labor compliance program annual report 2 … reports fy 2014-15/city of santa... · lcp-ar2 labor...
TRANSCRIPT
)
LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT
RECEIVED
AUG 2 4 2015 Format for Awarding Body that enforces its own Labor Compliance Program for all projects (Labor C~~=j~7!a::, · •
Report foe the reporting pedod 07/0 I /2014 . to 06/30/20_15 . ~
1. Name of Labor Compliance Program (LCP): (J J-6 Labor Compliance Program- City of Santa Clarita
2. LCP I.D. Number (assigned by DIR): 3. Date of Initial Approval:
2003.00362 November 20,2003
4. Contact person (include name, title, address, telephone, fax, and e-mail, if available):
Harry Corder, Senior Engineer
City of Santa Clarita, 23920 Valencia Boulevard, Santa Clarita, CA 91355-2196
(661) 286-4025
5. Did LCP perform any LC § 1771.5 enforcement activities during the 12 months in the reporting period?
Please check one: PYes If Yes, proceed to item 6 on the next page
I No If No, complete the information below, sign the form and submit to DIR, Office of the Director, Attn: LCP Special Assistant,
455 Golden Gate Avenue, lOth Floor, San Francisco CA 94102
/
What suggestions do you have for the Department of Industrial Relations to better assist you with your program in the coming year? (attach additional sheets if necessary)
SUBMITTED BY:
/J ~~ Harry Corder, Senior Engineer/Labor Com11Iiance Officer I l ~o 61 '- u I '[;; ~ Signature Name and Title Date
LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all pr~jects 2008
I
LCP-AR2 6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary).
A. List projects handled by LCP within the past 12 months.
Project Name Bid Advertisement Date Prime Contractor Contract Amount
B3003 Sand Canyon Road/SR-14 Gateway 4/24/2013 Diversified Landscape Management $1,624,124 Beautification
S1037 McBean Parkway Bridge Widening 5/5/2013 Security Paving $6,728,427
P40 12 Central Park Phase 3 5/29/2013 R.C. Becker & Son $1,996,820
F2009 Santa Clarita Incubator 911/2013 R.L. Passarelli Enterprises $203,150
B3003 GVR/Centre Pointe Medians 9/25/2013 R.C. Becker & Son, Inc. $1,778,420
R0011 Aquatics Variable Frequency Drive Pump 9/27/2013 Hidden Valley Pump $50,883
F1017 City Hall Seismic Retrofit 10/2/2013 Fast-Track Construction $1,192,400
B20 14 Railroad A venue Beautification 10/25/2013 R.C. Becker & Son, Inc. $1,707,667
C4011 HSIP Signal Modifications 1/21/2014 Excel Company $564,657
M3019 JoAnne Darcy Canyon Country Library -Exterior Painting
1/23/2014 Sparta Builders $66,880
M0094 Jan Heidt/SC Metro Parking Lots 1/28/2014 California Pavement Service $218,841
M0098 2013-14 Annual Concrete Rehab 2/10/2014 F.S. Construction $920,575
M0096 2012-13 Federal Overlay 2/13/2014 All American Asphalt $2,066,750
T2009 Downtown Newhall Wayfinding Signage 3114/2014 PVL Signs & Graphics $51,500
M0097 2013-14 Annual Overlay & Slurry Seal 3/16/2014 Toro Enterprises $6,007,717
B3007 Sierra Highway Sidepanels 4/7/2014 Draper Construction $142,000
M3015 SCSC HV AC Phase 2 5/5/2014 Multizone,HV AC, Inc. $70,000
B0013 Canyon Country Monument Sign and 6/16/2014 Martinez Landscape Co,. Inc. $89,000
Landscape
14-00256 Traffic Signal Projects 7/10/2014 Taft Electric $15,990
14-0025 8 Loop Contract 7/11/2014 Taft Electric $28,500
14-00288 Time & Material for Traffic Signals 7/11/2014 Traffic Development Services $24,985
14-00260 Time & Material for ITS 7/11/2014 Crosstown Electrical and Data $25,000
R4003 Arundo Removal II 7/22/2014 R.A. Atmore & Sons $487,953
LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all projects 2008
LCP-AR2
R4003 Annual Arundo Removal 7/22/2014 R.A. Atmore & Sons, Inc. $487,953
M1 017 Valencia Library Roof Replacement 7/27/2014 Rey-Crest Roofing and Waterproofing $442,164
B3011 Soledad Canyon Road Median 8/24/2014 R.C. Becker & Son, Inc. $1,311,671 Refurbishment 14-00398 Backflow Prevention Device 8/29/2014 Backflow Prevention Device Tester $230,000 Maintenance 2year
14-00073 City Trail System Fence Replacement 9/5/2014 STL Landscape $88,840
TR-00103 MTS Fiber Optic Connection 9/10/2014 Crosstown Electrical and Data $17,988
T0040 Bus Stop Improvements Fed 9/15/2014 R.C. Becker & Son, Inc. $717,867 '
R1002A Paseo Pathways LED Conversion 9/24/2014 Express Energy Services, Inc. $916,027
T0043 Sidewalk Access Ramps CDBG 10/17/2014 F.S. Construction, Inc. $90,000
14-00383 LED Replacement Project 10/22/2014 Taft Electric $39,900
M0093 2012-13 Bridge Preventive Maintenance 11/2/2014 Peterson/Chase General Engineering $211,435
M3 022 SCSC HV AC Phase 3 11110/2014 United Mechanical Contractors, Inc. $91,425
S3028 SGV/SR-14 Bridge Widening 11110/2014 Security Paving Company $6,607,715
C3014 Signal Modification at Lyons Avenue and 11114/2014 Los Angeles Signal Construction $67,639
Newhall Avenue
T2008 Newhall Avenue HSIP 11114/2014 F.S. Construction $264,505
