1 The purpose of this Standard Operating Procedure is to document the steps required to process a new order, schedule Pulling, Packing and Shipping by Order Processing as well as Process Service Items on a new order. Main Steps 1. Order Processing and Scheduling 2. QA Order Processing and Scheduling 3. Process Service Order 4. QA Process Service Order Section I - ORDER PROCESSING AND SCHEDULING A. Pre-Processing 1) Order comes in from Designer or Sales Manager (if the designer did not participate in selection of items) to Processing/Scheduling Department with following standard folder: a. Order with Contract ID b. Order processing page c. Proof of Payment (Cybersource payment confirmation with authorization id if credit card, if check or cash, Annie and/or Sean’s signature are required) d. Pull Document f. Service Document g. Packaging Document h. Tracking Info 2) Running board should be checked daily in AM for the new orders for the previous day. If the folder does not exist for the new order on the running board, Processor sends an email to all designers to find out whose order it is. If it is a designer order and no folder with appropriate documents are provided to the Processor, Designer has to notify the Processor as to the reason for incomplete/absent folder. 3) Order paperwork is processed/modified/corrected and scheduled and the products on hand are in sold status, unless out of stock or modifications are needed.

Upload: dieter-drews

Post on 25-May-2015

122 views

Category:

Business


0 download

DESCRIPTION

These order processing procedures were designed for training and process improvement.

TRANSCRIPT

Page 1: Kitchen Cabinet company order processing procedures

1

The purpose of this Standard Operating Procedure is to document the steps required to

process a new order, schedule Pulling, Packing and Shipping by Order Processing as well as

Process Service Items on a new order.

Main Steps

1. Order Processing and Scheduling

2. QA Order Processing and Scheduling

3. Process Service Order

4. QA Process Service Order

Section I - ORDER PROCESSING AND SCHEDULING

A. Pre-Processing

1) Order comes in from Designer or Sales Manager (if the designer did not participate in selection of

items) to Processing/Scheduling Department with following standard folder:

a. Order with Contract ID

b. Order processing page

c. Proof of Payment (Cybersource payment confirmation with authorization id if credit

card, if check or cash, Annie and/or Sean’s signature are required)

d. Pull Document

f. Service Document

g. Packaging Document

h. Tracking Info

2) Running board should be checked daily in AM for the new orders for the previous day. If the

folder does not exist for the new order on the running board, Processor sends an email to all

designers to find out whose order it is. If it is a designer order and no folder with appropriate

documents are provided to the Processor, Designer has to notify the Processor as to the reason

for incomplete/absent folder.

3) Order paperwork is processed/modified/corrected and scheduled and the products on hand are in

sold status, unless out of stock or modifications are needed.

Page 2: Kitchen Cabinet company order processing procedures

2

A. Types of orders

1) True Stock- Fastest ETA possible or when customer requests it

2) True Stock/Service – 2/4 ETA rule applies; delay notification and reason are provided

by Service to Cesar within 24 hours via email, also to customer service who communicates

the delay to the customer; based on that communication a decision is made how to proceed

with order; communicates with scheduling via email of resolution; ETAs are adjusted in

MOP. Cesar schedules service according to modification, color changes,

3) True Stock/Production/Service -2/4 ETA rule applies; delay notification and reason are

provided by Service to Cesar within 24 hours via email, also to customer service employee

who communicates the delay to the customer; based on that conversation a decision is

made how to proceed with order; communication with scheduling via email of resolution,

ETAs are adjusted in MOP

4) Items 2,3 4 may have out of stock items that will be shipped in either by container or via

Airmail. If shipped by ship container, the inventory will take up to four weeks to reach the

port of Miami and then take another two days for customs, unloading, and delivery

B. New Order Processing

1) Check all documents required for the folder. If any document is missing from the folder, contact

the designer.

2) Check to make sure that the check list is filled out appropriately: Customer Name, Date,

Projected start date, Style, Color, Special instructions, Notes (*verify with designer on validity of

special instructions and any documentation/email of changes/special requests*)

3) Open order in the MOP

a. Open Order Management, enter the order number, tab to Search, Enter

b. Order will open on the running board, click the order number link on the left side of the

bar (Fig. 1)

c. Click on Order ID

d. Check the order notes, style and the relationships of the items, make sure they are

e. correct.

