kljuČne brojke - huka · 2 duljina mreže po broju trakova / length by number of lanes autoceste /...

20
ISSN: 1848-0993 KEY FIGURES KLJUČNE BROJKE HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE 2018

Upload: others

Post on 07-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

ISSN: 1848-0993

KEY FIGURES

KLJUČNE BROJKE

HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE

2018

Page 2: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

2

Duljina mreže po broju trakova / Length by number of lanes

Autoceste / Poluautoceste u prometuMotorways / Semi-motorways in service 1.306,5 km

Nove autoceste otvorene u 2017.New motorways opened in 2017 0 km

Nove autoceste – otvorenje u 2018.New motorways scheduled in 2018 0,30 km

Ukupna duljina mostovaTotal length of bridges 40,3 km

Duljina zidova za zaštitu od bukeLength of noise protection walls 96,7 km

57,1 km km km

1.228,6 20,8

2x1 trak / lanes 2x2 traka / lanes 2x3 traka / lanes

Broj mostova / Number of bridges219

Prijelazi za divlje životinje / Crossings for wild animals

14

Mreža autocesta Motorway network

Page 3: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

3

Duljina mreže po broju trakova / Length by number of lanes

Razvoj mreže / Development of networkPo godinama (km) / By years (km)

2018.-’19.

2017.-’18.

2015.-’16.

2013.-’14.

2011.-’12.

2009.-’10.

2008.

2007.

2006.

2005.

2004.

2003.

2002.

2001.

2000.

1999.

1998.

1997.

1996.

0 200 400 600 800 1.000 1.200 1.400

1.306,5

1.313,8

1.313,8

1.289,4

1.250,7

1.240,7

1.201,3

1.159,9

1.078,9

1.035,2

942,9

747,6

598,6

559,0

540,8

522,5

466,9

418,2

394,3

Po godinama (km) / By years (km)Otvoreno novih autocesta / New motorways opened to traffic

100

50

02006. 2007. 2008. 2009. 2010. 2011. 2012. 2013. 2014. 2015. 2016. 2017. 2018.

43,7

81

41,4

39,4

0 0 0 0 010

32,5

24,4

Mreža autocesta Motorway network

195,3km

Izgrađeno i pušteno u promet 2004. Built and opened to trafic in 2004

0

Page 4: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

4

Mreža autocesta Motorway network

Ukupna duljina tunelaTotal length of tunnels 49,07 km

Udio tunela u ukupnoj mrežiPortion of tunnels in total network 3,8 %Najduži tunel

Mala Kapela A1The longest tunnel 5,8 km

Ukupan broj tunela / Total number of tunnels

50

Broj nesreća u tunelima / Number of accidents in tunnels

96

45

5

7> 1 km

2> 2 km

3> 5 km

Udio nesreća u tunelima u ukupnom broju nesreća Portion of accidents in tunnels in the total accidents

3,4 %

Page 5: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

5

Ukupno / Total1.306,5 km

Dijelom autoceste A1 od Zagreba do Bosiljeva upravlja ARZ d.d. / Part of the motorway A1 from Zagreb to Bosiljevo is operated by ARZ d.d.ARZ d.d. upravlja dijelom autoceste A7 / Part of the motorway A7 is operated by ARZ d.d.

918,5 km

187,0 km

141,0 km

60,0 km

U prometu In service

U izgradnji In construction

U planiranju In project

D10 i D12 predane su na upravljanje Hrvatskim cestama d.o.o. i nisu pod naplatom / D10 i D12 were handed over to Croatian Roads Authority

Page 6: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

6

Autocesta – poluautocesta / Motorway – Semi motorway U prometu / In service 31/12/2018

Otvoreno / Open in 2018

U izgradnji / In con-struction 31/12/2018

Početak izgradnje / Start of const. in 2019

Ukupno /Total 2019

Otvaranje / Opening in 2019

HRVATSKE AUTOCESTE d.o.o.A1 Bosiljevo 2 – Split – Dubrovnik 415.30 - - - 415.30 -