F1021 City hall Access Improvements 11114/2014 Draper Construction $157,072
M1016 TMF Floor Recoating 11114/2014 Specialty Flooring $101,967
B2015 Newhall Ave Beautification 12/9/2014 · R.C. Becker & Son, Inc. $1,615,244
R0012 Valencia Glen Parking Lot Low Impact 12/10/2014 Draper Construction $90,000 Development Retrofit
15-00064 Irrigation Controller Replacement PH3 1211112014 V alleyCrest Landscape Maintenance $308,590
M0103 2014-15 Annual Concrete Rehab 12/22/2014 F.S. Construction $1,318,000
P3020 Park Shade Structures- Various 115/2015 USA Shade $50,604
S1042 John Russel Drive POC Replacement 1111/2015 Taro Enterprises $429,419
Rubberized Playground Surface Replacement 1113/2015 Spectra Turf $107,393
15-00046 Decaro Access Ramps 2/2/2015 F.S. Construction. $30,000
M3021 SCSC Switchgear Replacement 2/4/2015 T &D Electric $49,500
M0106 NONG Parks Pool Renovations 2/8/2015 AMG Associates, Inc. $220,348
LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all projects 2008
I --------------
LCP-AR2
TR-00101 Blank-Out Sign Installations 2117/2015 Crosstown Electrical and Data $27,427
TR-00102 Signal Re-Wire Soledad Cyn Road at 2118/2015 Crosstown Electrical and Data $42,480 Camp Plenty & Via Princessa @ Whites Cyn Rd
TR-00100 2014-15 Striping Project 2/23i2015 Chrisp Company $34,429
15-LMD03 Old Orchard Bridge Painting 311/2015 Hahn Contractors $34,500
T0044 Crosswalk Improvements CDBG 3/2/2015 Ruiz Concrete & Paving $70,722
MO 1 02A 2014-15 Annual Overlay 3/12/2015 Sully-Miller Contracting Co. $6,013,964
M0102B 2014-15 Annual Slurry Seal 3/12/2015 Intermountain Slurry $1,302,253
LMD 15-15-20 TMF Landscape Improvement 4/9/2015 Venco Western $117,195
15-UF-02 TurfMedian Retrofit 4/16/2015 Stay Green, Inc. $33,532
15-UF-01 TurfMedian Retrofit 4116/2015 Oakridge Landscape, Inc. $34,118
P40 14 Pacific Crest Park Improvements 4/20/2015 AMG & Associates $517,450
B3014 Sierra Hwy Beautification & Intersection 4/24/2015 STL Landscape $1,068,000 Improvements C3014A Signal Modifications Whites and
4/29/2015 JFL Electric $116,630 Pleasantdale
M0102 2014-15 Annual Slurry Add'l Work 5/14/2015 Intermountain Slurry $888,001
GS-00 101 CNG Fueling Stations Repairs 6/112015 ALLSUP Corporations $18,000
GS-00 100 Corporate Yard Evaporative Coolers 6/1/2015 JCT Mechanical $36,000
120856 EMS Project 6/16/2015 Honeywell Building Solutions $49,814
11-003 87 LMD Zones T23A&B 8/12/2011 American Heritage Landscape $267,030
10-00236 LMD/UF Tree Service Requests 7/1/2014 Four Seasons Landscape $710,000
12-00324 LMD Zone T8 6/29/2012 Marina Landscape $279,192
12-00203 LMD Zone 28 7/112014 Marina Landscape $69,368
09-00048 LMD Zones 20,21,23 8/1/2013 Oak Springs Nursery $21,150
14-00029 LMD Lost Canyon Medians 2008-1 1116/2014 Oak Springs Nursery $19,198
12-00397 LMD Zone T51 Valencia High School 8/23/2012 Oakridge Landscape, Inc. $249,800
13-00245 LMD NRR Slopes 4/5/2013 Oakridge Landscape, Inc. $75,900
14-00091 LMD Zones 7, 19, & T1· 1/27/2014 Oakridge Landscape, Inc. $99,800
14-00198 LMD Zone 2008-1 J/21/2014 Oakridge Landscape, Inc. $1,019,816
LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all projects 2008
LCP-AR2
12-00149 LMD Zone 18, T1 AdVal (Cityscapes) 6/1/2014 Oakridge Landscape, Inc. $147,456
12-00262 LMD Transit Facilities. 8/1/2014 Oakridge Landscape, Inc. $76,064
10-00445 LMD Zones T46, T-47 12/112010 Stay Green, Inc. $523,780
12-00322 LMD Zones T2-T7 Old Orchard and 6/22/2012 Stay Green, Inc. $730,000 various Valencia Districts
12-00323 LMD Zone T17 6/29/2012 Stay Green, Inc. $30,280
12-00396 LMD Zones 17,T23,T29 8/23/2012 Stay Green, Inc. $294,500
12-00415 LMD Zones T33,T65,T65A 9/27/2012 Stay Green, Inc. $137,081
13-00177 LMD Heritage Park Slope 4/12/2013 Stay Green, Inc. $25,500
13-00341 Tree Maintenance Grid Work 5/23/2013 Stay Green, Inc. $853,550
09-00194 LMD Zones 2008-1 only-.1 month ext 7/1/2013 Stay Green, Inc. $50,000
14-00195 LMD Zones 4,8,26 4/4/2014 Stay Green, Inc. $49,536
14-00187 LMD Zones 15,16 4/4/2014 Stay Green, Inc. $99,058
14-00270 LMD Zone T8 (interim) 7/1/2014 Stay Green, Inc. $49,999
14-00316 LMD Zone T8 8/1/2014 Stay Green, Inc. $769,200
13-00384 LMD Zone 27 9/13/2013 V alleyCrest Landscape $97,080
13-00413 LMD Zone T52 9/25/2013 ValleyCrest Landscape $110,200
13-00439 LMD Zones 3,5,6,T31 9/25/2013 ValleyCrest Landscape $149,400
14-00409 LMD City/LMD Hybrid Parks (new) 10/8/2014 ValleyCrest Landscape $232,640
13-00317 LMD Zones T20,T44,T48,T62,T67, 711/2013 Venco Western, Inc. $315,777 T71,T72
12-00268 LMD City/LMD Hybrid Parks (end) 8/1/2014 V en co Western, Inc. $117,376
Total ·· ···.• .. ·~."~~~ii~ .;, . ''~(;~;:~;:·~~;?[;~~.·~'iii~~.~;:~~ .• :-~~(i;·.~f~~'~li'•·ii::,:.: • ·;:' ;:. i:t,ii'"i \~>;·~'"~"" $60,199,751
LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all pr~jects 2008
LCP-AR2 B. List any project subject to the limited exemption clause ofLC § 1771.5(a), if applicable.
