Karnataka Power Corporation Limited INTRODUCTION Organization study is a part of MBA programme which a student has to undergo during their course of study. It narrows the gap between theoretical knowledge and practical situations. Training makes a knowledge man into an experienced one. The principal objective of the study is to inter-relate the theoretical aspects with practical things that are moving in industry, and studying the organization as a whole. No doubt that the necessary training will be imparted at the work place, but having a brief knowledge before entering an organization will certainly help the individual in learning about the organization quickly and to improve his performance for the betterment, as well as the betterment of the organization for the organization for which he is working Objectives of the study To get the practical exposure in the corporate world. To have a proper balance between the theory and practical knowledge. To study origin, growth, vision, mission and status of the organization. VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 1

Upload: ravikumar1987

Post on 07-Apr-2015

2.559 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Kpcl Final Project

Karnataka Power Corporation Limited

INTRODUCTION

Organization study is a part of MBA programme which a student has to undergo during

their course of study. It narrows the gap between theoretical knowledge and practical situations.

Training makes a knowledge man into an experienced one. The principal objective of the study is

to inter-relate the theoretical aspects with practical things that are moving in industry, and

studying the organization as a whole.

No doubt that the necessary training will be imparted at the work place, but having a brief

knowledge before entering an organization will certainly help the individual in learning about the

organization quickly and to improve his performance for the betterment, as well as the

betterment of the organization for the organization for which he is working

Objectives of the study

To get the practical exposure in the corporate world.

To have a proper balance between the theory and practical knowledge.

To study origin, growth, vision, mission and status of the organization.

To study the functional departments exist in the organization.

To evaluate the effectiveness of the organization.

To study the problem areas in the organization.

To provide some valuable suggestion to improve the efficiency in the

organization.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 1

Page 2: Kpcl Final Project

Karnataka Power Corporation Limited

COMPANY PROFILE

History of the Karnataka power sector

The gears of enterprise in Karnataka powered nascent industrial activity as early

as the year 1800, when the first sugar unit was set up. In 1902, Karnataka recorded another

“mega watt sized project first” - Asia’s first Hydro Electric Power Station in Shivanasamudram,

on the banks of river Cauvery.

In fact, Karnataka’s pioneering spirit in the field of power has been translated into several

major milestones. Karnataka was the first to embark on Alternating current, when Bangalore

City’s lighting scheme was completed.

Karnataka had the longest transmission line in the world in 1902, from Shivanasamudram to

KGF, covering a distance of 147 km. and Karnataka was the first state in the country to conceive

and set up a professionally managed Corporation to plan, construct, operate and maintain power

generation projects in the state. That’s the legacy that KPCL started with and built on.

KPCL – an overview

For over three decades, the Karnataka Power Corporation has been a prime mover and

catalyst behind key power sector reforms in the state - measures that have spiraled steady growth

witnessed in both industrial and economic areas.

Right from the year of inception, in 1970, KPCL set its sights on “growth from within”

meeting growing industry needs and reaching out to touch the lives of the common man, in more

ways than one.

KPCL today has an installed capacity of 5509.82 MW of hydel, thermal and wind energy, with

4000 MW in the pipeline. The 1470 MW Raichur Thermal Power Station located in Raichur dist

is accredited with ISO 14001-2004 certification for its environment protection measures. From

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 2

Page 3: Kpcl Final Project

Karnataka Power Corporation Limited

an industry vantage point, KPCL has raised the bar on the quality of deliverables and is

constantly working at lowering the cost per megawatt - a commendable cost-value equation that

has become a benchmark on the national grid. KPCL’s stock in trade is industry proven - well-

established infrastructure & modern, progressive management concepts and a commitment to

excel, helping it meet the challenges of the rising energy demands of Karnataka.

The leverage point of KPCL initiatives are its resource management strengths – right

across planning, financing and project engineering. KPCL also has a high rating in terms of

project completion and commissioning within the implementation calendar.

KPCL Mission & Objectives

KPCL seeks to touch higher vantage points in the world of power engineering. Our

formula for achieving this - start with a world class organization, build-in efficiency and cost

control and ensure that progress is in harmony with the environment.

Exploring, identifying and developing opportunities in power generation.

Devising innovative ways of setting up and operating power plants.

Investing in a resource base of technical competence, systems, processes and capability.

Empowering people, work teams and the support network to achieve these objectives.

KPCL Vision

“Ensuring energy security for Karnataka through diversified energy portfolio”.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 3

Page 4: Kpcl Final Project

Karnataka Power Corporation Limited

KPCL's record achievements:

Highest generation of 26635 million units (2006-2007).

Highest thermal generation of 11484 Million Units 2006-07.

Highest Plant Load Factor (PLF) of 90.39 % at Raichur Thermal Power Station (2002-

2003).

Highest capacity addition of 600 MW, in 1999.

Highest Annual Turnover of Rs.3387 Crores (2006-2007). Commissioning of Unit - 7 at

RTPS in 25 Months - A National record

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 4

Page 5: Kpcl Final Project

Karnataka Power Corporation Limited

ACHIEVEMENTS OF RTPS

2003-04 – GOLD SHIELD & CERTIFICATE FOR OUTSTANDING

PERFORMANCE - 88.23% PLF

2002-03 – GOLD SHIELD & CERTIFICATE FOR OUTSTANDING

PERFORMANCE -90.39% PLF

2000-01 and 2001-02 - CERTIFICATE & SILVER SHIELD FOR GOOD

PERFORMANCE.

2000,2002 - CERTIFICATE FOR REDUCTION IN AUXILIARY COMSUMPTION.

2001,2002,2003 - CERTIFICATE FOR REDUCTION IN SECONDARY FUEL OIL.

1999-2000 Rs 22.82 LAKHS FOR REDUCTION IN SECONDARY

FUEL,OIL,AUXILLARY CONSUMPTION & HIGH PLF OF 81.52%

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 5

Page 6: Kpcl Final Project

Karnataka Power Corporation Limited

1998-99 Rs 6.65 LAKHS FOR CASH AWARD & BRONZE MEDAL FOR

ACHIEVING HIGH PLF OF 81.65%

1998 - Rs 9.94 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL &

AUXILLARY CONSUMPTION.

1997-98 Rs 9.22 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL &

AUXILLARY CONSUMPTION.

1996-97 Rs 16.75 LAKHS CASH AWARD AND SHIELD FOR ACHIEVING HIGH

PLF OF 70 % &REDUCTION IN SECONDARY FUEL OIL CONSUMPTION.

1995 - Rs 6.10 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL &

AUXILLARY CONSUMPTION

1994 - Rs 6.10 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL

CONSUMPTION.

1993 - Rs 12.5 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL &

AUXILLARY CONSUMPTION.

1992 - Rs 16.88 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL &

AUXILLARY CONSUMPTION.

1991 - Rs 9.26 LAKHS FOR REDUCTION IN SECONDARY FUEL OIL

CONSUMPTION.

1990 - Rs 14.48 LAKHS CHSH AWARD & A GOLD MEDAL FOR ACHIEVING

HIGH PLF OF 78.59%

1989 – Rs 10.00 LAKHS FOR ACHIEVING HIGH PLF OF 72.99%.

1988 – Rs 8.00 LAKHS FOR ACHIEVING HIGH PLF OF 66.3%.

For Renewable Energy

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 6

Page 7: Kpcl Final Project

Karnataka Power Corporation Limited

1993 - A ROLLING SHIELD FOR BEST PERFORMANCE IN RENEWABLE

ENERGY.

Social Responsibility

The corporation made a total contribution of Rs. 1.5 Crs to chief Minister’s Relies fund

during the year 2004-2005.

Enhancement of knowledge and skill of employees through training.

Voluntary implementation of best practices having regard to the regulatory tariff regime.

High priority in compliance to environment laws, regulation and norms.

