Wapda Town (Re-Cond) D/C 19.7 LESCO 20.00 8.00 0.050 1.00 10.00 1.000 40.050

4 l32KV T/L S/NAGAR -MANGA MANDI D/C 14.9 LESCO 20.000 5.000 0.050 2.000 10.000 2.000 39.050

5 132kV Chak 65 - Mango Mandi (Re. Cond) D/C 4.5 LESCO 5.00 2.00 0.050 1.00 2.00 1.000 11.050 6 132kV D/C from 220kV Ghazi Road to 132kV Ghazi D/C 10 LESCO 20.000 1.000 0.050 2.000 10.000 1.000 34.050 7 132 kV Pattoki - Renala (Re-

Coed) D/C 14.7 LESCO 120.00 10.00 0.050 3.00 12.00 5.000 150.050 132 kV Khuddian - Ellahabad D/C 26.5 LESCO 30.000 10.000 0.050 2.000 5.000 4.000 51.050

Page 46: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

ESTIMATED BUDGET DURING FY-2013-14

FOR 6th STG Under Own Resources, World Bank and Asian Development Bank 9 220 kV Ghazi - DHA Phase V (New Line) D/C 9.7 LESCO 80.00 1.00 0.050 2.00 11.00 1.500 95.550

10 Upgradation of 66kV Attabad - EMCO to 132 kV Level D/C 7 LESCO 80.00 5.00 0.050 2.00 11.00 3.500 101.550

11 Upgradation of 66kV EMCO - UIS-Rustam to 132 kV Level D/C 10.9 LESCO 80.00 5.00 0.050 2.00 10.00 1.000 98.050

12 132 kV Shahkot - Sangla (new line) D/C 18 LESCO 45.000 8.000 0.050 3.000 8.000 2.000 66.050 13 132 kV S/C Pattoki - Chunian T/L D/C 13 LESCO 6.00 0.000 5.00 20.00 4.000 35.000 14 132 kV S/C Chunian - Ellahabad T/L D/C 16 LESCO 50.00 6.00 0.050 3.00 15.00 2.000 76.050 15 132 kV Kasur - Khuddian (Re-Cond) D/C 29.2 LESCO 120.00 10.00 0.050 4.00 10.00 2.500 146.550 16 132 kV D/C Lullyani - Kahna T/L D/C 16 LESCO 5.00 3.00 0.050 2.00 2.00 1.000 13.050 17 132kv ICSK-Shamkey-Shandra-Ravi

(Recond)

132 kV

D/C 20 LESCO 10.00 1.00 0.050 2.00 2.00 1.000 16.050 18 Okara City 1- Bhaipheru (Re- coed) D/C 48.7 LESCO 50.00 8.00 0.050 3.00 10.00 4.000 75.050

19 132kV Bhaipheru- Orient T/L D/C 6 LESCO 25.00 5.00 0.050 2.00 3.00 4.500 39.550 20 I32kV Orient - Bucheki (Re-Cond) D/C 12.5 LESCO 20.00 0.050 1.00 15.00 10.000 46.050 21 132kV Sarfraz Nagar - Bhaipheru T/L D/C 6 LESCO 60.00 8.00 0.050 3.00 12.00 3.000 86.050 22 132kV Ellahabad - Hujra T/L D/C 25 LESCO 50.00 8.00 0.050 0.50 10.00 0.500 69.050 23 132kV Bucheyki - Nankana T/L D/C 25 LESCO 50.00 0.000 5.00 20.00 5.000 80.000 24 132kV F/F Mandi Usman Wala D/C LESCO 50.00 8.00 0.000 0.20 1.00 0.200 59.400 25 132kV Okara City H - Okara City I D/C LESCO 35.00 5.00 0.050 2.00 5.00 3.000 50.050 26 132kV F/F Jandials Sher Khan D/C 17 LESCO 50.00 0.000 5.00 20.00 5.000 80.000 27 132kV F/F Mandi Ahmadabad D/C LESCO 50.00 8.00 0.000 5.00 8.00 1.000 72.000 28 132kV F/F Punjab University Town ( In &

Out from Wapda Town - Sukh Chayen) D/C 0.45 LESCO 10.00 0.050 1.00 10.00 2.000 23.05

29 220kV

220kV

In

Shalamar

Shalamar- 132kV Shalamar - Mominpura (Underground Cable from

Shalamar 132kV Shalamar H) &

& Out at 220kV Shalamar from 132kV

1- 132kV Shalamar

D/C 4.9 LESCO 20.00 0.50 0.050 0.30 2.00 1.000 23.85

30 By Pheru

Passing Orient Power House from Bhai C/S D/C LESCO 5.00 2.00 0.050 1.00 3.00 3.000 14.05

Page 47: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

35.94 Sub- TOTAL (I)

ADB FTNANCIN

Material/ dunes/taxes/store handling charges

or New Gnd Stations Under ALB Pro ec

Sri/ Particular of Work Type SCOPE OF WORK Source of rmancing

132KV F/F DHA Rahber Japan Power-Wapda Town In & Out at DHA Rahber (Turn Key)

D/C 0.2 LESCO

2 132kV F/F Jubilee Town In & Out Wapda

Town - Multan Rd Sukh Chayn (Turn

Key) D/C 1.67 LESCO

3 132kV F/F Central Park In & Out Raiwind - 1Casur (Turn Key) D/C 13.82 LESCO

4 132kV F/F for Press Club In & out Fatehgarh - Shalamar (Turn Key)

D/C 0.15 LESCO

5 132kV F/F Donis Chouchak W.R.R - Doula Chouchak (Turn Key) D/C 20.1 LESCO

Rs In Million

COUNTER PART FUNDING

Crop Compensation / Land Labour (10%) Overhead (10 Ai)

Civil Works Others/

interest (6%) Consultancy Total Electrical Civil Division

1.00 2.00 1.00 4.00

1.00 3.00 0.50 4.50

2.00 2.00 2.00 6.00

2.00 1.00 1.00 4.00

5.00 2.00 2.00 9.00

10.00 8.00 3.00 6.50 27.50 20.00

5.00

6.00

3.00

6.00

ESTIMATED BUDGET DURING FY-2013-14 12 V.PIN■ ULU J 1 %Jr Lanier v._ywn resources, woria Bank and Asian Development Bank

31 By Passing N6hat Power Hose Cirut from Bhai Pheru G/S D/C LESCO 6.00 2.00 0.050 1.00 0.40 - 2.000 11.45

32 12KV D/C Attabad-Green View-Rustam (Re-Conduct) D/C 19.5 LESCO 10.00 5.00 0.050 4.00 15.00 3.00 4.000 41.05

33 I1KV STLUI RIVER CROSSING NEAR MAND1USMANWALA S/C LESCO 3.00 0.20 0.050 2.00 0.40 - 2.000 7.65

34 132KV D/C T/L ATTABAD-ICI (Re Conducting) D/C LESCO 0.50 1.50 0.000 1.00 - - 1.000 4.00

35 132KV KSK-NARANG D/C 20 LESCO 3.00 3.00 0.050 1.10 1.00 1.00 2.500 11.65 36 132KV T/L Sundar-Manga D/C LESCO 2.00 0.000 1.00 1.00 1.000 5.00 37 Kahan

132KV D/C T/L KLP-WIFOWN F/F D/C LESCO - - 0.050 1.00 9.00 1.500 11.55

38 132KV D/C T/L Okara-Depalpur D/C do 40 5.00 0.000 0.10 6.00 1.100 52.20 39 132KV YousafWala Bhaipheru at 132KV G/S Habibabad D/C do 50 7.00 0.050 0.60 8.00 4.00 1.000 70.65

40 Miscelleneous/ Emergency Breakdowns/GSO Works for providing proper clearance 24.00 9.00 14.00 16.00 9.000 72.000 Sub- TOTAL (H) 121.55 1,353.50 172.20 1.55 88.80 324.00 24.00 105.80 - 2,069.85

(J) Transmission Lines planned under World bank Financing

Rs in Million

SrJI Type Source of financing

COUNTER PART FUNDING

Civil Works

Particular of Work WORLD BANK

Material/ duties/taxes/store handling charges

Crop Compensation / Land Labour (10%) Overhead (10%) Others/

interest (6%) Consultancy

SCOPE OF WORK

Electrical

Civil Division Total

Page 48: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

ESTIMATED BUDGET DURING FY-2013-14 ...,.....sx vial ...3 .a. kir IL/ tiller WWII resources, work! Bank and Asian Development Bank

I 132KV T/L F/F Johar Town 11 (In & Out from wapda Town - Bund Road) D/C 4.5 World Bank 30 1.00 0.050 1.00 30.00 5.000 1.50 38.55

2 132KV T/L F/F Inayat Pura/State Life Housing Society D/C 5 do 30 1.00 0.050 0.05 25.00 5.000 0.50

_

31.60 3 132KV T/L F/F Mominpura G.T Road D/C I do 10 0.050 0.50 8.00 5.000 0.50 14.05 4 132KV T/L F/F Saggiao D/C 0.464 do 5 1.00 0.050 0.60 6.00 4.00 1.500 1.50 14.65 5 132kV F/F Punjab University ( In & Out from

G/TOWN 41/TOWN) D/C 0.5 do 5 1.00 0.050 0.60 7.00 0.60 1.500 - 10.75 6 I32KV F/F ASKARI X(IN &OUT FROM

DEFENCE-AIRPORT) D/C 0.2 do 1 0.30 0.050 0.60 4.80 0.200 5.95 Sub- TOTAL (J) 11.664 81 4.30 0.30 3.35 80.80 4.60 18.20 4.00 - - 115.55

`NW 7 1 • Ir. •

Page 49: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Prior Year Adjustment For FY 2012-13

Description Mln. Rs.

Notified Ref Price During FY 2012-13 Assessed Distribution Margin FY 2012-13 Assessed PYA for FY 2011-12 Adjustments Q1 Q2

Q3 Q4 Total Recoverable Less Recovered Regulatory PPP Recovered Regulated DM Recovered Regulated PYA Recovery

182,199 18,817 25,740

(1,944) (4,221) (8,635) (3,149)

208,807

147,188 9,984 4,279

161,450 47,357

PYA Add: Net impact of actual assessed other income Mix Variance Net PYA

406 47,764

Page 50: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

130,820 10,799

424

4,532 5,427 1,449

822

130,820 12,789

424

6,264 7,137 2,749 2,007

131,373 10,484 (1,947)

131,373 10,484 (1,947)

Prior Year Adjustment For FY 2011-12

Description NEPRA LESCO

Notified PPP FY 2011-12 Distribution Margin FY 2011-12 PYA for FY 2011-12 Adjustments

Q1 Q2

Q3 Q4 Total Recoverable Less Recoverd Regulatory PPP Recoverd Regulated DM Recoverd Regulated PYA Recovery

154,273 162,190

PYA Add: Net impact of actual assesed other income Mix Variance Net PYA

139,910 14,363

388 2,850

17,601

139,910 22,280

3,460 25,740

Page 51: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Profit & Loss Statement (Test Year) FY 2012-13

. _

Oft Prov. Prov. Pmv.

Just Projected

Oft Projected

:Total Provisional

Prov. Prov. v. Prov. Pray. Prov. Projected Projected Power Balances Balances

Units Received

Units Lost

Units Lost

Units Sold

[lAkWh]

pAkWhj

Map'

(MkWh]

1,823

287

15.74%

1,536

1,736

275

15.84%

1,461

1,573

206

13.10%

1,367

5,132

768

14.96%

4,364

1,444

165

11.45%

1,278

1,198

86

7.18%

1,112

1,165

117

10.04%

1,048

3,806

368

9.68%

3,438

1,080

98

9.08%

982

1,001

43

4.33%

957

1,134

144

12.74%

990

3,215

286

8.89%

2,929

1,283

180

14.00%

1,103

1,393

167

12.00%

1,226

1,378

176

12.80%

1,202

4,054

523

12.90%

3,531

16,207

1,945

12.00%

14,262

Revenue

Sales Revenue Min Rs] 14,524 13,863 12,754 41,141 10,664 9,895 8,616 29,175 9,203 7,983 9,094 26,280 15,785 14,324 12,617 42,726 139,321 Subsidy /Min Rs] 2,796 2,731 2,605 8,131 2,403 2,085 1,903 6,391 1,760 1,734 1,770 5,264 2,034 2,260 2,216 6,510 26,296 Fuel Price Adjustment Ran Rs] 1,046 - - 1,046 - - - - - - - - - - - - 1,046 Total Sales Revenue pain Rs] 18,366 16,594 15,358 50,318 13,067 11,980 10,519 35,566 10,962 9,717 10,865 31,543 17,819 16,584 14,833 49,235 166,663 Rental 8 Service Income [Min Rs] 15 15 15 46 15 15 15 46 15 15 15 46 15 15 15 46 183 Amortization of Def Credits pain Rs] 73 73 73 220 73 73 73 220 73 73 73 220 73 73 73 220 881 Other Income Min Rs] 289 289 289 868 289 289 289 868 289 289 289 868 289 289 289 868 3,472 Total Revenue pAln Rs] 18,744 18,972 15,736 51,452 13,445 12,358 10,897 36,700 11,340 10,095 11,243 32,677 18,197 16,962 15,211 50,369 171,199

Operating Cost

Power Purchase Cost Min Rs] 16,677 14,770 13,629 45,076 13,874 12,386 13,739 39,999 14,879 11,103 13,199 39,180 16,271 15,034 13,255 44,561 168,816 08M Expenses pain Rs] 1,313 1,313 1,338 3,963 1,313 1,313 1,350 3,975 1,325 1,325 1,350 3,999 1,325 1,325 1,350 3,999 15,935 Depreciation - [Min Rs] 185 185 185 556 185 185 185 556 185 185 185 556 185 185 185 556 2,223 Amortization (Min Rs] - - - - - - - - - - - Provision for Bad Debt ]Mtn Rs] - _ - - - - - - Total Operating Cost [Min Rs] 18,175 16,268 15,152 49,594 15,372 13,884 15,274 44,530 16,388 12,613 14,734 43,735 17,781 16,544 14,790 49,115 186,974

EBIT [Lan Rs] 570 704 585 1,858 (1,927) (1,526) (4,376) (7,830) (5,048) (2,518) (3,491) (11,058) 416 418 421 1,254 (15,775) Financial Charges pAln Rs] 66 66 66 199 66 66 66 199 66 66 66 199 66 66 66 199 797 EBT jam Rs] 503 637 518 1,659 (1,994) (1,593) (4,443) (8,029) (5,115) (2,585) (3,557) (11,257) 349 352 354 1,055 (16,573) Tax RAM Rs] - - - - EAT pAln Rs] 503 637 518 1,659 (1,994) (1,593) (4,443) (8,029) (5,115) (2,585) (3,557) (11,257) 349 352 354 1,055 (16,573) VVPPF [Mat Rs] - - - Profit for the period RAM Rs] 503 637 518 1,659 (1,994) (1,593) (4,443) (8,029) (5,115) (2,585) (3,557) (11,257) 349 352 354 1,055 (16,573)

Page 52: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

Profit & Loss Statement (Projected*) FY 2013-14 ,- --.