- Project Name Description of Project Contract Amount
SEE ATTACHED LIST
Total ·.:: .~:; .;~_,;,·;:1;:S:c;::~'·~;:<~~:.i;:.~:~~~~
C. Summary of all wages and penalties assessed and/or recovered. Approval of
Affected Contractor Amount Amount Forfeiture Requested
Project Name (who directly employed the Assessed Recovered from Labor Description ofViolation
worker) Commissioner?
F2009 Santa Clarita Incubator R.L. Passarelli Enterprises P'Yes I No
Underpayment of prevailing wal $4,053.72 $4,053.72 and non-payment of training
funds F2009 Santa Clarita Incubator Patriot Striping
!Yes P'No Underpayment of prevailing waJ
$80 $80 and non-payment of training funds
I Yes I No
I Yes I No
!Yes I No
I Yes I No
I Yes I No
Total I•' • > : •• ' ;p:~-~~~~l\~'·i.,,0 ;·l~)\:.:~J~)\~~~~i~~~~'/ $4,133.72 $4,133.72 --~~li~~iif~,.,;,:<.2r':li~di!Ii,'~~~~H&.~· .·· ~~·' .. ~.
LCP ANNUAL REPORT 8 CCR § 16431--AB all projects 2008
" .I
LCP-AR2
D. For any amount identified in item C for which approval of forfeiture not requested from the Labor Commissioner, please explain below.
Project Name Amount Assessed Amount
Explanation Recovered
F2009 Santa Clarita Incubator Patriot Striping $80
Proof of payment to workers and CAC provided. Penalty collected. Summary of Violations sent to the Labor Commissioner.
!
Total
I
E. For any amount identified in item C for which approval of forfeiture was requested from the Labor Commissioner, please provide the following: '
Project Assesse Amount Recovere Amount d d
Name LC LC§ LC § Wages
Training Total
LC§ LC§ LC§ Wages
Training Total §1776(g) 1775 1813 Funds 1776(g) 1775 1813 Funds
F2009 Santa /
Clarita 0 $800 0 $2,325 $924.92 $4,053.72 0 $800 0 $2,325 $924.92 $4,053.72 Incubator
Total -- ---
LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all projects 2008
-----~-- -- ---
LCP-AR2 F. Identify cases that are or were the subject ofLC § 1742 proceedings.
Project Name Contractor Nature ofViolation ODLCase# Current Status
G. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?
Please check one: I Yes ·17No
If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:
H. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?
Please check one: 17Yes I No
Ifyes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: Specialized Terrazo 7/11/14, Carter Fence Co. 10/1/14
-
LCP ANNUAL REPORT 8 CCR ~ 16431-- AB all projects 2008
City of Santa Clarita Labor Compliance Report
Exempt Listing 7/1/2014 through 6/30/2015
Project Name Description of Project
GVR PEDESTAL REPAIR ELECTRICAL MAINTENANCE AND REPAIR OF PEDESTAL GOLDEN
VALLEY ROAD
HIDDEN OAK PEDESTAL ELECTRICAL MAINTENANCE AND REPAIR DAMAGED/EXPOSED
WIRES 29306 HIDDEN OAK PLACE LMD ZONE T52
JASON/FLYNN DRIVES METER ELECTRICAL MAINTENANCE AND REPAIR METER MAIN LMD ZONE
T33 (JASON DR/FLYNN DR)
OLD TOWN NEWHALL LIBRARY ELECTRICAL MAINTENANCE AND REPAIR SERVICES; EST NO.
