KM 71.00. KM 72.00. Package7 EWE & FE of 38L to 77L of DBM-71 from km 40 to 72 main, minors & sub-minors & FCs. 162943 Ac. Works Completed Works under execution EPC works. 129450 Ac. KHAMMAM (68,914 Ac.). - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/1.jpg)
KM
28
4.0
00
KM
28
6.5
00
KM
29
1.7
60
KM
29
4.8
34
KM
29
5.0
00
KM
29
6.2
50
Km 296.50 to Km 297.96
KM
30
0.4
00
KM
30
2.5
00
KM
30
6.8
82
KM
31
0.6
30
KM
31
3.0
82
KM
31
7.7
82
.
KM
32
3.2
07
Km 326.754 to Km 325.460
KM
32
8.7
17
KM
33
3.5
72
K
M 3
34
.00
0K
M 3
34
.50
7
KM
34
1.0
00
KM
34
5.9
32
Tail
end
Br.
canal
DB
M 5
4
KM
13
.50
KM
2
KM
3
KM
13
.00
KM
16
.00
KM
71
.00
KM 55.00
KM 34.4
KM 20
KM
5
KM
5
KM
4
KM
4
KM
4
KM
39
.00
KM
9
KM
72
.00
KM 40
KM 20
DB
M 5
5
DB
M 5
6
DB
M 5
7
DB
M 5
9
DB
M 6
0
DB
M 6
1
DB
M 6
2
DB
M 6
3
DB
M 6
7
DB
M 6
8
DB
M 6
9
DB
M 7
0
DB
M 7
1
15,0
00 A
c
618
Ac
496
Ac
102
49
Ac
109
96
Ac
129
45
0 A
c
384
1 A
c.
407
1 A
c.
129
7 A
c
773
Ac
808
Ac
560
69
Ac
717
3 A
c
162
94
3 A
c
Infa
ll R
eg
ula
tor
MYLARAM B. R
ou
tfall R
eg
ula
tor
Package 3 EWE & FE of minors & sub-minors & FCs from KM 45 to 71 of DBM-60
Package 2 EWE & FE of minors & sub-minors & FCs from KM 0 to 45 of DBM-60
Package 1 CC lining of Kakatiya canal from KM 284 to 346
BA
YA
NN
AV
AG
U
B.R
Package 4 EWE & FE of dbm-69 FROM km 0 TO 39 including main, minors & sub-minors & FCs
Package7 EWE & FE of 38L to 77L of DBM-71 from km 40 to 72 main, minors & sub-minors & FCs
Package6 EWE & FE of 23R to 37L of DBM-71 from km 32 to 40 main, minors & sub-minors & FCs
Package5 EWE & FE of 1R to 22L of DBM-71 from km 0 to 32 main, minors & sub-minors & FCs
Works Completed
Works under execution
EPC works
WARANGAL (1,13,578 Ac.)
NALGONDA (2,57,508 Ac.)
KHAMMAM (68,914 Ac.)
SRI RAMA SAGAR PROJECT STAGE-II
![Page 2: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/2.jpg)
1 Project Profile : Excavation of Kakatiya canal from 284 KM to 346 KM (62 KM) including Main canal lining CM & CD works, distributaries, field channels etc.
2 Administrative Sanction :G. O. Ms. No. 88, I & CAD, Dt: 11-07-2005 for Rs. 830.75 Crores
3 No. of EPC Packages : 7 No.
4 Agt. Value of 7 Pkgs : Rs. 427.37 Crs.
5 Budget Provision for 2006-07 : Rs. 265 Crs.
6 Expenditure of the Project
Old ongoing works upto 2004 : Rs. 133.62 Crs.
2004-05 : Rs. 21.37 Crs.
2005-06 : Rs. 167.47 Crs.
TOTAL : Rs. 321.46 Crs.
