Marianne Eide, Jeroen van der Hejden og Bo Malmquist
November 2012
Knarr FPSO Storulykkerisiko
Forebyggende arbeid som gjøres i
utbyggingsfasen
Legal notice
Certain statements included in this presentation contain forward-looking information concerning BG
Group plc’s strategy, operations, financial performance or condition, outlook, growth opportunities or
circumstances in the countries, sectors or markets in which BG Group plc operates. By their nature,
forward-looking statements involve uncertainty because they depend on future circumstances, and relate
to events, not all of which are within BG Group plc’s control or can be predicted by BG Group plc.
Although BG Group plc believes that the expectations reflected in such forward-looking statements are
reasonable, no assurance can be given that such expectations will prove to have been correct. Actual
results could differ materially from the guidance given in this presentation for a number of reasons. For a
detailed analysis of the factors that may affect our business, financial performance or results of
operations, we urge you to look at the “Principal risks and uncertainties” included in the BG Group plc
Annual Report & Accounts 2011. Nothing in this presentation should be construed as a profit forecast and
no part of this presentation constitutes, or shall be taken to constitute, an invitation or inducement to
invest in BG Group plc or any other entity, and must not be relied upon in any way in connection with any
investment decision. BG Group plc undertakes no obligation to update any forward-looking statements.
No representation or warranty, express or implied, is or will be made in relation to the accuracy or
completeness of the information in this presentation and no responsibility or liability is or will be accepted
by BG Group plc or any of its respective subsidiaries, affiliates and associated companies (or by any of
their respective officers, employees or agents) in relation to it.
2
Occupational Safety – The Lion
dreamstime free stock images
4
Hunts ? In packs
Detectable ? Often visible and audible
Results ? A born killer
Fully tame it ? Never
Leave unguarded ? Never
Watch it ? Always
Asset Integrity – The Tiger
Hunts ? Alone
Detectable ? Secretive & camouflaged
Results ? A born killer
Fully tame it ? Never
Leave unguarded ? Never
Watch it ? Always
dreamstime free stock images
5
Knarr Field Development
6
• Jordbær discovery July 2008 FPSO Contract June 2011
• Concept Selection April 2010 FPSO sailaway Dec. 2013
• PDO Submission Jan. 2011 First oil May 2014
7
Asset Integrity Standard throughout the life-cycle
Design & Build
Integrity
Sustain
Integrity
Operate
with integrity
Asset
Integrity
Maintain BarriersIdentify &
create Barriers
Working
within the
Barriers
Design & Build
Integrity
Sustain
Integrity
Operate
with integrity
Asset
Integrity
Maintain BarriersIdentify &
create Barriers
Working
within the
Barriers
8
Barriers in the Lifecycle
Technical (initial &
ongoing) Integrity
Operating
(ongoing) Integrity
Asset Integrity = Design Integrity + Technical Integrity + Operating Integrity Assess & treat risk
Documentation
Communicate
Assess & treat risk
Construct to design
Document as-built
CMMS & Maintain fit for ops
Understand changing risk
Measure performance
Communicate
Assess & treat risk
Operated by competent staff
Within parameters & controls
Manage ongoing change
Communicate
Design (Initial) Integrity
Risk Understanding Maturity & Safety Cases
Boundaries
• Limited to Knarr Central and West
• No shore based processing facilities
• No new/unproven technology
• Compliance BG and Norwegian regs
Project drivers
• Health, Safety & Environment
• Schedule
• Value
• Flexibility to reserves
• Maximise recovery of oil and gas
Knarr Concept Selection
9
Subsea tie-back to an existing host
Subsea tie back with subsea processing
Compliant tower (wellhead facility)
Mini SPAR (wellhead facility)
TLP with export of oil via pipeline or FSO
SPAR with export of oil via pipeline or FSO
Semi-Sub with oil export via pipeline or FSO
FPSO development, with subsea templates
Early Concept & Define Activities
• Safety Layout Review – Topsides
– Early identification of possible ’Major Accident Hazards’, ’Initatiors’ and ’Escalators’ and their relative proximity
– Redistribution of ’, ’Initatiors’ and ’Escalators’ to mitigate ’Major Accident Hazards’
– To build in ’Inherent Safety’
• Concept based Working Environment Impact Assessment
– Early identification of shortcomings in design wrt
– NCS and NORSOK compliance
– “Logistics” for the LQ
– Functionality and interfaces between different functional areas
– Potential space issue related to technical installations
– Significant potential for freeing space (excessive cabin size)
– Paramount to include correct competence, especially Architectural with Offshore Design experience
11
Early Concept & Define Activities
Safety Layout Review
12
Free standing H-rated blast walls
Jet fire deflection
Before - SLR
After - SLR Free standing H-rated blast walls
Knarr FPSO
Requirements
• All PSA regulations including
NORSOK
– S-001 Technical Safety
– S-002 Working Environment
– Z-13 Emergency Preparedness
& Risk Assessment
• 50 BG Standards
13
Number Standard
