Kiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 1 of 12

Upload: others

Post on 26-Mar-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Kiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855

Page 1 of 12

Page 2: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Kiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855

Page 2 of 12

Contents

Contents Reference Page Number

Introduction 3

Company Integrated Management System 3

Company Organization Chart 4

Management of the Installation 4

Infrastructure and Operation 5

Emissions 5

Compliance declaration regarding Risk Phases in Paint Systems 5

Control & Monitoring 6

License Specific Reports 6

Pollutant Release and Transfer Register (PRTR) 7

Solvent Emissions 7

Solvent Management Plan 8

Emissions Reduction Plan 8

Resource Use and Energy Efficiency 8

Materials Handling- Waste Handling 9

Accident Prevention and Emergency Response 10

Decommissioning and Residuals Management 10

Notification, Records and Reports 11

Financial Charges and Provisions 11

APPENDICES

APPENDIX REFERENCE

Number of Pages

Appendix 1 Solvent Mass Balance Equation 1

Appendix 2 Noise Survey Report 1

Appendix 3 KSSL Solvent Reduction Scheme Report 2

Appendix 4 Emissions to Atmosphere Report 3

Appendix 5 Certificate of Analysis for Storm Water at SL2 position 1

Appendix 7 Extract from AER Returns Workbook, Releases to Air 3

Appendix 8 Extract from AER Returns Workbook, Treatment & Transfers of Waste 3

Page 3: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Kiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855

Page 3 of 12

Introduction Kiernan Structural Steel Ltd fabricates structural steel products at our factory at Carrigglass, Co Longford,

which is located in a rural setting about 4 Km from Longford Town, (National Grid Reference 216940E

278193N). The River Camlin and the adjacent Carrickglass Demesne, a Natural Heritage Area is located

300m south of the site.

The factory comprises of a fabrication shop of 3,500 sq m, a separate paint spray shop of 1,500 sq m, a

transport compound of 2,500 sq m and an outside steel holding area of 5 acres. Manufacturing processes

include shot blasting of steel, cutting, drilling, grinding and flame-cutting operations, welding and paint

spraying. Emissions from the plant include noise emissions from activities on site and air emissions from

paint spraying activities, solvent recovery and emissions from empty paint containers. There are no trade

effluent discharges and domestic effluent is discharged to a package septic tank system where surface run-

off is discharged to ground. Potable water is supplied from our own on-site borehole via a water treatment

system. A new attenuation pond and petrol interceptor has been added at the end of our drainage system.

Normal operating hours is from 8am to 5.30pm, Monday to Friday.

The company operates and maintains an IPPC licence (since 2009), covering paint spraying activities and

the safe storage of paint-related materials, reference the First Schedule of PoE Act 2004, Class 12.2.2,

description “The manufacture …of coating materials in processes with a capacity to make or use at least

10 tonnes per year of organic solvents….” Compliance to our licence conditions is demonstrated by the

operation of our emissions reduction scheme to achieve target emissions levels for VOC compounds and

the monitoring and maintenance of safe storage of paint-related materials.

The RBME risk category is rated at C1 level.

Environmental monitoring has been maintained during this period and we are able to report full

compliance with our solvent reduction scheme.

Company Integrated Management System

The Company maintains an integrated management system that is certified to ISO9001 (Quality),

ISO14001 (Environmental) and OHSAS 18001 (Occupational Health & Safety) requirements. The

Company conforms to our Environmental Policy and our Integrated Management System addresses the

licence requirement for a documented Environment Management System and an Environmental

Management Programme. The Company has also been certified to EN1090 for the fabrication of

structural steel products to Execution Class 4 and maintains a Factory Production Control and Welding

certification.

Management has established a framework for setting and reviewing environmental objectives and targets,

which is implemented under our management program. The Company ensures it has the resources,

support and commitment to training so as to maintain the features of this policy

We are committed to complying with IPPC licence requirements, all relevant environmental legislation

and regulations, and with any other such requirements to which we subscribe.

Page 4: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Kiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855

Page 4 of 12

Company Organizational Chart The Company organizational chart indicates responsibilities and areas of activity; refer to the attached

chart. The positions of Company Representative and Deputy Representative, with responsibility for the

IPPC licence and matters relating to the integrated management system, are indicated.

COMPANY ORGANISATION CHART

Management of the Installation Our integrated management system includes both quality and environmental aspects, which is fully

documented and has been certified by Intertek.