--e'nrh-rift•"--MOntti2 ' Month 3

71et„-.QnW

t-.----liiti41* . Month 6 Month 6

1.i2 ii

._ iiif._,.-±.'.WOiiiii 7T,.,..iO;... i • .,.. ....

a i. '.

tt, --i. --.- --v ' - "iielztott. 4. Total'

IOOttlf"m..;oi iif.•t•."-4aiit l..•i -•a

i arra total „. . .,

Power Balances

Units Received (MkWhj 1,850 1,762 1,597 5,209 1,465 1,216 1,182 3,864 1,096 1,016 1,151 3,263 1,302 1,414 1,399 4,115 16,450 Units Lost fMkWh] 291 279 209 780 168 87 119 374 99 44 147 290 182 170 179 531 1,974 Units Lost f%age] 15.74% 15.84% 13.10% 14.96% 11.45% 7.18% 10.04% 9.68% 9.08% 4.33% 12.74% 8.89% 14.00% 12.00% 12.80% 12.90% 12.00% Units Sold [MkVVh1 1,559 1,483 1,388 4,429 1,297 1,129 1,064 3,490 996 972 1,005 2,973 1,120 1,244 1,220 3,584 14,476

Revenue Sales Revenue (me Rs] 24,558 23,180 20,491 68,228 21,205 17,749 18,903 57,856 19,854 16,221 19,871 55,946 22,016 21,221 19,892 63,129 245,159 Subsidy ]Min Rs] - - - - - - - - - - - - - - Fuel Price Adjustment Mn Rs] - - - - - - - - - - - - - - - - - Total Sales Revenue fMln Rs] 24,558 23,180 20,491 68,228 21,205 17,749 18,903 57,856 19,854 16,221 19,871 55,946 22,016 21,221 19,892 63,129 245,159 Rental & Setvice Income (Min Rs] 17 17 17 50 17 17 17 50 17 17 17 50 17 17 17 50 201 Amortization of Def Credits [Mln Rs] 80 80 80 240 80 80 80 240 80 80 80 240 80 80 80 240 960 Other Income ItAn Rs] 306 306 306 918 306 306 306 918 306 306 308 918 306 306 306 918 3,673 Total Revenue [Mln Rs] 24,961 23,583 20,893 69,437 21,607 18,151 19,306 59,065 20,257 16,624 20,274 57,155 22,419 21,624 20,294 64,337 249,993

Operating Cost

Power Purchase COSt fMln Rs] 17,569 16,485 14,103 48,157 15,156 12,293 13,634 41,083 14,843 11,292 14,794 40,928 16,550 15,307 13,490 45,348 175,516 O&M Expenses [Mln Rs] 1,456 1,426 1,451 4,332 1,428 1,426 1,463 4,315 1,438 1,438 1,463 4,339 1,438 1,438 2,005 4,881 17,867 Depreciation [Min Rs] 217 217 217 651 217 217 217 651 217 217 217 651 217 217 217 651 2,604 Amortization [Mln Rs] - - - - - - - - - - - - - - - - Provision for Bad Debt Min Rs] - - - - - - -

Total Operating Cost awn Rs] 19,242 18,128 15,771 53,141 16,799 13,935 15,315 46,049 16,498 12,947 16,474 45,918 18,206 16,962 15,713 50,880 195,988

EBIT imin As] ' 5,719 5,455 5,122 16,296 4,808 4,216 3,992 13,016 3,759 3,678 3,800 11,237 4,214 4,662 4,582 13,458 - 54,006 Financial Charges [Min Rs] - 104 104 104 311 104 104 104 _ 311 104 104 104 311 '104 104 104 311 1,244 EBT [Min Rs] 5,615 5,351 5,019 15,985 4,705 4,112 3,888 12,705 3,656 3,574 3,697 10,926 4,110 4,558 4,478 13,147 52,762 Tax [Min Rs] - - - - - - - - -

EAT fMln Rs] 5,615 5,351 5,019 15,985 4,705 4,112 3,888 12,705 3,656 3,574 3,697 10,926 4,110 4,558 4,478 13,147 52,762 WPPF Win Rs] - Profit for the period [M1n Rs] 5,615 5,351 5,019 15,985 4,705 4,112 3,888 12,705 3,656 3,574 3,697 10,926 4,110 4,558 4,478 13,147 52,762

Page 53: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Balance Sheet fin million Ruoees1

Description Actual

FY 2010-11 as on

Actual FY 2011-12

as on

Provisional FY 2012-13

as on

Projected FY 2013-14

as on

Intangible Fixed Assets Net Fixed Assets in Operations 34,571 38,783 43,988 52,304 Total Net Fixed Assets in Operations 34,571 38,783 43,988 52,304

Capital Work in Progress 2,887 3,540 3,511 5,161 Long Term Loans to Employees 78 87 101 116 Deferred Cost & Long Term Deposits 0 0 0 0

2,965 3,628 3,612 5,277 Current Assets

Stores & Spares 3,422 4,105 4,399 5,230 Trade Debts 19,990 28,717 30,121 32,572 Advances, Prepayments, Other Receivables 7,179 10,205 7,018 12,258 Tariff Subsidy (Receivable from GoP) 7,316 10,669 17,703 17,703 Pension Fund Investments 4,085 8,578 Receivable from Associated Companies 4,666 6,036 9,663 11,775 Cash & Bank Balances 12,664 9,484 17,455 22,523

Total Current Assets 55,237 69,215 90,443 110,639 Total Assets 92,773 111,626 138,044 168,220

Subscribed Equity 6,738 6,738 6,738 6,738 Unappropriated Profit (531) (27,705) (44,278) 8,485 Total Equity 6,207 (20,967) (37,540) 15,224

Long Term Liability Security Deposits 5,424 6,270 7,234 8,173 Employee Retirement Benefits 18,654 22,368 26,896 26,896 Pension Fund - - 4,085 8,578 TFCs & SUKUK 4,180 - Deferred Credits 23,008 26,210 28,255 30,789 Total Long Term Loan 2,536 3,553 3,733 6,612

Total Long Term Liability 53,803 58,401 70,202 81,049

Current Liability Current Maturity on Long Term Loans 277 486 756 650 Subsidy Received in Advance from GoP - Provision for Taxation 103 103 103 103 Payable to NTDC 25,134 64,397 90,647 56,769 Creditors, Accrued and Other Liabilities 7,250 9,206 13,875 14,426

Total Current Liability 32,763 74,192 105,381 71,948

Total Liabilities and Commitments 86,566 132,593 175,583 152,997

Total Liabilities and Equity 92,773 111,626 138,044 168,221

Page 54: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Cash Flow Statement fin million Rupees'

Limited

Description Actual

FY 2010-11 Actual

FY 2011-12 Provisional FY 2012-13

Projected FY 2013-14

3,472 Average Monthly Demand Index (MDI) [MW] 3,125 3,461 3,301 Units Purchased [GWh] 16,986 16,727 16,207 16,450 Transmission Losses (132 kV) [GWh] 170 167 162 164 Distribution Losses [GWh] 2,075 2,092 1,783 1,809 Units Sold to Customers [GWh] 14,741 14,467 14,262 14,476

Average Tariff Required [Rs/unit] 9.218 12.534 13.156 16.936 Average Tariff Existing [Rs/unit] 9.197 10.541 11.686 16.936

Tariff Difference [Rs/unit] 0.021 1.993 1.470 0.000

Revenue from Sales 114,723 132,830 140,367 245,159 Collection from Required [%] 96.1% 93.4% 99.0% 99.0%

Inflows from Operations Collection from Current Sales 110,299 124,103 138,964 242,707 Prior Year Recovery - - - - Total Inflows from Operations 110,299 124,103 138,964 242,707

Outflow from Operations Payment for electricity (to CPPA) 150,260 147,964 162,000 229,600 Distribution Service Cost (=DMC) 11,134 13,363 15,935 17,867 Total Outflow from Operations 161,394 161,326 177,935 247,467

Surplus/Deficit from Operations (51,095) (37,223) (38,971) (4,759)

Inflows from Other Sources Capital Contributions 2,566 3,953 2,926 3,495 Consumer Security Deposits 837 846 964 939 Other Incomes 4,025 3,908 3,655 3,874 GOP Subsidy (Actual and Estimated) 38,617 16,313 19,262 0 Long Term Loan / Redeemable Capital 1,524 1,457 683 3,034 Total Inflows from Other Sources 47,569 26,477 27,490 11,342

Outflow Others Financial Charges 327 108 797 1,244 Repayment of Long Term Loans 235 231 233 260 Investment Program 6,426 6,233 7,399 12,570 Working Capital/other Changes -10,015 -22,746 -21,908 -21,908 Total Outflow Others -3,028 -16,174 -13,479 -7,834

Surplus/Deficit Others 50,597 42,651 40,969 19,176

Total Inflows (Operations + Others) 157,868 150,580 166,454 254,050

Total Outflows (Operations + Others) 158,367 145,152 164,456 239,633

Opening Balance 13,139 12,641 18,068 20,066 Surplus/Deficit for Fiscal Year (499) 5,428 1,997 14,417 Deficit from Financing/Loans 0 0 0

12,641 18,068 20,066 34,483

Page 55: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Power Purchase (FY 2012-13)

ul Prov. Prov.

sep Prov.

Oct Prov.

Jan r Prov. Prov. Prov.

Jun Prov.

Total Prov.

Demand & Energy Prov. Prov. Prov.

- Prov.

Units Received [MkWh] 1,823 1,736 1,573 1,444 1,198 1,165 1,080 1,001 1,134 1,283 1,393 1,378 16,207 MDI DAM 3,343 3,458 3,426 3,548 3,389 3,196 3,270 2,629 2,944 3,308 3,461 3,634 3,301 Energy Purchase Price [Rs/ kVVh] 7.299 6.650 6.607 7.035 7.230 8.956 10.554 8.312 9.136 10.230 8.606 7.731 Capacity Purchase Price [Rs/ kW/ MI 921.93 847.24 858.54 962.17 1,013.53 947.92 979.36 973.58 877.10 866.23 794.16 629.22 Transmission Charge (Rs] kW/ MI 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910 85.910

Power Purchase Cost Energy Charge [Min Rs] 13,306 11,545 10,393 10,155 8,661 10,433 11,395 8,319 10,364 13,122 11,988 10,656 130,336 Capacity Charge [Min Rs] 3,082 2,930 2,942 3,414 3,435 3,030 3,202 2,559 2,583 2,865 2,749 2,287 35,076 Transmission Charge [Mln Rs] 287 297 294 305 291 275 281 226 253 284 297 312 3,403 Adjustment ** [Ain Rs] - - - - - - - - -

Total Operating Cost [Mln Rs] 16,675 14,772 13,629 13,873 12,386 13,738 14,879 11,104 13,199 16,271 15,034 13,255 168,815

Lahore Electric Supply Company Limited Power Purchase (FY 2013-14)

but Aug Sep Oct v_ Dec Jan : Feb ay.±. , Jun Total

Demand & Energy Units Received [MkWhj 1,850 1,762 1,597 1,465 1,216 1,182 1,096 1,016 1,151 1,302 1,414 1,399 16,450 MDI Imwl 3,516 3,638 3,604 3,732 3,565 3,362 3,439 2,765 3,097 3,479 3,641 3,823 3,472 Energy Purchase Price [Rs/ kWh] 7.299 6.650 6.607 7.035 7.230 8.956 10.554 8.312 9.136 10.230 8.606 7.731 8.042 Capacity Purchase Price [Rs/ kW/ M] 1,069.77 1,224.64 900.33 1,213.41 896.60 819.60 866.70 94408 1,294.23 842.98 776.25 613.63 951.63 Transmission Charge [Rs/ kW/ M] 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.91 85.91

Power Purchase Cost Energy Charge [Mln Rs] 13,505 11,718 10,549 10,307 8,791 10,590 11,566 8,443 10,519 13,319 12,168 10,816 132,291 Capacity Charge [Mln Rs] 3,761 4,455 3,245 4,529 3,196 2,756 2,981 2,611 4,008 2,933 2,826 2,346 39,646 Transmission Charge [Mln Rs] 302 313 310 321 306 289 295 238 266 299 313 328 3,579 Adjustment ** [min Rs] - - - - - Total Operating Cost [Mln Rs] 17,569 16,485 14,103 15,156 12,293 13,634 14,843 11,292 14,794 16,550 15,307 13,490 175,516

Page 56: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Line Losses (Test Year) FY 2012-13

a JP-11,,,--

Power Balances

Jul: - Prov.

_Aug,, Prov.

Sep Prov. Prov

Nov Prov.

Dec : Prov.

. Jan.... Prov.

-------- Feb - Prov.

, Mar Prov. Prov.

ay Prov.

Jun Prov.

Total Prov.