13406.11.110; PROVIDE AND INSTALL NEW SURFACE MOUNT RECEPTACLE INSTALL
WI REMOLD AND RECEPTACLE AT OTNL
MISC ELEC REPAIRS ELECTRICAL MAINTENANCE AND REPAIR SERVICES
MAIN STREET REPAIR MAIN STREET TREE RECEPTACLE REPAIRS
LMD EMERGENCY ELECTRICAL EMERGENCY ELECTRICAL MAINTENANCE AND REPAIR SERVICES ALL
LMD ZONES-BLANKET PO
MISC ELEC REPAIRS ELECTRICAL MAINTENANCE AND REPAIR SERVICES
DOWNTOWN NEWHALL REPAIR LED TREE LIGHTS-NEWHALL
TV INSTALL CC LIBRARY INSTALLATION OF 2 NEW TV'S AT CANYON COUNTRY LIBRARY;
PROPOSAL 13406.16.160
TRANSFORMER REPLACEMENT REPLACE THE 225KVA TRANSFORMER AT NEWHALL PARK
NEW CIRCUIT RECEPTACLES 2 NEW 120V, 20A. CIRCUIT RECEPTACLES FOR BREAK ROOM
CONDUIT INSTALL INSTALL CONDUIT AND WIRING ON A NEW 208V 30A CIRCUIT
W/SAFETY DISCONNECT AND RELOCATING EXISTING LIFT #4
LMD METER REPLACEMENT ELECTRICAL MAINTENANCE AND REPAIR SERVICES 00 METER
REPLACEMENT, LMD T2
FURNISH AND EMERGENCY INSTALLATION OF NEW 3 POLE 200 A.
TMF NEW POLE INSTALL 600 V. 3 PHASE, PULSE ON AND PULSE OFF 2-STAGE LIGHTING AT
TMF.
NEW CEILING CURTAIN INSTALL INSTALL NEW 120V POWER TO EXISTING HIGH CEILING MOUNTED
ELECTRIC CURTAINS
INSTALLJUNCTION BOX FURNISH AND INSTALL NEW SUBMERSIBLE, ENCAPSULATED BRASS
JUNCTION BOX AND REPAIR DAMAGED CONDUIT.
LOST CANYON PEDASTAL ELECTRICAL MAINTENANCE AND REPAIR SERVICES EST# 15234MH,
LMD ZONE T65A PEDESTAL-LOST CYN/WINTER PINE
LMD MONUMENT SIGN ELECTRICAL WORK IN LMD T2- OLD ORCHARD MONUMENT
LIGHTING
CITY CLERK IMPROVEMENTS CITY CLERK 1ST FLOOR IMPROVEMENTS
CONCRETE REPAIR GENERAL CONSTRUCTION CONCRETE POSTS & RAILSLMD ZONE T8
GOLDCREST & DEL MONTE
CARRIZO BRIDGE REPAIR GENERAL CONSTRUCTION WROUGHT IRON REPAIR CARRIZO
BRIDGE
Contract
Amount
$5,161
$5,750
$5,750
$1,616
$2,650
$15,000
$2,850
$2,265
$8,868
$1,602
$1,967
$1,250
$4,178
$1,925
$2,840
$1,211
$1,845
$2,688
$5,375
$1,655
$1,634
$10,235
.I 1
City of Santa Clarita Labor Compliance Report Exempt Listing 7/1/2014 through 6/30/2015 ·
Project Name Description of Project
LMD REPAIRS VARIOUS GENERAL CONSTRUCTION: BLOCK WALL, WROUGHT IRON,
CONCRETE DEVIATION REPAIRS-VARIOUS LMD ZONES
CC LIBRARY EMERGENCY REPAIRS EMERGENCY REPAIRS TO CANYON COUNTRY/JOANNE DARCY
LIBRARY
LMD GENERAL REPAIRS GENERAL CONSTRUCTION: PROPOSAL 350 {$716.59) LMD T46
CITY HALL KITCHEN MAINTENANCE CITY HALL THIRD FLOOR KITCHENS; PROPOSAL 348
PARKS REPAIRS REPAIRS AT VALENCIA GLEN PARK AND SANTA CLARITA PARK, AN-
13-14-34 PER PROPOSAL #358
LMD CONCRETE REPAIRS GENERAL CONSTRUCTION: CONCRETE FENCE POSTS & RAILS LMD
T8-VALENCIA SUMMIT
VIA CENTER SIGN GENERAL CONSTRUCTION: FRAMING/FOUNDATION VALENCIA
INDUSTRIAL CTR SIGN
MCBEAN PARKWAY CONCRETE REPAIR GENERAL CONSTRUCTION: CONCRETE IN MEDIAN ON MCBEAN
PKWY
PARK CABINETS REPLACEMENT REPLACEMENT OF CABINETS AT PARK DUE TO MOLD PER
PROPOSAL #335
BRIDGE PAINTING MAINTENANCE BRIDGE PAINTING PER PROPOSAL #347
CENTRAL PARK SIGN REPLACEMENT REMOVE 4 OLD SIGNS/INSTALL 5 NEW WAYFINDING SIGNS@
CENTRAL PARK. PART OF P4012, SPORTS FIELDS.
FENCE POST REPAIR GENERAL CONSTRUCTION: DEVIATIONS AND FENCE POSTS
PROPOSALS: 355,356,357,359,370
lMD GENERAL REPAIRS GENERAL CONSTRUCTION: PROPOSAL: 360 {ZONE 6 $590.26),AND
361 (ZONE T46791.29)
LMD LIGHT POLES GENERAL CONSTRUCTION CONCRETE WORK AT LIGHT POLES LMD
ZONE T7 {PROPOSAL 375)
GENERAL REPAIRS GENERAL CONSTRUCTION: MANAGEMENT DEVIATION REPAIRS
PROPOSALS 378 {$2450.09) & 381 {612.00}
MCBEAN TRANSFER CONCRETE SAW CUT, DEMO, REMOVE, AND INSTALL CONCRETE AT THE
MCBEAN TRANSFER STATION.
MOLD REMEDIATION MOLD REMEDIATION EOR PROPOSAL#398
ZONE 18 (PROP. 397 $2,997.34)
LMD GENERAL REPAIRS ZONE T4 {PROP. 396 $1,915.39}
ZONE T2 (PROP. 395 $693.00}
PASEO REPAIRS SIDEWALKS/PASEO, REMOVAL AND/OR REPLACEMENT OF
EXISTING. LMD T46- PROPOSAL #400
PAMPLICO PARK CONCRETE PAMPLICO PARK CONCRETE REPAIRS, AS NEEDED CONTRACT.