7 Utilisation : 24.405 TMC
8 Ayacut New Ayacut : 4,40,000 acres
Stabilisation : --
SRI RAMA SAGAR PROJECT STAGE-II
![Page 3: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/3.jpg)
9 Land Acquisition
Required : 19,313 acres
Acquired : 5924 acres
Requisitioned : 4948 acres
10 Est. Cost for LA : Rs. 118 Crores
11 Est. Cost for R & R : Rs. 2 Crores
12 Clearances :All CWC clearances including investment clearance obtained
13 Mobilisation Advance : PaidRecovered
2004-05 : Rs. 21.37 Crs. --
2005-06 : Rs.3.65 Crs. Rs.8.88 Crs.
Total : Rs.25.02 Crs. Rs.8.88Crs.
14 Target date for completion : 9/2007
SRI RAMA SAGAR PROJECT STAGE-II
![Page 4: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/4.jpg)
PKG No.
Description AwardedBid AmountRs. in Crs.
52SRSP Stage.II - Lining of Kakatiya Main Canal from Km.284.00 to 346.00
Sri K.Sudarshan Reddy & K.Venkateshwarlu & Co.(JV) 58.37
53Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of DBM-60 Distributory from Km.0.00 to Km.45.00
Ms R.M.Mohite & Co.,Bhoorathnam & Co., 62.15
54Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of DBM-60 Distributory from Km.45.00 to Km.71.00
M/s Rani Constructions 60.90
55Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of DBM-69 Distributory
M/s AKR-COASTAL 72.99
56Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of BM-71 Distributory from Km.0.00 to Km.32.00
M/s Ramky Infrastructure & Mr.V.Satya Murthy 72.00
57Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of BM-71 Distributory from Km.32.00 to Km.40.00
M/s Ramky Infrastructure & Mr.V.Satya Murthy 55.35
58Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of BM-71 Distributory from Km.40.00 to Km.72.00
M/s Rani Constructions 45.61
TOTAL 427.37
CATEGORY-II
SRI RAMA SAGAR PROJECT STAGE-II
![Page 5: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/5.jpg)
Package No. 52/Cat-II : CC Lining in bed and sides of Kakatiya main canal from Km 284.00 to KM 346.00
SRSP - II
Name of the Contractor : M/s K. Sudhrashan Reddy &
M/s K. Venkateshwarlu & Co.(JV)
Agreement Amount : Rs. 58.37Crs.
Agreement Date : 11-03-2005
Period of Completion : 24 Months (8 milestones)
Date of completion : 11-03-2007
Investigation : KM 56 completed against 56 KM – Completed
Execution : Lining in good progress for entire length of 56 KM
Expenditure : Rs. 38.56 Crs. against Rs. 58.37 Crs. (including
Mob.Adv. of Rs.2.92Crs.)
Mob. Adv. Recovered : Rs. 2.92 Crores.
![Page 6: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/6.jpg)
Package No. 53/Cat-II : DBM-60
distributory from KM 0.00 to KM
45.00 earth work excavation and
forming embankment, construction
of CM & CD works of Major & Minor.
SRSP - IIName of the Contractor : M/s R.M. Mohite & Bhooratnam
& Co.
Agreement Amount : Rs. 62.15 Crs.
Agreement Date : 07-03-2005
Period of Completion : 30 Months (10 milestones)
Date of completion : 07-09-2007
Investigation : KM 48 completed against 322 KM length
Designs : KM 48 approved against 322 KM of length
Execution : In slow progress due to land
acquisition
Expenditure : Rs. 3.70 Crs. against Rs. 62.15 Crs.
Land Acquisition : Required : 2127 Acres, Requisitioned : 149 Acres
![Page 7: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/7.jpg)
Package No. 54/Cat-II : DBM-60
distributory from KM 45.00 to KM
71.00
SRSP - II
Name of the Contractor : M/s Rani Constructions
Agreement Amount : Rs. 60.90 Crs.