Units Received [MkWh] 1,823 1,736 1,573 1,444 1,198 1,165 1,080 1,001 1,134 1,283 1,393 1,378 16,207 Units Sold [MkWh] 1,536 1,461 1,367 1,278 1,112 1,048 982 957 990 1,103 1,226 1,202 14,262 Units Lost [MkWh] 287 275 206 165 86 117 98 43 144 180 167 176 1,945 Units Lost [%age] 15.74% 15.84% 13.10% 11.45% 7.18% 10.04% 9.08% 4.33% 12.74% 14.00% 12.00% 12.80% 12.00% Distribution Losses [%age] 13.57% 13.67% 10.93% 9.28% 5.01% 7.87% 6.91% 2.16% 10.57% 11.83% 9.83% 10.63% 9.83% Transmission Losses rkagel 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17%

Technical Losses at Different Levels Transmission Losses 132 kV [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% - - 0% 0% 0% 0% 11 kV Losses [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% LT Losses [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total Technical Losses [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Lahore Electric Supply Company Limited Line Losses * (Projected) FY 2013-14

Power Balances

uf. Aug Sep Oct N Jan Feb Mar. ay

Units Received [MkWh] 1,850 1,762 1,597 1,465 1,216 1,182 1,096 1,016 1,151 1,302 1,414 1,399 16,450 Units Sold [MkWh] 1,559 1,483 .1,388 1,297 1,129 1,064 996 972 1,005 1,120 1,244 1,220 14,476 Units Lost [MkWh] 291 279 209 168 87 119 99 44 147 182 170 179 1,974 Units Lost [%age] 15.74% 15.84% 13.10% 11.45% 7.18% 10.04% 9.08% 4.33% 12.74% 14.00% 12.00% 12.80% 12.00% Distribution Losses [%age] 13.57% 13.67% 10.93% 9.28% 5.01% 7.87% 6.91% 2.16% 10.57% 11.83% 9.83% 10.63% 9.83% Transmission Losses [%age] 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17%

Technical Losses at Different Levels

Transmission Losses 132 kV [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 11 kV Losses [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% LT Losses [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total Technical Losses [%age] 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Page 57: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Operational and Technical Information 2012-13

34% DISCO load factors on yearly basis

NTDC/DISCO Delivery Points metering accuracy 0.2% & 0.5

DISCO metering accuracy For all customers (residential, commercial, industrial, etc.) 0.5-2%

Estimated High Voltage Transmission lines losses (132 kV) 2.17%

?i/

Page 58: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Average Rate per Unit Purchased and Sold

- Weighted Average Cost per Unit Sold to Customers

10.01 Use of System Chimes (NTDC) FY 2012-13

Provisional

FY 2013-14

Projected 10.02 Estimated Average Rate

10.03 Estimated (Table 11 - 11.18) [Rs/kW/Month] 85.91 85.91

Maximum Demand Indicator (MDI)

10.04 Number of Months (Fiscal Year) (Table 11 - 11.17) [MW] 3,301 3,472

[ p) 12 12 10.05 Estimated Use of System Charges = (10.02 x 10.03 x 10.04)

[,000,000 Rs] 3,402.59 3,579.13

10.08 Fixed/Capacity Chime

10.07 Estimated Average Rate

10.08 Estimated MDI (Table 11 - 11.33) [RsAW/Month] 885.62 951.63

10.09 Number of Months (Fiscal Year) Form 8 ( A) 3,301 3,472

[ # 12 12 10.10 Estimated Capacity Charge = (10.07 x 10.08 x 10.09)

[,000,000 Rs] 35,076.38 39,646.28

10.11 gnerav Charae

10.12 Estimated Average Energy Charge

10.13 Estimated (Table 11 - 11.33) [Rs/kWh] 8.0418 8.0418

Energy Purchase for Fiscal Year [GVVh] 18,207 18,450

10.14 Estimated Energy Charges = (10.12 x 10.13) [,000,000 Rs] 130,335.68 132,290.28

10.15 Estimated Power Purchase Price - (10.05 + 10.10 + 10.14) (,000,000 Rs] 188,814.65 175,515.70

10 16 Average Rate per Unit Purchaser( • (10.15 / 10.13) [ Rs/kWh ] 10.42 10.87

10.17 Estimated Energy Sold [GWh] 14,262 14,476

10.18 Average Energy Rate per Unit Sold = (10.15 / 10.17) [ Rs/kWh ] 11.8367 12.1247

10.19 Distribution Margin [,000,000 Rs] (2,163.24) 21,879.58

10.20 Distribution Margin per Unit 1311= (10.19 / 10.17) [ Rs/kWh ] (0.1510) 1.5115

10.21 Total Cost per Unit Sold to Customers = (10.20 + 10.18) [ RslkWh ] 11.8857 13.8382

10.22 Estimated Revenue from Energy Sold (10.15 + 10.19) [,000,000 Rs] 168,661 197,395

10.23 Prior Period Adjustement (Uncovered Costs) [,000,000 Rs] 47,784

10.24 Required Estimated Revenue from Energy Sold (10.22 + 10.23) [,000,000 Rs] 168,681 245,159

While submitting Quarterly Petitions , this form should be submitted with actual amounts of previous quarters and projected figures of next quarter.

Figures in the forms should be substantiated with the forms below.

Page 59: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Table 11 - CPPA Charges: Use of System, Capacity and Energy

11.01 Use of System Charges (NTDC)

Variable

E Demand Fixed Use of Fixed Use of Use of Variable Use of Sum Use of System Rate System Charges nergy System System Charges System Charges Rate

11.02 Month Year [kW] iRsAVVI [ Rs] [kWh] IRs/k

11.03 1 2 3 Whl [ Rs] [ Rs] 4 5.3x 4

6 7 8 - 6 5 7 9

11.04 Jul 3,518,145 85.910 302,071,984 1,850,345,000 - -

11.05 Aug 3,637,686 85.910 312,513,493 1,762,040,000 302,071,984

11.06 Sep 3,604,016 85.910 309,620,921 1,696,696,000 312,513,493309,620,921

11.07 Oct 3,732,072 85.910 320,622,347 1,466,162,600

11.08 Nov 3,684,601 85.910 306,228,267 1,215,878,660 320,622,347

11.09 Dec 3,362,151 85.910 288,842,366 1,182,476,000 306,226,267288

11.10 Jan 3,439,245 85.910 295,465,579 1,096,976,700 295,485,842,366

11.11 Feb 2,786,232 85.910 237,561,085 1,015,749,159 237,561,579 ,085

11.12 Mar 3,097,166 85.910 266,076,831 1,151,324,650 266,076,831

11.13 Apr 3,479,396 85.910 298,914,940 1,301,857,210

11.14 May 3,640,917 85.910 312,791,152 1,413,896,270 31 298,914,

2,791,1940

11.15 Jun 3,822,928 85.910 328,427,711 1,399,042,496 328,427341

,752 1

11.18 41,881,445 85.910 3,579,134,478 16,450,332,640 3,579,1

11.17 Avg per month [MW] 3,471,787 Avg per month [MWh] 1,370,861,063 ,487

11.18 Caoaclty and Energy

Capacity Rate per

kWh [ Rs/kWh

16.111 6

Capacity Energy Sum of all Use Of System Charge Charge Charges Rate per kWh

11.19 Month Year [Rs] [Rs] [Rs] [ Rs/kWh ]

11.20 1 2 11 12 13 . 9+11+12 14.916

11.21 Jul 3,761,482,158 13,505,409,107 17,568,963,249 0.163

11.22 Aug 4,454,847,302 11,717,888,691 16,485,247,486 0.177

11.23 Sep 3,244,810,163 10,548,891,989 14,103,123,073 0.194

11.24 Oct 4,528,548,016 10,307,038.690 15,158,207,054 0.219

11.25 Nov 3,195,915,828 8,790,575,270 12,292,717,385 0.252

11.26 Dec 2,755,635,497 10,589,923,284 13,634,401,148 0.244

11.27 Jan 2,980,780,705 11,568,424,079 14,842,670,363 0.270

11.28 Feb 2,810,587,816 8,443,361,052 11,291,509,953 0.234

11.29 Mar 4,008,422,321 10,519,035,088 14,793,534,018 0.231

11.30 Apr 2,933,044,795 13,318,519,999 18,550,479,734 0.230

11.31 May 2,828,259,889 12,167,708,520 15,306,759,561 0.221

11.32 Jun 2,345,852,455 10,816,137,429 13,490,417,595 0.235

11.33 39,648,184,946 132,290,711,176 175,616,030,600 0.218

11.34 Avg Cap. Charge . 951.63

Energy Final Rate Rate per kWh per kWh

RsAVVh ] [ RsAcWh

16.1216 17=13/6

7.299 9.495

8.650 9.356

6.807 8.833

7.035 10.344

7.230 10.110

8.956 11.530

10.554 13.543

8.312 11.116

9.138 12.849

10.230 12.713

8.608 10.826

7.731 9.643

8.042 10.670

2.033 2.528 2.032 3.091 2.828 2.330 2.720 2.570 3.482 2.253 1.999 1.677 2.410

Page 60: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited DEMAND (Actual and Calculated) and Number of Customers

A. Actuals for Demands and Number of Customers B. Forecasted Demands and Number of Customers using re resion analysis

Fiscal Year

Demand Actual

/Forecast change

Demand Calculated /Forecast

change

Number of

Customers change [,000 kW 1 1,000 kW ] [ ,000 ]

12.01 2000-01 2,006 12.02 2001-02 2,089 4.14% 12.03 2002-03 2,194 5.03% 12.04 2003-04 2,332 6.29% 12.05 2004-05 2,782 2,782 2,480 6.37% 12.06 2005-06 3,087 10.94% 3,087 10.94% 2,638 6.34% 12.07 2006-07 3,097 0.32% 3,097 0.32% 2,795 5.98% 12.08 2007-08 3,440 11.09% 3,440 11.09% 2,925 4.63% 12.09 2008-09 3,158 -8.19% 3,158 -8.19% 3,046 4.13% 12.10 2009-10 3,504 11.0% 3,504 10.96% 3,182 4.49% 12.11 2010-11 3,620 3.3% 3,620 3.30% 3,313 4.11% 12.12 2011-12 3,938 8.8% 3,938 8.78% 3,434 3.64% 12.13 2012-13 4,788 21.6% 4,788 21.58% 3,582 4.31% 12.14 2013-14 5,171 8.0% 5,171 8.00% 3,728 4.09% 12.15 2014-15 5,585 8.0% 5,585 8.0% 3,880 4.08% 12.16 2015-16 6,032 8.0% 6,032 8.0% 4,036 4.00%

Page 61: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

MIUMM4$! .WWW-filiVIRf4=MPWP1-. ------ -- latalltillatIMM!!!!!711=11;117AWW;;;M:Wil

ggEFAIKAVEMIEHEEniiii§gm:iii igsgragm it -------

5 wm

O

0 30

5;

F,

122_ 8:WMERIEEE

Page 62: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

IA I.. 10 MW111 1000000

DISCO Evaluation of Load Growth by using 12 month moving average

11100000

1010000

1200000

1000000

000000

t11111111 1 1gi t 11 111 t it 111 1 111! ■■Intelly annmpt. •-•.- 17 Me. osevie. Awe. at MT., 0IIIM,41.0

ore Electric Suoolv Comoanv Limited Tahla/Graph 13 - Load Growth Evaluation and Setting up Load Amigo

12 month.

Load

moving nth 111W1

wereg• 11,03 0:03 0-03

-03 v-03 0-03 n-04

5-04 r-04 r-04 7-04 n-04 1-04 2,643 0 5-04 2.6212 220 544 2,7215 439 -04 2.372 067 -04 2,024 904 -04 2,134 1.033

0-05 2,067 1.211 4505 2,097 1,385 ar-05 2,245 1,550 nr-05 2,550 1.747 00-05 2,630 1,050 in-05 2,762 2,170 u1-05 2,770 2,410 4-05 2.631 2,421 65-05 2.940 2.439 01-05 2,412 2.450 5v-05 2,142 2.454 ec-05 2,340 2,404 rn-08 2,267 2,491 05-06 2,282 2,497 ar-06 2.349 2,513 or-00 2,769 2.521 ev-06 3,087 2,540 In-06 3,062 2,578 u1-013 2.675 2,603 o-06 2,977 2.011 N5-06 2.531 2,023 .ct-06 2.761 2.619 ov-06 2,470 2.650 ec-06 2.558 2,678 en-07 2,554 2,606 eb-07 2,451 2,719 'ar-07 2,654 2,733 or-07 2,960 2,756 ay-07 3,097 2.774 un-07 3,083 2.775 101.7 3,106 2.775 19-07 3,236 2.795 eo-07 2,919 2,821 1ct-07 2,665 2,828 ov-07 2,630 2,820 ec-07 2,594 2,825 an-08 2,376 2,829 05-08 2,328 2.813 ler-08 3.440 2.803 150-08 2,883 2,808 00-08 2.929 2,862 un-08 2 864 2 848 ul-08 3,158 2,829

539-08 2,878 2.834 00-08 3,073 2.799 151-08 2,651 2,812 ov-08 2,653 2.809 on-08 2,658 2,619 an-09 2,233 2,824 eb-09 2,604 2,812 00,-09 2,812 2,8351 100-09 2,766 2,766 ley-09 2,855 2,758 un-09 2.944 2,755 Jul-09 3,175 2.781 05-09 3,485 2.763 sto-09 3,472 2,813 lot-09 3,259 2,847 lov-09 2.724 2,897 oc-09 2.611 2.003 lan-10 2,934 2,916 'eb-10 2,967 2.974 ter-10 2,609 3,005 k0r-10 3,070 3,004 lay-10 3,430 3,028 lun-10 3,504 3,073 Jul-10 3,376 3,120 09-10 3.020 3,137 le5-10 3,057 3.146 Dct-10 2.1790 3,114 1ov-10 2,963 3.091 )0c-10 2,980 3,111 on-11 2,870 3,125 '05-11 3,048 3,120 Alp-11 3.041 3,127 Nor-11 3.240 3,103 lay-11 3.285 3.177 lun-11 3,021 3,165 Jul-11 3,615 3.125 0o-11 3.380 3.145 105-.11 3.038 3.125 7c1-11 3.712 3.198 Iov-11 3.401 3.258 )ec-11 3,547 3.295 lan-12 3.538 3.342 ieb-12 3,267 3,398 Aar-12 3.228 3,418 Apr-12 3.145 3,433 Aey-12 3.251 3,425 Jun-12 3,455 3,425 Jul-12 3,343 3,401 bug-12 3,459 3.439 505-12 3,426 3,445 Oct-12 3,546 3,403 gov-12 3.389 3,399 30c-12 3,196 3,388 Jan-13 3,270 3,355 05.13 2.629 3,336

401,13 2.044 3,281 Apr-13 3,308 3,259 Aay-13 3,481 3,271 Jun-13 3.634 3,288

2,829 Load Average for last 12 months 33,951 Average Load for next Focal Year

2,915 Load Average for last 12 months 34.966 Average Load for next Focal Year

3,133 Load Average for last 12 months 37,597 Average Load for next Fiscal Year

3,299 Load Average for 10st 12 months 39,585 Average Load for next Fiscal Year

Page 63: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

. FROM •13

Asset register as the year ended at date 2,013

No. Description

Cost Accumulated De areciation As at July 01, Addition/

deletions As at June 30, As at July 01,

ear

Charge during the year Adjustments

As at June 30, Book Value as on

June 30,

A.

