l8 horiz struc pt.2

24
arc5410 Advanced Structure and

Upload: chuhonsan

Post on 21-Jan-2015

363 views

Category:

Education


3 download

DESCRIPTION

Horizontal structure

TRANSCRIPT

Page 1: L8 horiz struc pt.2

arc5410 Advanced Structure and Construction

Page 2: L8 horiz struc pt.2

4.0 Horizontal Structural Systems Pt. 2

Page 3: L8 horiz struc pt.2

Lloyds Insurance Building Richard Rogers Partnership London 1978-1986

Page 4: L8 horiz struc pt.2
Page 5: L8 horiz struc pt.2
Page 6: L8 horiz struc pt.2
Page 7: L8 horiz struc pt.2
Page 8: L8 horiz struc pt.2
Page 9: L8 horiz struc pt.2
Page 10: L8 horiz struc pt.2
Page 11: L8 horiz struc pt.2
Page 12: L8 horiz struc pt.2
Page 13: L8 horiz struc pt.2
Page 14: L8 horiz struc pt.2
Page 15: L8 horiz struc pt.2
Page 16: L8 horiz struc pt.2
Page 17: L8 horiz struc pt.2
Page 18: L8 horiz struc pt.2
Page 19: L8 horiz struc pt.2
Page 20: L8 horiz struc pt.2

Long-span steel beams and trusses illustrating comparative depths and profile variation (designed for a 15m X 6m floor grid).

Page 21: L8 horiz struc pt.2

Commerzbank steel framing. Isometric of floor framing (above left), view of floor framing under construction (above right), elevation of end-tapered steel girders with various openings for services. Note the steel studs on the top flange (above) to create composite action between the slab and girder.

Page 22: L8 horiz struc pt.2

Typical floor framing section of Commerzbank. Note the tapered ends of main spanning beams. This resolves conflict with lower flange of outside spandrel beam making the connection easier to make. Exterior wind bracing structure of the atrium glazing set in approximately 2 meters providing a balcony but also allowing connection to full depth of the floor beams

Page 23: L8 horiz struc pt.2

Fabricating lightweight steel beams by increasing the depth and removing un-needed steel from the web area of the beam.

Page 24: L8 horiz struc pt.2

Metro station in Genoa, Italy by Renzo Piano Building Workshop.