L..... .... ___ I STATE OF INDIANA INDIANA UTILITY REGULATORY COMMISSION IN THE MATTER OF AN ORDER ) APPROVING ADVISORY COMMITTEE ) RECOMMENDATIONS PURSUANT TO ) INDIANA CODE CHAPTER 8-1-26. ) APPROVED: AUG 2 3 201 7 ORDER OF THE COMMISSION Indiana Code chapter 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission's Pipeline Safety Division ("Division") to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee ("Advisory Committee") reviews those recommendations and recommends civil penalties in the Case. The Cases received pursuant to Indiana Code chapter 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations. Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission hereby UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is hereby directed to prepare and send notice to the parties advising them of the determination. IT IS SO ORDERED. ATTERHOLT, FREEMAN HUSTON, WEBER AND ZIEGNER CONCUR: APPROVED: AUG 2 3 2017 I hereby certify that the above is a true correct copy ofllieOriler as approveel. , fffkl!NL Mary 1 M0:cerra Secretary of the Commission

Upload: dangkhue

Post on 26-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

~~~~~~~1 -0-R-IG_l_N_A_L -l~~~~~QA_ L..... .... ___ I ~'

STATE OF INDIANA

INDIANA UTILITY REGULATORY COMMISSION

IN THE MATTER OF AN ORDER ) APPROVING ADVISORY COMMITTEE ) RECOMMENDATIONS PURSUANT TO ) INDIANA CODE CHAPTER 8-1-26. )

APPROVED: AUG 2 3 2017

ORDER OF THE COMMISSION

~

Indiana Code chapter 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission's Pipeline Safety Division ("Division") to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee ("Advisory Committee") reviews those recommendations and recommends civil penalties in the Case.

The Cases received pursuant to Indiana Code chapter 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations.

Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission hereby UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is hereby directed to prepare and send notice to the parties advising them of the determination.

IT IS SO ORDERED.

ATTERHOLT, FREEMAN HUSTON, WEBER AND ZIEGNER CONCUR:

APPROVED: AUG 2 3 2017

I hereby certify that the above is a true -----a~na correct copy ofllieOriler as approveel.

, /,a~ fffkl!NL Mary1M0:cerra Secretary of the Commission

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Caliber Construction (Fort Branch) Vectren Energy Delivery

Case Number: 14056 Date of Advisory Meeting: 6/20/2017 Date of Damage: 7/25/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

% Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Construction Solution Group Vectren Energy Delivery 14072 6/20/2017 7/25/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ~--------------------------

Abstentions:

APPROVED: - Lw.---Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

James H Drew Corp. Citizens Gas 14805 6/20/2017 10/12/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1,000

!ti Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ----------------------------Abstentions: Warren

APPROVED: - iki!--Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

City of Indianapolis Citizens Gas 14806 6/20/2017 10/14/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

B Civil penalty of$ 3 COD + j) \OQQ o o h'c.Jtd esca.JafruVJ

Abstentions: Warren

APPROVED: Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Weber Concrete Company Citizens Gas 14835 6/20/2017 10/17/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

~ Civil penalty of$ S 1000 t- :\\\)00 V\O :.\1cltl C-SCc.R 1d-t'D(\ D Other

~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions: Warren

APPROVED: Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Tracy Anderson Citizens Gas 14836 6/20/2017 10/19/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

, ~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other -------------------------- -Abstentions: Warren

APPROVED: Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Bobby Killmon Citizens Gas 14837 6/20/2017 10/20/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

R Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

lk:1. Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Warren

APPROVED: Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Midwest Natural Gas Corporation Gehring Underground, Inc.

Case Number: 14932 Date of Advisory Meeting: 6/20/2017 Date of Damage: 1113/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

0 Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

rR. Civil penalty of $1, 000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Steve Dunaway Construction Sycamore Gas Company 14934 6/20/2017 10/17/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

fi.. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Amanda Bullins Northern Indiana Public Service Company 14994 6/20/2017 10/15/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

R Warning letter (Special instructions:)

D Self-Repair D Clearance Zone

D Damaging Lines

81. Dig Tickets

D Failure to Plan

D Potholing

. D Probing

D Using Stakes or Post Hole Diggers

D White Lining

D Demolitions

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ _____________________ _ _

D Other ---------------------------Abstentions: Selking

--------tf-W~--APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Robert Roach Other Party: Case Number:

Northern Indiana Public Service Company 14995

Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/15/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

tfl Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Grimmer Construction Co. Other Party: Case Number:

Northern Indiana Public Service Company 14996

Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/14/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

Civil penalty of$ _')---+-"'Sl::;;...l:tJ _________________ _

Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Liberty Developing, Inc.

Case Number: 14997 Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/14/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other -----------------------------Abstentions: Selking

APPROVED: - LM-Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Pfister Sprinkler Systems, Inc.

Case Number: 14998 Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/14/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

a. Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Citizens Energy Group Citizens Gas 15071 6/20/2017 10/17/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

13. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ___________________ ___ _

D Other ---------------"""---- - -------Abstentions: Warren

APPROVED: %£PC--Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Kenneth Flinchum Citizens Gas 15072 6/20/2017 11/26/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Warren

APPROVED: Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Kevin Hughes L.CLnJ 5COf ;~ Citizens Gas

Case Number: 15073 Date of Advisory Meeting: 6/20/2017 Date of Damage: 11122/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

!!&. Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

B Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of$1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Warren

APPROV_E_D_:~~-~~~~~~~~~~~~~~~~~~~~­Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Capitol City Fence Citizens Gas 15084 6/20/2017 1113/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instruction;:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ----------------------------Abstentions: Warren

~~-AP~PR~O-VE~D-: ~~-~~~~~ Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Robert Skaggs Citizens Gas 15085 6/20/2017 111112016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions: )

D Clearance Zone

D Damaging Lines

~Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Warren

APPROVED: m -Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Hope Plumbing Citizens Gas 15086 6/20/2017 111112016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

rt>s. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions: Warren

APPROVED: Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Carlos Valles Other Party: Case Number:

Northern Indiana Public Service Company 15123

Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/20/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

j(j Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Gift Septic Service

Case Number: 15124 Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/20/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

!l{ Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lone Wolf Construction Other Party: Case Number:

Northern Indiana Public Service Company 15128

Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/19/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions: Selking