1

2

Land

Freehold

Leasehold

824,949,274

24,547,824

-

-

824949274 , ,

24,547,824

-

- 24,949,274

- - -

-

6

Total 849,497,098 - 849,497,098 • • -

24,547,824

B.

1

2

3

4

Buildings

Residential Buildings

Non-Residential Buildings

GSO Residential Buildings

Non-GSO Residential Buildings

253,578,138

1,621,137,731

12,534,074

807,749,589

32,744,047

209,334,333

1,618,500

104,303,119

286,322,183

1,830,472,064

14,152,574

912,052,708

48,238,371

308,377,535

2,384,288

153,652,476

849,497,098

5,739,617

36,893,662

283,703

18,283,018

-

-

-

-

-

53,975,988

345,071,197

2,887,971

171 935 494

232,346,195

1,485,400,868

11,484,604

Total 2,894,999,530 348,000,000 3,042,999,530 512,850,850 81,000,000 - 573 850 850

740,117,214

C.

1

2

3

Sub Transmission

132 KV Sub Transmission Lines

66 KV Sub Transmission Lines

33 KV Sub Transmission Lines

4,822,985,987

85,783,880

645,049

895,449,844

2,102,012

-

5,518,415,830

87,865,872

645,049

1,318,512,927

76,707,581

298,908

168,884,999

574,900

28,627

-

-

-

1,487,377,927

77,282,481

325,538

2,469,348,880

4,031,037,904

10,583,391

Total 4,709,374,898 897,551,858 5,808,928,751 1,995,519,418 189,488,527 - 1 584 985 943

319,513

D.

1

2

3

Grid Station

132 IN Grid Station

68 KV Grid Station

33 KV Grid Station

12,375,908,344

488,587,853

-

1,294,615,513

98,519,453

-

13,870,423,856

563,087,316

-

3,275,220,400

162,469,166

486,788,297

18,595,768

-

-

-

.

3,762,006,697

181,064,932

-

4,041,940,808

9,908,417,159

382,022,384

_ Total 12,842,478,207 1,391,034,968 14,233,511,172 3,437,889,566 505,382,083 -

E.

1

2

3

11 KV Distribution Equipments

11 KV Poles

11KV Line

Distribution Transformer 11,497,373,321

3,727,713,573

5,839,410,808

478,852,412

524,884,898

2,371,893,387

4,204,585,985

6,164,275,502

13,869,266,688

1,054,861,367

1,839,808,155

3,380,459,417

149,493,902

224,971,498

474,145,907

_

-

-

3,943,071,829

1,204,355,270

2,084,779,653

3,854605,324

10,290,439,543

3,000,210,715

4,099,495,849

Total 20,884,497,500 3,373,810,875 24,238,108,175 8,275,128,940 848,611,307 - 7,123,740 248

10,014,681,364

F.

1

2

3

4

5

LV Distribution Equipments

LV Poles

440 LV Distribution Line

220 LV Distribution Line

KWh Meters & Service Cable

Misc. Equipment

1,605,720,373

63,879,291

2,977,188,801

5,078,419,215

2,828,532,005

138,127,167

24,727,185

280,070,531

888,883,592

328,759,033

1,643,847,529

78,606,455

3,257,237,332

5,967,282,807

2,957,291,038

525,888,287

1,488,444

1,110,842,291

1,320,388,389

1,068,589,433

59,573,721

2,327,899

117,899,170

210,713,876

106,069,223

-

-

-

-

-

585,442,009

3,814,142

1,228,541,461

1,531,100,265

1,174,838,656

17 114 387 928

1,058,405,521

74,792,313

2,028,895,871

4,436,182,542

Total 12,243,717,884 1,860,547,479 13,904,265182 4,027,152,844 498,383,890 - 4,523538,534

1,782,652 382

G.

1

2

Vehicles

132/66/33 KV GS0 Vehicles

Vehicles

58,707,157

892,528,584

25,788,299

56,707,157

718,314,863

41,980,668

547,542,491

1,831,572

22,253,457

-

43,820,240

9,380,728,828

12,886,917

148,518,915 Total 749,235,721 25,786,299 775,022,020 589,531,158 24,085,029 •

589,795,948

813,816,187 H.

1

2

3

4

5

Detail of General Plant Assets

Computer Equipment

Furniture

Workshop Equipment

Laboratory Equipment

Misc. Equipment

203,384,442

49,139,908

-

22,024,543

28,416,932

840,359

-

13,182,142

-

229,781,374

49,980,267

35,188,685

61,381,934

38,742,188

-

-

• 10,084,932

100,579,929

1,877,055

-

-

1,397,542

-

-

.

_

-

181,941,863

38,619,243

-

-

11,482,474

18,554,844,789

254,834,423

18,809,479,192

181,405,833

67,839,511

11,361,024

-

-

23,704,211

44,210,833,485

107,441,502

44,318,074,987

Total 55,028,327,528 7,738,850,708 82,785,278,234 18,345,881,527 2,208,783,142 -

J. O&M Equipments 339,143,257 23132,668 382,275,925 238,205,981 18,828,442

Grand Total 55,387,470,785 7,780,083,374 83,127,554,159 18,584,067,808 2,225,411,584 -

White submitting Quarterly Petitions , this form should be submitted with actual figures of previous quarters and projected figures of next quarter. The Asset Register should be substantiated with notes to the accounts, If required.

Page 64: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Aging of Accounts Receivables as on 30th June • Outstanding for current year Rs In Million

Outstanding for more than 1 year Rs In Million

Outstanding for more than 2 years Its In Million

Outstanding for more than 3 years Rs In Million Outstanding for more than 4 years Rs In Million

Outstanding for more than 5 years Rs In Million

Total Receivables as on June 30, Rs In Million

Actual Provisional Projected FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14

17,028.00 17,401.00 16,645.00 16,000.00

3,809.00 8,044.00 11,018.00 10,500.00

1,192.00 2,680.00 4,159.00 4,000.00

22,029.00

28,125.00

31,822.00

30,500.00

Page 65: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Projected Energy Sales by Tariffs FY 1013-14

PARTICULARS vonaw Lev., Energy Parchmed 2012.13 Sales

(MkWh) 2012- 13

Distribution 1,..... 2012.0 Sale, Growth

Rate Projection 1 Sales Growth

Rate Projection 2

2 3 4 5 7

l.1,,,i,

OG

Up to 50 Units LV 303 252 51 1.50% 256

g 9

200% 257 Poe peak load requirement up to S kW

- -

01.100 Units pu month LV 2,204 1,836 368 1.50% 1,864 1 00% 1,873 101-300 Units per month LV 2,430 2,024 405 1.50% 2,055 100% 2,065 001 -700 Units per month LV 949 791 158 1.50% 802 2.00% 806 Above700 Units per month LV 370 308 62 1.50% 313 200°/ 315 For peak load requirement exceeding 5 kW - - Time of Use (TOU)-Peak LV 82 68 • 14 1.50% 69 2.00% 70 Time of Use (T01.)-01T Peak LV 377 • 314 63 1.50% 319 2,00% 321

Total Residential 6,715 5,594 1,121 5,678 5,706

CO

MM

ER

CIA

L- A

2 For peak load reqaireineat op to S kW LV 502 418 84 1.50% 425 2. 00% 427

For peek load reqairemeat exceeding S kW LV

Regular LV 163 136 27 1.50% 138 2.00% 139 Time of Use (TOU)-Peuk LV 120 100 20 1.50% 101 1 00% 102 Time of Use (T01.)-0IT Peak LV 542 451 .90 1.500/0 458 2.00% 460

Total Commercial 1,327 . 1,105 221 1,122 1,127

IND

UST

RIA

L

BI LV 106 89 18 1.50% 90 2.00% 90 131 - Time of Use (TOU)-Peak LV 67 , 56 11 1.50% 56 100% 57 131 - Time of Use (T011)-Off Peak LV 335 ' . 279 56 1.50% 284 100% 285 B2 LV 413 344 69 1.50% 349 100% 351 132 • Time of Use (r0U)-Peak LV 194 162 32 1.50% 164 100% 165 B2 - Time of Use (TOW-On-Peak LV 1,101 917 184 150% 931 100% 935 133 - Time of Use (TOU)-Peak HV 280 280 - 1.50% 284 2 00% 285 B3 - TTime of Use (TOU)-Off Peak HV 3,174 3,174 - 1.50% 3,222 100% 3,238 EN • Time of Use (TOW-Peak STG 83 83 - 1.50% 84 100% 85 B4 -Time of Use (f01.0-Off Peak STG 613 613 - 1.50% 622 100% 625

Total Industrial 6,365 5,995 370 6,085 6,115

SIN

GL

E P

OIN

T SU

PP

LY

FO

R F

UR

TH

ER

D

I ST

RIB

UT

ION

C 110 Supply at 400 Volts -up to 5 kW LV 1 I 0 1.50% 1 2.00% 1 Cl(b) Supply at 400 Volts - exceeding 5kW LV 38 31 6 1.50% 32 2.00% 32 Time of Use (TOW-Peak LV 2 2 0 1.50% 2 2.00% 2 Time of Use (TOU)-Olf Peak LV 1 I 9 2 1.50% 9 2.00% 10 C2 Supply at I I kV HV 240 240 - 1.50% 244 2 001/1 245 Time of Use ("TOW-Peak HV 17 17 - 1.50% 17 100% 17 Tote of Use (rou)-Off Peak HV 74 74 - 1.50% 75 200% 75 C3 Supply above I I kV STG 47 47 - 1.50% 48 2.00% 48 Time of Use (YOU)-Peak STG - - - 1.50% - 2.00% - Time of Use (TOU)-OH Peak STG - - - ' 1.50% - 100% -

Total Slagle Point Supply 430 421 9 427 429 DI Scarp LV 140 117 23 1.50% 119 2.00% 119 02 Amicultual Tube-wells LV 102 85 17 1.50% 86 2.00% 87

7TJL

1 7

I3- I (b) SCARP and agricultural more than 20 KW LV

Time of Use (TOU) - Peak LV 152 127 25 1.50% 129 2.00% 129 Time of Use (T01.) -Off Peak LV 821 684 137 1.50% 694 2.00% 698

Total Agriculture 1,215 1,013 203 1,028 1,033 E-1(t) Residential Supply LV 0 0 0 1.50°/ 0 2.00% 0 (-10t)Commercial Supply LV 25 25 - 1.50% 26 2.00% 26

EM

I SU

. T

A

-r E-2 Industrial Supply LV 0 0 - 1.50% 0 2.00% 0

Total Temporary 26 26 0 26 26

U, Public Lighting - G LV 124 103 21 1.50% 105 2.000/ 105 Residential Colonies-H HV 4 4 - 1.50% 5 2.00% 5

0 Railway Traction - I HV 0 0 - 1.50% 0 2.00% 0 Co-Generation Tariff - - - - -

Total 16,207 14,262 1,944 14,476 14,547

Page 66: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Operating Cost

A Power Purchase Cost

Energy Charge

Capacity Charge

Transmission Charge

Adjustment *

Total Power Purchase Cost

2012-13 • .1 ,•.■

Determined Provisional

2013-14 Projected

[Min Rs] 138,822 130,336 132,291 [Mln Rs] 39,616 35,076 39,646 [min Rs] 3,760 3,403 3,579 [Mln Rs]

[Min Rs] 182,199 168,815 175,516

* Provide the detail of adjustment

B Operation & Maintenance *

Employees Cost **

Salaries, Wages & Benefits [Mln Rs]

Retirement Benefits [Mln Rs]

Total Employees Cost [Min Rs]

Repair & Maintenance [Mln Rs]

Travelling [Mln Rs]

Transportation [Mln Rs]

Miscellaneous Expenses [Min Rs]

Total O&M [Mln Rs]

C Depreciation & Amortization

Depreciation [Mln Rs]

Amortization of Leased Assets [Mln Rs]

Total [Mln Rs]

D Provision for Bad Debts

Provision for bad debts * [Mln Rs]

Bad debts written off [Mln Rs]

* Basis of this provision should be elaborated

7,917 7,999

5,265

1 8,592

5,791 7,917 13,264 14,383 1,060 1,061 1,167

212 212 234 334 376 451 863 1,022 1,632

10,386 15,935 17,867

1,790 2,223 2,604

1,790 2,223 2,604

0 0 0

0

Page 67: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Distribution Margin Comparison:

2011 2012 2013 2014 O&M Expenses Increase in %

11,134 13,363 15,935 17,867 12.03% 20.02% 19.25% 12.12% Depreciation

RORB 1,553 1,790 2,223 2,604

Income Tax/WPPF 2,002

84 (27,064) (15,775) 6,243

Other Income (4,683) (4,660) (4,536) (4,834) Distribution Margin Energy Sold

10,090 (16,570) (2,153) 21,880 DM per unit

14,741 14,467 14,262 14,476 0.684 (1.145) (0.151) 1.511 DM per unit increase 0.418 (1.830) 0.994 1.662

)1,

Page 68: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Financial Charges

4011:1 2012.13,

Actual Provisional Projected

A Long Term Loans GOP loans Foreign Loans Bonds

TFCs

Others Total

B Short Term Loan Running Finance Short Term Loan Others

Total

719 1,200

110

79 44 110 797 1,244

■•■

C Total Financial Charges (A+B) 110 797 1,244

Page 69: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited RORB Calculation