Passing on the benefit of cost cutting in construction, finance and operations to the customers.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 7

Page 8: Kpcl Final Project

Karnataka Power Corporation Limited

INDUSTRY PROFILE

The power sector has registered significant progress since process of planned

development of the economy began in 1950. Hydro-power and cost based thermal power has

been the main sources of generating electricity. Nuclear power development is at slower pace,

which was introduced, in late sixties. The concept of operating power systems on a regional basis

crossing the political boundaries of state was introduced in the early sixties. In spite of the

overall development that has taken place, the power supply industry has been under constant

pressure to bridge the gap between supply and demand.

HISTORY

Although electricity had been known to be produced as a result of the chemical reactions

that take place in an electrolytic cell since Alessandro Volta developed the voltaic pile in 1800,

its production by this means was, and still is, expensive. In 1831, Michael Faraday devised a

machine that generated electricity from rotary motion, but it took almost 50 years for the

technology to reach a commercially viable stage. In 1878, in the US, Thomas Edison developed

and sold a commercially viable replacement for gas lighting and heating using locally generated

and distributed direct current electricity.

The world's first public electricity supply was provided in late 1881, when the streets of

the Surrey town of Godalming in the UK were lit with electric light. This system was powered

from a water wheel on the River Way, which drove a Siemens alternatr that supplied a number of

arc lamps within the town. This supply scheme also provided electricity to a number of shops

and premises.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 8

Page 9: Kpcl Final Project

Karnataka Power Corporation Limited

Coinciding with this, in early 1882, Edison opened the world’s first steam-powered

electricity generating station at Holborn Viaduct in London, where he had entered into an

agreement with the City Corporation for a period of three months to provide street lighting. In

time he had supplied a number of local consumers with electric light. The method of supply was

direct current (DC).

It was later on in the year in September 1882 that Edison opened the Pearl Street Power

Station in New York City and again it was a DC supply. It was for this reason that the generation

was close to or on the consumer's premises as Edison had no means of voltage conversion. The

voltage chosen for any electrical system is a compromise. Increasing the voltage reduces the

current and therefore reduces resistive losses in the cable. Unfortunately it increases the danger

from direct contact and also increases the required insulation thickness. Furthermore some load

types were difficult or impossible to make for higher voltages.

Additionally, Robert Hammond, in December 1881, demonstrated the new electric light

in the Sussex town of Brighton in the UK for a trial period. The ensuing success of this

installation enabled Hammond to put this venture on both a commercial and legal footing, as a

number of shop owners wanted to use the new electric light. Thus the Hammond Electricity

Supply Co. was launched. Whilst the Godalming and Holborn Viaduct Schemes closed after a

few years the Brighton Scheme continued on, and supply was in 1887 made available for 24

hours per day.

Nikola Tesla, who had worked for Edison for a short time and appreciated the electrical

theory in a way that Edison did not, devised an alternative system using alternating current. Tesla

realised that while doubling the voltage would halve the current and reduce losses by three-

quarters, only an alternating current system allowed the transformation between voltage levels in

different parts of the system. This allowed efficient high voltages for distribution where their

risks could easily be mitigated by good design while still allowing fairly safe voltages to be

supplied to the loads. He went on to develop the overall theory of his system, devising theoretical

and practical alternatives for all of the direct current appliances then in use, and patented his

novel ideas in 1887, in thirty separate patents.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 9

Page 10: Kpcl Final Project

Karnataka Power Corporation Limited

In 1888, Tesla's work came to the attention of George Westinghouse, who owned a patent

for a type of transformer that could deal with high power and was easy to make. Westinghouse

had been operating an alternating current lighting plant in Grea Barrington, Massachusetts since

1886. While Westinghouse's system could use Edison's lights and had heaters, it did not have a

motor. With Tesla and his patents, Westinghouse built a power system for a gold mine in

Telluride, Colorado in 1891, with a water driven 100 horsepower (75 kW) generator powering a

100 horsepower (75 kW) motor over a 2.5-mile (4 km) power line. Almarian Decker finally

invented the whole system of three-phase power generating in Redlands, California in 1893.

Then, in a deal with General Electric, which Edison had been forced to sell, Westinghouse's

company went on to construct a power station at the Niagara Falls, with three 5,000 horsepower

(3.7 MW) Tesla generators supplying electricity to an aluminium smelter at Niagara and the

town of Buffalo 22 miles (35 km) away. The Niagara power station commenced operation on

April 20, 1895.

Tesla's alternating current system remains the primary means of delivering electrical

energy to consumers throughout the world. While high-voltage direct current (HVDC) is

increasingly being used to transmit large quantities of electricity over long distances or to

connect adjacent asynchronous power systems, the bulk of electricity generation, transmission,

distribution and retailing takes place using alternating current

Growth of Indian power sector

Power development is the key to the economic development. The power sector has

been receiving adequate priority ever since the process of planned development began in 1959.

The power sector has been getting 18-20% of the total public sector outlay in initial plan periods.

Remarkable growth and progress have led to extensive use of electricity in all the sectors of

economy in the successive five years plans. Over the years (since 1950) the installed capacity of

power plants (utilities) has increased to 109092 MW (2004-05) from 1713 MW in 1959,

registering a 63 fold increase in 54 years. Similarly, the electricity generation increased from

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 10

Page 11: Kpcl Final Project

Karnataka Power Corporation Limited

about 5.1 billion to 440 billion units –86 fold increases. The per capita consumption of electricity

in the county also increased from 15 KWH in 1950 to about 395 KWH in 2004-05, which is

about 26 times. In the field of rural electrification and pump set energization, country has made a

tremendous progress, 88% of the village have been electrified except far flung areas in North

Easter states, where it is difficult to extend the grid supply.

Generation mix

The share if hydel generation in the total generating capacity of the country has

declined from 34% at the end of the sixth plan to 29% at the end of the seventh plan and further

to 25.5 percent at the end of eighth plan. The share is likely to decline ever further unless suitable

corrective measures are initiated immediately. Hydel power projects, with storage facilities,

provide peak time support to the power system. Inadequate hydel support in some of the regions

is adversely affecting the performance of the thermal power plants. In western and Eastern

regions, peaking power provided by thermal plants, some of which have to back down during off

peak hours.

Emergence regional power systems

In order to optimally utilise the dispersed sources for power generation it was

decided right at the beginning of the 1960’s that the country would be divided into 5 regions and

the planning process would aim at achieving regional self sufficiency. The planning was so far

based on a region as a unit for planning and accordingly the power systems have been developed

and operated on regional basis, strong integrated grids exist in all the five regions of the country

and the energy resources developed are widely utilised within the regional grids. Presently, the

Eastern and North-Eastern regions are operating in parallel. With the proposed inter-regional

links being developed it is estimated that it would be possible for power to flow any where in the

country with the concept of National Grid becoming a reality during 12th plan period.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 11

Page 12: Kpcl Final Project

Karnataka Power Corporation Limited

Private Sectors

The initial response of the domestic and foreign investors to the policy of private

participation in power sector has been extremely encouraging. However, many projects have

encountered unforeseen delays. There have been delays relating to finalisation of power purchase

agreements, guarantees and counter guarantees, Environmental clearances, matching

transmission networks and legally enforceable contracts for fuel supplies. The shortfall in the

private sector was due to the emergence of a number of constraints, which were not anticipated

at the time the policy was formulated. The most important is that leaders are not willing to

finance large independent power projects, selling power to a monopoly buyer such as SEB’s do

not pay for electricity. Uncertainties about fuel supply arrangements and the difficulty in

negotiating arrangements with public sector fuel suppliers, which concern penalties for non-

performance, is another area of potential difficulty. This important to resolve these difficulties

and revolve a framework of policy which can ensure a reasonable distribution of risks which

make power sector projects financially attractive. The capacity addition programmed for the 9 th

plan envisaged around 17588MW to be added by private generating companies. In order to

achieve the targeted private sector capacity addition during the 9 th plan, the following additional

facilitating measures have recently been suggested by the promoters. Most of these have been

accepted while some of them are under the consideration of the government.

Objectives of the power sector

To provide reliable and quality power at a economic price.

To make the sector commercially sound and self-sustaining.