Managing Director Frank Kiernan

Engineering Manager John Kiernan & Environmental Representative

Quality Department John Kiernan

Safety Environmental

Consultant Noel McKiernan

Engineer Cormac O'Reilly

Deputy Representative

Quality

Production Seamus Farrell

Construction

Finance & Administration

Dolores Kiernan

Page 5: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Kiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855

Page 5 of 12

The Company has a documented procedure for our objectives, targets and management program. The

Company conducts our AER in conformance with our internal procedure, which addresses the

Environmental Management Program (EMP), internal management reviews, and covers corrective actions,

awareness and training, communications, maintenance and efficient process control.

The Company has established five environmental objectives in our EMP, namely

1. The maintenance of our VOC reduction program

2. The optimization of the spraying process

3. Ensuring water monitoring results are kept within limits and measures to reduce the likelihood of

pollution

4. The reclaim of C&D waste and maximization of recycling activities

5. Improvements in materials storage

Each objective has been set out individually with a start date, responsibility, the main program steps,

completed actions and the time frame for completion.

Infrastructure and Operation

In reply to the required conditions of the licence the Company ensures;

• Storm-water monitoring is maintained when fabrication activities take place within the factory.

• All oil, paint drums and suchlike materials are stored in bunded areas

• Spill kits are readily available to contain spillages

• The package sewage system is being regularly maintained and there is no trade effluent.

Emissions

The Company has monitored all emissions specified in the conditions of our licence.

There have been no complaints on behalf of any member of the public in the last year and no smells,

odours or noise emissions have been noted that would impair or interfere with the environment outside the

Company site.

There have been no recorded spillages of materials, which would have any adverse effect on aquatic life.

The Company monitors our annual performance regarding the VOC Reduction Scheme. The spreadsheet

in Appendix 3 indicates the total amount of paint used by type during 2014 and the usage of VOCs has

been calculated. The results show that we were within 9% of our allowed targets and therefore it

indicates our compliance with the requirements of the Reduction Scheme.

The reduction of fugitive emissions is addressed in our management programme.

Compliance Declaration Regarding the Risk Phases in Paint Systems

The Company has not used materials that carry the risk phases R40, R45, R46, R49, R60 and R61.

The Company has not used materials that contain halogenated VOCs; assigned the risk phase R40.

The Company has not used materials that contain lead chromate, which are assigned the risk phases R61

or R62.

Page 6: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Kiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855

Page 6 of 12

Control & Monitoring The Company has reported a higher level of business activity with an increase of 42% in steel output over

the previous year’s production. The following reports for solvent usage, steel usage, fuel and electrical

usage and waste figures reflect this higher level of activity.

Licence-Specific Reports-

Reference Schedules A, B and C

Schedule A: Limitations

A.1 The organic solvent consumption of the installation did not exceed 150 kg /h or 200 Tonnes per year.

Schedule B: Emission Limits

Emissions to Air

There were no emissions to air of environmental significance, i.e. we are in compliance with the volatile

reduction scheme.

Emissions to Water

There were no emissions to water of environmental significance.

Emissions to Sewer

There were no emissions to sewer of environmental significance. Noise Emissions

There were no complaints of noise during the year.

Schedule C: Control and Monitoring

Control of Emissions to Air

There were no emissions to air of environmental significance, i.e. we are in compliance with the volatile

reduction scheme.

Monitoring of Emissions to Air

Emission point reference A2-1, A2-2.

Emissions reporting: See Appendix 4 for a report on our emissions from our exhaust stacks.

C.2.3 Monitoring of storm water emissions, presented as average readings, taken routinely over the year.

Table 1-Storm Water monitoring

Reference Point: SL2

Parameter Result (KSSL routine monitoring) Results (Laboratory

Report, Appendix 5)

pH 7.9 7.7

TOC - 3.15

Conductivity 320 471

Visual Inspection Clear, except when construction

work was ongoing

Clear

The company conducts routine monitoring and logs such records as per Condition 6 – Control and

Monitoring – and Schedule C.2.3 of our licence. These results are averaged and presented in the table

above.

Page 7: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Kiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855

Page 7 of 12

C.3.1 and C.3.2 Control and Monitoring of Emissions to Sewer

T he company does not use water in any of our production processes.