D76 Spojna cesta Zagvozd – tunel Sv. Ilija – Baška Voda*** - -7.30*** - - - - Spojna cesta Karamatići – luka Ploče*** 1.20 - - - - -

A3 Bregana – Zagreb – Lipovac 306.40 - - - 306.40 - Čvor Lipovljani - - - - - -

A4 Zagreb – Goričan 96.90 - - - 96.90 -

A5 Beli Manastir – Osijek – granica s BiH 58.70 - - - 58.70 - Most Drava - - 2.50 - - - poddionica Most Halasica – Most Drava - - 0.80 - - - dionica most Drava – čvor Osijek - - 3.80 - - - Most Sava - - 0.70 - 0,30 0.30 poddionica Beli Manastir - Most Halasica - - 17.50 - - -

A10 Granica BIH – čvor Metković 8.50 - - - 8.50 -

A11 Zagreb – Sisak 32.70 - - - 32.70 -

D10 Brza cesta Podravski ipsilon - - - - - - Gradec – Križevci*** 12.50 - - - -

D12 Brza cesta Podravski ipsilon - - - - - - Vrbovec – Farkaševac*** - - 10.60*** - 10.60*** 10.60***Ukupno / Total 918.50 -7.30*** 35.90 0.00 918.80 10.90

AUTOCESTA RIJEKA-ZAGREB d.d.A1 Bosiljevo 2 – Zagreb 65.25 - - - 65.25 -

A6 Rijeka – Bosiljevo 2 81.25 - - - 81.25 -

A7 Rupa – Matulji – Diračje – Orehovica 28.00 - - - 28.00 -

D102 Most Krk i pristupne ceste 12.53 - - - 12.53 -

D6 Neretić – čvor NovigradUkupno / Total 187.03 - - - 187.03 -

BINA-ISTRA d.d.A8 Kanfanar – Matulj 64.20 - - - 64.20 -

Kanfanar – Pazin (čvor Rogovići) 18.13 - - - 18.13 - Pazin – Matulji* 46.08* - 1.85** 9.84** 46.08* -

A9 Umag – Pula 76.80 - - - 76.80 - Umag – Medaki 41.84 - - - 41.84 - Medaki – Kanfanar 7.36 - - - 7.36 - Kanfanar – Vodnjan jug 20.70 - - - 20.70 - Vodnjan jug – Pula 6.90 - - 6.90 -

Ukupno / Total 141.00 - 1.85** 9.84** 141.00 -

AUTOCESTA ZAGREB-MACELJ d.o.o.A2 Zagreb – Macelj 60.00 - - - 60.00 - Zagreb – Krapina 42.80 - - - 42.80 - Krapina – Macelj 13.40 - - - 13.40 - Dio dionice Krapina – Đurmanec* 3.80* - - - 3.80 -Ukupno / Total 60.00 - - - 60.00 -

Ukupno sve autoceste / Total all motorways 1,306.53 -7.30***25.3010.60***

1.85**9.84** 1,306.83 0.30

10.60***

*poluautocesta/brza cesta / semi motorway/rapid road **dopuna do punog profila / upgrade to full motorway profile***dionice državnih cesta koje gradi HAC i nakon izgradnje predaje na upravljanje Hrvatskim cestama (HC)

Page 7: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

7

Autocesta – poluautocesta / Motorway – Semi motorway U prometu / In service 31/12/2018

Otvoreno / Open in 2018

U izgradnji / In con-struction 31/12/2018

Početak izgradnje / Start of const. in 2019

Ukupno /Total 2019

Otvaranje / Opening in 2019

HRVATSKE AUTOCESTE d.o.o.A1 Bosiljevo 2 – Split – Dubrovnik 415.30 - - - 415.30 -

D76 Spojna cesta Zagvozd – tunel Sv. Ilija – Baška Voda*** - -7.30*** - - - - Spojna cesta Karamatići – luka Ploče*** 1.20 - - - - -

