SAFETY INFORMATION and OPERATING PROCEDURE
MASTER ALLOY CASTING
College/Dept: COEN Building/Room: HML 103
Laboratory Name: Magnetic Materials Lab Revision: 1
Approval
Authored by:
Doug Kellis (Research Engineer)
-------
Name, Title Signature Date
Reviewed and Approved by:
Peter Müllner (Principal Investigator)
-------
Name, Title Signature Date
Procedure Type Process/Protocol Chemical Hazard Class
Brief OverviewThis SOP describes the proper operation of the Master Alloy Casting process located in HML 103
ScopeFor use as a reference when casting master alloys
Potential Hazards Chemical Thermal Hydraulic Electrical Slip/Trip Biological
Mechanical Radiation Pneumatic Fire Fall Other
Hazard Specifics: Thermal Radiation, High Vacuum, Pressure
Engineering Controls (EC) Fume hood Biosafety Cabinet Other Local Exhaust Shielding Other
EC Specifics:
Certification of Hazard Assessment 1
MASTER ALLOY CASTING
Training Requirements – except for classroom lab safety, must be completed prior to performing the procedure
Classroom Laboratory Safety Radiation Worker
Online Safety Topics (specify): Gas Handling, Thermal Radiation, Chemical Safety
Lab/Work Group Specific Training (specify): General Lab Safety Tests
Other (specify): Operator Test
2
MASTER ALLOY CASTING
Personal Protective Equipment (PPE) Safety glasses Safety goggles Face shield & safety glasses Face shield & safety goggles
Lab coat Apron Tyvek suit Tyvek sleeves
Gloves Leg coverings Hard hat Hearing protection
Respirator Shoes Fall protection Other
PPE Description: Nitrile gloves should be used when handling pure elements
Equipment, Materials, Supplies, & Facility RequirementsQuartz Tubes: Technical Glass Services Inc 108 W 31st Street Boise, ID 83714 208-426-8775Order Specs: 38mm OD x 35mm ID x 294mm long; closed one end with three Maria’s placed 175mm up from the closed end
Alumina Crucibles: Coorstek 303-277-4564Order Specs: Part # 66457-C-4.00: 31.75mm OD x 25.40mm ID x 101.6mm long; closed one end
Handling, Work Area & Storage Requirements Keep area clean and free of debris, do not re-use alumina crucibles
Spill, First Aid & Incident Requirements Report incidents to Dr. Peter Müllner (426-5136), Dick Sevier (426-1022), Matt Lundgren (426-3906), and fill out incident report form.
Decontamination & Waste Disposal Place used crucibles in broken glass container
Additional Safety Information Review of applicable safety references such as material safety data sheets to ensure appropriate protective measures, spill supplies, and first aid procedures.
References Pfeiffer Turbo Pump manual, Reitel Operators manual
3
MASTER ALLOY CASTING
Procedure
REQUIRED EC & PPE*
Use of nitrile gloves, face shield, and darkened safety glasses required
* Applicable to all steps and substeps unless otherwise noted.
SYSTEM DESCRIPTION
The Master Alloy Casting system uses a multi-step process to produce an alloy. The first process evacuates the system and purges in an inert gas. The second process melts the constituent elements together to form the alloy. The main components of the system are:
1. Inert Gas Supply Systema. Gas Cylindersb. Restek Oxygen Getterc. Gas Control Valvesd. Gas Pressure Controller
2. Quartz tube/Crucible/Valve Assembly3. Reitel Induction Furnace4. LabView Control Program
4
(1b)(1a)
(1c)(1d)
MASTER ALLOY CASTING
5
(2) (3)
(4)
MASTER ALLOY CASTING
OPERATING STEPS
1. Quartz Tube and Crucible
a. Place constituent elements in Crucible.
b. Place the Crucible in Quartz Tubea. Quartz Tube must be at an angle so Crucible material will
not spill out of Crucible.
c. Gently slide Crucible to bottom of Quartz Tube.
d. Insert Quart Tube into Hybrid Adapter.