Waste monitoring

The Company monitors and controls both hazardous and non-hazardous waste streams. Hazardous wastes

amounted to 11.7 T while non-hazardous wastes amounted to 303.7 T, of which

• 230 T was steel waste sent for recycling. See Table 8 below.

• 40.26 T was municipal waste and

• 33.0 T was mill scale waste.

Noise Monitoring;

The last report of noise was carried out in March 2014 and showed noise levels below 55 dB at the noise-

sensitive location NSL1.

Ambient Monitoring

Groundwater Monitoring at point GW1. In-house monthly monitoring of groundwater for pH and conductivity is carried out and the results are

summarized below.

Table 2 – Groundwater Monitoring

Parameter Result In-house Monthly

Monitoring

pH 7.6

Conductivity 327

Pollutant Release and Transfer Register (PRTR)

The Company has completed and electronically submitted our PRTR, reference Appendix 6.

The 11.7 T of hazardous waste was categorized as waste paint, EWC code 08 01 11 and was disposed off at

the Geocycle site in Belgium.

Solvent Emissions

As indicated above the Company maintains a procedure for monitoring and recording our VOC usage,

reference Appendix 3 -Determination of Compliance with the Solvent Reduction Scheme.

The Company complied with the Reduction Scheme solvent: solid ratio for the years 2009-14, as follows:

Table 3 Results of reduction Scheme 2009 to 2014.

Year Total actual

emissions (kg)

Total Target

Emissions (kg)

Difference (kg) % Under

target

2009 6706 11111 4405 40

2010 7945 10368 2423 30

2011 10927 13358 2431 18

2012 18654 19547 893 5

2013 23094 27369 4276 16

2014 26851 29415 2685 9

The mix of products, thinners and equipment cleaning solvents used shows the installation met the

Reduction Scheme solvent: solids ratio requirements for 2014 and previous years.

Page 8: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Kiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855

Page 8 of 12

Solvent Management Plan

The weekly usage of solvents was calculated by weight (kg).

Referring to the mass balance equation in Appendix 1 the significant emission is due to extraction by

the two fans situated at A2-1 and A2-2. The flow rate from these fans has already been calculated and

using the concentration figures found in the extracted air the amount of emissions was calculated. The

weekly amount of VOC generated was 502 kg while the weekly emissions through the extraction fans

were 84.8 kg. Weekly fugitive emissions were 417 kg.

Emission Reduction Plan Potential customers will be requested to select complaint coatings for their projects.

Personnel responsible for selecting and purchasing paints and paint products have been made aware and

have been trained in their responsibilities to ensure compliance with target emissions. Production

personnel have been made aware of the best techniques of paint spraying and the efficient use of

materials.

Resource Use and Energy Efficiency

Raw Material, Intermediates and Products Solvent-based paints, supplied mainly by a selection of the main paint suppliers, and thinners are stored in

two concrete bunded areas. The bunds are vented to prevent the build up of potentially noxious and

dangerous gases. The amounts of paints and thinners are shown in the spreadsheet in Appendix 3. The

total amount of paint used during the year was 70,000 liters. Paint types consist of single and two-pack

primers, single and two pack build/finish coats, mostly of zinc rich epoxy types. Intumescent and the

associated primers were employed where fire protection was required. Particular customers required

some special finishes. Thinners are mainly used for cleaning purposes and are recovered and reclaimed

in our distillation process.

Steel usage per annum

The Table below shows the annual change in the tonnage of steel (hot-rolled) used annually.

Table 4 Steel Usage per Annum

Year 2009 2010 2011 2012 2013 2014

Change on previous

year

-70% -9% +78% +53% +19% +42%

Other raw materials include welding gases and consumables, salt for water softeners and fuels.

Energy efficiency The table indicates our annual electricity usage. This shows an increase in 2014, corresponding to the

increase in throughput of steel.

Table 5 – Electricity Usage

Year 2010 2011 2012 2013 2014

Total Consumption kWh

/Tonne Steel

152.4 89.8 89.2 98.7 88.8

Electrical Consumption,

Change on previous year

%

-12% +5% +52% 31% +28%

Page 9: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Kiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855

Page 9 of 12

Water The Company uses our own on-site well for supplying toilets and canteen. There are no process water

requirements.

LPG Usage LPG is used both for space heating and forklift fuel. The total amount purchased during the year 2014

i n c r e a s e d b y 3 3 %. The amount used depends on the amount of painting activities and weather

conditions; cold and humid weather requires more heat in the spray shop.