To achieve environmentally sustainable power development.

High performance levels to reduce cost and ensure reliable power supply.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 12

Page 13: Kpcl Final Project

Karnataka Power Corporation Limited

PRODUCT/SERVICE PROFILE:

The study is conducted in “Karnataka Power Corporation limited”, which has generating

the power as its product. The firm is providing the service of power with out which lightening is

not possible. Now a day’s power is very essential in all the activity of life of human beings.

KPCL is a monopoly producer of power in Karnataka state. The corporation is generating

the power by Hydro, wind and coal. It is really very expensive to generate power. Because it

needs constructed dam for Hydal power generation, generators, plants, which incur huge

investment, it also costly in the case of wind and coal. At present KPCL producing at 70%

through hydro, 20% by coal and 10% by wind.

The power generated by KPCL is sold KPTCL (Karnataka Power Transmission

Corporation Limited). As per data collected the corporations is generating power capacity is

19713 million units. The generated power can not be saved and sold some days later, it should be

sold out while generating. Power is sold with the help of the gridlines, transforms and other

power supply tools.

At present KPCL is using modern techniques of power generation. In addition to this the

corporation is training their employees regarding the power generation techniques. The KPCL

has more than 20 projects.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 13

Page 14: Kpcl Final Project

Karnataka Power Corporation Limited

HYDRO ELECTRIC POWER GENERATION

This is one of the cheapest ways to electricity, the kinetic and potential energy of running

water being harnessed to drive generators. However, it is limited to mountainous region where

fast rivers flow. A fairly large difference in height is required to produce enough force in he

flowing water to turn the water wheels to which the generators are connected.

Early installation had vertical water turning the machinery. Modern plants use vertical

generators mounted on horizontal water wheels. These generators of the synchronous salient

pose type are of very large diameter (30 to 40) feet and have a large number of poles (up to 60)

depending on the speed of rotation (usually from 100 to 600rpm). The required head of water

obtained by constructing a dam across the river, usually at its steepest point to make maximum

use of height. A reservoir forms behind the dam, so that a constant head of water is obtained.

This water form the reservoir is carried through underground ducts and they directed against the

generators are usually mounted in the range 6.6 to 15 KV. The exciter set on top of the main

generator provides the low voltage, high current D.C required to set up the magnitude field in the

min generator. Transformers situated just outside the powerhouse raise the voltage to the long

distance transmission level of 275 to 400KV.

These plants are cheap to run, for this only a small staffs is required. However, the initial

capital is enormous since dam construction is a major civil engineering feat. Suitable sites for

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 14

Page 15: Kpcl Final Project

Karnataka Power Corporation Limited

hydro electricity transmission lines must be added. However, these stations have a long life up to

5 years.

THERMAL POWER STATION

Thermal power stations were the best energy, which is converted in to electric energy and

provide the majority power generation at present. The main is advantage is that they can be sited

where needed thus saving on the cost of the transmission lines. However, high cost of fuel (coal,

oil or gas) is incurred.

In operation, fuel is burnt to heat the water in the boiler, which then produces steam at

very high pressure (up to 5000 Ib/sqare Inc) and temperature (1100 f). This steam is directed on

to blades of high-speed turban, which is connected to the generator. The steam is condensed then

the water is return to the boiler, thus forming a closed cycle. This condensed is required large

cooling tower of external water (15 million gales/hour for a 300 MW station) or large cooling

tower. These sites must be chosen near the river or where the unsightly cooling tower will not

detract from the surrounding. The generation are of 2 cycles pole construction rotating at 3000

rph again the voltage output varies between 6.6 to 33KV, the machine rating the higher the

voltage used. The excited set is again amounted on the shaft. Large amounts of heat are produced

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 15

Page 16: Kpcl Final Project

Karnataka Power Corporation Limited

is important fans mounted each end of he rotor circulate air or hydrogen gas. Hydrogen is better

cooling medium then air and also only and fourteenth is its densities. Thus less power is required

to circulate. Recently liquid cooling is using oil or water as being adopted. Liquid are far

superior to gases for cooling, water being 50 times better then the air. Thermal stations are not

particularly efficient, the overall figure about 38% of the thermal power being put into plant from

the fuel is available as electric energy. The main limitation is the boiler design, the generators

being up to 90% efficient.

WIND POWER STATION

It is also one type of power generation where KPCL produce power by using the wind.

This form of power generation contributes only 1% of total power generation.

Ex:- Kappatagudda wind farm

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 16

Page 17: Kpcl Final Project

Karnataka Power Corporation Limited

DIESEL POWER STATION

A diesel generator is the combination of a diesel engine with an electrical generator

(often called an alternator) to generate electric energy. Diesel generating sets are used in places

without connection to the power grid or as emergency power-supply if the grid fails.

KPCL has 6 units and 21.32 capacity in MW, total installed capacity is 127.92. this type

of power generation is very costly, it costs nearly Rs.10 per unit and used only for emergency

purpose. KPCL’s Diesel power station is situated in Yelahanka.

Ex:- Yelahanka Diesel Generating station

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 17

Page 18: Kpcl Final Project

Karnataka Power Corporation Limited

ORGANIZATIONAL STRUCTURE

Grouping of activities is an essential step in designing an organizational structure.

Grouping of activities into departments or other homogeneous units is known as

departmentation. Departmentation is the process of grouping tasks into job’s the combining of

jobs into effective work groups into identifiable segment or departments.

In Prateeks activities are grouped into different functional units. Each major function

of the enterprise is grouped into different department. This can also be studied as a separate

function. Departmentation based on functions is a simple form of organizing the activities.

Specialization of department promotes the excellence in performance. It lead to improve

planning and control of key functions and ensure economy.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 18

Page 19: Kpcl Final Project

Karnataka Power Corporation Limited

ORGANISATION CHART

Technical Director Finance Director H R Director

Executive Director

General Manager

(accounts)

General Manager (Finance)

General Manager (HR)

Chief Engineer DGM (A/C’s)

DGM (Finance)

DGM (HRD-1) workers

DGM (HRD-2) corporate

Superintend Engineer

Asst GM (Accounts)

Asst GM (Accounts)

AGM (HRD)

AGM (HRD)

Executive Engineer

Accounts Officer

Accounts Officer

Personal Officer

Personal Officer

Assistant Engineer

Asst Accounts Officer

Asst Accounts Officer

Junior Personnel Officer

Junior Personnel

Officer

Junior Engineer Senior

Asst

Senior Asst Senior Asst

Administrator

Senior Asst

Administrato

r

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 19

Board of Directors

Managing Director

Page 20: Kpcl Final Project

Karnataka Power Corporation Limited

Board consists of:

Chairman is chief minister of the state

Managing Director

Technical Director

Financial Director

Human Resource Director

Principal secretary

Principal secretary to chief minister

Board of Directors:

The corporation has at its apex board of directors duly constituted under the 11 th

provision of Articles of association of the corporation and the Companies Act of 1956. Board of

Director’s will be appointed by the government on such remuneration, as it may fit and shall be

entitled to remove the directors from office at any time. But subject to provision of section 252

of the Act. The number of directors of the company shall not be less than 3 and not more than 17.

The govt may free from time to time appoint one or more of the directors as Chairmen,

Vice Chairmen or Managing Director of the corporation. Usually Chairmen will be Chief

Minister or the Minister of Power & Energy or Member of Parliament or state Legislature.

Shri.Veerendra Patil was the first chairmen of the corporation and at present

Shri.B.S.Yeddyurappa Chief Minister is the Chairmen of KPCL.

Managing Director

Managing director of the corporation is the chief executive having substantial powers of

management delegated to him by the board. He will be the supreme authority of the corporation.