Agreement Date : 09-03-2005
Period of Completion : 30 Months (10 milestones)
Date of completion : 09-09-2007
Investigation : KM 42 completed against 278 KM of length
Designs : KM 42 against 278 KM of length
Execution : Excavation in progress in 3 KM length against total
length of 278 KM
Expenditure : Rs.3.84Crs. against Rs. 60.90 Crs. (in. MA of
Rs.3.04Crores)
Land Acquisition : Required 1500 Acres, Requisitioned : 214Acres.
Bottlenecks : Land Acquisition
![Page 8: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/8.jpg)
Package No. 55/Cat-II : DBM-69 Main
and minors, sub minors & field
channels
SRSP - II
Name of the Contractor : M/s AKR – COASTAL
Agreement Amount : Rs. 72.99 Crs.
Agreement Date : 11-3-2005
Period of Completion : 30 Months (10 milestones)
Date of completion : 11-09-2007
Investigation : KM 27 completed against 125 KM of length
Designs : KM 27 approved against 125 KM of length
Execution : In good progress in the entire length of 125
Km
Expenditure : Rs. 28.43 Crs. against Rs. 72.99 Crs. (inc.
MA of Rs.7.30Crs.)
Mob. Adv. Recovered : Rs. 3.65 Crores.
Land Acquisition : Required 2880Acres, Requisitioned: 262 Acres
![Page 9: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/9.jpg)
Package No. 56/Cat-II : DBM-71
distributary from Km 0.00 to Km
32.00
i) Earthwork excavation and forming
embankment.
ii) Construction of CM & CD works
iii) Investigation, design and estimation of
distributary system
iv) Distributaries Majors, Minors, sub-minors
and field channels of DBM-71 Branch
canal
SRSP - II
Name of the Contractor : M/s Ramky Infra
Structures &
V. Satyamurthy
Agreement Amount : Rs. 72.00 Crs.
Agreement Date : 06-3-2005
Period of Completion : 30 Months (10 milestones)
Date of completion : 06-09-2007
Investigation : Completed
Designs : Approved
Execution : Excavation in progress in 16 KM length against
total length of 96 Km
Expenditure : Rs. 15.00 Crs. against Rs. 72.00 Crs.(inc.
Mob.Adv. of Rs.3.60Crs)
Mob. Advance recovered : Rs. 1.26 Crores.
Land Acquisition : Required 2065 Acres, Requisitioned : 1345 Acres.
![Page 10: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/10.jpg)
Package No. 57/Cat-II : DBM-71
distributary from Km 32.00 to
Km 40.00
i) Earthwork excavation and forming
embankment.
ii) Construction of CM & CD works
iii) Investigation, design and estimation of
distributary system
iv) Distributaries Majors, Minors, sub-minors
and field channels of DBM-71 Branch
canal
SRSP - II
Name of the Contractor : M/s Ramky Infra
Structures &
V. Satyamurthy
Agreement Amount : Rs. 55.35 Crs.
Agreement Date : 06-3-2005
Period of Completion : 30 Months (10 milestones)
Date of Completion : 06-09-2007
Investigation : Completed
Designs : Approved
Execution : Excavation in good progress in total length of
99 KM
Expenditure : Rs. 16.00 Crs. against Rs. 55.35 Crs.(inc.
MA of Rs.2.97Crs.)
Land Acquisition : Required 1264 Acs, Acquired : 378 Acs,
Requisitioned:739Acs.
![Page 11: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/11.jpg)
Package No. 58/Cat-II : DBM-71
distributory from Km 40.00 to
Km 72.00
i) Earthwork excavation and forming
embankment.
ii) Construction of CM & CD works
iii) Distributaries Majors, Minors, sub-minors
and field channels of DBM-71 Branch
canal
SRSP - II
Investigation : KM 47 completed against 135 KMof length
Designs : KM 15 approved against 135 KM of length
Execution : Started Not in good progress
Expenditure : Rs. 3.67 Crs. against Rs. 45.60 Crs.
Land Acquisition : Required 1591 Acs, Acquired : 161 Acs,
Requisitioned:360Acs
Name of the Contractor : M/s Rani Constructions
Agreement Amount : Rs. 45.60 Crs.