~~~AP_P_R_O-VE~D~:~~~~~Z----~ Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Discipling Men Ministries Other Party: Case Number:

Northern Indiana Public Service Company 15130

Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/19/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~· Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

B Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of$1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Hamady Excavating Service Other Party: Case Number:

Northern Indiana Public Service Company 15131

Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/19/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

AP-PROVED: --~-w c----Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Aaron's Plumbing

Case Number: 15132 Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/19/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

lb( Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------0 Other __________________________ ~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Kain Tool Other Party: Case Number:

Northern Indiana Public Service Company 15133

Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/18/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lone Wolf Construction Other Party: Case Number:

Northern Indiana Public Service Company 15134

Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/18/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

ti. Warning letter (Special instructions:)

~ Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Davenport Excavating & Grading

Case Number: 15135 Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/18/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions: )

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: - £_ Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Woodruff & Sons, Inc.

Case Number: 15136 Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/18/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

0 Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

0 Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$ ______________________ _

0 Other --------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Deichman Excavating Co., Inc. Other Party: Case Number:

Northern Indiana Public Service Company 15137

Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/17/2016

The IURC Pipeline Safety Division finds the following violation( s): IC 8-1-26-20(a)(l)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$------------ ------ -----

0 Other ----------------------------Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company L G S Plumbing, Inc.

Case Number: 15138 Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/17/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5 ,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions: Selking

APPROVED: -Lwf_--Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Moore & Moore Excavating Inc. Other Party: Case Number:

Northern Indiana Public Service Company 15139

Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/17/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

[fA.. Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Meade Electric Company, Inc.

Case Number: 15141 Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/17/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

0 Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1 ,000

0 Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$-----------------------

0 Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Gardens Of Growth Citizens Gas 15148 6/20/2017 12/3/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D

D

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

Training or $5 ,000 civil penalty if fail to complete training

Civil penalty of $1 ,000

Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

Ii Civil penalty of$ \ I qpQ () D +ic1g)-= e SC_ aJoJ-; JV\._)

Abstentions: Warren

- APPROVED: £Ju,c-Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Yoder & Yoder Concrete Contractor's, Inc. Citizens Gas 15149 6/20/2017 12/2/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of$1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ----------------------------Abstentions: Warren