Under him there will be three types of directors namely Finance director, Technical director, HR

director. Shri.R.Nayak was the first MD and Shri.Dr. S.M.Jaamdar an IAS officer is the

present MD of the corporation.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 20

Page 21: Kpcl Final Project

Karnataka Power Corporation Limited

Board of Directors

As on 20-10-2008

Shri B.S. Yeddyurappa Shri K.S. Eshwarappa

Hon’ble CM of Karnataka Hon’ble Minister of Energy,

& Chairman, KPCL GOK & Vice Chairman KPCL

Dr. S.M.Jaamdar, IAS,

Managing Director.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 21

Page 22: Kpcl Final Project

Karnataka Power Corporation Limited

Murlidhar Rao D.C.Sreedhar, IRS K.Jairaj, IAS M.R.Kamble,

IAS

Technical Director. Finance Director. Principal Secretary, Secretary,

Energy Department, Water ResourcesDept.

Powers of the Board

To authorize the corporation for undertaking of work of a capital nature.

To pay and change to the capital amount of the company and any interest law full

payable.

To act on behalf of the company in all matters relating to bankrupts and insolvents.

To open any account or accounts with such banks as the board of directors may select or

appoint.

To appoint or remove or suspend such managers, secretaries, supervisors, clerks, agents

and servants or permanent or temporary as they fit.

To establish any board or agency for managing any of the affairs of the company in any

locality in India or elsewhere.

To appoint any person to be the attorney’s of the company.

No member shall be entitled to visit or inspect works of the company without permission

of directors in the nature of trade secrets, trade mystery and secret process.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 22

Page 23: Kpcl Final Project

Karnataka Power Corporation Limited

Introduction

The functional areas of Karnataka power Corporation Ltd are divided into categories.

They are Production department, Human Resource department, Finance department ,Marketing

department, Environment department and, Computer department Finance is the main source of

every business. Finance department of Karnataka Power Corporation ltd involves managerial

activities concerned with procurement at low cost and utilization of funds for business purposes

the financial manager deals with planning, organizing, directing and controlling financial

activities of the enterprise Production is also an important work in every manufacturing unit.

Karnataka Power Corporation ltd have latest technological machineries so that the production

process can be done easily. The HRD department of the company is well structured and

employees are getting good benefits and this is one strategy of the company to increase the

productivity. Lastly, Marketing department of the company is helping the organization in

increasing the dealers and customers through their marketing strategies and campaigns and

promotional activities. This is all about functional departments. Let us know each department in

depth.

To know the all the Departments detailed information.

To carry out the easy work.

To know how the company process is taken place.

To forecast the future needs of the each Department.

To provide timely services to each department.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 23

Page 24: Kpcl Final Project

Karnataka Power Corporation Limited

FINANCE DEPARTMENT

FINANCE CHART

Managing Director

Finance Director

DGM (A/C’s) DGM (Finance)

Asst GM

(Accounts)

Asst GM

(Accounts)

Accounts Officer Accounts Officer

Asst Accounts

Officer

Asst Accounts

Officer

Senior Asst Senior Asst

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 24

General Manager

(accounts)

General Manager

(Finance)

Page 25: Kpcl Final Project

Karnataka Power Corporation Limited

Finance department is very essential for any organisation to be set up. It is the backbone

of any organisation. Similarly the finance department plays a vital role in the set up and running

of KPCL.

Chief accountant manager and chief finance manager works under the direct control of

finance Director at KPCL. Other top executive in the finance department are executive

(Finance), divisional officer (Finance), accounts officer, assistant officer, senior assistant

(Accounts) and assistant (Accounts).

The chief finance manager and accounts manager handle various activities in the finance

department. Each of them has their tasks cut out systematically in these areas.

In KPCL, finance and accounting department is subdivided into 11 sub departments.

Salary department

Cash department

Bills department

Budget and costing department

Consultancy department

Provident fund department

Monthly and annual accounts department

Debt servicing department

On going project department

Taxation department

Pension department

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 25

Page 26: Kpcl Final Project

Karnataka Power Corporation Limited

Its brief explanation as follows:

Salary Department

In KPCL salary department looks after the advances to employee’s salary payable to the

employees.

Salary department calculates the salary of employees, on the basis of information given

by the Human Resource department regarding the employee’s attendance, leave, leave not

sanctioned, under salary amount deduction made in respect of provident fund, tax, and

remittance charges, recoveries for advance. Salary department credit net salary amount and

reimbursement of Medical and Electricity charges amount to employee’s bank account by

issuing cheques.

Cash department

The cash section is responsible for all receipts and payments of cash, cheques, etc., and

accounting the same in the books of accounts. KPCL provided 150 corers as working capital to

cash department, to carryout its transactions. If need arises beyond 150 corers, it requires to get

permission from senior executive of finance.

The functions of Cash department are:-

Operation of Bank accounts.

Withdrawal of cash from bank, to cater for daily needs.

Payment of voucher by cheques / cash

Cash disbursement to salary department for payment of salaries, wages and other

payments.

Writing of cash / bank books.

Preparation of Bank reconciliation statement.

Safe custody of cash, cheque book, revenue stamp & other documents like bank

guarantees, fixed deposit receipts and investment etc.

Reconciliation of inter transfer of funds transaction.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 26

Page 27: Kpcl Final Project

Karnataka Power Corporation Limited

Bills department

Bills department concerned with the verification of bills relating to expenses after

verification, the bills will be sent to cash section for payment.

Bills department ensure that the bills amount are not exceeds the budgeted amount. If bills

amount exceeds the budgeted amount, the bill department is not having power to process the bill,

in that case managing director has power to process the bill.

In the department bills are divided in to two types.

1. Major bills.

2. Minor bills.

Major Bills

Major bills stands for amount payable for suppliers to supply goods to the power

generating units according to the predetermined agreements. Agreement is made on Rs. 100/-

stamp papers. In case of delay in supply of goods, penalty of 10% on the purchase work is

demanded. 80% of the payment will be made during the agreement, if the goods are being

transported by railways. In case, goods are transported roadways, payment will be made only on

receiving the goods, at the site, the quality and quantity of goods are verified and inspection

report will be sent to the bills section. In bills section the terms and conditions based on the

agreement are verified and if they are found to coincide with inspection report, then the bills will

sent to cash section for payment. If C-form is producing or submitted the right of royalty and

exercise duty would be 4%, otherwise 12%. C-form is issued only after receiving the goods.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 27

Page 28: Kpcl Final Project

Karnataka Power Corporation Limited

Minor Bills

The minor bills include:-

Payment of interest of loan, debenture, repayment of loan amount and debenture.

Payment of rent, telephone bill, office expenses printing and stationary, computer

maintenance expenses.

Payment of director’s fee and remuneration.

Reconciliation of balance of head offices with Banks.

Budget department

Budgeting is nothing but the blue print of the future needs of the company. Budget refers

to forecast of future need. KPCL involves two types of Budget.

BUDGETING

REVENUE BUDGET CASH BUDGET

Revenue Budget

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 28

Page 29: Kpcl Final Project

Karnataka Power Corporation Limited

The revenue budget mainly focuses on the sales revenue and the associated costs to

generate the power. The power generation is budgeted on the basis of average of last ten years

sales and expenses on the basis of previous year actual and estimation received from different

departments.

Establishment and general expenses.

Operation and maintenance.

Fuel and chemicals.

Royalty paid for water use.

Financial charges the outstanding loans.

Depreciation.

Cash budget

It is helpful in estimating each requirement, planning short term financing and scheduling

payments in connection with capital expenditure project, planning purchase of materials.

Consultancy Department

KPCL today has the capability to undertake large scale power projects from concept to

commissioning. It can also operate the plant on an EPC basis, with a host of exclusive auxiliary

services.

KPCLs Consultancy and Engineering Services Division, an offshoot of its core competency,

offers its clients a wide spectrum of consultancy inputs across the complete cycle of power

project development. It has the expertise in analysis and design of structures using STADPRO –

2006, NISA – Finite Element package, AUTOCAD – 2006, micro station and in house

developed software packages for reservoir operation, Stability of Dams etc.

These include

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 29

Page 30: Kpcl Final Project

Karnataka Power Corporation Limited

Feasibility studies / evaluation and the compilation of detailed project reports

Design, Engineering, procurement and construction services

Consultancy on both Thermal and Hydel Power Stations, including handling of

international competitive bids

Project Management from project scheduling to preparation of final invoice and

certification.