1

2012-,13

2013 13 " :2013-14 Determined Provisional Projected

A Gross Fixed Assets in Operation - Opening Bal [Mln Rs] 55,387 55,387 62,816 B Addition in Fixed Assets [Mln Rs] 6,944 7,428 10,920 C Gross Fixed Assets in Operation - Closing Bal [Mln Rs] 62,331 62,816 73,735 D Less: Accumulated Depreciation [Mln Rs] 18,619 18,827 21,431 E Net Fixed Assets in Operation [Mln Rs] 43,712 43,988 52,304 F Add: Capital Work In Progress - Closing Bal [Mln Rs] 4,450 3,511 5,161 G Investment in Fixed Assets [Mln Rs] 48,161 47,499 57,465 H Less: Deferred Credits [Mln Rs] 28,465 28,255 30,789 I Regulatory Assets Base [Mln Rs] 19,697 19,245 26,676 J Average Regulatory Assets Base [Mln Rs] 17,905 17,679 22,960

Working Capital Requirement [Mln Rs] 27,212 30,989

Rate of Return " [%age] 11.57% 11.57% 11.57% Return on Rate Base [Mln Rs] 2,072 2,045 6,242

Page 70: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Annex-7

Revenue Requirement

:. ;91;1,P Determined

012-130;, Provisional Projected

A Power Purchase Price [Mln Rs] 182,198 168,816 175,516 B DM

O&M [Mln Rs] 10,386 15,935 17,867 Depreciation [Mln Rs] 2,015 2,223 2,604 RORB [Mln Rs] 2,071 (15,775) 6,243 Other Income [Mln Rs] (4,594) (4,536) (4,834) Impact of Disallowed Losses [Mln Rs]

Total DM [Mln Rs] 9,878 (2,153) 21,880

C Revenue Requirement (A+B) [Min Rs] 192,076 166,663 197,396

D Less/ (Excess) Recovery [Min Rs] 18,341 47,764 E Total Revenue Requirement (C+D) [Min Rs] 210,417 166,663 245,159

Revenue Requirement (per unit sold)

201243 Determined Provisional

291314 Projected

A Power Purchase Price [Rs/ kWh] 12.125 11.837 12.125 B DM

O&M [Rs/ kWh] 0.691 1.117 1.234 Depreciation [Rs/ kWh] 0.134 0.156 0.180 RORB [Rs/ kWh] 0.138 (1.106) 0.431 Other Income [Rs/ kWh] (0.306) (0.318) (0.334) Impact of Disallowed Losses [Rs/ kWh]

Total DM [Rs/ kWh] 0.657 (0.151) 1.511

C Revenue Requirement (A+B) [Rs/ kWh] 12.782 11.686 13.636

D Less/ (Excess) Recovery [Rs/ kWh] 1.221 3.300 E Total Revenue Requirement (C+D) [Rs/ kWh] 14.003 11.686 16.936

I

Page 71: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Investment

2012-13 201213 2013-14 Determined Provisional Projected

A Investment Plan

DOP [Mln Rs]

ELR [Mln Rs]

STG [Mln Rs]

TOU Meters / Smart Metering [Mln Rs]

Others (Please Mention) [Min Rs]

Total [Mln Rs]

B Financing Arrangement

Local [Mln Rs]

Loan [Mln Rs]

PSDP / Own Resources [Mln Rs]

Grant [Mln Rs]

Consumer Contribution [Mln Rs]

Others (Please Mention) [Mln Rs]

Total [Min Rs]

4,145

850

7,853 7,399 6,859

716

7,853 7,399 12,570

4,752 3,034

3

6,041 7,399

3,101 3,495

7,853 7,399 12,570

Note: it is apprised to the authority that data regarding Form 21(B) is still in process and it is ensured that LESCO will file the said form later on , upon completion of information as soon as possible.

Page 72: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Interest on Development Loans

Rs. Million Sr. No. Loans Interest Rate % FY 2013-14

1st Qrt 2nd Qrt 3rd Qrt 4rth Qrt Total

1

2

Term Finance Facility

WB/ADB

3 Month KIBOR + 150 bps

17%

20

-

20

359

20

-

20

359

79

719

20 379 20 379 797

This form should be submitted for each loan appearing on the DISCO's Balance Sheet

Page 73: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

Dew!comsat Loans FORM -23

—..........,

Or. Nn Leas Interml Rale RamenIng Yams Fkst On of FY 2013-14

Secant Ort of FY 2013-1! Third Ort of FY 2013-14 oar am June blia Olstemement Repayment Otstemannnt Rams/tont OleMersarmnt Repayment CJba Ota01

Fame Ort et FY

Disbursement

2013-14

Repayment

ACM 1 Lean No 24314Mk

Omni pan'

ra:kn 'No 75115-PMC

ADO 3 -Pa Loon Ma 2727k

17.0016

1700%

10.110%

MI

0.1

20

35,274

034

-

310

235

30

35

35,144

900

35.144

0% 3l5

]00

35,144

1.263

M70

1,563

35,144

1263

070 350

130

81

35,014

1563

1.220

33,014

1563

1,220 300

33,014

1,120

165 34713 30,713 37.277 37277 000 771 37,717 37,797 300 - 34097 —. .

form should e submitted for each loan appearing on the DISCO's Balance Sheet

Page 74: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

FY -- Interest

Rate

Particulars Opening 1 Redemption

Balance i Closing

Balance

Interest

Charges

LAHORE ELECTRIC SUPPLY COMPNAY LIMITED BONDS

Page 75: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

DOMESTIC CONSUMERS (UNITS IN MILLIONS) FY 2013

Sr. No

Slabs Consumers (30-04-2013)

Units (May - 12 to Apr - 13

Variable Charges (May - 12 to Apr - 13 )

(Rs. In Million)

Avarage Rate PS / KWH

1 0 50 1,159,130 260.72 672.29 2.58

2 1 100 738,674 506.97 2,897.48 5.72

3 101 200 744,990 1,357.04 8,750.50 6.45

4 201 300 183,455 1,070.28 7,581.37 7.08

5 301 400 50,347 617.99 4,889.22 7.91

6 401 500 19,895 386.06 3,415.83 8.85

7 501 600 9,174 256.14 2,413.44 9.42

8 601 700 5,059 183.05 1,792.15 9.79

9 701 800 2,809 133.52 1,359.35 10.18

10 801 900 1,867 103.75 1,099.45 10.60

11 901----1000 1,317 79.38 863.86 10.88

12 1000---1100 945 64.21 711.82 11.09 13 Above 1100 4,256 519.14 6,109.18 11.77

Total 2,921,918 5,538.25 42,555.94 1

Page 76: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Rs. Million Sr. No. Provision for Tax allowed

2nd Qrt 3rd Qrt 4rth Qrt Total

t‘ott. PRONcie •

r

Lahore Electric Supply Company Limited Provision for Tax

Page 77: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Existing & Proposed Tariff Statement FY 201J-14

Armes-6 (1/2)

PARTICULARS Avg. Lod (kW) Projected

Sales (MkW6)

.., 34" '''''

(%)

NEPRA Del. Rana 12012- 13) doled 28-024013

Proposed N w Tariff (2013- 14) Differeoce

Fixed Charges ReJ

kW/ M

Var. aurae. Rat kWh

Flood Charges ReJ

kW/ M

Var. Charges Rai kWit

Flood Charges Rai

kW/ M

Var. Chart. Rai

I 2 3 4 0 9 10 II 12

kWh 13

.-1

IA 9

Of

Up to 50 URA. 7 256 1.77% • 4.00 - 4.00 - - For peak rad relidseemot op le 5 kW - •

01-000 Units per month - 1,864 12.07% • 11.09 - 13.98 • 189 101.300 Units par month - 2,055 14.19% 14.00 - 16.89 - 189 301 -700 Units pot month • 802 5.54% • 17.00 • 19.89 - 189 Above700 Units per month - 313 2.16% - 18.00 20.09 - 189 For peak load nopsiremer exordia' 5 kW - -

Time of Use (10U)•Posk 5,664 69 0.48% - 18.00 20.89 2.89 Tre of Use (TOU)-011 Peak 23,177 319 2.20% - 1250 - 15.39 - 189

Total Roddeotial 28,848 5,678 39.22%

CO

MM

ER

CIA

L-A

Z For peak load regalement op lo 5 kW 7 425 2.93% - 18.00 - 20.89 - 189

- -

For peak load respreaseat exordia' S kW - -

Regular 53,750 138 0.95% 400.00 16.00 400.00 18.89 - 189 Time of Use (TOM-Peak 63,355 . 101 0.70% 400.00 10.00 400.00 20,89 - 189 Time of Use (1011).Off Pcsk 198,780 458 3.16% 400.00 12.50 400.00 15.39 - 289

Total Commercial 315,892 1,122 7.75%

...1

0 G E

111 37 90 0.62% - 14.50 - 17.39 - 189 0I - Time of Use (T0108eak 52,583 56 0.39% - 18.00 - 20.89 - 2.89 01- Tune of Use (701.)401-Por 188,754 284 1.96% - 12.50 - 15.39 - 189 112 126,814 349 2.41% • 400.00 14.00 400.00 16.89 - 2.89 132 - Tune of Use (TOU)-Pcak 151,337 (64 I (3% 400.00 • 1800 400 00 20.89 - 189 B2 - Tune of Ur (T01040TPeak 407,716 . 931 6.43% 400.00 12.30 400.00 15.19 • 289 B3 - Time of Use (TOU)-1eak 129,304 . 284 1.96% 380.00 18.00 380.00 20.89 - 189 03- "[Tomo/ Use (101)}00Poak 847,714 3,222 22.26% , 380.00 , 12.20 380.00 15.09 - 189 B4 • Tune of Ur (T01.1)-Pak 19,254 84 - 0.58% . 360.00 . 18.00 360.00 20.89 - 289 B4 -Tune ofUse (T010-Off Peak 135,887 622 4.30% 36(1.00 12.10 360.00 14.99 - 2.89

Total ladustrIal 2,050,401 6,085 42.04%

SIN

GL

E P

OIN

T S

UP

PL

Y F

OR

FU

RT

HE

R

DIS

TR

IBU

TIO

N

CIO) Supply el 400 Volta -up to 3 kW 77 I ' 0.00% 15.00 - 17.89 - 189 C 1(b) supply at 400 Vohs - roading 5kW 7,785 32 • 0.22% 400.00 14.50 400.00 17.39 - 189 Time ul Use (701.0-Peak 936 2 0.01% 400.00 18.00 400.00 20.89 - 189 Time of Use (TOU)-Off Peak 2,169 9 0.07% 40000 12.50 400.00 15.39 - 189 C2 Supply at I I kV 43,683 244 1.68% 380.00 14.30 380.00 17.19 - 189 Tune of Ur (TOU)-Peak 3,568 17 0.12% 380.00 18.00 380.00 20.89 - 2.89 Time of Use (TOU)-0/1 Per 19,719 75 0.52% 380.00 12.30 380.00 15.19 - 2.89 C3 Supply above I I kV 8,008 48 0.33% 360.00 14.20 360.00 17.09 2.89 Time or Um (10U)-Peak - - 0.00% - 18.00 36)1.00 2089 360.00 2.89 Time of Use (TOL)-Off Peak - - 0.00% - 12.20 360.00 15 09 360.00 189

Teri Slagle Polio Supply 85,946 427 2.95%

AG

RIC

UL

TU

RE

T

UB

EW

EL

L- T

ARIF

F D

DI Scarp 100 119 0.82% 14.50 - 17.39 • 2.89

In Agnoultual Tabo•et!. 27,605 86 .0.60% 2)10.00 14.00 200.00 1689 - 189

15-1(b) SCARY and agricultural more than 20 KW - - - - • - -

Time or Use (TOU) • Peak 78,208 129 0.89% 20000 18.00 200.00 20.89 - 189

limo of Use ((OU).0(TP410, 249,971 694 4.80% 200.00 12.20 200.00 15.09 - 189

Total Agriculture 355,884 1,028 7.10%

TE

MP

OR

AR

Y

SU

PP

LY

T

AR

IFF

E-1(i) Residential Supply - 0 0.00% 18.00 - 20.89 - 2.89

E-Rii)Commoreial Supply - 26 0.18% 18.00 - 20.89 - 189

E-2 Industrial Supply 104 0 0.00% - 14.50 - 17.39 - 189

Total Tenspontry 104 26 0.18%

V 41

0

Public Lighting -13 - 105 0.72% - 15.181 - 17.89 - 2.89

Residaniel Colonies-H - 5 0.03% - 15.00 - 17.89 - 2.89

Railway Traction - 1 - 0 0.00% - 15.00 - 17.89 - 2.89

Co-tieneratton Tariff - - • - - • - -

Total 2,846,074 14,476 100.00%

Note: The NEPRA Determilied Rates vide a. decision Ord 28.02-2013 have been taken for this exercise. The said detenninatiol is stal to be wined by flop.

Page 78: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Existing & Proposed Tariff Statement FY 21713-14

Annex-6 (2/2)

PARTICULARS Avg. Load (kW) Projected

Sales (MkWh)

..._ n., '.." ....a ()

NFPRA Del Rates (2012- 13) dated 2812-2013 Preponed New Tariff Difference

Fixed Charges (Me

R.)

Var. Charge. (MI. R.)

Fled ,...... ---'is'

(MI. Ra.)

Var. Charges

("1" Rs.)

Fixed Charges

Var. Charges

I 2 3 4 8 9 10 11 (Min Rs.1 (MI. R.)