Agreement Date : 09-03-2005
Period of Completion : 30 Months (10 milestones)
Date of completion : 09-09-2007
![Page 12: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/12.jpg)
STATUS OF WORKS OF FLOOD FLOW CANAL PROJECT FROM SRSP
DISTRICT WISE AYACUT OF FFC FROM SRSP
Sl. No.
DistrictAyacut in Acres Total
Phase-I Phase-II
1 Karimnagar 1,00,000 30,000 1,30,000
2 Warangal --- 60,000 60,000
3 Nalgonda --- 30,000 30,000
TOTAL 1,00,000 1,20,000 2,20,000
MID MANAIR RESERVOIR 25.87 TMC
KM
(-)
0.8
5
KM
15
.00
KM
17
.00
KM
28
.40
0
KM
43
.00
0
KM
57
.00
KM
70
.00
KM
86
.00
KM
10
3.0
0
KM
12
2.0
0
FRL +318 M
FRL +318.00 M
1.646 TMC
7.0 TMC
FRL +311 M
THOTAPALLY RESERVOIR
25 kms 39 Kms
GOURAVELLI RESERVOIR
RIG
HT S
IDE G
RA
VIT
Y C
AN
AL
LEFT S
IDE G
RA
VIT
Y C
AN
AL
RIG
HT S
IDE
GR
AV
ITY
CA
NA
LLEFT S
IDE G
RA
VIT
Y C
AN
AL
NIZAMABAD KARIMNAGAR
1,00,000 Acres Phase-I
KARIMNAGAR
30,000 Acres Phase-II
WARANGAL
60,000 Acres
NALGONDA
30,000 Acres
FRL +398.5 M
1.090 TMC
TOTAL AYACUT : 2,20,000 Acres
Mothe Reservoir
INDEX
Works Completed
EPC Works in Progress
Reservoirs
District Border
Works under Investigation
![Page 13: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/13.jpg)
1 Project Profile : Excavation of Flood Flow canal (122 KM) from SRSP reservoir to Mid Manair and formation of Mid Mannair Reservoir.
2 Administrative Sanction : G. O. Ms. No. 209, I & CAD, Dt: 17-11-1997 for Rs. 859 Crores
3 No. of EPC Packages : 7 Nos.
4 Agt. Value of 7 Pkgs + old ongoing works : Rs. 1514.75 Crs.
5 Budget Provision for 2006-07 : Rs.400.50Crs.
6 Expenditure
Ongoing works upto 2004 : Rs. 212.69 Crs.
2004-05 : Rs. 94.33 Crs.
2005-06 : Rs. 590.93 Crs.
TOTAL : Rs. 896.95 Crs.
7 Utilisation : 20 TMC
8 Ayacut New Ayacut : 2,20,000 acres
(Tenders to be called for canals & distributaries)
FLOOD FLOW CANAL FROM SRSP
![Page 14: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/14.jpg)
9 Land Acquisition
Required : 19,313 acres
Acquired : 5,924 acres
Requisitioned : 4,948 acres
10 Est. Cost for LA : Rs. 368 Crs.
11 Est. Cost for R & R : Rs. 188.66 Crores
12 Clearances :All CWC clearances including investment clearance obtained
13 Mobilisation Advance : PaidRecovered
2004-05 : 73.65Crs
2005-06 : 10.93Crs.72.79Crs.
Total : 84.78 Crs. 72.79 Crs.
14 Target date for completion : 7/2007
FLOOD FLOW CANAL FROM SRSP
![Page 15: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/15.jpg)
PKG No.
Description AwardedBid AmountRs. in Crs.