6
MASTER ALLOY CASTING
e. Tighten the Collar on the Hybrid Adapter.
f. Open the Butterfly Valve. (This is a ¼ turn valve)
g. Open the Bellows Valve. (Turn the valve 1-3 turns)
7
2. Evacuating the System
a. Click on the Manual Control icon on the desktop.
b. The Manual Control panel will appear.
c. Press the Turbo Pump Valve Open/Close button. (The green light on the button will glow when the valve is open)
d. Press the Start/Stop Pump button. (The green light on the button will glow when the pump is running)
e. Allow the system to run until the Pressure is ~ 3.xx E4 mbar.
Certification of Hazard Assessment 8
MASTER ALLOY CASTING
f. Set the Pressure Controller SetPoint to 5.
g. Press the Turbo Pump Valve Open/Close button.(The green light on the button will be off when the valve is closed)
h. Press the Argon Valve Open/Close button. (The green light on the button will glow when the valve is open)
i. Allow the system to run until the Pressure is ~ 5.00 E+2 mbar.
j. Press the Argon Valve Open/Close button.(The green light on the button will be off when the valve is closed)
9
MASTER ALLOY CASTING
k. Close the Butterfly Valve.
l. Close the Bellows Valve.(Turn the valve until it seats, then apply light pressure to ensure valve is seated)
m. Press the Start/Stop Pump button.(The green light on the button will be off when the pump is off)
10
MASTER ALLOY CASTING
3. Producing an Alloy
n. Loosen the Clamp at the base of the Bellows Valve.
o. Carefully remove the Clamp while holding the Bellows Valve.
p. Place the Vacuum Port Cover over the open Vacuum Port.
11
MASTER ALLOY CASTING
q. Slide the Quartz Tube/Crucible/Bellows Valve Assembly onto the Assembly Rod holder.
r. Guide the Quartz Tube into the Induction Coil in the Reitel Furnace.
s. Align the Quartz Tube such that it is centered in the Induction Coil.
t. Allow the Quartz Tube/Crucible/Bellows Valve Assembly to seat against the Assembly Stop.
12
MASTER ALLOY CASTING
u. Close the Locking Lever on the Reitel Furnace ensuring that the Magnet is located close to but Not touching the Safety Switch.
v. Turn the Power Switch to the Reitel Furnace to the On position. (Green LED should glow steady)
w. Turn the Main System Knob to Position 1.
x. Turn the Heater Knob to 10.
y. Heat the Quartz Tube/Crucible/Bellows Valve Assembly until the Crucible is glowing. Allow the Alloy to heat for approximately 2-3 minutes.
13
MASTER ALLOY CASTING
z. Turn the Heater Knob to 0.
aa. Turn the Main System Knob to 0.
bb. Allow the Crucible to cool for at least 30 minutes before removing it from the Induction Coil.
cc. Lift the entire Quartz Tube/Crucible/Bellows Valve Assembly up and out of the Reitel Furnace.
dd. Swing the Quartz Tube/Crucible/Bellows Valve Assembly to the right, slide the Quartz Tube/Crucible/Bellows Valve Assembly back down until it comes to rest against the Assembly Stop.
14
MASTER ALLOY CASTING
ee. Open the Bellows Valve. (Turn the valve 1-3 turns)
ff. Loosen the Collar on the Hybrid Adapter. (Hold the Quartz Tube while doing this)
gg. Slide the Quartz Tube out of the Hybrid Adapter and remove the Crucible.
hh. Close the Bellows Valve.(Turn the valve until it seats, then apply light pressure to ensure valve is seated)
ii. Remove the Vacuum Port Cover and set the Bellows Valve back onto the Vacuum Tube. Reassemble the Clamp and recover the Hybrid Adapter with the plastic bag.
15
MASTER ALLOY CASTING
jj. Turn the Power Switch to the Reitel Furnace to the Off position. (Green LED should not be lit)