4) Check Customer Preferred Shipping Date

5) Check that relationships are correct in out of stock parts column - those parts may not have

been linked in relationships correctly.(Fig.2)

6) Go back to the running board page with the same order, click on “Order Status” link on the right

side of the page below “Process Order” link

7). Order status page will appear (see example below)

Page 3: Kitchen Cabinet company order processing procedures

3

Fig 1. Figure above shows Contract ID, Customer Name, Order Date, Expected Receiving Date, Expected Pulling Date, Actual Pulling Date,

Estimated Pulling Time, Actual Pulling Time, Estimated Pulling Date, Actual Pulling Date, Estimated Service time, Estimated Packing Date,

Estimated Packing Time, Estimated Shipping Date, Actions (Process Order/Status Manager).

Page 4: Kitchen Cabinet company order processing procedures

4

Fig 2.

8) IN STOCK ITEMS

a. Check status and notes, and change the status of “Available” items to “Sold”

i. Items needing service will have * next to the item name.

ii. 1st Click on check box next to the status of the items that need to be sold.

iii. 2nd Go to the bottom of the page, select status from drop down

iii. 3rd, Click Update Selected

iiii.4th, Click Update All Changes (see Fig.3)

Page 5: Kitchen Cabinet company order processing procedures

5

Fig.3

9). Follow same procedure when changing status on any other item except when modifying an

item.

10) Modifying Items (see Fig. 4)

A. Select an Out of Stock item to modify

B. Go to Order Management

C. Go to Modify Part

1. Select types: Box, Door and Draw Front, Accessory with color, Accessory with no color

2. Select a new part

3. Select modified part

4.Select quantity (if a modifying part is larger/longer than modified part, enter quantity

of 1)

6. Enter your password

D. Keep the item pricing in mind when modifying parts.

Page 6: Kitchen Cabinet company order processing procedures

6

Fig. 4 Modification page

Fig. This shows In Stock items that were converted from Available to Sold Status

Page 7: Kitchen Cabinet company order processing procedures

7

1. OUT OF STOCK ITEMS (except container) must be distributed by department, i.e. select

vendor. (Fig 5)

A. Vendor Choices:

1). Local Vendor (accessories, knobs, pulls, BTPO, Custom Crown Molding,

aluminum items)

2) AirMail (scheduled by International Logistics). SELECT THAT VENDOR

ONLY IF THE ORDER IS EMERGENCY, IF THE NUMBER OF PARTS IS

ONLY A FEW AND NO MODIFICATION IS POSSIBLE.

3) Container (container is scheduled by Charlie)

Dates, container number

Enter the part quantities and order id on the WarehouseLogCurrent

Spreadsheet Instructions, located in the following location on the network:

\\DATASERVER\Shared\warehouse (Fig. 7)

4) Mei Production

Modern styles: Gloss, Wood Veneer and Texture

Fig 5. Out of Stock table with some of the items on Container 82 and some items that need to be assigned to

vendors.

B. Vendor selection procedure

1) Select Vendor for all unassigned

2) Go to the bottom of the table and click “Submit” button (see Fig. 6) below for

instructions)

Page 8: Kitchen Cabinet company order processing procedures

8

Fig. 6

Fig.7

Page 9: Kitchen Cabinet company order processing procedures

9

Fig 8. This demonstrates Out of Stock parts on Container 82 and Production parts that were previously in Out of

Stock table were assigned Mei Production parts and therefore moved to Mei Production table.

NOTE*****Out of Stock Transitional and Traditional Doors and Drawers not on container –

check availability in inventory on hand before assigning to AirMail. (Fig.8)

5) Out of stock parts not on container can be modified as follows:

a. Any transitional or traditional style can be stripped and painted white (C6-

old white; C6B – New white).

b. Parts can be sprayed from lightest to darkest. i.e. honey, toffee, wenge to

chocolate. Java, Merlot to Chocolate needs stripping.

c. Parts can be cut down to smaller/shorter items if those are not available.

6) To check inventory for parts:

a. Click on Inventory Management

b. Go to Inventory On Hand link (See Fig. 9)

c. Sold and available can be selected.

d. Other selections are available in drop down menus to narrow the search.

e. Click Run

f. Inventory table will appear (see Fig 10.)

g. All columns can be sorted and items can be searched by part

name/acronym by pressing CTRL-F and entering the name in the Find

field.