A3 Bregana – Zagreb – Lipovac 306.40 - - - 306.40 - Čvor Lipovljani - - - - - -

A4 Zagreb – Goričan 96.90 - - - 96.90 -

A5 Beli Manastir – Osijek – granica s BiH 58.70 - - - 58.70 - Most Drava - - 2.50 - - - poddionica Most Halasica – Most Drava - - 0.80 - - - dionica most Drava – čvor Osijek - - 3.80 - - - Most Sava - - 0.70 - 0,30 0.30 poddionica Beli Manastir - Most Halasica - - 17.50 - - -

A10 Granica BIH – čvor Metković 8.50 - - - 8.50 -

A11 Zagreb – Sisak 32.70 - - - 32.70 -

D10 Brza cesta Podravski ipsilon - - - - - - Gradec – Križevci*** 12.50 - - - -

D12 Brza cesta Podravski ipsilon - - - - - - Vrbovec – Farkaševac*** - - 10.60*** - 10.60*** 10.60***Ukupno / Total 918.50 -7.30*** 35.90 0.00 918.80 10.90

AUTOCESTA RIJEKA-ZAGREB d.d.A1 Bosiljevo 2 – Zagreb 65.25 - - - 65.25 -

A6 Rijeka – Bosiljevo 2 81.25 - - - 81.25 -

A7 Rupa – Matulji – Diračje – Orehovica 28.00 - - - 28.00 -

D102 Most Krk i pristupne ceste 12.53 - - - 12.53 -

D6 Neretić – čvor NovigradUkupno / Total 187.03 - - - 187.03 -

BINA-ISTRA d.d.A8 Kanfanar – Matulj 64.20 - - - 64.20 -

Kanfanar – Pazin (čvor Rogovići) 18.13 - - - 18.13 - Pazin – Matulji* 46.08* - 1.85** 9.84** 46.08* -

A9 Umag – Pula 76.80 - - - 76.80 - Umag – Medaki 41.84 - - - 41.84 - Medaki – Kanfanar 7.36 - - - 7.36 - Kanfanar – Vodnjan jug 20.70 - - - 20.70 - Vodnjan jug – Pula 6.90 - - 6.90 -

Ukupno / Total 141.00 - 1.85** 9.84** 141.00 -

AUTOCESTA ZAGREB-MACELJ d.o.o.A2 Zagreb – Macelj 60.00 - - - 60.00 - Zagreb – Krapina 42.80 - - - 42.80 - Krapina – Macelj 13.40 - - - 13.40 - Dio dionice Krapina – Đurmanec* 3.80* - - - 3.80 -Ukupno / Total 60.00 - - - 60.00 -

Ukupno sve autoceste / Total all motorways 1,306.53 -7.30***25.3010.60***

1.85**9.84** 1,306.83 0.30

10.60***

***stretches of state roads that will not be integrated into motrway network, built by HAC and handed over to Croatian Roads Authority (HC)

Page 8: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

8

Usluge Services

Benzinske postaje / Filling stations

75Odmorišta / Rest areas

124

Hoteli / Hotels

10

Cafe barovi / Caffe bars

86Restorani / Restaurants

26

Dinamički informacijski paneli / VMS

136

COKP Centri održ. i kont. prometa / MTCC Maint. & Traffic Control Centres

27

Parkirališna mjesta LV / Parking places LV

6.746

Parkirališna mjesta TV / Parking places HV

2.122

Broj intervencija vatrogasnih jedinica / Number of firebrigade interventions

1.583

Broj nadzornih video kamera / Number of CCTV cameras

1.596

Broj ralica / Number of snowplowers

214

Page 9: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

9

Društvo Company

%18./17.

%18./17.

Total % 18./17.

HAC 35.980.659 1,39 5.577.300 4,53 1,80

ARZ 21.163.407 4,52 2.413.085 3,12 4,38

BINA-ISTRA 9.465.911 7,22 828.756 7,88 7,28

AZM 6.386.607 4,26 789.786 3,18 4,14

Ukupno Total 72.996.584 3,26 9.608.927 4,34 3,39

SVEUKUPNO TOTAL

82.605.511 3,39

Promet Traffic

Broj vozila u područjima naplate Number of vehicles in toll collection zones

82.606 mil./mio.