.3

9

1/p to 50 units 7 256 1.77% 1,024 1,024

12

-

13

- For peak load requiremeat up to S kW - -

01-100 Unita per month 1,864 12.87% 20,667 26,062 - 5,395 101 -300 Unite per month - 2,055 14.19% 28,764 34,712 - 5,948 301 .700 Units pa month - 802 5.54% 13,641 15,964 - 2,323 Above700 Units per month - 313 216% 5,635 6,542 - 906 Far peak load reqtdrentent exceeding S kW - - - - Time of Use Cft)U)-Peek 5,664 69 0.48% - 1,246 1,448 - 201 Time of Use (IDlf)-0IT Peak 23,177 319 2.20% - 3,989 - 4.913 924

Total Rraldendal 28,848 5,678 39.22% . 74,967 - 90,664 - 15,696

CO

MM

ER

CIA

L-A

2

For peak kind rag alremeat op So 5 kW 7 425 2.93% - 7,642 - 8,871 - 1.229

- _

For peak load requirement exceeding 5 kW - -

Regular 53,750 138 0.95% 258 2,207 258 2,606 - 399 Time of Use (TOIJ)-Peak 63,355 101 0.70% 304 1,826 304 2,119 - 294 Time of Ilse (T011)-01TPeak 198,780 458 3.16% 954 5,726 954 7,052 - 1,326

Total Commercial 315,892 1,122 7.75% 1,516 17,400 8,516 20,648 - 3,248

IND

US

TR

IAL

BI 37 90 0.62% - 1,305 - 1,566 - 261 01 -Time °Woe (TOM-Peak . 52.583 56 0.39% - 1.016 - 1,179 - 163 91- Time of Use (T01.0-011 Peak 188,754 284 1.96% - 3,546 - 4,367 - 821 02 126,814 • 349 2.41% 609 4,885 609 5,895 - 1.010 132 - Time of the (TOM-Peak 151,337 ' 164 • 1.13% 726 2,953 726 3,428 - 475 R2 - Time of Use (TOM-011NA 407.716 931 '6.43% 1,957 11,448 1,957 14,142 - 2,694 B3 - Time of llse (1331.0-Peak 129,304 284 196% 590 5,108 590 5,930 - 822 as . "'Time of Ilac (13311)-01T Peak 847,714 3.222 22.26% 3,866 39.305 3,866 48,632 - 9,327 54 - Time of use (1.01D-Peek 19,25,4 84 0.58% 83 1,515 83 1,758 - 244 134 -Tune of lire (TOU)-Off Peak 135,887 622 4.30% 587 7,524 587 9,324 - 1,800

Total InduatrIal 2,059,401 6,085 42.04% 8,418 78,604 8,418 96,221 - 17,617

SIN

GL

E P

OIN

T S

UP

PL

Y F

OR

FU

RT

HE

R

DIS

TR

IBU

TIO

N

CI la) Supply at 400 Volta -up to 5 kW ' 77 I 0.00% - 8 - 10 - 2 CO) Supply a 400 Volts - according 5kW 7,785 32 0.22% 37 463 37 555 - 92 Time of Use (TOID-Peak 936 2 0.01% 4 36 4 42 - 6 Time of Use (10l1).011Pak ' 2.169 9 0.07% 10 119 10 146 - 27 C2 Supply at 11 kV 43,683 244 1,68% 199 3,482 199 4,187 - 705 Time of Ilse (T01.1)-Peak 3.568 . 17 0.12% 16 307 16 357 - 49 Tirtie of Use (TOU)-Off Peak 19,719 75 0.52% 90 922 90 1,139 - 217 C3 Supply above I I kV 8,008 4R 0,33% 35 680 35 8118 - 139 Time of Use (TOU)-Peak - - 0.00% - - - - - - Time of Use (ro)-orr Peak - - 0.00% - - - - -

Total Single Point Supply 85,946 427 2.95% 392 6,017 392 7,255 - 1,237

AG

RIC

UL

TU

RE

F

TU

BE

WE

LL

- T

AR

IFF

D

. .

.

1)1 Scarp 100 119 0.82% - 1,720 - 2,063 - 343 D2 Agricultual Tube-wells 27,605 86 0.60% 66 1,2(17 66 1,456 - 250 13-1(h) SCARP and agricultural more than 20 KW - - - - - -

Time of Use (TOU) - Peak 78,208 129 0.89% 188 2,317 188 2,690 - 373 Time °Il1a rf0t0 43f1Peak 249,971 694 4.80% 600 8,469 600 10,478 - 2,010

Total A8riceihn• 355,884 1,028 7,10% 854 13,713 854 16,688 - 2,975 P-1(i) Residential Supply - 0 0.00% - 6 - 7 - 1

Y T

A

P-100Commercial Supply - 26 0.18% 462 - 536 - 74 F.-2 Malarial Supply 104 0 0.00% - 3 - 4 - 1

. . .

Tote Temporary 104 26 0.18% - 471 - 547 - 76

id Public Lighting - G

105 0.72% - 1,568 1,871 - 303 uj Residential Colonies-21 5 0.03% - 68 - 81 - 13 0

Railway Traction -1 - 0 0.00% - 4 . 5 - 1 Co-Generation Tariff

Total 2,846,074 14,476 100.00% 11,180 192,813 11,180 233,979 41,166

Page 79: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

Revenue & Subsidy Statement F12012-14

PARTICULARS Avg. Load DM) Proyecied

R.I.,

(MkWh)

... ._ otter. Mla

1,5/

f4EPRA Del Rata. (101243) dId" TS-02-2013 CosP Nadi d Tsrilf Sabskly

Fixed Cha rgn Ri./ kW/M

Var . Ckare s Ra/ kWh .

. Fixed Cho w s V.r. Charge Rs/

Fixed Chage s Rs/

Vsr. Chi. Ra/

2 4 3 7 9 t kWh kW/M kWh

lal P

Up to 50 Una. 7 256 1.77% - 4.00 - 2.00

II

-

I 2

2.00 For peak Rod millimetre np ki 3 kW -

01-100 Units per month - . 1,864 12. 9% - 11.09 - 5.79 • 5.30 101-300 Units per month - 2,055 14.2% - 14.00 • &II - 5.89 301 - 700 Unite par month - 602 5.5% - 17.00 - 12.33 - 4.67 Abine700 Unils per month - 313 2.2% - 18.00 - 1507 - 2.93 For peak laid regalreinent exceadlog 3 OW . -

Time of Use (TOU)-Pcak 5,664 69 0.5% - 18.00 - 13,99 - 4.01 Time of Um (TOU)OIT Ptak 23,177 319 2.2% - 1250 . - 8.22 - 4.28

Total ResIdeetlal 28,848 5,678 39.22•

CO

MM

ER

CIA

L- A

2 For peek bed raipelrennet .p b 3 kW 7 425 2.9% - 18.00 - 14.77 - 3.23 •

For peek Ind regelrenteet extsedleg SOW _ .

Regular 53,750 138 1.0% 400.00 16.00 400.00 9.72 • 028 Tune of Bea (TOU)-Pesk 63,355 101 0.7% 400.00 18.00 40000 13.20 - 4.80 Two of Ulm (TOU).011Peak 198,780 458 3.2% 400.00 12.50 400.00 8.01 - 4.49

Total Commercial 315,892 1,122 7.75%

...) le

tttnnn D

Z

B1 37 90 0.6% 14.50 10.51 - 3.99 BI - Tumor Use 0-011}Peak 52,583 56 0.4% - 18.00 13.99 - 4.01 Ill - lion of Us(T011}0f Peak 188,754 284 2.0% • .50 12 8.22 • t28 Ell 126,814 349 2.4% 40000 14.00 4oaoo 9.14 4.86 B2 - Tune ofthie(TOW-Peok 151,337 164 1.1% 400.00 18.00 40000 12.77 - 5.23 B2 - Tune of Bac (T0111-017 Peek 407,716 931 6.4% 400.00 12.30 40aoo sal 4.29 119 - Tuna of thre (TOW-Peak 129,304 284 2.0% 380.00 18.00 380.00 12.68 - 5.32 B3 - Truro of Use D'0B-011Peek 847,714 3,222 22.3% 380.00 12.20 380.00 7.75 - 4.45 134 - Tune of Use (TOU)-Polik 19,254 84 0.6% 360.00 18.00 360.00 1237 - 5.63 114 -Tune of Use (TOU1•0ff Peak 135,887 622 4.3% 360.00 12.10 360,00 7.46 - 4.64

Toni] ledostrial 2,059,401 6,085 42.0%

SIN

GL

E P

OIN

T S

UP

PLY

FO

R F

UR

TH

ER

D

IST

RIB

UT

ION

C its) Supply .1 400 Volts -up to 3 kW 77 I 0,0% - 15.00 - 11.55 - 3.43 CI (13) Supply al 400 vo, - exoesding 3kW 7,785 32 0.2% 40000 14.50 400.00 10.35 - 4.15 Tore of We 01.11/5Peak 936 2 0.0% 400.00 18.00 400.00 13.01 - 4.99 Tune of Use (TOU)-041 Peak 2,169 9 0.1% 400 00 12.50 400.00 8.01 - 4A9 C2 Supply al II kV 43,683 244 1.7% 380.00 14.30 380.00 10.25 • 4.05 Time of Use (TOM-Peak 3,560 17 a I% 380.00 18.00 38000 12,60 - 5A0 Tuna of U.e(TOU)-Off Peak 19,719 75 0.5% 38000 12,30 380.00 7.75 • 4.55 Cl Supply above I I kV a 8,008 48 0.3% 360,00 14.20 360.00 10.10 - 4.10 Tinw of Us (TOU1-Peak - 0.0% - 18.00 - - • 18.00 Time of Use (1131B-Off Peak - - 0.0% • 12.20 - - - 12.20

Tots! Slagle Kew &apply 85,946 427 3.0%

AG

RIC

UL

TU

RE

T

UB

EW

EL

L- T

AR

IFF

D

. .

. .

DI Scarp 100 119 0.8% - 14.50 10.00 4.50 D2 Agricultta/ Tube-wells 27,605 86 0,6% 200.00 14.00 120.00 6.77 80.00 7.23 I31(b) SCARP and aviculture! more then 20 KW - 0.0% . - - • -

Time of We (TOU)- Peak 78,208 129 0.9% 200.00 18.00 200.00 13.00 - 5.00 Tiine o(Use (TOU) -Off Peek 249,971 694 4.8% 20.00 12.20 200,00 8.00 - 4 20

Total A/Mullion 355,884 1,028 7.1%

E•1(t) Residential Supply - 0 • 0.0% 18.00 - 15.50 - 2.50

'OR

) P

PL

' .R

IF1

E-100Commercial Supply - 26 0.2% - • 18,00 - 15.00 - 3.00 E-2 Industrial Supply 104 0 0.0% • 14.50 - 11.50 - 3.00

Total Temporary 104 26 0.2%

Public LIghting - 0 - 105 0.7% - 15.00 - 13.73 • 1.27 tal Residential Colonica-/I - 5 0.0% • 15.00 • 12.92 • Z08

Railway Dutton - I - 0 0.0% - 15.00 - 11.00 - 4.00 Co-Gencralion TanIT -

- - - Tout 2,846,074 14,476 100.00%

• Ia meW m danush d.tw128-03-2013 haw bee town for Iltu macaw Tho said detenntnotion is still to be not lied by UuP.

Page 80: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

13 Lahore Electric Supply Company Limited . Revenue & Subsidy Statement FY 2013-14

PARTICULARS Avg, Load (gw) Projected

,..„,,

(MOWN)

,

(%)

Sales Mix

NEPRA Det Rates (2012-13) dated 20-02-2013 GoP Notified Ter117 Sohaldy

Flarcl Charge. (Mlo Ra)

V•I, ,,, -̀"r". (Ml. Rs.)

Fixed Chorgel (Kb R.)

Vat Cher

n..6 Cheep»

Ver. Chem.

I 2 3 7 g MI. Ra) (MI. Rs.)

11 (MI. Ra.)

12

2 ,,

e i

1.1p to 50 Unita 7 256 41 77% - 1.024

9 10

• 512 - 512 For peak load reqelmmeot op to 5 kW

01-100 Units per month - 1.864 12.879'. - 20,667 - 10,790 - 9,877 101-300 Units pea month - 2055 14.19% 28,764 - 16,663 - 12,101 701- 7110 Unib per month - 602 3.54% - 13,641 - 9,894 - 3,747 Ahose700 Units per month - 313 2.16% • 5,633 - 4,718 - 917 For peek load regelreineel exceeding 5 kW - - o.00": .

Time of Use (1011).Peek 5,664 69 OAR% - 1.248 - 970 - 278 Time of Use (TOU).Off Peak

23,177 319 2.20% - 3,989 • 2,623 1,366

Tote) RmIdeolle( 28,848 5,678 39.22% - 74,967 - 46,169 - 28,798

IND

US

TR

IAL

C

OM

ME

RC

IAL

-A2 For peek load resmIremeet op to 5 kW

7 425 2.93% - 7,641 - 6,271 - 1,371

For peek load requirement exceeding 5 kW • - 0.00% - . . .

Regular 53,730 138 0.95% 258 2,207 258 1,341 . 866 Time of Use (TOU)•Penk 63.355 101 0,70% 304 1,826 304 1,339 • 487 Time of Ilse tTOU).Off Peak

198,780 458 3.16% 954 5,726 954 3,669 • 2,057 Total Commercial 315,892 1,122 7.75% 1,516 17,400 1,516 12,619 - RI

37 90 0.62% - 1.305 - 946 -

4,781

359 01- Time of Use (T01.1).Peok 32.583 56 039% - 1,016 - 790

1- Time of Ilse iT010.017 Peak 188,754 284 1.96% • 3,346 - 2,332 - 1/14 92 (26,8)4 349 2.41% 609 4,885 609 3,189 - 1,696 112 - Time of Ilse (TOU)-Peak 151.337 164 1.13% 726 2,933 726 2,095 - 858 2- Time of Ule (T019-01T Peak .407,716 931 6.43% 1,957 11,448 1,957 7A55 - 3,993 03 - Time of Use )7011).Peok (29,304 284 1.96% 590 5,108 590 3,598 - 1.510 03 - TTnne of Use (TOU).011" Peak 847,714 3,222 22.26% 3,866 39,305 3,866 24.968 - 14,337 94 - Time of Use (TOU).Peak

19,254 84 0.58% 83 1,515 83 1,041 - 474 04 -Time of Ilse (7011)-Off Peak 135,887 622 4.30% 587 7,524 587 4,639 - 2,8815

Tote) Imlostrial 2,059,401 6,085 42.0%. 8,418 78,604 8,418 51,053 -

PO

INT

SU

PP

LY

FO

R F

UR

TH

ER

D

IST

RIB

UT

ION

. _ .

