L. Greiner 1IPHC-LBNL Phone Conference 05/2012
STAR
IPHC-LBNL Phone Conference
News and updated ladder testing
![Page 2: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing](https://reader030.vdocuments.site/reader030/viewer/2022033100/5697c0271a28abf838cd6773/html5/thumbnails/2.jpg)
L. Greiner 2IPHC-LBNL Phone Conference 05/2012
STARTopics
• Two power bus cable design and status• Power regulator testing cable design and
status• Ladder testing results post IPHC visit (MS)• General project progress.• Discussion
![Page 3: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing](https://reader030.vdocuments.site/reader030/viewer/2022033100/5697c0271a28abf838cd6773/html5/thumbnails/3.jpg)
L. Greiner 3IPHC-LBNL Phone Conference 05/2012
STARTwo power bus cable design
• Design and layout are complete.• Gerbers have been sent to Rui at CERN
PBC shop.• LBNL PO has been placed.• Waiting on delivery date.
![Page 4: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing](https://reader030.vdocuments.site/reader030/viewer/2022033100/5697c0271a28abf838cd6773/html5/thumbnails/4.jpg)
L. Greiner 4IPHC-LBNL Phone Conference 05/2012
STARTwo power bus cable design (cont)
Outer and Inner driver board design and layout complete. Outer driver board has been sent for fabrication (10 pieces) to CERN PCB shop.
![Page 5: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing](https://reader030.vdocuments.site/reader030/viewer/2022033100/5697c0271a28abf838cd6773/html5/thumbnails/5.jpg)
L. Greiner 5IPHC-LBNL Phone Conference 05/2012
STARPower Regulator Test Cable
• Power regulator cable test schematic is complete.
• Power regulator cable layout is underway.• We will be producing these PCBs locally,
not in the CERN PCB shop.
![Page 6: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing](https://reader030.vdocuments.site/reader030/viewer/2022033100/5697c0271a28abf838cd6773/html5/thumbnails/6.jpg)
L. Greiner 6IPHC-LBNL Phone Conference 05/2012
STARPXL Project News
• Preparation for DOE yearly review at BNL in July• Primarily a project progress review with significant technical content.• A set of documentation for the PXL detector CD-2/3 is available at
http://rnc.lbl.gov/hft/hardware/docs/sensor_review/summary_v2.doc • Additional documentation for this review will be posted soon.
• New Virtex-6 based RDO motherboards.• Design is complete and testing has finished• 3 PCB architecture, new connectors, cables, 9U VME physical format.• Full complement of 10 assembled boards have been ordered for the
prototype run RDO. Expected delivery in 3 weeks.
• Significant Progress in mechanical structures.• See pictures next slide
![Page 7: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing](https://reader030.vdocuments.site/reader030/viewer/2022033100/5697c0271a28abf838cd6773/html5/thumbnails/7.jpg)
L. Greiner 7IPHC-LBNL Phone Conference 05/2012
STARHardware progress
![Page 8: L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing](https://reader030.vdocuments.site/reader030/viewer/2022033100/5697c0271a28abf838cd6773/html5/thumbnails/8.jpg)
L. Greiner 8IPHC-LBNL Phone Conference 05/2012
STARDiscussion Topics
• Ladder testing results. • Implications of instability in thresholds and noise.• Any other suggested testing?• Are these effects understandable through the
analysis of the sensor design?• Ultimate 2 submission schedule.• Monthly phone conferences – propose a
schedule. (2nd Tuesday of every month?) Please check your recurring meetings)