Page 10: Kitchen Cabinet company order processing procedures

10

Fig. 9

`

Fig. 10

Page 11: Kitchen Cabinet company order processing procedures

11

PULLING, PACKING AND SHIPPING -SCHEDULING

1. Once items are distributed by department, pulling, packing and shipping scheduling can be

performed.

A. Go to Process Manager for the order just distributed

B. Check the number of minutes that are needed for pulling that order (see Fig

C. Go to Warehouse Future Daily Processing Board located on the Running Board (see Fig)

D. Total pulling time per order is 660 minutes. Look at the next available date for the Estimated

Pulling Time allows enough balance to fit the order (look at Date and Est. Pulling Time columns)

E. Follow the 2/4 ETA rule (two weeks internal ETA/four week customer ETA) for orders that are

not waiting for container. If the order is waiting for container, check the ETA of arrival for that

container with International logistics. Add a week to that ETA and schedule the estimated internal

pulling ETA for that date. A rule of thumb is five weeks ETA for container to arrive and complete

processing items (customs, delivery, unloading, updating inventory, QA)

F. Enter the pulling date on the order:

1) Recommended Back Order Shipping Date

2) Recommended In Stock Shipping Date

3) Hit Submit Button (see Fig. 11,12)

G. Go to Process Manager

1) Enter the Pulling date

2) Enter Packing date

3) Go to bottom of page, hit “Submit” button.

Page 12: Kitchen Cabinet company order processing procedures

12

Fig.11

Fig 12

Fig. 13

Page 13: Kitchen Cabinet company order processing procedures

13

Fig. 14

A. For TS, TS/Service, TS/Processing, TS/Service/Processing orders

1. Check the number of minutes for the order on the Process order link. Use 80% of that time for

Pulling and 70% for Packing.

2. Go to Warehouse Future Daily Processing Board and check the next available PULL date with

number of minutes. If the number of minutes of that order and the total of the current minutes for that

day is less or equal to 660 system minutes (standard number of daily system minutes), schedule that

order for that day, otherwise schedule for the next day with available time.

3. Follow the 2/4 rule for scheduling. Enter the date in Estimated Pull Date, Estimated Service

Date and Estimated shipping date on the process order page.

4. For the above orders with Air Service and/or Out of Stock items on Container, estimated

pulling and shipping time will be extended to the date of container arrival plus three days for container

processing, customs, delivery and unloading and processing in warehouse.

5. Order processor notifies all pertinent department heads of the new order processed and

scheduled on the running board via email

6. Customer service get notified automatically of the processed order once the ETA dates are

entered.

A. After the Order Process is complete, Processor will check the Customer Service Board and

following tables:

i. Manage Pending Shipping Date Orders

II. Service Request Board

B. Check Customer Preferred shipping date on both for each order

i. If the scheduled shipping date is later the customer's preferred shipping date,

Customer Service will give customer two options:

a. Partial Shipment

b. Wait for complete order to ship every part of the order together.

C. Pending shipping date ETA is the farthest internal ETA plus 2 weeks.

7. Processed order is QA’d for confirmation of parts, departments, out of stock items.

8. Service Scheduling creates a spreadsheet with each order broken out by department.

Page 14: Kitchen Cabinet company order processing procedures

14

1/21/2014 PROCESSED Carol Tanguay W150114113028 87 3 13 1 2

1/22/2014 PROCESSED Jim Cairns W210114141424 1 3

1/22/2014 PROCESSED Arcadio Bertram W210114094318 24 2 5 2

1/22/2014 PROCESSED Kevin Noppinger W210114105223 58 37 1 12

1/22/2014 PROCESSED Paul Iwanski W170114142410 50 102 1 21

1/22/2014 PROCESSED Juan Merino W280114121544 119 16

1/22/2014 PROCESSED Juan Merino W210114140736 3 2

PROCESSED Kathleen Dowling W201213161113 177 9 29

Fig. 15 Spreadsheet breaking down order by departments and quantities of parts per department

9. Order is ready to be pulled (should be within 24 hours of scheduling receiving the order

A. Print out Order Processing Page and include into folder

B. Folder is to be placed into a Service Bin

10. Scheduling is to be notified within 24 hours of receiving the order; customer service is notified

and contacts customer to discuss delay-communicates with scheduling via email of resolution.