.

Cl).) Supply s1400 Volt. -up to 5 kW 77 I O.00% • 8 - 6 -

27,552

2 CI ibI Supply at 400 Volts - exceeding 5kW 7,785 32 022% 37 463 37 330 • 132 Time of Use iTOU)-Peok 936 2 0.01% 4 36 4 26 - 10 Time nil use (T01.1).017 Palk

2,169 9 007. 10 119 10 76 - 43 C2 Supply al II kV 43,683 244 1.68% 199 3,482 199 2,496 • 986 Time of Use iTOU5.1'enk

3,568 17 0.12% 16 307 16 215 - 92 'Time of Uwe (TOU).Off Peak 19,719 75 0.52% 90 922 90 5111 - 341 CY Supply show 11 kV 8.008 48 0.33% 35 680 35 484 - 196

Y A

GR

ICU

LT

UR

E S

ING

LE

T

UB

EW

EL

L-

TA

RIF

F D

Time of Um iTOID-Peak - - 0.00: . . . - Time of Um ('7015)(07' Peak • - 0. 00% - . . - .

-

. Thal Slagle Point Supply 85,946 427 3.0% 392 6,017 392 4,214 - DI Scarp

(00 119 0.82% - 1,720 - 1,186 -

1,803

534 92 Agricultusl Tube-well. 27,605 86 0.60% 66 1,207 40 584 27 623 0-1(13) SCARP and ogricultural more than 20 KW - 0.00% . - • Time of Um (IOU) • Pink 78,208 129 0.89: 188 2,317 188 1,673 -

-

644 Time of Use (TOM -Off Peek 249.971 694 4.80% 600 8,469 600 5,553 • 2,913 Tole! AgrIcoltore 355,884 1,028 7.1% 854 13,713 827 8,996

I I T

EM

PO

RA

R1

S

UP

PL

Y

TA

RIF

F

I a

I re

I r

Residential Supply 0 o.00% 6 - 5

27

-

4,716

1 Supply - 26 0.18% - 462 • 385 . 77 Industrial Supply 104 0 0.00% - 3 • 3 - 1 - • 0.00% . -

- Totol Temporcry 104 26 0.2%

E

Public Lighting - G - 105 0,72• - 1,568 - 1,435 - 133

S Residential Colonies-II

• 5 003% - 68 - 59 - 9 Railway Treetion -1 - 0 0.00% - 4 • 3 . 1 Co-Generation Tariff • - - - .

Tote! 2,846,074 14,476 100.00% 11,180 192,343

-

11,153 124,549 27 67,793

Page 81: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

Proposed Revenue & Subsidy Statement FY 2013-14

PARTICULARS Avg, Loma (kW) Projected

Sole. (MkWk)

Sala Ml. (%)

Propmed New Tariff GoP rtot30c4 Tariff Subsidy

Fixed Charge. Rai kW/ M

Var. Charge. R../ kWh

Fixed Charge. Rat kW/ M

V''' Charge. R./

kWh

M ara Charge. Rai

kW/ M

Var. Charge. R./

kWh I 2 3 4 7 8 0 10 11 12

.-I

W G i

Up to 50 Unita 7 256 1.77% - 4.00 - 200 - 2.00

For peak lead regd.:meat op to 5 kW - -

01.100 Units per muoth - 1,864 12.87% - 13.98 - 5.79 - 8.19

101-300 0nux par month - 2,055 14.19% - 16.89 - 8 11 - 8.78

301-700 Uniia p.. month - 802 5.54% - 19.89 - 12.33 - 7.56

Abovc700 Units per mouth - 313 2.16% - 20.89 - 15.07 - 5.82

F. peak load requiren.e.) exceeding 5 kW . -

Tune of D. (TOU)-Porak 5,664 69 0,48% - 20.89 - 13 99 - 6.90

Tune of Use (TOU)-01TPeak 23,177 319 2.20% - 15.39 - 8 22 - 7.17

Total ReaWeanal 28,848 5,678 39.22%

CO

MM

ER

CIA

L-A

2 For peak load requirement up to 5 kW 7 425 2.93% - 20.89 - 14 77 - 6.12

- - 0.00%

For gook load regalrement exceeding 3 kW - - 0.00%

Reguhu 53,750 138 0.95% 400 00 18.89 400.00 9.72 - 9.17

T11110 of the crOtb-Peak 63,355 101 0.70% 40000 20.89 400.00 13.20 - 7.69

111110 of 11. (T020-011 Peak 198,780 458 3.16% 400.00 15.39 400.00 8.01 - 7.38

Total Commercial 315,892 1,122 7.75%

4

I:' Z

131 37 90 0.62% - 17.39 - 10.51 - 6.88

111 • Time of Use (TOU)-Pmk 52,583 56 0.39% - 20.89 - 13.99 - 6.90

121 - Time of U. (T01)-181Pmk 188,754 284 1.96% - 15.39 - IL 22 - 7.17

02 126,814 349 2.41% 400.00 16.89 400.00 9.14 - 7,75

132 - Tom of Use (Toll)-Pak 151,337 164 1.13% 400 00 20.89 400.00 12.77 - 8.12

02 - Tom of Use (1011)-011 Peak 407,716 931 ,.,

6.43% 400.00 15 19 400.00 13 01 - 7.18

113 -Tow Ttnic of 21. (roll)-Pak - 129,304 284 196% 380.00. 20.89 380.00 12.68 - 8.21

Bl - num of Lhic 0200-011Poak 847,714 ' 3,222 22.26% 38000 15.09 380.(X 7.75 - 7.34

04 - Tim. of Else (TOU)-Pak 19,254 84 0.58% • 360.00 20.89 360.00 12.37 - 8.52

04 Tune of Um (f02/14M Peak 135,887 622 - 4.30% 360.oo 1499 360.00 7.46 - 7.53

Total 1.d.trial 2,059,401 . 6,085 42.0%

SIN

GLE

POIN

T S

UP

PL

Y F

OR

FU

RT

HER

D

IST

RIB

UT

ION

C BO Supply al 400 Volta-up to 5 kW 77 1 0.00% - 17.89 - 11.55 - 6.34

CI(b) Supply at 400 Volts - ermeding 5kW 7,785 32 0.22% 4 40000 .17.39 400.00 1035 - 7.04

Time ail. 01211)-Peak 936 2 0.01% own) 20.119 400.00 13(11 - 7.88

Tune of Use iTOU)-Off Peetk 2,169 9 0.07% 400.00 15.39 400.00 8.01 - 738

C2 Supply .111 kV 43,683 244 1.68% 380.00 17.19 • 380.00 10 25 - 6.94

Time of Ilse (TOU)-Peak 3,568 17 0.12% 380.00 20.89 380 00 12.60 - 8.29

Time of Use (T01.0-Off Peak 19,719 75 0.52% 380.00 15.19 380,00 7.75 - 7.44

L.3 Supply show 11 kV 8,008 48 033% 360.00 17.09 360.0 10.10 6.99

Time of U. (TOM-Peak - - 0.00% 360.00 20.89 - - 360.00 20.89

Time of Use (TOU)-011 Peak - - 0.00% 360.00 15.09 - 360,00 15.09

Toad Slagle Point S.W., 85,946 427 3.0%

AG

RIC

ULT

UR

E

TU

BE

WEL

L- T

AR

IFF

D

Dl Scarp 100 119 0.82% - 17.39 - 10.00 7.39

D1 Agneultual Tao-wells 27,605 86 0.60% 200.00 1689 12000 6.77 80.00 10.12

0-1(b) SCARP and ngricultural um than 20 KW - - - - . - - -

Tune of Um (T01) - Peak 78,208 129 1380% 200.00 2089 200.00 13.00 - 7.89

Time of Use (TOU) 42i2Peak 249,971 694 4.80% 200.00 15.09 200.00 8.00 - 7.09

Total Agrimeihre 355,884 1,028 7.1%

TE

MP

OR

AR

Y

SU

PP

LY

T

AR

IFF

01-10) Random.' Supply - 0 0.00% - 20.89 - 15.50 - 5.39

0-1(0)Commercial Supply - 26 0 IN% - 20.89 - 15,00 - 5,89

11-2 Winn.) Supply 104 0 am% - 17.39 - 11.50 - 5.89

Total Temporary 104 26 0.2%

C

Public Lighting -U - 105 0.72% - 17.89 - 13.73 - 4.16

Residential Colonies-11 - 5 0.03% _ 17.89 - 12.92 - 4.97

Railway Traction -1 - 0 (law. - I voo - (11.00)

Co-Ocncratiun Toni! - - 0.00% - - - - - -

Told 2,846,074 _ 14,476 100.00%

Page 82: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited

Proposed Revenue & Subsidy Statement FT 201144

PARTICULARS A•& Load (kW) Pr°J"" Sales

(MkWh)

Proposed New Tariff CoP Nodfled Tariff Fixed ch

im,:r ) Subsidy

Var. Sala Mk

(%) Fixed Carnes (Mk Re.)

Var. Carnes (Ma 14a)

Fixed Clown. Rix/ (Min R.)

ch.V.r. (MI. I 2 3 4 7 S 9

Rat 10

(Mtn

•-I

9

i Time

Ilp to 50 Units 7 256 1.77% - 1,024 - 512

II

-

12

512 For peak load requirement op to 5 kW • -

0l-I00 Unita per month - 1,804 12.87% - 26.062 - 10,790 - 15,272 101-300 Unita per mtmth - 2,055 14.19% - 34,712 - 16,663 - 18,049 301 - 700 Unit. per month - 802 5.54% - 15,964 - 9,894 - 6,070 Above700 Unita per mob - 313 2.16% - 6,542 4,718 - 1,824 For peak lad requirement caftan it kW - - 0 00% - - - •

of Use (1121R-Peak 5,664 69 0.48% - 1,448 - 970 479 Time of Use (11)1)-017 Peak 23,177 319 2.20% 4,913 - 2,623 - 2,290

Total Realdeulial 28,848 5,678 39.22% - 90,664 - 46,169 - 44,495

CO

MM

ER

CIA

L-A

2 For peak load aquarium, up to 5 kW 7 425 2.93% - 8,871 - 6,271 - 2,600

- - 0.00% - - - -

Far peak lad requirement exceeding 5 kW - • 0 00% - - - . Regular 53,750 138 0.95% 258 2,606 258 1,341 - 1,265 Time of Use (11)1))-Peok 63,355 101 0.70% 304 2,119 304 1,339 - 780 Time of Ilso (TOU3-011 Peak 199.780 458 3.16% 954 7,032 954 3,669 - 3,383

Total Commercial 315,892 1,122 7.75% 1,516 20,648 1,516 12,619 - 8,029

.1

gB2

,a,

4 Z

RI 37 90 0.62% - 1,566 - 946 - 620 RI • Tune of Use (1171.0-Pak 52,583 56 0.39% - 1,179 - 790 - 390 RI • Time of Ilse (T01)-01T Peak 188,754 ' 284 • 1.96% 4,367 2,332 - 2,035 02 • 126,814 349 2.41% 609 5,895 609 3,189 - 2,706

- Time of the (T01).11esk ' 151,337 104 1.13% 726 3,428 726 2,095 - 1,333 132- Time of 11.e (T011)-01T Peak 407,716 931 6.43% 1,957 14,142 1.957 7,455 - 6,687 03 -Time of time (T010•Peak 129,304 284 1.96% 590 5.930 590 3,59R - 2,331 B3-.Time of 11.e (TOUR-Off Pink 847,714 3,222 22.26% 3,866 48,632 3,866 24,968 - 23,663 B4 - lime of Use (TOL)•Peak 19,254 84 ' 0.58% 83 1,758 83 1,041 .. 717 124 -Time of Use (T031)-01T Peak 135,887 622 4.30% 587 9,324 587 4,639 • 4,685

Total Industrial • 2,059,401 6,085 42.0% 8,418 96,221 8,418 51,053 - 45,168

SIN

GL

E P

OIN

T S

UP

PL

Y F

OR

FU

RT

HE

R

DIS

TR

IBU

TIO

N

C 1(a) Supply a1400 Volt.-up to 5 kW 77 1 Q.00% - 10 - 6 - 3 C I (b) Supply 0 400 Volts • exceeding 514 . 7,785 32 0.22% 37 555 37 330 - 225 Time of Use (11)11)•Pcak 936 2 0.01% 4 42 4 26 - 16 Time of lbw (12/1R-Off Peak 2,169 9 0.07% 10 146 10 76 - 70 C2 Supply at I I kV 43,683 244 1.68% 199 4,187 199 2,496 - 1,691 Time of Ilse (MI fl-Pak 3,568 17 0.12% 16 357 16 215 • 142 Tine of I /w (TOI 0-017 Pak 19,719 75 052% 90 1.139 90 581 558 C3 Supply sane I I kV 8.008 48 0.33% 35 II 18 35 484 - 335 Tinte of the 01)11)-Peak - um. - -

-

- - -

Time of Use (T011)-01Tikuk - - 0.00% - - - -

Total Single Point Sapply 85,946 427 3.0% 392 7,255 392 4,214 - 3,040

'

AG

RIC

UL

TU

RE

T

UB

EW

EL

L- T

AR

IFF

D

DI Scarp 100 119 0.82% - 2,063 - 1,186 877 02 Agrieullual Tulle-walls 27,605 86 0.60% 66 1,456 40 584 27 873 0-100 SCARP and agricultural more than 20 KW - - 0.00% • - - - •

Time of Use (TOU) - Pak 78,208 129 0.89% 188 2,690 188 1,673 - 1,016 Time of Use (T011) 4)fr Pak 249,971 694 4.80% 600 10,478 600 5,553 - 4,925

Total Agrialare 355,884 1,028 7.1% 854 16,688 827 8,996 27 7,691

TE

MP

OR

AR

Y

SU

PP

LY

T

AR

IFF

ii- Ili) Residential Supply - 0 0.00% - 7 - 5 - 2 F-1(ii)Canmercial Supply - 26 0.18% - 536 - 385 - 151 02 Industrial Supply 104 0 000% - 4 3 - 1