~ I

~~~~AP~P-R_O_V_E_D_:~~-~~~~~~--~~~~~~~~~~~~~ Dan Meiners Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

Northern Indiana Public Service Company All Star Construction & Excavating, Inc. 15159

Date of Advisory Meeting: 6/20/2017 Date of Damage: 1111112016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ----------------------------Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Miller Cable Inc. Other Party: Case Number:

Northern Indiana Public Service Company 15160

Date of Advisory Meeting: 6/20/2017 Date of Damage: 1111112016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

{li. Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$------------- ----------

0 Other ~--------------------------

Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Tate Cook Other Party: Case Number:

Northern Indiana Public Service Company 15161

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11/11/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

~ Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other -------------------- -------Abstentions: Selking

~~~-AP~PR_O_V_E_D_:~~--£1 ~~~ Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Walsh & Kelly Other Party: Case Number:

Northern Indiana Public Service Company 15163

Date of Advisory Meeting: 6/20/2017 Date of Damage: 1111112016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

@ Civil penalty of$ ____.S"'-'-'1 e;e0'------ - -------------

0 Other ~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Adams Concrete Inc. Other Party: Case Number:

Northern Indiana Public Service Company 15164

Date of Advisory Meeting: 6/20/2017 Date of Damage: 1111112016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________ ________ _

D Other ---------------------------Abstentions: Selking

~~-AP-P-RO_VE_D_:~-~ fvt_~~~ ..............__

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lone Wolf Construction Other Party: Case Number:

Northern Indiana Public Service Company 15165

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11/10/2016

The IURC Pipeline Safety Division finds the following violation(s ): IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other -----------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Rothenberger Co., Inc. Other Party: Case Number:

Northern Indiana Public Service Company 15167

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11110/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

~ Civil penalty of$ _5~;000 __________________ _

D Other ~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Hawk Enterprises

Case Number: 15168 Date of Advisory Meeting: 6/20/2017 Date of Damage: 1119/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

IR. Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ----------------------------Abstentions: Selking

~~-AP-P_R_O_V-ED-:~~:;f;, /vf--__ ~~~ Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

C & M Asphalt Construction Inc. Northern Indiana Public Service Company 15169

Date of Advisory Meeting: 6/20/2017 Date of Damage: 1119/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

~ Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

0 Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other -----------------------------,-Abstentions: Selking

~~-AP~PR_O_VE_D_: ~-7'f:_-M~~~~ Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Steve McKowen Other Party: Case Number:

Northern Indiana Public Service Company 15171

Date of Advisory Meeting: 6/20/2017 Date of Damage: 1118/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

i Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Yoder Straight Line Construction, LLC Northern Indiana Public Service Company 15172 6/20/2017 11/8/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

t\ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other - --------------------------Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lawn & Turf Landscaping, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 15174

Date of Advisory Meeting: 6/20/2017 Date of Damage: 1117/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

JS.. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ----------------- ----------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Grahams Trucking & Excavating LLC Northern Indiana Public Service Company 15175 6/20/2017 11/7/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

Construction-Management & Design, Inc. Northern Indiana Public Service Company 15176

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11/7/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Cmmnittee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$------------------------

0 Other ---------------------------Abstentions': Selking , ti\ 11 ~

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Award's Fence & Deck

Case Number: 15177 Date of Advisory Meeting: 6/20/2017 Date of Damage: 1116/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~- Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

- ~-PROVED:- ·~ w~ - -- ---

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Mark Harness Other Party: Case Number:

Northern Indiana Public Service Company 15178

Date of Advisory Meeting: 6/20/2017 Date of Damage: 1115/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

gi_ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

Emcor Hyre Electric Co. of Indiana, Inc. Northern Indiana Public Service Company 15179

Date of Advisory Meeting: 6/20/2017 Date of Damage: 1115/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

~ Civil penalty of$ 3itXX) -\- (\> I, oo 0 0 0 bCXe.± f scoJav-lioV\ D Other

~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions: Selking

__ AP_ P_R-OVE_ D_ : -~~£;~----+Q-7---'J\......._~----Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Abonmarche Consultants of Indiana, Inc. Northern Indiana Public Service Company 15180 6/20/2017 1113/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$---------------------- -

0 Other ------------- ---------------Abstentions: Selking

APPROVED: Ben Warren

--==::::::::

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Cut Rite Lawncare LLC Other Party: Case Number:

Northern Indiana Public Service Company 15182

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11/2/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ _______________ _______ _

D Other ~-------------------------~

Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company R & R Excavating

Case Number: 15183 Date of Advisory Meeting: 6/20/2017 Date of Damage: 1112/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

rR Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Cummings Landscape, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 15184

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11/2/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ----------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Walsh & Kelly Other Party: Case Number:

Northern Indiana Public Service Company 15185

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11/1/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

8. Civil penalty of $--=s ....... · '""'e>B():;;....._ _________________ _

D Other ~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Jim Knapke Other Party: Case Number:

Northern Indiana Public Service Company 15186

Date of Advisory Meeting: 6/20/2017 Date of Damage: 111112016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

i{ Warning letter (Special instructions:)

~ Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ _ _____________________ _

D Other ---------------------------Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Zach Bowser Other Party: Case Number:

Northern Indiana Public Service Company 15187

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11130/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

,81 Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

Iii Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Northwest Indiana Fence Co.

Case Number: 15188 Date of Advisory Meeting: 6/20/2017 Date of Damage: 11129/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

/)? Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other --------___,...------------------Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Founders Contracting, Inc.

Case Number: 15189 Date of Advisory Meeting: 6/20/2017 Date of Damage: 11129/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ~---------------------------

Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

Cohee Construction & Masonary LLC Northern Indiana Public Service Company 15191

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11/29/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

EJ. Warning letter (Special instructions:)

lli1_ Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Superior Excavating

Case Number: 15192 Date of Advisory Meeting: 6/20/2017 Date of Damage: 11129/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

--1

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Michiana Tree Works, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 15193

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11128/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

g Training or $5 ,000 civil penalty if fail to complete training

0 Civil penalty of $1 ,000

0 Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

0 Civil penalty of$------------------- ---

0 Other ~-------------------------~

Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Joy Martin Other Party: Case Number:

Northern Indiana Public Service Company 15196

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11126/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~g"fic""kets

D Demolitions

g Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Hawthorn Valley Enterprises, Inc.

Case Number: 15197 Date of Advisory Meeting: 6/20/2017 Date of Damage: 11/26/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Dewey's Excavating, Inc. Other Party: Case Number:

Northern Indiana Public Service Company 15198

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11/25/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _____ _ ________________ _

D Other ----------------------------Abstentions: Selking

- ---AP- PR_O_VE_ D_: --~ y:_____ Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Janet Archer Other Party: Case Number:

Northern Indiana Public Service Company 15199

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11125/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: L - hl- -Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Wagner Steel & Fabricating Other Party: Case Number:

Northern Indiana Public Service Company 15201

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11122/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D W aming letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Northern Indiana Public Service Company Meade Electric Company, Inc.

Case Number: 15202 Date of Advisory Meeting: 6/20/2017 Date of Damage: 11/22/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

Iii._ Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

APPROVED: ~---Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Pete's Construction Other Party: Case Number:

Northern Indiana Public Service Company 15203

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11122/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

I& Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ -----------------------

0 Other ~---------------------------

Abstentions: Selking

---AP- PR_O_VE_ D_:--efl - -ft/z_____---------

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: John J Zehr & Brother Other Party: Case Number:

Northern Indiana Public Service Company 15204

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11122/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

iY. Training or $ 5, 000 civil penalty if fail to comp 1 ete training

0 Civil penalty of $1 ,000

0 Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

0 Civil penalty of$ _____ _________________ _

0 Other -------- ------- ------------Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Saint Joseph County Highway Department Northern Indiana Public Service Company 15209 6/20/2017 1112112016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Selking

Additional Information: Q.,o°'{? lt~J (p J 7 J / {

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

J & M Fence Vectren Energy Delivery 15272 6/20/2017 10/14/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

raDig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$------------------- ----

0 Other

Abstentions:

- -------------------- ------

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery A M Contracting, Co. 15273 6/20/2017 10/14/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other --------------------------~

Abstentions:

APPROVED: - £ t/c_ _ ___

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

J E Reedy, Inc. Vectren Energy Delivery 15275 6/20/2017 10/17/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

I& Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ~--------------------------

Abstentions:

--AP- P-RO_VE_ D_: -=--¥'-'~'""""----=-M---=----~-----=--Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Bowen Engineering CorPoration. Vectren Energy Delivery