BGA LNG MAR TS 1 Offshore Marine Assurance
BGA OPS GEN OS 1 Management of Competence Assurance
BGA ENG PROC TS 2 Safe Plant and Equipment Isolation 02a
BGA ENG FPSO TS 2 Floating Production Storage & Offloading Systems
BGA ENG PROC TS 3 Relief, Blowdown and Flaring Rev 03a
BGA DEV PT OS 6 Production Data Mgt System
BGA BGA GEN OS 11 Asset Integrity Management
BGA ENG PROC TS 12 High Integrity Protection Systems HIPS Rev 02a
BGA ENG PROC TS 15 Process Safety in Design
BGA PM PM OS 23 Managing Precommissioning Commissioning in Projects
BGA BGA OPS OS 43 Offshore Marine Operations
BGA OPS GEN OS 44 Aviation Operations
BGA HSSE SAF ST 1526 Safety Case Rev 01
BGA BGA OPS OS 22 Permit to Work System Requirements
BGA BGA OPS OS 20 Entry into Vessels & Confined Spaces
BGA BGA OPS OS 30 Control of Temporary Equipment
BGA BGA OPS OS 33 Working at Heights
BGA BGA OPS OS 34 Management of Over-Rides
BGA BGA OPS OS 42 Hoisting and Lifting
BGA BGA OPS OS 52 Maintenance Management
BGA BGA OPS OS 19 Application of Process Isolations
BGA OPS ELEC TS 1 Electrical Safety Rules Rev01
BGA ENG MECH TS 1 Selection of Rotating Machinery Rev 03a
BGA ENG MECH TS 2 Design and Selection of powered actuators for ESD Rev 02a
BGA ENG MECH TS 3 Piping Design Rev 02a
BGA ENG MATL TS 4 Thermal Insulation Rev 01a
BGA ENG MATL TS 7 Fabrication of Equipment and Piping Rev 02a
BGA ENG MATL TS 8 Materials of Construction Requirements Rev 01
BGA ENG MECH TS 9 General Requirements for Lifting Equipment Rev 02a
BGA ENG PROC TS 10 System Design Temperatures Due to Solar Radiation Rev02a
BGA ENG MECH TS 12 Flange Joint Management, Cleaning & Pressure Testing Rev 03a
BGA ENG PROC TS 1 Hazard and Operability HAZOP Studies Rev 03a
BGA ENG MATL TS 1 Material Selection & Corrosion Control Rev 02a
BGA ENG INST TS 1 Control, Communication and Safety Systems Rev02a
BGA ENG ELEC TS 1 Project Dev Construction Commissioning Requirements Rev 02
BGA ENG ELEC TS 2 Electrical Equipment in Flammable Atmospheres Rev02a
BGA ENG MATL TS 5 Protective Coatings Rev 02a
BGA ENG MATL TS 6 Cathodic Protection Rev 02a
BGA ENG MECH TS 8 Selection/Design Dry Gas Seals/Systems for Centrifugal Compressors
BGA ENG PROC TS 16 Gas-Liquid Separation Rev 02a
BGA BGA OPS OS 40 Shutdown Management Planning
BGA HSSE GEN ST 401 HSSE Training and Competency
BGA HSSE SAF ST 1504 Personal Protective Equipment PPE
BGA HSSE SEC ST 1505 Security
BGA HSSE ENV ST 1508 Water Quality Rev 01
BGA HSSE SAF ST 1512 Behaviour-Based Safety
BGA HSSE ENV ST 1530 Resource Use and Waste Management Rev 01
BGA HSSE SAF ST 1532 Escape Muster Evacuation and Rescue
14 See also NORSOK Standard S-001
BG Standard – Process Safety in Design Remove – Reduce – Minimize – Inherent Safety
Specific Philosophies for areas that warrant specific focus
Design Case for Safety
• Input to the Design Safety Case
– HSSE Management System
– Safety Studies and Risk Assessments
– MAHEE – Major Accident Hazards &
Environmental Events
– SCEs & ECDs – Safety Critical
Elements & Environmental Critical
Devises
– PS’ – Performance Standards
– * NB – the above is developed in the
FEED phase prior to detailed
engineering, procurement, etc.
• Design Safety Case format
– Field and Development Description
– HSSE Management System in Design
– Design Philosophies and Processes
– Development of Concept
– Facilities Description
– Control of MAHEEs (Major Accident
Hazards & Environmental Events)
– Preliminary QRA & Safety Studies
and Risk Assessments
– Description of Barriers
– SCEs & ECDs, incl. PS’
15
Register of
MAHEEs
Register of
Barriers (SCEs &
ECDs)
Performance
Standards
Documented
Assessments and
Studies
Writen
Scheme of
Verification &
Validation
Review & CommentReview & Comment
Review & Comment Review, Comment &
Develop
Execute
Verification &
ValidationComplete Verification &
Validation
Written
Report of
Verification &
Validation
Completion of
Verification & Validation
Independent Verification Process
• Development of
– WSV (Written Scheme of Verification)
– Activity plans for Detailed Design, Procurement, Fabrication / Construction, MC & Commissioning, Installation , etc.
– Work instructions
• Execution of
– Verification & Validation
– Report on Verification & Validation
16
• Review of
– Design Case for Safety
– Studies & Register of MAHEEs (Major Accident Hazards & Environmental Events)
– SCEs (Safety Critical Elements)
– ECDs (Environmentally Critical Devices)
– PS’ (Performance Standards)
– *Design Case for Safety is the starting point for the development of the required Independent Verification
AoC (SUT) & Operational Case for
Safety • AoC (SUT) submission will enhanced to include the requirements as for an Operational Safety Case
– Scope will be the full field development
• AoC (SUT) will be based on
– OLF 065 – Handbook for Application for AoC
– BG-ST-HSSE-AI-001 – Safety Case Standard
– IADC – HSE Case Guidelines for MODUs
– * With precedence as shown above
• Main difference to the Combined Operational Safety Case and AoC (SUT) are:
– Demonstration of ALARP
– Incorporation of the Working Environment aspects
– Posivite identification of Regulatory Compliance
– Positive identification of Deviations to Regulations
– Formal aceptance of submission by Workers Representative
17