- - 0.00% • - - - Total Temporary 104 26 0.2% - 547 - 392 - 154

0

Public Lialuing - 0 105 0.72% 1,871 1,435 435 E Residential Co1onia41 • 5 0.03% - 81 - 59 - 23 Railway Traction - I - 0 0.00% - - - 3 - (3) Co-Generation Tana' - - 0.00% - - - - - -

Total 2,846,074 14,476 100.00% 11,180 233,974 11,153 124,942 27 109,032

Page 83: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Existing & Proposed Tariff Statement

Annex-6 (1/2)

F1' 2013-14

PARTICULARS Avg. Lewd (kW) Projected

Sa • les (MkWY)

Saks Mix (54)

NEPRA Des Rate, (2012- 13).410.11 . 2S-02-2013

Proposed N Is Tariff (2013- 4) DIITermote

Fixed Charges Rad

kW/ M

Var. Charges RA/ kWh

Fixed Classes Rai

kW/ M

Var. Charges RBJ kWh

Fixed Charges Re./

Var. Charge. Re./

1 2 3 4 N 9 10 I 1 kW/ M kWh

t-3 i

s W

Up to 56 Ulm, 7 256 • 1.77% - . 400 - .00 4

12

-

13

- For peak load regairemr,a1 .p Se 5 kW - -

01-1001/nth per month - 1,864 (2.87% . 11,09 - 13.98 - /89 101.300 Unit, per month - /055 14.19% - • 14.00 - 16.89 - 2.89 301 - 700 Uthis per month - 802 5.54% - 17.00 - 19.89 - /89 Above700 Units per month - 313 2.16% - 111.00 - 20,89 - 2.89

n For peak load reqeirenical exceedlog 5 kW - -

Time of Ilse (11)13)-0eak 5,664 69 0 48% - 18 00 - 20.89 - /89 Time of Ulm (T03.1)4117Prek 23,177 319 2.20% - 12.50 . 15.39 - /89

Total Reoldeadal 28,848 5,678 39.22%

O U

For peak load respilmtheet op lo S kW 7 425 193% - 111.00 - 20.89 - 2.89 - -

CS For peek toed regaining.) exceedieg 5 kW - -

Regular 53,750 138 0.95% 400.00 16.00 400.00 18.89 - 2.89 Time of Um (11.81)-Peak 63,355 101 0.70% 400.00 18.00 400.00 20.89 - /89 Tune of Ilse (101.1)-01T Peek 198,780 458 3.16% 400.00 12.50 400.00 15.39 - 189

Total Commercial 315,892 1,122 7.75%

..)

i

02

4

BI 37 90 0 62% - 14.50 - 17.39 - /89 DI - Tim of Use (TMJ)-Peek 52.583 56 0.39% - 18.00 . 20.89 2.89 111 - 'rule of 1.1m (T0).0-011. Pink 188,754 284 1.96% - 12 . 50 - 15.39 - 2.89 02 126,814 349 141% 400.00 14.00 400.00 16.119 - 2.89

- 'fire of Use JODI-Peak 151,337 164 1.13% 400.00 18.00 400.00 20.89 2.89 02 - Time of Use (T01.6-OR Peak 41(7,716 931 6.43% 401).00 12.30 400.00 15.19 - 2.89 0 113 • Time of Use (TOU}Peak 129,304 284 1.96% 380,00 18,00 380.00 20.89 - /89 03 - Time of Use (7036-0f7Poth 847,714 3,222 22.26% 30000 12.20 380,00 15.09 - 2.89 104 - Time of We (T0(1).Peek 19,254 84 0.58% 360.00 18.00 360 00 20.89 - 2.89 134 -Tune or Use (TOU)-017 Peak 135,887 622 4.30% 360 00 12.10 360.00 14.99 - 2.89

Total hubwria1 2,059,401 6,085 42.04%

SIN

GL

E P

OIN

T SU

PP

LY

FO

R F

UR

TH

ER

D

IST

RIB

UT

ION

CI(2) Supply .1 sou Volt. -up to 5 kW 77 1 0.00% - 15 .00 - 17.89 - 2.89 C1(b) Supply at 400 Volt. - exceeding 5kW 7,785 32 0.22% 400.00 14.50 41000 17.39 - 189 Time of Use COOth-Posk 936 2 0.01% 400.00 18.00 400.00 20.89 - /89 rim." ,O. (T0304/if Peak 2,169 9 0.07% 40000 12.50 4(0.00 15.39 - /89 C2 Supply at I I kV 43,683 244 1.68% 380.00 14.30 38000 17.19 - /89 Time of Use (TOU)-Peak 3,568 17 0.12% 38000 18.00 380.00 20.89 - 2,89 Time of Use (1131.00ff Mak 19,719 75 0.52% 380.00 12.30 380.00 15.19 - 2.89 C3 Supply above 11 kV 8,008 48 0.33% 360.00 14.20 360.00 17.09 2.89 Time of Use (1THR.Ptek - - 000% - 18.00 360.00 20.89 360.00 2.89 Time of Use (101.0-011.Posk - - 0.00% - 12.20 360.00 15.09 360.00 2.89

Total Slagle Point Sappy 85,946 427 2.95%

AG

RIC

UL

TU

RE

T

UB

EW

EL

L- T

AR

IFF

D

DI Scarp 100 119 082% - 14.50 - 17.39 - /89 D2 46..1104 Tube-wells 27,605 86 0.60% 20.00 14.00 200.00 16.89 2.89 13-1(6) SCARP and wicultural more than 20 KW - - - - -

Tune of Um (TOU) - Peek 78,208 129 0.89% 200.00 18 00 200.00 20.89 . /89 Time of Use (TOU) -01T Peak 249,971 694 4.80% 200.00 12.20 200.00 15.09 - /89

Total Agriculture 355,884 1,028 7.10%

TE

MP

OR

AR

Y

SU

PP

LY

T

AR

IFF

E-1(i) thaidential Supply - 0 0.00% - 18.00 - 20.89 - /89 E-100Commercial Supply - ' 26 0.18% - 18.00 - - 20.89 2.89 E-2 buludrial Supply 104 0 atm% - 14.50 - 17.39 - 2.89

Total Temporary 104 26 0.18%

E Public Lighting - 0 - 105 0.72% - 15.00 - 17.89 - 2.89 Residential Colonics-H - 5 0.03% - 15,00 - 17.89 - /89

0 Railway Tnalion - I - 0 0.00% - 15.00 - 17.89 - 2 89 Co-inetinHom Tasiff - - - - - - - -

•-• • - -

Taal 2,846,074 14,476 100.00%

mon . here hat. mkt.. IN this minis. The ad determination ir eli0 to be notified by GDP,

Page 84: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Fixed V... Cliargem

atones (Mh Ra)

Fixed Var. Charges Charges

(Min Rs.)

Var.

Charges (MIA Rix) (Mtn R..) R..)

13 9 10 12

1,024 1,024

20,667 26,062 5,393

28,764 34,712 5.948

13,641 15,964 2,323

5,635 6,542 906

1,248 1.448 201

3.989 4,913 924

74,967 90,664 15,696

7,642 8.871 1,229

)7 258 2,606 - 399

16 304 2,119 - 294

16 954 7,052 - 1,326

10 1,516 20,648 3,248

/5 - 1.566 - 261

6 - 1,179 - 163

16 - 4,367 - 82I

5 609 5,895 - 1,010

3 726 3,428 - 475

8 1,957 14.142 - 2,694

8 590 5,930 - 822

5 3,866 48,632 - 9,327

$ 83 1,758 - 244

4 587 9,324 - 1,800

4 8,418 96,221 - 17,617

1 - 10 - 2

1 37 555 - 92

4 42 - 6

1 10 146 - 27

! 199 4,187 - 705

16 357 - 49

90 1,139 - 217

1 35 818 - 139

. - . -

. . .

392 7,255 - 1,237

- 2,063 - 343

66 1,456 - 250

- _ - 188 2,690 - 373

600 10,478 . 2.010

854 16,688 - 2,975

- 7 . 1

- 536 - 74

- 4 - 1

' .

- 547 - 76

- 1,871

- 81 - 303

5 - 13

. . I

11,180

. 233,979 - 41,166

2,2

1,8

5,7

17,4

1,3

1,0

3.5

4.8

2,9

11.4

5,1

39,30

1,5

7,52

78,

46

3

11

3,48

30

92

68

6,01

1,720

1,207

2,317

8,469

13,713

6

462

3

471

1,568

68

4

192,813

Lahore Electric Supply Company Limited

Existing & Proposed Tariff Statement FY 2013-14

Annex-6 (2/2)

NEPRA Del Rates (2011-

PARTICULARS Avg. Load (kW) Projected

5.8.11

(MkWh)

Sales Mix

(%)

13) dated

Fixed

Charges (Mln

Rs.) 4

it2

P.

Up to 50 Units 7 256 177%

For peak had regairement op to 5 kW

01 -100 Units per month 1,864 12.87%

101400 Unit. per month 2,055 14.19%

301 - 700 Units per month 802 5.54%

Above700 Unita per month 313 2.16%

For peak load requirement ,seceding 5 kW

Time of Use (701.1)-Pesk 5.664 69 0.48%

Time of the (1301.1)t35 Peak 23,177 319 2.20%

Total Residential 28,848 5,678 39.22%

5

O

O

E

Z 6. 0

E :4.

2

rn

O

241 41 0 it

0 a s

E.

1-20 00

C fv Residential

0

For peak lead requirement op to 5 kW 7 425 2.93%

1.32

5-2

Public

Railway

Co.Oenention

For peak load reqviretnent exceeding 5 kW

Regular

Tune of Use (TOM-Peak

Tune of Ilse iTOU)-017Petik

Total Commercial

RI

131 - Tone of Use al Rh-Peek

01 - Time of Um (T01)-017 Peak

112

02 - Time of Use (T011)-Peak

112 - Time of Ilse (T0U)1)If Park

113 - Time of Ilse (URN-Peak

ELI - Trim, of Ilse (1131.5-(31T Peek

114 -Tune of Ihe (TOU)-Peak

114 'Time of Ilse (T0111-011. Peak

Tend Industrial

CI).) Supply al 400 Voht -up to 5 kW

C1(h) Supply at 400 Volt, - exceeding 5kW

Tune of Use (U)U)-Pak

Time of Use (T011)-Off Peak

C2 Supply at I I kV

Time of Use (U)U)-Pak

Time of The (TOIL1)-05 Peak

C3 Supply shove I I kV

Tune of Use (TOU)-Peak

Time of Ilse (11/1/)1M Peak

Total Single Point Supply

DI Scarp

Agricultual Tube-wells

0-159 SCARP and agricultural more than 20 KW

Time of Use (f)1.5 Pak

Time of the (TM') -Off Peak

Total Agricoltare

-1(i) Residential Supply

I(ii)Commercial Supply

Industhol Supply

Total Tempontry

Lighting - 0

Colonies-El

Traction - I

Tara

Total

53,750

63,355

198,780

315,1192

37

52,583

188,754

126,814

151.337

407,716

129.304

847,714

19,254

135.887

2,059,401

77

7,745

936

2.169

43,683

3,568

19,719

8,008

85,946

100

27,605

78.208

249,971

355,884

104

104

2,846,074

138

101

458

1,122

90

56

284

349

164

931

284

3.222

84

622

6,085

32

2

9

244

17

75

48

427

119

86

129

694

1,028

0

26

0

26

105

5

0

14,476

095%

0,70%

3.16%

7.75%

062%

0.39%

1.96%

2.41%

1.13%

6.43%

1.96%

22.26%

0.54%

4.30%

42.04%

0.00%

022%

0.01%

0.07%

L 68%

0.12%

0.52%

0.33%

0.00%

0.00%

2.95%

0 82%

0.60%

0.89%

4.80%

7.10%

0.00%

0.18%

0.00%

0.18%

0.72%

0.93%

0.00%

100,00%

258

304

954

1,516

609

726

1,957

590

3,866

83

587

8,418

37

4

10

199

16

90

35

392

66

188

600

854

11,180

Propoeed New Teriff

Differema 21-02.2013

Page 85: LAHORE ELECTRIC SUPPLY COMPANY LIMITED OOFICE OF THE … Petition... · Lahore Electric Supply Compartv Limited 1. DETAILS OF THE PETITIONER 1.1 Name And Address:- Lahore Electric

Lahore Electric Supply Company Limited Revenue Requirement

Annex-7

A

B

C

D

E

Power Purchase Price DM

O&M

Depreciation

RORB

Other Income

Impact of Disallowed Losses

Total DM

Revenue Requirement (A+B)

Less/ (Excess) Recovery

Total Revenue Requirement (C+D)

[Mln Rs]

[Min Rs]

[Mln Rs]

[Mln Rs]

[Mln Rs]

[Mln Rs]

[Mln Rs]

[Mln Rs]

[Min Rs]

- 2012-13 Determined

182,198

10,386

2,015

2,071

(4,594)

9,878

192,076

18,341

2012-13 „ Provisional

168,816

15,935

2,223

(15,775)

(4,536)

(2,153)

166,663

2013-14 Projected

175,516

17,867

2,604

6,243

(4,834)

21,880

197,396

47,764 [Mln Rs] 210,417 166,663 245,159

Revenue Requirement (per unit sold)

A

B

C

D

E

Power Purchase Price DM

O&M

Depreciation

RORB

Other Income

Impact of Disallowed Losses

Total DM

Revenue Requirement (A+B)

Less/ (Excess) Recovery

Total Revenue Requirement (C+D)

[Rs/ kWh]

[Rs/ kWh]

[Rs/ kWh]

[Rs/ kWh]

[Rs/ kWh]

[Rs/ kWh]

[Rs/ kWh]

[Rs/ kWh]

[Rs/ kWh]

46'143 Determined

12.125

0.691

0.134

0.138

(0.306)

-

0.657

12.782

1.221

• • ..• Provisional

11.837

1.117

0.156

(1.106)

(0.318)

(0.151)

11.686

20

Projected

12.125

1.234

0.180

0.431

(0.334)

1.511

13.636

3.300 [Rs/ kWh] 14.003 11.686 16.936