Supervision of erection, commissioning and operation of civil, electrical,

mechanical systems and equipment.

Operation and maintenance services,

Rehabilitation of dams in distress

Renovation, modernization and updating of hydro stations

Overall project and performance management.

Provident Fund department

Karnataka power corporation Ltd employee’s contributory provident rules. These rules

shall come in to force from 20th July 1970. The fund shall be deemed to have been

established on and from 20th July 1970. The regional provident fund commissioner decision

is final regarding interpretation of any rule and it must be carried out by both the trustees and

the member of the fund.

Pension department

The employee pension scheme 1995 (statutory). The central Govt established “THE

EMPOLYEES PENSION SCHEME 1995” through the employee’s provident fund and

miscellaneous provision Act 1952. This scheme shall come into force on 16 th day of

November 1995.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 30

Page 31: Kpcl Final Project

Karnataka Power Corporation Limited

Internal Audit Department

Internal Audit in KPCL a statutory requirement as per GOI order of 1975 was established

in KPCL in 1977 was earlier under the charge of financial adviser for a quite long, but now

not exist separate wing since 1986 is headed by chief manager (internal audit) and report to

M.D KPCL has 5 audit units.

Insurance department

Insurance is a service of an undertaking taken in order to over come or setoff the losses or

damages while operating the business. In order to cover the risk and maintenance KPCL has

taken out insurance policy with many companies. The risky projects among all power

generating project are RTPS in order to cover all those risks while operating all those

insurance policies covered under RTPS can be classified:

1. Maintenance

Standard fire and special perils.

Boiler explosion policy.

Terrorism.

2. Construction.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 31

Page 32: Kpcl Final Project

Karnataka Power Corporation Limited

HUMAN RESOURCE DEPARTMENT

CHART OF HRD

Managing Director

H R Director

General Manager HR

AGM (HRD) AGM (HRD)

Personnel Officer Personnel Officer

Junior Personnel

Officer/ Office

Manager

Junior Personnel

Officer/ Office

Manager

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 32

DGM (HRD-1)

Workers

DGM (HRD-1)

Workers

Page 33: Kpcl Final Project

Karnataka Power Corporation Limited

Senior Asst

Administrator

Senior Asst

Administrator

KPCL believes that its true investment lies in its workforce, and their happiness lies in

the future of KPCL, it therefore strives to make every effort to promote a work culture that

enable an employee to give his very best.

Employee participation in decision making negotiations has enabled the employee to

develop a sense of belongingness and in turn contributes to the progress of the organisation. A

high professional approach to recruitment, induction, on the job training appraisals and proper

channels of promotion help KPCL get personnel of the finest quality.

Human resource department concerned with managing/developing people. As the

organisation is made up of people, they should be managed/developed to attain higher level of

performance this can be done by developing their skills and motivating them. This helps the

organisation to achieve its objective.

KPCL has a dedicated of 2287 professionals, which share the vision of the KPCL

technocrats, administrators and supporting staff of KPCL joining hands to give more power to

Karnataka.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 33

Page 34: Kpcl Final Project

Karnataka Power Corporation Limited

STAFF OF KPCL

Particular % of manpower No. of manpower

Corporate: 37.64% 2287

Workmen: 62.36% 3788

Total: 100% 6075

HRD MISSION

A congenial work environment supportive of high performance leading to attainment of

HRD in KPCL.

Maintaining optimum staff level nurturing and developing talents, trust, empowerment,

concern for people and reward and key elements of congenial work environment which is

dynamic.

KPCL’s strength is its people. In its journey to achieve excellence, KPCL is focusing on

every aspect and area of work with the trust area being the development of its human resource.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 34

Page 35: Kpcl Final Project

Karnataka Power Corporation Limited

Functions of the Human Resource Department:

RECRUITMENT:

It is the process of finding and attracting capable applicants for employment. It is the

process of searching for and obtaining applicants for jobs, from among whom the right people

can be selected.

Online Recruitment:

200 Engineers recruited in 2005

Website notification.

About 4500 applications received online.

Written test through IIsc.

Interview/selection finalized in about 3 months.

TRAINING

Every year the corporation the training program for the benefit of the employees and the

company. During the year 2008-09 in house and external training 92 programs were conducted

totally 1151 employees consisting of 1031 corporate and 120 non-corporate cards benefited from

the training was Rs.41.07 lakhs.

IN-HOUSE TRAINING PROGRAMMES

Corporate excellence through co-operation and collaboration.

Company a/c’s and accounting standards.

Performance management.

Managing conflict for organisation excellence.

Total quality management.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 35

Page 36: Kpcl Final Project

Karnataka Power Corporation Limited

Motivating and goal setting.

BPR and bench marking.

Attitudinal shift through self development.

EXTERNAL TRAINING PROGRAMMES

National seminars on utilization of fly ash.

Earthquake resistance design of dams.

Renewable energy source and energy audit.

National seminar views of the future civil engineering in 21st century.

Role of energy efficiency in the Indian energy sector.

Seminar on instrumentation engineering practice, team and research.

Conference on the condition monitoring of plant and equipment.

International conference on civil engineering.

PERFORMANCE APPRAISAL

To ensure greater objectivity in appraising the performance of employees and also taking

in to account the present day practices in professionally managed organisation, KPCL decided to

introduce a new system called performance appraisal and development system in the corporation.

The PADS will apply to all the employees in the corporation cards.

In KPCL once in year the performance appraisal will be sent to the entire department in

order to know the appraisal of employees. It will be measured by immediate supervision,

reviewing authority and accepting authority.

TRANSFER

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 36

Page 37: Kpcl Final Project

Karnataka Power Corporation Limited

Transfer of an employee from one place of work to another place of work or one job to

another job is ordered primarily in the interest of the service of the corporation. Request of an

employee for transfer is given consideration and acted upon if it is in consonance with the

interest of the service of the corporation. Transfer also aims at rotation of employees among

relate jobs of the discipline to which the employee belongs, thereby enabling the employee to

acquire wider knowledge and experience in the discipline. Transfer and non-transfer, however is

not a matter of right for any employee.

KPCL has right to transfer any employee from one place to another place with in the country.

Transfer may arise due to:

Administrative grounds

suitability

Higher studies

Medical grounds

Joining spouse

RETIREMENT

The corporation has multiple schemes of retirement benefits of its employees, majority of

employees retiring under the pension and allied schemes, few employees retiring under

contributory provident fund schemes prevailing them, a scheme exempted.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 37

Page 38: Kpcl Final Project

Karnataka Power Corporation Limited

WELFARE ACTIVITIES

The HR Department is in charge of all the welfare activities in the organisation. The

welfare activities under taken by KPCL are:-

School recreation, club.

House journal.

Libraries and reading rooms.

Sports and games.

Consumer co-operative society.

Literacy programmes.

Canteen.

Medical facilities.

Cultural activity.

LOANS

House building / purchase / repairs improvement and extension advance may be granted

to the employees of KPCL for his bonafide, residential purpose only.

Vehicle advance to the employers and employees.

Festival advance to the employees of the corporation.

Loan assistance for the personal computer..

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 38

Page 39: Kpcl Final Project

Karnataka Power Corporation Limited

SAFETY MEASURES

Providing conveyance and other facilities to the employees involved in the accident while

on duty or service.

Accidents resulting in minor injuries / service injuries.

Fatal accidents while on duty.

Death of employee while on service.

Lost homage.

Free conveyance.

Retention.

PRODUCTION DEPARTMENT

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 39

Page 40: Kpcl Final Project

Karnataka Power Corporation Limited

For a power Generation Company a good production team is necessary. KPCL is having

a very good production department with highly skilled labour. They recruit experience

professionals. They upgrade technology on a continuous basis. KPCL gives them adequate

training in order to update them with latest techniques and with new skills. These production

teams are placed at project sites with adequate facilities. Today KPCL owns and operates 34

Dams and nearly 25 Power houses.