MOLD REMEDIATION MOLD REMEDIATION AT CITY HALL; PROPOSAL401
LMD CONCRETE REPAIRS GENERAL CONSTRUCTION: SIDEWALK CONCRETE REPAIR-LMD T7
PROPOSAL 404
Contract
Amount
$2,380
$13,521
$1,419
$18,203
$5,574
$1,476
$14,220
$1,966
$6,320
$14,920
$1,692
$5,989
$1,381
$3,441
$3,062
$1,098
$9,144
$5,605
$4,426
$5,930
$2,421
$2,857
2
City of Santa Clarita Labor Compliance Report
Exempt Listing 7/1/2014 through 6/30/2015
Project Name Description of Project
CITY HALL WATER DAMAGE WATER DAMAGE REPLACEMENT OF CITYHALL CABINETS PER
PROPOSAL #423, DATED 11/6/14
HELMERS CONCRETE REPAIR GENERAL CONSTRUCTION SERVICES CONCRETE BEHIND HELMERS
ELEMENTARY PROPOSAL 439
GENERAL REPAIRS CONSTRUCTION WORK AS PER PROPOSAL #376, DATES 9/17/14
CENTERAL PARK CONCRETE REMOVE AND REPLACE CONCRETE AT CENTRAL PARK PER
PROPOSAL #441.
CC LIBRARY WATER HEATER WATER HEATER INSTALLATION AT CANYON COUNTRY LIBRARY;
PROPOSAL400
NORTH OAKS CONCRETE NORTH OAKS CONCRETE REPAIR PER PROPOSAL #450, DATED
12.17.14
CENTERL PARK FENCE INSTALL CENTRAL PARK RAIL FENCE
LMD IRON RAIL GENERAL CONSTRUCTION IRON RAIL (PROP 407 $605.34)-LMD T8
SLUMPSTONE (PROP 408 $402.86}-LMD T8
CITY HALL DRAIN PIPE PROPOSAL 453; INSTALLATION OF DRAIN PIPE AND RAIN GUTTER
AT CITY HALL
CITY HALL EM ERG DOOR INSTALL PURCHASE AND INSTALL OF EMERGENCY DOOR FOR SUITE 110.
PROPOSAL 467. ..
LMD BRICK SEAT GENERAL CONSTRUCTION PROP 469 ($2700} LMD T3 BRICK SEAT
PROP 466 ($5818) LMD T5 MON.SIGN
FACILITY SEWER PIPE EMERGENCY REPAIR TO CLOGGED SEWER PIPE (WATER
OVERFLOW). DEMO AND REPAIR
VAL MEADOWS DOORS REPLACE DOORS FOR VALENCIA MEADOWS PARK PER PROPOSAL
#472
CORP YARD DOOR LABOR AND MATERIAL TO INSTALL DOOR AT CORPORATE YARD
HOMELESS ENCAMPMENT CLEAN UP PROPOSAL #481: PROVIDE CLEAN UP SERVICES FOR HOM LESS
ENCAMPMENT PER JOB WALK ON 1/29/15
LMD GENERAL REPAIRS GENERAL CONSTRUCTION PROPOSAL 474 DEVIATIONS LMD T8
PASEO CONCRETE PASEO CONCRETE REPAIR PER PROPOSAL #483, DATED 2/11/15,
APPROVED BY
CITY HALL NEW CABINETS INSTALL LABOR AND MATERIALS FOR NEW KITCHEN CABINETS
INSTALLATION AT CITY HALL
LMD WROUGHT IRON GENERAL CONSTRUCTION WROUGHT IRON REPAIRS ZONE 27
PROPOSAL 485
LMD CONCRETE REPAIRS GENERAL CONSTRUCTION SVCS CONCRETE PROPOSAL 478 LMD
ZONET6
HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 3-23-15
HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 3-26-15
Contract Amount
$4,123
$1,800
$6,534
$8,310
$2,198
$14,690
$15,690
$1,008
$1,475
$3,892
$8,518
$5,500
$9,144
$7,560
$9,310
$1,271
$3,594
$22,844
$1,355
$5,388
$4,868
$7,562
3
. City of Santa Clarita Labor Compliance Report Exempt Listing 7/1/2014 through 6/30/2015
Project Name Description of Project
CONCRETE/FENCE INSTALL BREAKOUT AND REMOVE EXISTING CURBS AND BLOCKS AND ADD
CONCRETE RAMPES, POLES, AND CHAINS.
EMERGENCY FENCE INSTALL GENERAL CONSTRUCTION EM ERG-VINYL FENCING ALONG 1-5
PROPOSAL491
HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 4-27-15
LMD CONCRETE REPAIRS GENERAL CONSTRUCTION SERVICES CONCRETE REPAIR. LMD T6
PROPOSAL516
GENERAL PAINTING PAINTING AND EXTERIOR WORK AT 28111 SAND CANYON PER
PROPOSAL 518.