Rast broja vozila u područjima naplate Increase in number of vehicles in toll collection zones

2018. / 2017.3,4 %

Udio LV i TV u ukupnom broju vozila Portion of LV & HV in total no. of vehicles

71,4 %

28,6 %

Page 10: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

10

Društvo Company

HAC 13.044 2.184 15.229

ARZ 18.680 2.421 21.101

BINA-ISTRA 16.921 1.482 18.403

AZM 16.194 1.904 18.098

Ukupno Total 14.342 2.123 16.466

Promet Traffic

PGDP po tvrtkama / AADT by companies

Broj voznih kilometara Number of km travelled 106 x km7.662,7

5.078,4 HAC

1.252,4 ARZ

947,1 BINA-ISTRA

396,3 AZM

Broj vozila u područjima naplate / Number of vehicles in toll collection zonesU mil. voz. / In Mio. veh. 2015.–2018.

80

75

70

65

60

55

50

70,4

76,0

79,9

2015. 2016. 2017. 2018.

82,6

Page 11: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

11

Broj vozila koja su sudjelovala u nesrećama / Number of vehicles involved in accidents

3.884

Sigurnost Safety

PGDP po tvrtkama / AADT by companies

Nesreće po tvrtkama / Accidents by companies

Ukupno nesreće po vrstama / Total accidents by typeU RH / In Croatia

Ukupno prometne nesreće / Total traffic accidents2.801

Rast prometnih nesreća Increase in traffic accidents

2018. / 2017.13,63 %

2.015 HAC (918 km)

576 ARZ (178 km)

85 BINA-ISTRA (141 km)

125 AZM (60 km)

2015. 2016. 2017. 2018.

S poginulima With fatalities 18 27 20 30

S ozlijeđenima With injuries 307 315 332 316

S materijalnom štetom With material damage

1.961 2.055 2.113 2.455

Ukupno Total 2.286 2.397 2.465 2.801

Page 12: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

12

Sigurnost Safety

Rast broja poginulih Increase in fatalities

2018. / 2017.47,83 %

Ukupno poginuli / Total of fatalities34

Poginuli prema porijeklu registarske pločice vozila / Fatalities by origin of vehicle registration plates

50

40

30

20

10

02015. 2016. 2017. 2018.

Ukupno poginuli / Total of fatalities

Vozila registrirana izvan RH International registration plates

Vozila registrirana

u RH Croatian

registration plates

Stupanj opasnosti od smrtnog stradavanja (109 voz. km) Rate of dead (109 km travelled)4,67

2015.–2018.

25 HAC

7 ARZ

2 BINA-ISTRA

0 AZM

15 19

36

23

19

34

Page 13: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

13

Prometne nezgode službe održavanja / Traffic accidents of Maint. Service Staff

Poginuli prema porijeklu registarske pločice vozila / Fatalities by origin of vehicle registration plates Broj nesreća pri idealnim uvjetima vožnje /

The number of accidents in ideal driving conditions

1.913

Stupanj sigurnosti / Safety ratios

HAC BINA-ISTRA

ARZ AZM RHCroatia

RH %18./17.

Nesreća s ozlijeđenima Personal injury rate 40.36 10.97 58.18 37.85 43.40 -15.64

Nesreća s poginulima Fatal accident rate 4.33 1.57 4.31 0 4.12 49.83

Koeficijent poginulih Rate of dead 4.92 1.57 5.03 0 4.67 48.64

5

1

0 0

Ukupno Total

Lakše ozlijeđeni Injuries without hospitalisation

Teže ozlijeđeni Injuries with hospitalisation

Poginuli Fatalities

Najčešći uzroci Most frequent causes Prekoračenje brzine / Excess speed

Najčešće posljedice Most frequent consequences Materijalna šteta / Material damage