These are four type of power generation by KPCL and they are:-

1. THERMAL: In this type of power generation KPCL produces the power by using coal

and fuel as raw material. At present RTPS’s (Raichur Thermal Power Station) 8 th unit,

BTPS (Bellary Thermal Power Station) thermal plants are under construction. KPCL has

many track records in Thermal power production. In these case KPCL is well known in

Asia and world this form power generation contributes 31% of total power generation.

Ex: RTPS which have 7 units.

2. HYDEL: In this case KPCL produce the power by using the water as raw material it has

constructed 34 Dams for Hydel power generation. This form of power generation

contributes 68% of total power generation

Ex: sharavathi valley project, kalinadi hydro electric project

3. WIND: It is also one type of power generation where KPCL produce power by using the

wind. This form of power generation contributes only 1% of total power generation Ex:-

Kappatagudda wind farm.

4. DIESEL POWER STATION: - A diesel generator is the combination of a diesel

engine with an electrical generator (often called an alternator) to generate electric energy.

Diesel generating sets are used in places without connection to the power grid or as

emergency power-supply if the grid fails.

KPCL has 6 units and 21.32 capacities in MW, total installed capacity is 127.92. this type

of power generation is very costly, it costs nearly Rs.10 per unit and used only for emergency

purpose. KPCL’s Diesel power station is situated in Yelahanka.

Ex: - Yelahanka Diesel generating station

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 40

Page 41: Kpcl Final Project

Karnataka Power Corporation Limited

KPCL currently has 34 dams & 25 power stations across the State with profiles that range from

0.35 MW to 1035 MW.

The total installed capacity logged by KPCL is 55739.83 MW across a project canvas that covers

expansions, renovations and upgrading of existing plants. .

Generation performance

Generation 2008-09 2007-08 2006-07 2005-06 2004-05

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 41

Page 42: Kpcl Final Project

Karnataka Power Corporation Limited

Thermal 11717 10876 11484 9165 10730

Diesel + Hydro + Wind 13363 14737 15151 10724 8260

Total 25080 25613 26635 19889 18990

Thermal Details  

Generation(MU) 11717  10875 11484 9165 10730

Aux.Consumption (%) 8.55  8.66  8.22  8.62  8.68 

Plant Load Factor (%) 67.90  84.45  89.18  71.17  83.33 

Specific Coal Consumption

(KG/KWH)

0.646 0.643  0.658  0.660  0.647 

Specific Oil Consumption

(ML/KWH)

1.770 0.741  0.445  0.736  0.599 

Performance of Major Hydro Stations (2008 - 2009)

Power Stations %Age Availability %Age Auxiliary

Consumption

Sharavathi 96.39 1.10

Nagjhari 85.10 2.21

Varahi 95.77 2.72

POWER HOUSES

Power Station No of Units MW Total

Thermal

Raichur 7 210 1470

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 42

Page 43: Kpcl Final Project

Karnataka Power Corporation Limited

Bellary 1 500 500

Diesel - Yelahanka 6 21.32 127.92

Hydel

Sharavathi

Linganamakki 2 27.5 55

Sharavathi 10 103.5 1035

Gerusoppa 4 60 240

MGHE Jog 4

4

21.60

13.20

139.20

Bhadra Right Bank 1

1

7.2

6

13.20

Bhadra Left Bank 2

1

12

2

26

Kalinadi

Supa 2 50 100

Nagjhari 2

4

135

150

870

Kadra 3 50 150

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 43

Page 44: Kpcl Final Project

Karnataka Power Corporation Limited

Kodasalli 3 40 120

Varahi

Varahi 2 115 230

Mani 2 4.5 9

Other

Ghataprabha 2 16 32

Almatti 1

5

15

55

290

Munirabad 2 9 28

Shivanasamudram 4

6

6

3

42

Shishma 2 8.6 17.20

Mallapur 2 4.5 9

Sirwar 1 1 1

Kalmala 1 0.40 0.40

Ganekal

Wind 1 10

Kappadagudda 9

11

0.225

0.230

4.55

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 44

Page 45: Kpcl Final Project

Karnataka Power Corporation Limited

KPCL’S ONGOING AND NEW PROJECT

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 45

NO PROJECT CAPACITY

(MW)

1

2

3

4

5

6

7

8

9

10

11

12

13

14

Bellary Thermal Power Station Stage – I

Bellary Thermal Power Station Stage – II

Bidadi Combined Cycle P

Raichur Thermal Power Station Unit – 8

Varahi Hydel Projects 3 & 4

Nagjhair Power House- R & M

Gundia High Lead Scheme

Yermars Thermal PowerStation

Yadgir Thermal Power Station

Annehakanahalli Thermal Powe Station

Kalguriki thermal Power Station

Edlapur Thermal Power Station

BTPS unit 3

Kudathini Thermal Power Station

500

500

1400

250

230

45

400

2x500

2x500

3x500

3x500

1x500

1x500

3x500

Page 46: Kpcl Final Project

Karnataka Power Corporation Limited

MARKETING DEPARTMENT

KPCL directly sells power to the particular customer that is KPTCL, it is a sub part of the

KPCL. KPCL generates power directly sells to the KPTCL (Karnataka Power Transmission

Corporation Ltd). Its carries out transmission of power, thus KPCL no need to carry out

marketing its power generated.

It’s producing ¾ of the demand offered by the KPCL, it fulfilling market demand by

joining hands with central government, Private organisation and other companies.

Within the KPTCL zone power is supplied to the households, commercial establishment,

industries etc, and other government under takes namely:

BESCOM- Bangalore Electricity Supply Company (HQ in Bangalore)

MESCOM- Mangalore Electricity Supply company (HQ in Mangalore)

GESCOM- Gulbarga Electricity Supply Company (HQ in Gulbarga)

HESCOM- Hubli Electricity Supply Company (HQ in hubli)

CESCOM- Chamundeshwari Electricity Supply Company (HQ in Chamundeshwari)

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 46

Page 47: Kpcl Final Project

Karnataka Power Corporation Limited

COMPUTER DEPARTMENT (TECHNICAL)

CHART OF TECHNICAL DEPARTMENT

Managing Director

Technical Director

Executive Director

Chief Engineer

Superintend Engineer

Executive Engineer

Assistant Engineer

Junior Engineer

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 47

Page 48: Kpcl Final Project

Karnataka Power Corporation Limited

In KPCL, whole organisation is computerised. It is the first state utility in the power

section to have established computerised satellite communication network, through V-SAT.

LAN is established at office in Bangalore and at all project sites. LAN is used for E-mail, file

sharing, and printing of document, internet, and application software. The computerisation

includes latest software like Auto-CAD, Oracle, developed 2000, Windows NT, Server etc. The

software developed with in KPCL deals with –Finance, Administration, Design, MIS, Public

Deposit, and Provident Fund.

MIS plays a vital role in KPCL, as information is required for any company to set up and

also to work. In 1996, KPCL started a full-fledged computer services department, there are 18

projects at Bangalore carried on by KPCL employees; so, in order to cater to all of them system

department was organised. There 13 system engineers and 8 computer engineers catering

according to KPCL. Wide Area Network (WAN) has been installed connecting 9 projects with

use of V-SAT at Bangalore. LAN is also been installed at all project locations at Bangalore.

There are around 750 computers in the organisation at Bangalore. The whole organisation is

computerised. All the projects are automated and they go online to rectify the problems in the

project. They train their staff whenever required, i.e. when the technology is being updated.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 48

Page 49: Kpcl Final Project

Karnataka Power Corporation Limited

The Hi-Tech V-SAT network apply called “SHAKTHINET” was commissioned during

June 1997.