1Earth work excavation, construction of CM & CD works of FFC from SRSP in 8 (V) Main canal from KM 28.40 to KM 43.00
M/s Patel – Soma (JV) 165.50
2Earth work excavation, construction of CM & CD works of FFC from SRSP in 6 (V) Main canal from KM 43.00 to KM 57.00
M/s Jai Prakash-Gayatri (JV) 187.00
3Earth work excavation, construction of CM & CD works of FFC form SRSP in 9 (V) Main canal from KM 57.00 to KM 70.00
M/s. IVRCL – SEW & Prasad (JV) 195.03
15Earth work excavation, construction of CM & CD works of FFC from SRSP in Mallal (M) Main canal from KM 70 – KM 86
M/s. Simplex – Subash 218.77
16Earth work excavation, construction of CM & CD works of SRSP in Gangadhara (M) FFC Main canal from KM 86 – KM 103
M/s. Maytas – NCC (JV) 210.06
17Earth work excavation, construction of CM & CD works of FFC from SRSP in Ramadugu (M) Main canal from KM 103 – KM 122
Madhucon Projects Ltd., 199.00
OC Formation of Mid Mannair ReservoirM/s. ZVS-RATNA-
SUSHEEL (JV) 339.39
TOTAL 1514.75
FLOOD FLOW CANAL FROM SRSP
![Page 16: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/16.jpg)
Package No.1/Cat-I : Earth work
excavation and forming
embankment including CM & CD
works from KM 28.40 to KM 43.00
(14.60 KM length)
FLOOD FLOW CANAL FROM SRSPName of the Contractor : M/s PATEL – SOMA(JV)
Agreement Amount : Rs. 165.57 Crores
Agreement Date : 23-10-2004
Period of Completion : 30 Months
(8milestones)
Date of Completion : 23-04-2007
Investigation : Completed
Designs (Structures) : Approved
Execution (canals) : Excavation in good progress for total length of 14.60 KM
Qty. of earth work done : 54.62 Lakh Cum against 125.6 Lakh Cum.
No. of Machinery : Deployed = 131 Nos (Excavators = 18 Nos., Dumpers =
56 Nos.,
Dozers = 13 Nos. etc)
Expenditure : Rs. 120.21Crs. (including Mob. Adv. of Rs.16.55Crs.)
against Rs. 165.50 Crs.
Mob. Adv. Recovered : Rs. 16.55 Crores.
Land Acquisition : Required 859 Acres, Acquired 739 Acres, Requisition:120Acs.
![Page 17: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/17.jpg)
Package No.2 / Cat-I : Earth work
excavation and forming embankment
including CM & CD works from KM 43.00
to KM 57.00 (14.00 KM length)
FLOOD FLOW CANAL FROM SRSPName of the Contractor : M/s JayaPrakash-
Gayathri (JV)
Agreement Amount : Rs. 187.00 Crores
Agreement Date : 23-10-2004
Period of Completion : 30 Months
(10milestones)
Date of Completion : 23-04-2007 Investigation : Completed
Designs (Structures) : Approved
Execution (main canal) : Excavation in progress for total length of 14 KM
Qty. of earth work done : 62.40 Lakh Cum against 97.99 Lakh Cum.
No. of Machinery : Deployed = 168 Nos (Excavators = 18 Nos., Dumpers =
56 Nos.,
Dozers = 13 Nos. etc)
Expenditure : Rs. 104.31 Crs (including Mob. Adv. Of Rs.18.70Crs.) against Rs. 187 Crs.
Mob. Adv. Recovered : Rs. 18.70 Crores.
Land Acquisition : Required 769Acres, Acquired 710Acres, Requisitioned:59Acs.
![Page 18: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/18.jpg)
Package No. 3 / Cat-I : Earth work
excavation and forming embankment
including CM & CD works from KM
57.00 to KM 70.00 (13.00 KM length)
FLOOD FLOW CANAL FROM SRSP
Name of the Contractor : M/s IVRCL-SEW &
Prasad (JV)
Agreement Amount : Rs. 195.03 Crores
Agreement Date : 20-10-2004
Period of Completion : 30 Months (10
milestones)
Date of Completion : 20-10-2007 Investigation : Completed
Designs : Approved
Execution : Excavation in good progress for a total
length of 13 KM
Qty. of earth work done : 75.47Lakh Cum against 131.27 Lakh Cum.