Najkritičniji dani The most critical days

Najsigurniji dan The safest day

Najkritičniji mjesec The most critical month

Petak / Friday

Srpanj/ July

Na 109 voz. km / Per 109 km travelled

Četvrtak / Thursday

Page 14: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

14

Porast prihoda od cestarine Increase in toll revenues

2018. / 2017.4,76 %

Postaje Plazas

109

Ekonomija Economy

255,8 HAC

88,6 ARZ

32,3 BINA-ISTRA

29,5 AZM

Naplata / Toll

ENC / ETC

712Trakovi Lanes

Pretplatnici Subscribers 12,1 %

Uređaji OBUs 14,2%

Povećanje Increase 2018. / 2017.

Prihodi od cestarine (bez PDV-a) Toll revenues (without VAT) 406,2

mil./mio. eur

Pokrivenost Coverage (km) 1.246Trakovi Lanes 505Uređaji OBUs 700.012Pretplatnici Subscribers 403.326

Prosječan broj godišnjih transakcija po ENC uređaju

Average annual number of

transactions per OBU

31

Page 15: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

15

2.414,302.594,93

2.876,60

SMART KARTICE SMART CARDS

3,10%

mil./mio.Ukupan broj transakcija / Total number of transactions

82,60

33,51

57,72

Prihodi od cestarine / Toll revenuesU mil. KN / In Mio. HRK 2015.–2018.

2015. 2016. 2017. 2018.

3.000

1.500

0

Udio načina plaćanja u ukupnim transakcijama / Breakdown of transactions by payment mode

GOTOVINA CASH

49%

KREDITNE KARTICE CREDIT CARDS

20,55%

ENC ETCAZM nema ENC AZM has no ETC

26,06%

OSTALO OTHER

1,30%

U nove dionice Into new sections

U izgrađene dionice Into existing sections

Ukupno investicije Total investments 91,23 mil./mio. eur

Srednji tečaj HNB na dan 31.12.2018 / Average exchange rate on 31st December 2018, Source: Croatian National Bank)

1 EUR = 7,42 HRK

3.013,67

*Bez AZM-a udio ENC-a iznosi 34,06% / Without AZM penetration of ETC is 34,06%

Page 16: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

16

Ekonomija Economy

Ukupno investicije / Total investments

39,25 HAC

7,69 ARZ

3,43 BINA-ISTRA

7,35 AZM

Investicije u izgrađene dionice Investments into existing sections 57,72

mil./mio. eur

Plan investicija za 2019. Investment plan for 2019 163,16 mil./mio. eur

Investicije u nove dionice* Investments into new sections* 33,51 mil./mio. eur

HAC 29,91 mil./mio. eur

BINA 10,6 mil./mio. eur

*AZM i ARZ nisu imale investicija u nove dionice*AZM and ARZ had no investments into new sections

U mil. KN / In Mio. HRK

700

350

02015. 2016. 2017. 2018.

485,3

376,3341,61

U nove dionice Into new sections 74,38U izgrađene dionice Into existing sections 88,78

2015.–2018.

676,90

Srednji tečaj HNB na dan 31.12.2018 / Average exchange rate on 31st December 2018, Source: Croatian National Bank)

1 EUR = 7,42 HRK

Page 17: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

17

Zaposlenici Workforce

Ukupno investicije / Total investmentsStalno zaposleni u društvima upraviteljima autocesta Permanent workforce in managing motorway companies

512

209303

451 HAC***

40 ARZ**

11 BINA-ISTRA

10 AZM

Podjela po društvima upraviteljima / Breakdown by managing motorway companies

*Od 1.12.2017. HAC je i upravitelj i operater / As of 1.12.2017. HAC became managing comp. and operator**Od 1.12.2017. ARZ je samo upravitelj, a ostale poslove preuzeo je HAC / As of 1.12.2017. ARZ became managing comp. while tolling and maintenance were handed over to HAC***Sve službe HAC-a osim naplate i održavanja / HAC staff without tolling and maintenance workforce