CHICANE IMPROVEMENTS CHICANE IMPROVEMENTS PER PROPOSAL #524
HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 5/18/15
HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 5/26/15
DEMOLISH EXISTING SHADE STRUCTURE AND DESIGN AND
VAL MEADOWS SHADE STRUCTURE CONSTRUCT NEW SHADE STRUCTURE AT VALENCIA MEADOWS
PARK.PROPOSAL#527
ALMENDRA PARK CONCRETE CONCRETE WORK AT ALMENDRA PARK PER PROPOSAL #515
NORTH OAKS POOL CONCRETE NORTH OAKS POOL CONCRETE PROPOSAL #533
CENTRALPARK DOORS R.EPLACE CF,NTRAL PARK DOORS PROPOSAL #5.07
BRIDGEPORT PARK DOOR DOOR REPLACEMENT AT BRIDGEPORT PARK PROPOSAL #504 ·
GENERAL WROUGHT IRON REPAIRS GENERAL CONSTRUCTION PROPOSAL #543, WROUGHT IRON
HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 6/29/15
ACTIVITIES CENTER KITCHEN REPLACEMENT/REFACING COUNTERS IN KITCHEN AND RESTROOMS
AT THE ACTIVITIES CENTER
CHESEBROUGH PARK BRIDGE LIGHTS ELECTRICAL MAINTENANCE AND REPAIR SERVICES LMD ZONE T47-
BRIDGE LIGHTS AT CHESEBROUGH PARK & MCBEAN
NORTHPARK BALLASTS/BULBS. ELECTRICAL MAINTENANCE AND REPAIR SERVICES RGPLACE
BALLASTS AND BULBS LMD ZONE T47 NORTH PARK
LMD LIGHT FIXTURES ELECTRICAL MAINTENANCE AND REPAIR SERVICES LMD LIGHT
FIXTURE REPAIRS ZONES T5 {PROPOSAL 008) & T6 {PROPOSAL 007)
LMD PAINTING VARIOUS PAINTING, MAINTENANCE AND REPAIR SERVICES FENCE PAINTING
VARIOUS LMD AREAS
NEWHALL INCUBATOR PAINTING PAINTING, MAINTENANCE AND REPAIR SERVICES NEWHALL
INCUBATOR
SC AQUATICS CENTER PAINTING PAINTING OF EXTERIOR TRIMS, DOORS, WINDOWS, AND WAVE
COVER ATSCAQUATICS CENTER.
LMD PAINTING CIRCLE J PAINTING, MAINTENANCE AND REPAIR SERVICES LMD ZONE 27
CIRCLE J WROUGHT IRON
PAINTING, MAINTENANCE AND REPAIR SERVICES WO #2015-005
LMD PAINTING VARIOUS {670.00) LMD ZONE T8 WO #2015-006 {400.00) LMD ZONE T8 WO
#2015-007 {120.00) LMD ZONE T8
Contract
Amount
$7,848
$1,200
$5,910
$3,845
$6,775
$5,516
$6,740
$2,911
$14,820
$14,386
$13,506
$6,745
$8,754
$1,150
$6,326
$6,950
$6,562
$6,562
$1,184
$13,920
$6,480
$14,980
$12,970
$1,190
4
City of Santa Clarita Labor Compliance Report
Exempt Listing 7/1/2014 through 6/30/2015
Project Name Description of Project PAINTING THE 5 SHUTIER DOOR, STORAGE PUMP ROOM DOOR,
SC AQUATICS CENTER PAINTING AND OVERHANG WEST OF THE EXIT DOOR AT THE AQUATIC
CENTER.
LMD PAINTING VARIOUS PAINTING, MAINTENANCE & REPAIR SERVICES ALL LMD T46
LMD WROUGHT IRON CIRCLE J PAINTING, MAINTENANCE AND REPAIR SERVICES WROUGHT IRON
REPAIR LMD ZONE 27-CIRCLE J
VAL HERITAGE PARK PAINTING PAINTING SERVICES AT VALENCIA HERITAGE PARK.
LMD PAINTING ZONE T2 PAINTING, MAINTENANCE AND REPAIR SERVICES WROUGHT IRON
LMD ZONE T2
NORTHPARK PAINTING MAINTENANCE PAINTING, MAINTENANCE AND REPAIR SERVICES LMD ZONE T47-
NORTH PARK
VALENCIA BLVD PASEO BRIDGE PAINTING, MAINTENANCE AND REPAIR SERVICES PASEO BRIDGE
NEAR CITY HALL
SUMMIT PARK PAINTING REPAIRS PAINTING, MAINTENANCE AND REPAIR SERVICES PAINTING OF
SUMMIT PARK PLAYGROUND EQUIPMENT, LMD ZONE T8
VAL CENTRAL VALLEY PARK PAINTING PAINTING, MAINTENANCE AND REPAIR SERVICES PAINTING OF
PLAYGROUND EQUIPMENT VALENCIA CENTRAL VALLEY PARK '·
CENTRAL PARK ELECTRIC INSTALL ,.
CENTRAL PARK POWER INSTALLATION FOR SCOREBOARDS
CENTRAL PARK SCOREBOARDS INSTALLATION OF CENTRAL PARK SCOREBOARDS
LMD ELECTRICAL MAINTENANCE· ELECTRICAL MAINTENANCE AND REPAIR SERVICES PROP.10364-
LMD ZONE T20 PROP.10365-LMD ZONE T44
ROCKWELL/SUMMIT PLACE ELEC REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES LMD T8-
ROCKWELL/SUMMIT PL BID 10371
PASEO LIGHT REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES PASEO LIGHT
REPAIR: LMD ZONE T2
PUBLIC LIBRARY SIGN MAINTENANCE ELECTRICAL MAINTENANCE AND REPAIR SERVICES POWER TO THE
NEW CIVIC CENTER MONUMENT/SC PUBLIC LIBRARY SIGN
LMD ELECTRICAL MAINTENANCE ELECTRICAL MAINTENANCE AND REPAIR SERVICES PROP 10384
(LMD T47), PROP 10385 (LMD·T47) PROP 10374 (LMDZONE4)
LMD LIGHT REPAIR LIGHT REPAIR PER RPOPOSAL #10408 FOR ZONE T-7
SPORT COMPLEX BALLASTS REPLACE 6 BALLASTS AT THE GYM, SPORTS COMPLEX.