KPCL is a highly IT Savvy company among the public sector units in the state at large

and power sector in particular and has the distinction of being the first state owned company in

the power sector to have established SHAKTINET- a satellite based communication network

through V-SATs among all its power stations and Bangalore. Local Area Networks have been

established at all Project locations and about 800 officials have been wired to corporate office

with reliable VSAT back bone. All the activities of the corporation are computerized and KPCL

has the unique distinction among power utilities of establishing voice and data communication

between its projects and Bangalore through the new generation DAMA V-SATS on KPTCL’s

"VIDYUTNET". The computer services department of KPCL with fully dedicated engineers and

software professionals has developed and implemented all the software required for its business

activities and is geared to offer consultancy services in the field of software development and

networking.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 49

Page 50: Kpcl Final Project

Karnataka Power Corporation Limited

Some of the software developed in-house are:

Fuel Management system

Human resource Information System

Cash and Compilation Management system

Establishment

Integrated Inventory Management System

Public Deposit System

Generation Management System

Billing software for Bellary Thermal power station

Medicine Procurement system

 New Initiatives

Established 2 MBPS MPLS circuits between Bangalore and two of its major projects via

Raichur Thermal Power Station and Bellary Thermal power station for speedy

communication.

Extension of the above facility to other project locations in the near future.

Established Video Conferencing facility at Major project locations.

Exploring possibilities of establishing SCADA facility at corporate office, Bangalore for

real time data monitoring.

Providing reliable communication facility at major project locations through Fiber Optic

Cabling using state of the art technology.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 50

Page 51: Kpcl Final Project

Karnataka Power Corporation Limited

The computer services department has set for itself very high standards and firmly

believes that "It is not the IT Infrastructure of a few crores that needs to be managed but

the business that gets transacted over the network that needs to be managed".

ENVIRONMENT DEPARTMENT

“We have not inherited the earth from our parents. We have borrowed it from out

children”. Believing in this credo and translating this belief into action, KPCL is constantly and

consciously striving to return to the environment whatever the organisation borrows from it.

While carrying out its primary task of power generation, KPCL has also adopted a definite policy

that blends and harmonizes ecological balance even as it upholds human rights.

The modern civilization is looking for sustainable development, which in real sense

means improving quality of human life, and much depends on healthy environment development

can not be achieved at the cost of environmental destruction, ecological imbalance and human

health, at any time. Sustainable development has little value with out environmental protections.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 51

Page 52: Kpcl Final Project

Karnataka Power Corporation Limited

Keeping this in mind, KPCL is stringently adhering to its comprehensive environment

action plan that covers systematic strengthening of environment management, pollution

monitoring at power stations and implementation of specific environment projects.

Every time KPCL implements a power project, it undertakes a comprehensive

environmental impact study, to examine the impact of the proposed project on the environment.

KPCL also undertakes eco-friendly techniques like controlled blasting, constructing

colonies with least destruction to ecology, provision of fish ladder, installation of electro static

precipitators in thermal plants, etc. particular care is also taken to minimise pollution.

Environment Management Measure

KPCL’s power generation blueprint has a clear-cut policy on environment management.

Building in green-mapping concepts such as sustainable development, which creates the

framework for improving the quality of life. Sustainable development goes hand-in-hand with

'environment protection'

KPCL has a comprehensive action plan in place that enables environment management, pollution

monitoring and the implementation of specific environment projects.

All KPCL projects have the assurance of a comprehensive Environmental Impact Study to

evaluate the impact of the project on the environment. It also prepares an Environmental

Management Plan complying with all the conditions stipulated by KSPCB/MOEF.

KPCL's Raichur Thermal Power Station has been accredited with ISO 14001 -2004 for its efforts

towards environment protection management.

The following innovative and new measures to aid the process of environment control have been

put in place:

A unique Ayurvedic greenhouse has been developed at Kadra Project.

Fish fingerlings in power generation reservoirs to maintain aqua-balance.

Eco-friendly control measures adopted such as controlled blasting.

Construction of colonies with least destruction to ecology.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 52

Page 53: Kpcl Final Project

Karnataka Power Corporation Limited

Installation of Electro Static Precipitators in Thermal Plants.

Measures across the board to minimize pollution.

Fuel supply agreement with collieries to ensure high grade coal supplies.

Monitoring measures for ash minimization, ash emission control, ash utilization and ash

disposal.

Recycling of water from ash ponds for alternative use.

Modernization of sewerage treatment plant.

Continuous monitoring of air quality in work environments & environment management

measures.

Evacuation of Fly Ash from RTPS

KPCL has taken several steps to promote fly ash utilization as per MoEF notification. Fly ash is

being issued free of cost to SSI units. Leading cement manufacturers in the country have tied up

with KPCL for lifting fly ash to an extent of about 2500 metric tones per day. Besides several

small- scale industries, brick manufacturing Units & Government construction buildings are also

utilizing about 450 metric tones per day. The operation and maintenance of silos and issue of fly

ash to users from units 3,4,5,& 6 has been entrusted to M/s. ARV Cement society. In respect of

Units 1,2 & 7 M/s ACC has installed the necessary equipment for fly ash collection at their cost .

Fly ash utilization at RTPS is rapidly increasing and present utilization is 80% of the fly ash

production. Further, the users have proposed transport of ash through rail by having a dedicated

siding & this work is under progress. Total production of fly ash during 2006-07 was 17.5 lakh

MT and 12.14 lakh MT of fly ash was lifted.

KPCL has established a “Centre of Fly Ash Utilization Technology and Environment

Conservation” at Raichur Thermal Power Station in consultation with Central Power Research

Institute as consultant under Indo Norwegian Environmental Programme at a cost of Rs 58

million. Presently, in the above centre is manufacturing various Fly Ash products and are being

utilized by them for housing. This centre will demonstrate various process, technologies for the

manufacture of construction materials like brick, hollow concrete blocks, mosaic tiles etc.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 53

Page 54: Kpcl Final Project

Karnataka Power Corporation Limited

Fly ash Initiatives

MOEF/GOI has stipulated utilization of 100% Fly Ash generated at Thermal power

stations for manufacturing ash based products like Bricks, Asbestos sheets,

Embankments, Dams and Dykes. Fly Ash is issued free of cost

The approximate quantity of Fly Ash generated at Raichur Thermal Power Station from 7

units for the year 2004-05 is 16.0 lakh MT

RTPS has the distinction of utilizing approx. 60 to 65% of Fly Ash in a year

Total coal consumed during 2004 – 2005 69.10 lakh tones

Ash content - 22.02 lakh tones

(Weighted ash content 31.73 %)

Fly ash (80%) 16.0 lakh tones

Bottom ash (20%) 4.40 lakh tones

Initiatives to utilize maximum Fly Ash from RTPS :

* Agreement signed with major cement manufacturers like ACC and ARV society for

production of puzzalona cement using Fly ash

* The Fly ash is being transported through specially designed closed tankers by road

* MOU between KPCL and major cement companies like ACC and ARV is under

finalization for   transportation of fly ash by rail in closed railway wagons to enhance the

utilization

* Fly ash has been issued to many SSI units for manufacture of Fly ash bricks, asbestos

sheets   etc.

* Established an R&D centre in 2002 with Norwegian aid for the utilization of Fly ash in

the   manufacture of ash based products.

* Associated with the University of Agricultural Sciences, Raichur by extending financial

aid for   carrying out R&D on utilization of Fly ash in the agricultural sector.

* Pond ash is being used for construction of roads.

* Fly ash bricks utilized for construction of houses and station building

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 54

Page 55: Kpcl Final Project

Karnataka Power Corporation Limited

ASH UTILISATION:

2004 – 2005 64.82 %

2003 – 2004 56.00 %

2002 – 2003 31.00 %

CORPORATE COMMUNICATION

Corporate communication is playing a vital role in KPCL. The main aim of corporate

communication is image building.

Functions of Corporate communication

Various publications have been brought out

Media Relations – maintaining good rapport with Print &

Electronic Media.

Sports meet were organized

House magazine “Shakthi Vahini” being published regularly to maintain internal relation

and motivating the hidden talents of employees.

Organised various meetings, functions and Seminars.

Corporate film produced and screened.

Corporate Image building in news-paper and magazines released on important occasions.