Case Number: 15276 Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/17/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

B. Civil penalty of$ -"5......._o_0....;::;0'--------------------0 Other

~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions:

APPROVED: -~ -?J~-Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

FAS C 0 Inc. Vectren Energy Delivery 15277 6/20/2017 10/17/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other

Abstentions:

~--------------------------

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Kellie Plumbing Vectren Energy Delivery 15280 6/20/2017 10/18/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

~ Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

---AP- PR_ O_ V_E_D_: --g-j/ L7-

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Pyramid Technologies, Inc. Vectren Energy Delivery 15281 6/20/2017 10/18/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Firm Foundation Vectren Energy Delivery 15282 6/20/2017 10/18/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

fl\ Training or $5,000 civil penalty if fail to complete training

0 Civil penalty of $1,000

0 Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$ ______________________ _

0 Other ~~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions:

- --AP- P-RO_ V_E_D_: --~-d'-- -...............

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

Vectren Energy Delivery Windy City Underground, Inc. 15283

Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/18/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other

Abstentions:

--------------------------~

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Daryl Vanwinkle Construction LLC Vectren Energy Delivery

Case Number: 15284 Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/18/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone D Failure to Plan

D Damaging Lines D Potholing

D Dig Tickets D Probing

D Demolitions

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

ii( Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ~~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions:

APPROVED: --~~-----------------Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Snedegar Construction, Inc. 15285 6/20/2017 10/18/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other

Abstentions:

----------------------------

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Atlas Excavating, Inc. Vectren Energy Delivery 15286 6/20/2017 10/19/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

~ Civil penalty of$ _5_1CJ€0 __________________ _ D Other

~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Q C Communications 15287 6/20/2017 10/20/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ----------------------------Abstentions:

~~~~-AP~P-R_O_V_E_D_:~~~ ~=====:::: ____ ~~~-Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery C C T Underground 15288 6/20/2017 10/20/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1, 000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan ·

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Summers Heating and Cooling Vectren Energy Delivery 15289 6/20/2017 10/20/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Self-Repair D Clearance Zone

D Damaging Lines

D Dig Tickets

D Failure to Plan

D Potholing

D Probing

D Using Stakes or Post Hole Diggers

D White Lining

D Demolitions

0.., Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions:

APPROVED: Ben Warren Chairman

-----

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

S & G Excavating Vectren Energy Delivery 15290 6/20/2017 10/21/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

~ Self-Repair D Using Stakes or Post Hole Diggers

D White Lining

li'l_ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Fox Contractors Corp. Vectren Energy Delivery 15291 6/20/2017 10/21/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1,000

~ Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other - --------------------- -----Abstentions:

____ AP_ P_R_O_V_E_D_: __ ~ J/e:;"::::::=:;::::-----==----=--:::::::::::------------------Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

J B I Construction Vectren Energy Delivery 15292 6/20/2017 10/21/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

~ Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery S S E Utility Group 15293 6/20/2017 10/21/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Melmar Properties, Inc. Vectren Energy Delivery 15294 6/20/2017 10/21/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

Q5. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

G & G Construction Vectren Energy Delivery 15295 6/20/2017 10/21/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

18 Warning letter (Special instructions:)

~Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

----AP- PR_O_VE_ D_: --~ M _:::-:--...... _____________ _ " Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Ghering Underground Utilities & Pipeline, Inc. Vectren Energy Delivery

Case Number: 15318 Date of Advisory Meeting: 6/20/2017 Date of Damage: 10/31/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other

Abstentions:

- --- - -----------------------

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Blankenberger Brothers, Inc. Vectren Energy Delivery 15319 6/20/2017 10/31/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

~ Civil penalty of$ _5_ ,;_· 000 ___________________ _

D Other ~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

E & B Paving, Inc. Vectren Energy Delivery 15320 6/20/2017 10/31/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

I& Civil penalty of$ _Y.........._1 uoo ___ _______________ _ D Other

~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions:

~~~-AP-P_R_O_V-ED-:~~~~k/~ Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Doug & Steve Construction Inc. Other Party: Case Number:

Northern Indiana Public Service Company 15339

Date of Advisory Meeting: 6/20/2017 Date of Damage: 12/2/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions: )

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

@., Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ------------------------ ---Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Smeltzer Construction Other Party: Case Number:

Northern Indiana Public Service Company 15340

Date of Advisory Meeting: 6/20/2017 Date of Damage: 12/2/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

@.. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ----------------------------Abstentions: Selking

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Fieldstone Enterprises, LLC Other Party: Case Number:

Northern Indiana Public Service Company 15341

Date of Advisory Meeting: 6/20/2017 Date of Damage: 12/1/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

~ Civil penalty of$ 3, 5LJO +-- JJ.(J[JO f'D fj c/Ld eSL.oJ~.f,~ •

Abstentions: Selking

APPROVED: - L Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lawrence Building Corp. Other Party: Case Number:

Northern Indiana Public Service Company 15342

Date of Advisory Meeting: 6/20/2017 Date of Damage: 12/112016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(out)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

~ Civil penalty of$ __ Y ...... 1 S ...... W0.__-=-----------------0 Other

~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions: Selking

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Northern Indiana Public Service Company Reichelt Plumbing, Inc. 15343 6/20/2017 12/112016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

3-.. Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other --------------------------~

Abstentions: Selking

~~~AP-P_R_O_VE~D-:~~~.~ d/_~-~~-----~~~~~~~~~~~~~~~--i Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Keith Johnson 15372 6/20/2017 12/1/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5 ,000 civil penalty if fail to complete training

~ Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Lawyer Excavation 15373 6/20/2017 12/1/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

-~AP~PR~O~VE~D-: --.d; u~--------------Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Stokes Heating Plumbing and Cooling Inc Vectren Energy Delivery

Case Number: 15374 Date of Advisory Meeting: 6/20/2017 Date of Damage: 12/2/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

00 Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other --------------------- ------Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

C Y S Construction & Remodeling Vectren Energy Delivery

Case Number: 15376 Date of Advisory Meeting: 6/20/2017 Date of Damage: 12/3/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

Qf. Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of$1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other __________________________ _

Abstentions:

---APPROVED~: --rte u~--Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Miller Pipeline, LLC 15377 6/20/2017 12/3/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D . Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

[&. Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other --------------------- ------Abstentions: Miller

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Arc American, Inc. Vectren Energy Delivery 15444 6/20/2017 111112016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

~ Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions:

APPROVED: -~-Uc----Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Byron Marksberry Vectren Energy Delivery 15446 6/20/2017 1112/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

B Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ _ _____________________ _

D Other _ _ ____________________ ____ ~

Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Hire Construction, Inc. 15447 6/20/2017 1112/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: ·Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Town of Prince's Lakes Vectren Energy Delivery 15448 6/20/2017 1112/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,5 00, can mitigate $1 , 5 00 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other - -------------------- ------Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Tony Grant Concrete Vectren Energy Delivery 15449 6/20/2017 11/2/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(3)(b)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

g Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Brackney, Inc. Vectren Energy Delivery 15450 6/20/2017 1113/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

0 Failure to Plan

0 Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

0 Training or $5,000 civil penalty if fail to complete training

0 Civil penalty of $1 ,000

0 Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

I& Civil penalty of$ _ y_· L+f....,.,5=r-'-o0 _______________ _

0 Other ~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery Other Party: Case Number:

Mark Allen/ Nexgen Directional LLC 15452

Date of Advisory Meeting: 6/20/2017 Date of Damage: 1113/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

\ti Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$--------------------~--

D Other

Abstentions:

~---------------------------

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery Other Party: Shane's Outdoor Living and Landscapes (Delaby

Case Number: Date of Advisory Meeting: Date of Damage:

Outdoor, Inc.) 15453 6/20/2017 11/3/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5 ,000 civil penalty if fail to complete training

~ Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

DC Metals Vectren Energy Delivery 15454 6/20/2017 11/4/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

~ Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

~~-AP~P-R_O_V_E_D_:~~-~ ~~~~ -=::::::::

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Mammoth, Inc. Vectren Energy Delivery 15455 6/20/2017 1114/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(out)

The Advisory Committee recommends the following penalty:

[el. Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

IB- Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

~~~~AP~P-R_O_VE~D-: ~-=~~~--M:..__:L==-~~~~~ Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number:

Vectren Energy Delivery Daystar Directional Drilling, Inc. 15459

Date of Advisory Meeting: 6/20/2017 Date of Damage: 1117/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Cmmnittee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5 ,000 civil penalty if fail to complete training

B_ Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ____ ________ __________ _

D Other ~---------------------------

Abstentions:

APPROVED: k)· __

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Brackney, Inc. Vectren Energy Delivery 15462 6/20/2017 1118/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

8 Civil penalty of$ ...... 5 ........... , e ..... eQ ........... "------------------0 Other

~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vets Honoring Vets Vectren Energy Delivery 15464 6/20/2017 11/8/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers .

