  • 7/28/2019 Kingston High School Construction Plan, June 2013

    1/27

    1

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    KCSD Board of Education Meeting

    KHS Second Century Capital Plan5 June 2013

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    2/27

    2

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Agenda

    1) Guiding Principles of the Capital Plan2) Overview ofAlternative Plan Options3) Review ofRecommended Plan4) Review of Phasing / Swing Space Strategy and Schedule for

    Recommended Plan

    5)

    Discussion of Updated Bond Cost for Recommended Plan

    6) Next Steps

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    3/27

    3

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Guiding Principles of the 2nd Century Capital Plan

    1) Enhance the delivery of education services2) Correct ADA compliance issues3) Repair / replace building systems that are beyond their serviceable life4) Enhance campus security & safety5) Improve campus pedestrian & vehicle circulation6) Develop a budget cost model that is prudent

    = top 3 major ndings of 2009 2010 community survey

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    4/27

    4

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Alternative Conceptual Site Plan Studies

    Main

    New Const.

    Salzmann MJM

    Main

    New Const.

    Salzmann

    Main

    FieldHouse

    NewConst.

    Salzmann

    NewConst.

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    5/27

    5

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Existing Site Plan

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    6/27

    6

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Site Plan

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    7/27

    7

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Site Plan

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    8/27

    8

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Lower Level Concept Plan

    SLC#2(lowerlevel)

    Maker Space

    Media / Art

    Studios

    Fitness

    Center

    Support

    Music

    SLC#1(lowe

    rlevel)

    Examples of maker spaces

    SLC#2(lowerlevel)

    SLC#1(lowe

    rlevel)

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    9/27

    9

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Main Level Concept Plan

    Fitness

    Center

    Student

    Entrance

    New Entrance

    Wellness

    Student

    Commons

    High School

    Admin.

    Guidance /

    Student

    Services

    Examples of commons / exhibition spaces SLC#2(upperlevel)

    SLC#1(uppe

    rlevel)

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    10/27

    10

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Second Level Concept Plan

    Home &

    Careers

    District Special

    Ed.

    AP /

    Specials

    Examples of 21st Century instruction spaces

    SLC #3

    SLC#4(lowerlevel)

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    11/27

    11

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Third Level Concept Plan

    Examples of studio / media production spacesSLC#4(upperlevel)

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    12/27

    12

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Small Learning Community major program spacesGeneral Classrooms: 13 @ 785 nsf

    Science Labs: 4 @ 1,380 nsf

    Science Prep: 2 @ 300 nsfSpecial Education Instruction Spaces: 3 @ 550 nsf

    Health Classroom: 1 @ 785 nsf

    Instructional Break Out Areas: 4 @ 300 nsf

    Computer Lab: 1 @ 1,000 nsfMultipurpose Room: 1 @ 2,000 nsf

    Assistant Principal + House Administration: 1 @ 1,000 nsf

    Collaborative Workroom: 1 @ 1,100 nsfSupport Spaces (Restrooms, Storage, etc):

    Typical Lower Level Small Learning Community

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    13/27

    13

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Construction Delivery

    Complete Fall 2016

    Complete Fall 2017

    Tobin/Whiston Demo Summer 2016

    MJM Demo Summer 2018

    Construction Time Period:

    Spring 2015 to Fall 2018

    Complete Fall 2018

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    14/27

    14

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Summer Work

    1st Summer: Field House andSalzmann Classrooms

    2nd Summer: Salzmann Cafe,Kitchen and Media Center

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    15/27

    15

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Bond Cost Budget Update

    Site Landscaping/Hardscaping

    New architectural entrance for campusReplace landscape at Broadway entrance

    Storm DrainageRectify existing drainage issues at lower siteUpgrade drainage at rear of Main

    Parking/Pavement/Sidewalks New drop-off entrance for campus

    Re-configure roadways around siteRe-coat/Re-Pave entire site

    Site ImprovementsProvide new all-weather athletic fieldIncrease site lighting

    Remove deteriorated covered walkwaysUpgrade primary site utility entrances

    Repair damaged site stairs

    SUB_TOTALS: $ 5,000,000

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    16/27

    16

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Bond Cost Budget Update

    Main RenovationLight renovation of 19,200 sf and Heavy renovation of 22,200 sf

    Gut renovation of bathrooms

    Performance Space: replace stage, update power, new lightingReplace remaining roof and skylightRefurbish existing elevator

    Repair exterior wall deterioration at Music AdditionRepair damaged flooring: VCT and Terrazzo

    Replace door hardware with ADA accessibleRepair clogged roof drains

    Hazardous Material Removal

    Asbestos Abatement required for renovation workLead Paint Abatement required for renovation work

    Remove and replace VAT floor tiles

    Energy / Mechanical UpgradesReplace steam HVAC system with hot water

    Replace remaining singlepane windows in Music AdditionReplace 1920's electrical service entrance

    Replace plumbing systemUpgrade power to classroomsLeave sprinkler piping, replace outofdate heads

    HistoricRestore grand entry steps , add handrails, replace historic lights

    Restore Lay LightRepair roof cornice

    Create new "Art Gallery" spaceClean and repair masonry faade

    SUB_TOTAL: $ 18,700,000

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    17/27

    17

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Bond Cost Budget Update

    Salzmann Addition

    181,400 sf addition

    RenovationMedium renovation of 11,400 sfHeavy renovation of 23,200 sf

    Gut renovation of bathroomsReplace roof

    Replace windows and door, including at bridges

    Energy / Mechanical UpgradesReplace HVAC system

    Replace plumbing systemReplace electrical system

    Replace sprinkler system

    SUB_TOTAL: $ 65,700,000

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    18/27

    18

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Bond Cost Budget Update

    Field House Addition

    Add new fitness centerAdd new entrances

    RenovationGut renovation of all locker rooms

    Replacement of gymnasium floorReplace door hardware with ADA accessible

    Repaint/repair finishes throughout

    Energy / Mechanical UpgradesReplace steam HVAC system with hot water

    Add Air Conditioning to Field HouseReplace electrical service entrance & equipment

    Renovate/upgrade plumbing systemUpgrade sprinkler system for assembly space

    SUB_TOTAL: $ 14,100,000

    MJM Demolish the building in lieu of extensive renovations and additions

    SUB_TOTAL: $ 1,500,000

    Tobin/Whiston Demolish the building in lieu of extensive renovations and additions

    SUB_TOTAL: $ 1,400,000

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    19/27

    19

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Bond Cost Budget Update

    Site $ 5,000,000Main $ 18,700,000Salzmann $

    65,700,000Field House $ 14,100,000MJM $ 1,500,000Tobin/Whiston $ 1,400,000

    SUB-TOTAL: $ 106,400,000Contingency $ 10,600,000

    SUB-TOTAL: $ 117,000,000Indirect Costs $ 20,500,000

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    20/27

    20

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Aerial View from Broadway

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    21/27

    21

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Aerial View from Southeast

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    22/27

    22

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Aerial View from Broadway

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    23/27

    23

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    New Student Entrance

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    24/27

    24

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    New Fitness Center & Andrew Street Entrance

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    25/27

    25

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Celebrating the History a Vision to the Future

    KHS Second Century Capital Plan

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    26/27

    26

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Discussion

    1) Other discussion items

  • 7/28/2019 Kingston High School Construction Plan, June 2013

    27/27

    27

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    2013 Bond Follow Up Design Initiatives 6 Dec. 2012

    K H S S e c o n d C e n t u r y C a p i t a l P l a n

    Thank You !