Stalno zaposleni u društvima upraviteljima autocesta i njihovim operaterima Total workforce in motorway companies and their operators

3.185

6652.520

2.770 HAC*

40 ARZ**

233 BINA-ISTRA

142 AZM

(i/and BIUO)

(i/and EGIS)

Page 18: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

18

2.319 HAC*

222 BIUO

132 EGIS

0 ARZ**

Podjela po operaterima / Breakdown by operators

Podjela zaposlenika po poslovima / Breakdown of workforce by job

Naplata Toll collection 1.071Održavanje Maintenance staff 1.349Ophodari Patrol service 187Uprava Management board 14Ostali Other 52

Zaposlenici Workforce

Zaposlenici društava operatera Workforce in operating companies

2.673

4562.217

*HAC zaposlenici na poslovima naplate i održavanja / HAC workforce in tolling and maintenance sector**Od 1.12.2017. ARZ je samo upravitelj, a ostale poslove preuzeo je HAC / As of 1.12.2017. ARZ became managing comp. while tolling and maintenance were handed over to HAC

Page 19: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

AZM – Autocesta Zagreb-Macelj d.o.o.

Garićgradska 18, 10 000 Zagreb - HRtel.: + 385 1 36 89 600 fax: + 385 1 36 89 620e-mail: [email protected] www.azm.hr

Miloš Savić Predsjednik Uprave / President of the Managing Board

Ivica Mlinarević Član Uprave / Member of the Managing Board

Podjela po operaterima / Breakdown by operators

Članovi / Members

Širolina 4, 10 000 Zagreb - HR; tel.: + 385 1 65 15 375 e-mail: [email protected], [email protected] www.huka.hr

Miro Škrgatić, Predsjednik Udruge / PresidentMiloš Savić, Potpredsjednik Udruge / Vice-president

Izdavač / Publisher: HUKAUređivački odbor / Editorial Board: Miro Škrgatić, glavni i odgovorni urednik / Editor in ChiefBrankica Bajić, tehnička urednica / Technical EditorGrafičko oblikovanje / Graphic design: Modacom plus d.o.o.Fotografije / Photographs: Arhiva HUKATisak / Printed by: Kerschoffset Zagreb d.o.o.Datum izdanja / Published: svibanj 2019. / May 2019

Hrvatska udruga koncesionara za autoceste s naplatom cestarine The Croatian Association of Toll Motorways Concessionaires

HAC – Hrvatske autoceste d.o.o.

Širolina 4, 10 000 Zagreb - HRtel.: + 385 1 46 94 400 fax: + 385 1 46 94 505e-mail: [email protected] www.hac.hr

Boris Huzjan Predsjednik Uprave /President of the ManagingBoard

Stjepan BaranašićČlan Uprave / Member of the Managing Board

ARZ – Autocesta Rijeka-Zagreb d.d.

Širolina 4 10 000 Zagreb - HRtel.: + 385 1 65 15 100 fax: + 385 1 65 15 110e-mail: [email protected] www.arz.hr

Miro ŠkrgatićPredsjednik Uprave /President of the Managing Board

Tomislav TkalčićČlan Uprave / Memberof the Managing Board

BINA-ISTRA – Bina-Istra d.d.

Savska cesta 106 10 000 Zagreb - HRtel.: + 385 1 61 38 300 fax: + 385 1 61 38 301e-mail: [email protected] www.bina-istra.com

Dario Silić Generalni direktor / General Manager

Page 20: KLJUČNE BROJKE - HUKA · 2 Duljina mreže po broju trakova / Length by number of lanes Autoceste / Poluautoceste u prometu Motorways / Semi-motorways in service 1.306,5 km Nove autoceste

THE CROATIAN ASSOCIATION OF TOLL MOTORWAYS

CONCESSIONAIRES

HRVATSKA UDRUGA

KONCESIONARA ZA AUTOCESTE S

NAPLATOM CESTARINE

www.huka.hr