BID #10410
PASEO LIGHT POLES PASEO LIGHT POLES AND STANDARDS LMD ZONE T8
SCSC GYM LIGHTING CONTROLLER REMOVAL AND INSTALLATION OF THE EMERGENCY LIGHTING
CONTROLLER AT THE SCSC GYM.
PACIFIC CREST PARK RESTROOM ELECTRICAL INSTALLATION FOR RESTROOM BUILDING AT PACIFIC
CREST PARK BID 10424
Contract
Amount
$1,550
$2,980
$1,430
$5,000
$2,850
$12,350
$6,171
$8,900
$8,821
$14,630
$18,117
$1,333
$1,174
$2,301
$10,968
$4,034
$1,000
$2,150
$2,943
$8,996
$3,975
5
City of Santa Clarita Labor Compliance Report
Exempt Listing 7/1/2014 through 6/30/2015
Project Name Description of Project
PASEO LIGHTS REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES BID #10422, LMD
T7 PASEO LIGHTS
LMD LIGHT REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES LIGHT REPAIRS
LMD ZONE T47 BID# 10425
PASEO LED LIGHTING ELECTRICAL MAINTENANCE AND REPAIR SERVICES BID #10430
PASEO LED LIGHTING
MCBEAN TRANSIT CTR VERTICUS INSTALLATION OF OVERRIDE VERTICUS SYSTEM FOR MCBEAN
TRANSIT CENTER
AVE ROTELLA ELEC REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES 25172 AVENIDA
ROTELLA BID #10440
ELECTRICAL MAINTENANCE AND REPAIR SERVICES PASEO LIGHTS,
PASEOS/TUNNEL LIGHT REPAIRS BID 10451 VIA GAVOLA/TUNNEL, LMD T5 ELECTRICAL
MAINTENANCE AND REPAIR SERVICES BID #10450, REPAIR LIGHTS
LMD ZONE 18
LMD ELECTRICAL MAINTENANCE ELECTRICAL MAINTENANCE AND REPAIR SERVICES BIDS
#10454,10455,10456 LIGHT REPAIRS LMD ZONE T46
LMD PEDESTAL REPLACEMENT ELECTRICAL MAINTENANCE AND REPAIR SERVICES BID #10463, LMD
ZONE T231'y1ETER PEDESTAL REPLACEMENT
PACIFIC CREST PARK POWER PROVIDE POWER TO RESTRM BLDG- PACIFIC CREST Pk IMPROV,
PROJ P4014
LMD VANDALIZED LIGHTS REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES BID 10471
REPAIR VANDALIZED LIGHTS LMD ZONE T46
Flo Services Preventative maintenance, pump repairs & calibration
14-00414 LMD Zones Electrical Maintenance and repair for various LMD Zones
15-LMD-07 LMD Zones Electrical Maintenance and repair for various LMD Zones
15-00021 Summit Park Equipment Replacement of playground equipment in LMD park
14-00400 VIC Monument Sign Monument sign foundation repairs
15-LMD"05 Summit Park Surface Installation of playground surface
14-00395 Villa Metro Landscape Landscape Maintenance for Villa Metro
14-00309 LMD Zones Electrical Maintenance and repair for various LMD Zones
13-00450 Disney Berm Install landscape at Disney Berm
Drain Grate Replacement Pool drain grate replacement @ Aquatic Center
Santa Clarita Pump Repair Pool pump reinstallation@ Santa Clarita Pool
Fair Oaks Pump Repair Backflow and Pump repairs
Northpark Fence Project Fence Installation
Concrete Work in Various LMD Zones Concrete Walkway deviation repairs
Mulch installation Project at Lost Canyon Installation of mulched median
Lyons Avenue Refurbishment Project Landscape refurbishment
McBean Median Repair Remove and replace concrete
Contract
Amount
$2,301
$1,140
$10,000
$2,549
$1,179
$6,600
$1,943
$1,750
$18,302
$1,000
$13,798
$15,000
$15,000
$2,999
$15,000
$21,336
$3,924
$15,000
$13,686
$4,470
$1,952
$6,840
$13,118
$15,000
$19,198
$2,962
$11,397
6
City of Santa Clarita labor Compliance Report Exempt listing 7/1/2014 through 6/30/2015
Project Name Description of Project McBean Transfer Station Raised Planter Install new landscape and irrigation in planters areas at the McBean
Project Transfer Station
Landscape Correction Project Landscape repair
HMNMH SlOPE! Forestation Project Installation of trees on slope behind HMNMH
Community Center Painting Painting of Hallway and Kitchen @ Newhall Community Center
Aquatic Center Painting Painting of exterior of Aquatic Center
Valencia Meadows Pool Pipe Replacement of leaking pool pipe fitting@ Valencia Meadows Pool
Aquatic Center Pipe Repairs Repair of leaking pipe fitting on SOm pool @the Aquatic Center
Raypak Heat Exchanger Replacement of SOm pool heater heat exchanger@ Aquatic Center
SOm Paco Pump Repair Rebuild of SOm pool pump @Aquatic Center
SOm Paco Pump Repair Rebuild of SOm pool pump @Aquatic Center
Aquatic Center Painting Painting of Roll-up doors @Aquatic Center
Aquatic Center Shade Repair Patch and resew shade canopies @Aquatic Center
Valencia Glen Leak Test Test pool piping for leaks @ Valencia Glen Pool,
Santa Clarita Pool Heater Repair pool Heater@ Santa Clarita Pool
25m Paco Pump Rebuild Install new rotating element on 25m pool @ Aquatic Center
Santa Clarita Pump Repair Offsite pump rebuild for Santa Clarita Pool
Fire Alarm Panel Service Repair Of Newhall Community Center Fire Alarm panel
Aquatic Stadium Light Replacement Replace 34 stadium lights @Aquatic Center
North Oaks Alarm Install conduit for North Oaks· alarm installation