Develops relevant literature and documents of the Company.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 55

Page 56: Kpcl Final Project

Karnataka Power Corporation Limited

Enhance the image of KPCL through various sponsorships and financial assistance to

temples, educational institutions and hospitals, district festivals, sports personnel and

blind Association/orphanages as Community service measures.

Constant upgrading the image of the company and maintain cordial relations with opinion

makers and pressure group etc.

SWOT ANALYSIS

STRENGTHS:

Availability of resources:

Generally the power generation in India is based on natural resources. Availability of

abundant coal reserves and water resource are boon to power sector.

High potential:

Indian power sector have the vast hydro electric potential of producing 150,000 MW.

Emergence of strong and globally comparable central utilities (NTPC, Power Grid) has helped

the growth of power sector.

Effective planning and implementation:

Indian power sector have expertise in integrated and co-ordinated (CEA and Planning

Commission). Availability of highly skilled technical personnel in large numbers has helped to

implement these plans effectively.

Growing demand for the power;

Indian power sector has responded positively to the increasing demand for the power

throughout the country from all sectors due to industrialisation and irrigation facilities

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 56

Page 57: Kpcl Final Project

Karnataka Power Corporation Limited

WEAKNESS

Inadequate infrastructure:

Inadequate infrastructure has lead to inadequate power generation and thus under

utilisation of available resource.

Under utilisation of capacity:

Under utilisation of the existing generation capacity in present projects has decreased the

profitability.

Interstate disputes:

Improper water management and interstate water disputes are wasting valuable water

resource there by reducing the production efficiency.

Fluctuating monsoon:

Untimely monsoon causes water scarcity in the country affecting the generation of

power and leads to power cuts and load shedding.

Ineffective power administration:

Ineffective power administration leading to power thefts and inefficient use of electricity

by the end consumer decreases the revenue.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 57

Page 58: Kpcl Final Project

Karnataka Power Corporation Limited

OPPORTUNITIES

Investment opportunities:

Investment opportunities for private people are increasing because of increasing demand

for the power. This contributes to growth of power sector.

Subsidies given by government:

Subsidies are given by government for the generating companies to encourage power

generation and supply.

Largest power markets:

Potentially, Indian power sector is one of the largest power markets in the world.

Growing demand for the power from all sectors of economy like agriculture, manufacturing,

service.

Monopoly in power sector:

KPCL being the state monopolist in power generation holds tremendous growth

opportunities in the field of investigation, design, construction, generation and maintenance of

power projects.

Consultancy business:

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 58

Page 59: Kpcl Final Project

Karnataka Power Corporation Limited

As KPCL is venturing into consultancy business which is still at growing phase, company

can look for bright future.

Explore other source of energy:

KPCL has opportunity to explore other source of energy like wind based and solar power

projects.

Rural electrification:

Government has shown concern rural electrification. Schemes like Bhagya jyothi scheme,

which aims to power to the poor families at cheaper rate.

THREATS

Uncertain government policies:

Changes in political environment affect the government policies. Excess involvement of

government in decision making affects the industry.

Bad debts:

Increasing bad debts due to non payment of electricity bills by poor people and power

thefts.

Interstate water disputes:

The interstate water sharing disputes have halted the smooth functioning of many

projects.

Entry of private players:

With the advent of economic reforms and liberalization, there is an open gate policies for

private participants like TATA Power, Reliance Energy, GMR, etc, in the field of power.

Rise in prices:

Increase in political of coal due to increase in demand and transportation cost leads to

increase cost of production of Thermal power.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 59

Page 60: Kpcl Final Project

Karnataka Power Corporation Limited

FINDINGS

The organisation is reimbursing the medical bills on time.

The organisation is providing good leave facility to its employees.

The promotion scheme in KPCL is mostly based on seniority.

The training given in KPCL is serving the purpose that is employees are

improving the performance on the job.

The canteen facility provided should be improved so that the employees work

efficiency and their by to improve the productivity of the organisation.

Since the employees felt that there is disturbance at work place due to noise

necessary steps should be taken to remove it.

The financial performance of the company is good compare to previous financial

year

The investors are getting good returns.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 60

Page 61: Kpcl Final Project

Karnataka Power Corporation Limited

The employees are satisfied very much with good benefits.

The co-ordination between management and workers is good.

More training and development is required.

SUGGESTION

KPCL has both expertise and experience in power generation. Hence, the organisation

can focus on research and development activities leading to innovative methods of power

generation.

Generation of more power from natural sources which again depends on research and

development.

By generating more and more wind power, cost can be minimised.

More awareness program and other such events at places where power project are to be

constructed. The co has scope to improve on layout facility.

The company has to improve number of power station.

The factory should make the arrangement of pay to the middle men at the proper time.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 61

Page 62: Kpcl Final Project

Karnataka Power Corporation Limited

CONCLUSION

The organizational study helps to analyze the functioning of the overall

organization and to check out the strengths and weakness of the company. The study gives

details about the departments, its operation, coordination and functioning in detail. The company

is giving major preference to quality in its operation The company is having a very narrow

distribution channel.

It has been a long and rewarding journey for KPCL ever since its establishment in the

year 1970. Today, KPCL takes great pride in the experience it has gathered, the expertise it has

developed and the skills it has honed. Especially in planning, investigation, design, execution

and effective operation and large power projects. KPCL has completed power projects in record

time by compromising on quality of infrastructure and power generation, these by meeting the

challenges of the rising energy demands of Karnataka. An excellent HR department coupled with

innovation in technology and motivated staff further have led to the uplift the organisation.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 62

Page 63: Kpcl Final Project

Karnataka Power Corporation Limited

MY LEARNING EXPERIENCE

It was great opportunity to do the In-plant training /Organization study in one of the

Manufacturing company- KARNATAKA POWER CORPORATION LTD

As part of this program, acquired good knowledge about the Karnataka Power Corporation

limited. During my study I have visited almost all the department like Research and

Development, Human resource, marketing, Finance and Agriculture, Technical technology. I

have come to know that the theoretical concept which I have studied in my MBA has been

implemented in practice in the industry. However I would see a greated mismatch from the

theory and practice.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 63

Page 64: Kpcl Final Project

Karnataka Power Corporation Limited

I thank the university and the college for providing this kind of an exposure. Where I had

a chance to see what I have learnt in my theory classes.

BIBLOGRAPHY

Web sites:

www.powermin.nic.in-Official- website of Indian Ministry of power.

www.karnatakapower.com –KPCL Company website.

BOOKS REFERRED:

Human Resource Management – By Ashwathappa.k

Financial Management – By Prasanna Chandra.

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 64

Page 65: Kpcl Final Project

Karnataka Power Corporation Limited

Magazines in KPCL.

KPCL’s 38th Annual Report 2007-2008

Appendix

FINANCIAL PERFORMANCE

Financial result For the year ended

March 31, 2008

(Rs. in crores)

For the year ended

March 31, 2007

(Rs. in crores)

Gross income from Sale of

energy

3345 3434

Other income 306 316

Total Income 3651 3750

Operating expenditure 2624 2751

Operating profit 1027 999

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 65

Page 66: Kpcl Final Project

Karnataka Power Corporation Limited

Finance Charges, Depn,&

prior period adjustments

777 628

Profit before tax 250 371

Provision for Tax 29 77

Deferred tax 15 -28

Profit after tax 206 322

Graphical Representation of Financial Performance

Profit

Profit before tax during the year was at Rs.250 crores as against Rs. 371 crores during the

previous year.

Turnover

VVN.INST OF MGT ,TECH & RESEARCH B’LORE Page 66

Page 67: Kpcl Final Project

Karnataka Power Corporation Limited

Turnover during the year was Rs.3345 crores as against Rs.3434 crores during the previous

year, on account of higher generation in thermal & hydel stations.

Generation

Generation during the year was 25613 mus as against 26635 mus during the previous year on

account of higher hydel generation.

Dividend

A dividend of Rs.22.42 per share in previous years has been proposed. The total dividend

outgo will be Rs.14.87 crores.