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------0 Other __________________________ ~

Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Hittle Landscaping Vectren Energy Delivery 15465 6/20/2017 1119/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

0 Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5 ,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

ieJ-.. Civil penalty of$ _3--"-''"-0_-0_0 _______________ _ D Other

~~~~~~~~~~~~~~~~~~~~~~~~~~-

Abstentions:

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Lankford Excavating, LLC 15466 6/20/2017 1119/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other

Abstentions:

------------------------ ---

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Ron Darlage 15467 6/20/2017 1119/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

A Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ___________________________ _

Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Calumet Civil Contractors, Inc. 15468 6/20/2017 11110/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

Ji Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Garmong Construction Vectren Energy Delivery 15469 6/20/2017 11110/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

& Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery C C & T Construction, Inc. 15502 6/20/2017 11122/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

a Civil penalty of $1 ,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other

Abstentions:

----------------------------

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Miller Pipeline, LLC 15503 6/20/2017 11/22/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ---------------------------Abstentions: Miller

APPROVED: Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Oles Engineering Corp. 15504 6/20/2017 11122/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

0 White Lining

D Training or $5,000 civil penalty if fail to complete training

Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions:

APPROVED: £2{__'

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Steven Rumple Vectren Energy Delivery 15505 6/20/2017 11122/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

~ Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

ia Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other

Abstentions:

---------------------------

Ben Warren Chairman

Indiana Underground · Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Vectren Energy Delivery Taylor Home Improvement 15506 6/20/2017 11122/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

0 Clearance Zone

0 Damaging Lines

0 Dig Tickets

0 Demolitions

D Failure to Plan

0 Potholing

D Probing

0 Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

~ Civil penalty of $1,000

D Civil penalty of $1,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ~--------------------------

Abstentions:

APPROVED: - L?A_ -Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Kings Trucking & Excavation, Inc. Vectren Energy Delivery

Case Number: 15507 Date of Advisory Meeting: 6/20/2017 Date of Damage: 11/23/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

~ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ~---------------------------

Abstentions:

---~AP~P~R~OVE~D-: --~-a-~~--Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Sander Services Vectren Energy Delivery 15508 6/20/2017 11/26/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

0 Warning letter (Special instructions:)

D Clearance Zone

0 Damaging Lines

D Dig Tickets

D Demolitions

D Failme to Plan

D Potholing

0 Probing

0 Self-Repair

0 Using Stakes or Post Hole Diggers

0 White Lining

~ Training or $5,000 civil penalty if fail to complete training

0 Civil penalty of $1 ,000

0 Civil penalty of $1 ,500, can mitigate $1,500 by completing training and corrective action plan

0 Civil penalty of$------------------- ----

0 Other

Abstentions:

---------------------- -----

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Axis Fiber Solutions Vectren Energy Delivery 15510 6/20/2017 11129/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

'8 Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions:

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Energy Delivery Other Party: Case Number:

Mark Morron Excavating, LLC 15511

Date of Advisory Meeting: 6/20/2017 Date of Damage: 11130/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(f)

The Advisory Committee recommends the following penalty:

D Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

f9... Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$-----------------------

0 Other ---------------------------Abstentions:

APPROVED-: -Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:

Ohio Valley Gas Corp Asplundh Construction Corp. 15732 6/20/2017 11130/2016

The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

~ Warning letter (Special instructions:)

D Clearance Zone

D Damaging Lines

D Dig Tickets

D Demolitions

D Failure to Plan

D Potholing

D Probing

D Self-Repair

D Using Stakes or Post Hole Diggers

D White Lining

D Training or $5,000 civil penalty if fail to complete training

D Civil penalty of $1 ,000

D Civil penalty of $1 ,500, can mitigate $1 ,500 by completing training and corrective action plan

D Civil penalty of$ ______________________ _

D Other ~-------------------------~

Abstentions:

APPROVED: =-Ben Warren Chairman