No. of Machinery : Deployed = 232 Nos (Excavators = 34 Nos., Dumpers =
… Nos.,
Dozers = 16 Nos. etc)
Expenditure : Rs. 136.35 Crs. (inc. Mob. Adv.Rs.9.75Crs.)
against Rs.195.03 Crs.
Mob. Adv. Recovered : Rs.9.75 Crs.
Land Acquisition : Required 825Acres, Acquired – 825.33Acs, Balance
Nil.
![Page 19: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/19.jpg)
Package No. 15 / Cat-I : Earth work
excavation and forming embankment
including CM & CD works from KM 70.00
to KM 86 (16.00 KM length)
FLOOD FLOW CANAL FROM SRSP
Name of the Contractor : M/s Simplex –
Subhash
Agreement Amount : Rs. 218. 77 Crores
Agreement Date : 19-03-2005
Period of Completion : 30 Months
Date of Completion : 19-09-2007 Investigation : Completed
Designs (structures) : Completed
Execution : Excavation in progress in total length of 16.645 KM
Qty. of earth work done : 50.61Lakh Cum against 176.63 Lakh Cum.
No. of Machinery : Deployed = 84 Nos (Excavators = 14 Nos., Dozers = 5
Nos. etc)
Expenditure : Rs. 74.10 Crs. (inc. Mob. Adv. of
Rs.21.87Crs.) against Rs.218.77 Crs.
Mob. Advance recovered : Rs. 9.94 Crores
Land Acquisition : Required 1083Acs,Acquired 512.12Acs,Requisitioned
570.88 Acs
![Page 20: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/20.jpg)
Package No. 16 / Cat-I : Earth work
excavation and forming embankment
including CM & CD works from KM 86.00
to KM 103.00
(17.00 KM length)
FLOOD FLOW CANAL FROM SRSPName of the Contractor : M/s Maytas –
NCC (JV)
Agreement Amount : Rs. 210.06 Crores
Agreement Date : 23-03-2005
Period of Completion : 30 Months (10
milestones)
Date of completion : 23-09-2007 Investigation : Completed
Designs : Approved
Execution : Excavation in good progress in total length
of 17 KM
Qty. of earth work done : 62.68 Lakh Cum against 142.14 Lakh Cum.
No. of Machinery : Deployed = 84 Nos (Excavators = 11 Nos., Dozers = 5
Nos. etc)
Expenditure : Rs. 63.80 Crs. (including Mob. Adv.) against
Rs. 210.06 Crs.
Land Acquisition : Required 1098Acs,Acquired 778.33Acs, Requisition
319.67Acs
![Page 21: KM 284.000](https://reader036.vdocuments.site/reader036/viewer/2022081419/5681585f550346895dc5bbc9/html5/thumbnails/21.jpg)
Package No. 17 / Cat-I : Earth work
excavation and forming embankment
including CM & CD works from KM
103.00 to KM 122.00 (19.00 KM length)
FLOOD FLOW CANAL FROM SRSPName of the Contractor : M/s Madhucon–Sinc–
Hydro (JV)
Agreement Amount : Rs. 19900 Lakhs
Agreement Date : 19-3-2005
Period of Completion : 30 Months (10 milestones)
Date of Completion : 19-09-2007 Investigation : Completed
Designs (Structures) : 7Nos. Approved against 32Nos. Balance
with CE/CDO.
Execution : Excavation in good progress in total length
of 19.00 KM
Qty. of earth work done : 67.45 Lakh Cum against 141.3 Lakh Cum.
No. of Machinery : Deployed = 74 Nos (Excavators = 16 Nos., Dozers = 8
Nos. etc)
Expenditure : Rs. 94.90 Crs. (including Mob.
Adv.Rs9.95Crs.) against Rs. 199.00 Crs.
Mob. Adv. Recovered : Rs. 9.95 Crores.
Land Acquisition : Required 1108.40Acs,Acquired 606.12Acs,
Requisitioned:502.28Acs