MBA CPM SECTION A GROUP 2 SUBGROUP 1 ABIN BABU PUNEET SURI POORVA RATHORE DEVESH VERMA MOHIT MISRA STAKEHOLDER ANALYSIS OF KOCHI METRO RAIL Ltd (PHASE 1)

Upload: zigma-builders

Post on 16-Apr-2017

203 views

Category:

Engineering


13 download

TRANSCRIPT

Page 1: Kochi metro stakeholder analysis

MBA CPM SECTION A GROUP 2 SUBGROUP 1ABIN BABU PUNEET SURI POORVA RATHORE DEVESH VERMA MOHIT MISRA

STAKEHOLDER ANAL-YSIS OF KOCHI METRO

RAIL Ltd(PHASE 1)

Page 2: Kochi metro stakeholder analysis

ABOUT KOCHI METRO..PROJECT PROFILE

This PowerPoint Template has clean andTransit type Rapid transit

Number of lines 1

Number of stations(PHASE 1) 25 (including 3 in future)

Operation will start 7 June 2016(as per schedule)

Train length 3 coaches

Headway 5 minutes

System length 25.612 km (15.915 mi)

Average speed 34 km/h (21 mph

Top speed 80 km/h (50 mph)

Page 3: Kochi metro stakeholder analysis

•Ministry of Urban Development predicts an aver-age city speed of 6 to 8 kmph by 2030•The present transport facilities are inadequate•Further road development is very limited •first move in such a direction in Kerala.•The average citizen would get a reliable, safe, eco-nomic, comfortable, user friendly and punctual mode of transport at affordable rates

Why Kochi Metro?

WHY NOT?????

Page 4: Kochi metro stakeholder analysis

ALUVA PULIN-CHODU

COMPANYPADY AMBATTUKAVU MUTTOM

PATHADIP-ALAM

EDAPALLY CHANGAM-PUZHA

PALARIVAT-TOM

JLN

M.G.ROAD MAHARAJAS SOUTH KADAVANTHRA VYTTILAKALAMASSERY CUSAT TRIPUNITHARA ELAMKULAM THAIKOODAM

KALOOR LISSIE PETTA

Page 5: Kochi metro stakeholder analysis

Moving to business....Tools we used .....

Page 6: Kochi metro stakeholder analysis

MAJOR STAKEHOLDERS

KMRL DMRC GCDA CORPORA-TION

M1

M2 M3 M4 M5 M6

L&T SOMA E & R VINDHYA REDSTAR

ARDANUY ALSTROM CENTRAL STATE GOVT CM(KERALA)

JICA AFD MEDIA RESIDENTS

Page 7: Kochi metro stakeholder analysis

Power interest matrix

Page 8: Kochi metro stakeholder analysis
Page 9: Kochi metro stakeholder analysis

Engagement assessment matrix

Stakeholder Unaware Resistant Neutral Supportive leading

Residents c d

Media c d

corporation c d

Page 10: Kochi metro stakeholder analysis
Page 11: Kochi metro stakeholder analysis
Page 12: Kochi metro stakeholder analysis
Page 13: Kochi metro stakeholder analysis
Page 14: Kochi metro stakeholder analysis

So in short

People are unaware of benefits they are going to get.

Wrong attitude of media (which is further fired by DMRC )

Worsened traffic scenario due to constructions.

Page 15: Kochi metro stakeholder analysis
Page 16: Kochi metro stakeholder analysis

THANK you for this opportunity sir