11. Service, Pulling, Packing and Shipping schedules are created weekly on Friday of the prior week

12. Mei Production creates its own schedule; Local vendor department creates its own schedule

13. Time Frames:

A. Warehouse internal ETA is 1 week

B Service ETA is 6 week

C. Production ETA is 5 weeks

D. Local Vendor is 3 week.

14. When Service, Warehouse, Pulling, Packing, Shipping departments complete an order, the QA

person in charge will bring the department's documents to Processor to update the status and Actual

Completion dates in MOP.

SECTION II - SERVICE ITEMS PROCESSING (Fig. 16)

1. Once the order has been processed and QA’d, items needing Service have to be processed

2. Go to order’s contract id link

3. Check color and style

4. Go to Status Manager link

5. Count all items that need parts including modified orders

6. Write down all items that need service and their quantities

7. Go to Process order link

DATE PROCESSED STATUS Order ID

TRUE

STOCK

Service Items

Production Items

Local Vendor Items

Airmail/ Container CONTAINER

Page 15: Kitchen Cabinet company order processing procedures

15

8. On the bottom, go to Manage/Calculate Service Time

9. On the Service Category, select the necessary service

10. Service includes customizations, modifications, stripping, spraying and staining, routing

doors for glass and repairs.

11. In the Total # of tasks, enter the quantity of items to receive a particular service

12. Enter very specific comments using standard and consistent verbiage

13. Move on to the next set of items to be service by clicking Add More Service link below

Estimated Service Time.

14. Repeat steps 8-12

15. Time per person and estimated service time get added up by the MOP

16. Once all service items are complete, hit “Submit” button

17. The service items are entered on a weekly Service schedule

Fig. 16

I. SERVICE WORK FLOW

A. Service order is pulled

1. Pull order

a. The following documents are required at pulling/allocating stage:

b. Order processing page with Contract ID

c. Puller Quality Inspection Form, Contract Parts Sold Report

B. Check Service Requirements in the Processing form and notes on it.

1.. The following documents are required at Service Stage

a. Contract Service Parts report and/ or Service form.

Page 16: Kitchen Cabinet company order processing procedures

16

C. QA order

1. Pulled orders are placed in “Allocated” status by QA

2. Parts slated for Service are moved to Service department

a. The following documents are required at Moving to Service Stage

1. Contract Service Parts report and/or Service Report

3. QA at the completion of Service

4. If the service passes QA, the status if moved from “Allocated” to Serviced”

a. The following documents are required at Moving to Service Stage

1. Shipping List

5. Serviced components are returned to warehouse to be added

a. The following documents are required at Moving to Service Stage

1. Contract Service Parts report and/ or Service form.

D. Order is ready for Packing

1. The following documents are required at pulling/allocating stage:

a. Packing/Shipping Inspection form

b. Contract Parts Relationship List

c. Customer ID

E. Order is QA’d prior to shipping

F. Once ship docs are created, the order is shipped (Fridays)

1. The following documents are required at pulling/allocating stage:

Bill of Lading

G. QA changes the shipping date to “Shipped”

1. Shipping Manager creates a shipping document with Fedex and TLL

2. Email with tracking number is sent to Customer Service and customer

3. Customer service notifies the customer and verifies whether the email was received

H. If the order is local/picked up, customer is required to inspect and sign packing slip

1. Shipping department updates the order to “Shipped” and the order with signed packing

slip is placed in shipped orders bin.

Status is “Ordered” after the order is processed in MOP. The order is currently pending at

production.

Within 24 hours of receiving the order, production department has to notify scheduling of any delays

and reasons; customer service is notified and the customer is contacted in order to make further

arrangements.

Page 17: Kitchen Cabinet company order processing procedures

17

Status is “In Process” in MOP – order is acknowledged and ordered

Status is “Shipped” in MOP – products are received and produced.

Production notifies Warehouse on the completion of the order and products are QA’d by warehouse

staff prior to packing.

Basic Order Processing Flowchart