Activity Center Relamp Install new light bulbs in all fixtures at Activity Center
Fire Alarm Repair Replace faulty smoke detector on fire alarm system @ Newhall
Community Center
Newhall Community Center Re-lamp Install new bulbs in all fixtures @ Newhall Community Center
Gym Light Fixture Upgrade Replace light ballast w/ upgrade@ Gym
Gym Emergency Lighting Repair Remove and install new emergency battery backup system @ Gym
Newhall Community Center Lighting Repair light fixtures and replace ballast @ Newhall Community
Repairs Center
Drain Grate Replacement Prepare & design plans for SOm pool drain grate replacement @
Aquatic Center
BRIVO @ Canyon Country Library Install Library Card readers on Men's & Women's restroom doors
Rest rooms
Floor Sealing Apply Nano Sealer to Activities Center Floors
Newhall Park Replacement of Main Replace 3" and 4" Gate Valves in vault
Water Valves
(SCAC Sound System) Upgrade the Sound System Controller in the Aquatics Center
Contract
Amount
$12,000
$3,000
$4,900
$2,150
$14,980
$1,238
$1,524
$2,000
$6,312
$5,387
$1,550
$1,500
$1,219
$1,136
$2,495
$10,730
$1,029
$1,958
$1,100
$1,462
$1,285
$1,662
$2,150
$8,996
$1,630
$3,086
$6,967
$6,950
$5,000
$2,850
7
City of Santa Clarita Labor Compliance Report Exempt Listing 7/1/2014 through 6/30/2015
Project Name Description of Project Golden Valley Ranch Open Space Access Trail improvements, signage, restoration of areas damaged by
Improvements erosion.
SCSC Aquatic Center Pool Deck Grinding Grinding concrete pool deck to meet LAC Health Department
regulations
Pacific Crest Storm Drain Install storm drains in turf area of park
Signal Modifications Signal Modification at Valencia Boulevard & Citrus Street and
Newhall Ranch Road & West Rye Canyon Road
Signal Re-wiring Install new wiring on signals at Bouquet Canyon Road and Seco
Canyon Road
Fiber Optic Installation Sheriff's ALPR Camera System Fiber Optic Connection Project
Signal Modifications Signal Modification at Copper Hill Drive & San Francisquito Canyon
Road
B3013 Lost Canyon Median Concept design project- CF Engineering did pot holing for irrigation
Refurbishment sleeve locations
Heritage Park Painting Re-paint gazebo and restroom
Parks Lock Repairs Repair broken door locks at various park locations
TMF Bldg B HVAC Replace ductless air conditioner in parts manager office.
TMF Bldg. B Eurovac System Repair bus vacuum system at fuel island~
TMF Bldg. D lighting contactor Replace lighting contactor that controls parking lot lights.
TMF Bldg A dispatch window covering Install new window blinds in dispatch.
TMF clarifier Preparation of sanitation monitoring 6 months
TMF clarifier Preparation of sanitation monitoring 6 months
Total
Contract Amount
$14,917
$14,500
$7,921
$5,000
$21,584
$11,496
$6,015
$2,422
$5,100
$1,037
$4,090
$1,602
$2,840
$4,502
$1,797
$1,997
$1,123,407
8
City of
SANTA CLARITA 23920 Valencia Boulevard • Suite 300 • Santa Clarita, California 91355-2196
Phone: (661) 259-2489 • FAX: (661) 259-8125
www.santa-clarita. com
August 18, 2015 VIA CERTIFIED MAIL: 7013 1710 0000 9704 7292
Department oflndustrial Relations Office of the Director Attn: LCP Special Assistant 455 Golden Gate Avenl!e, lOth Floor San Francisco, CA 94102
Dear Sir/Madam:
Re:. Labor Compliance Program Annual Report Submission (per 8 CCR § 16431 (a)) Reporting Period: July 1, 2014, to June 30,2015 Labor Compliance Program Approval Date: November 20, 2003
The City of Santa Clarita ("City") is pleased to submit its Labor Compliance Program (LCP) Annual Report prepared in accordance with 8 CCR § 16431 (a). The LCP Annual Report covers the period of July I, 2014, to June 30,2015, as requested.
The LCP Annual Report enclosed provides detailed responses to all required questions. The City is confident that it meets all requirements of its LCP and is prepared to respond to questions in the event any arise.
Should you have any questions regarding the City's LCP Annual Report submittal, please contact me at (661) 286-4025 or [email protected].
Sincerely,~ . ··:·,-·· ... :
/~· ~~ Ha~er ·. Labor Compliance Officer
HC:mab ·
' '. ~
S:\PW\Labor Compliance-access\Labor Compliance Program_ DIR\Annual Reports\20 IS Annual Report to DIR\Transmillal Leller for 20 IS Annual Report lo DIR.doc
Enclosure
cc: Robe1i G. Newman, Director of Public Works Rick Gould, Director of Parks, Recreation, and Community Services Darren Hernandez, Deputy City Manager Damon Letz, Assistant City Engineer Andrew Yi, City Traffic Engineer Cruz Caldera, General Services Manager Travis Lange, Environmental Services Manager Dennis Luppens, Special Districts Administrator.