Table 6 - Annual Usages of LPG

Year 2010 2011 2012 2013 2014

Change on previous year % -64% +284% +191% -29% +33%

LPG usage liters

Per Tonne Steel

0.81 1.76 3.35 2.01 1.88

Diesel Oil Usage The Company uses marked diesel for factory transport and on-site transport. Kerosene is used for factory

heating, in addition to LPG. Road diesel is used for company cars and vans.

Table 7 - Annual Usage of Fuel

Fuel type 2010 2011 2012 2013 2014

Road diesel liters/tonnes steel

produced

12.4 9.1 8.2 8.8 7.8

Marked diesel liters/tonnes

steel produced

4.6 2.5 3.2 4.0 4.4

Kerosene liters/tonne steel

produced

2.5 2.1 2.0 1.8 1.1

Materials Handling

Waste Handling The Company confirms our commitment to meeting all waste regulations. There are relatively small

amounts of waste arising from the production processes at the plant. Types of waste typically generated

from the production process include:

• empty paint containers

• waste steel shot dust

• waste steel

• dust from the paint shop process

• waste thinners from cleaning processes (stored on premises) and mostly reclaimed from the

distillation process, and

• municipal waste

Hazardous waste was disposed off during the year. Quantities of such waste, stored on site, are being kept

to the minimum.

Page 10: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Kiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855

Page 10 of 12

Table 8 - Year 2014 Waste Recovery/Disposal

Waste

material

EWC code Main

source

Quantity

Tonnes

per

annum

On-site

recovery/

Disposal

Off-site

recovery,

reuse or

recycling

Off-site

Disposal

Waste steel 12 01 01 Steel off-

cuts 230.5 D recycled Hammond

Lane

General non-

hazardous

waste

20 03 01 Canteen,

office,

workshop

40.3 D landfill Mulleadys

Waste

Mill Scale 20 03 01 Work

shop 33 D landfill Mulleadys

Waste

Paint Waste 08 01 11 Spray

Shop 11.7 D incineration Enva/Geocycle

Waste monitoring of hazardous materials consists of controlling the following category: -

Paint-related waste; reference UN 1263 Class3 flammable liquid.

Copies of waste licences and permits of all waste contractors are maintained.

Accident Prevention and Emergency Response The Company has a procedure on emergency preparedness, which is subject to annual review. Personnel

have been trained in fire safety awareness, have carried out an annual fire and spill drills and are trained in

emergency response and first-aid.

The Company maintains a comprehensive safety statement, which covers all activities of our workforce.

The Company maintains relevant insurance certificates.

Decommissioning and Residuals Management

Shot blasting, metal fabrication and paint spraying processes are carried on at this site. Following the

cessation for a period greater than 6 months, for use or involvement of all or part of the operation at the

facility, any soil, subsoil, buildings, plant or equipment or any waste, materials or substances that may

result in environmental pollution will be commissioned, rendered safe or removed for disposal/recovery.

The need for any decommissioning or review shall be part of the Company’s AER and any proposed

amendments will be notified to the EPA for agreement. Such reviews shall take account of:

• any site or process changes,

• technology changes and costing changes

• site evaluation

• closure consideration, details of plant, buildings equipment and other materials, which require

consideration as part of the closure process

Page 11: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

• a programme covering all items

• A test programme, if relevant, to demonstrate the successful implementation and decommissioning

of the plan.

• Details off how costs are to be underwritten

• Environmental monitoring during decommissioning

• Site restoration and aftercare

• Long-term aftercare

• Aftercare maintenance and monitoring.

A final validation report on the residuals management plan shall be forwarded to the EPA within 3 months

of execution.

Notification, Records and Reports.

Two reportable accidents occurred during the last year and the HSA was informed, (one factory accident

involving a trip/fall type injury and one on-site injury.).

No complaints of an environmental nature were noted within the time period.

The Company maintains all environmental records required for the continued maintenance of our licence.

The Company maintains our Reduction Scheme spreadsheet and a file of technical and MSDS sheets for

all paints used in production. These documents contain all relevant records as regards solvent

concentrations and usage.

Financial Charges and Provisions The Company has made adequate financial provision in relation to the underwriting costs for any remedial

actions following anticipated events, accidents or incidents as are necessary for the carrying on of our

activities.

Signed:

Noel McKiernan

Quality Dept.

Page 12: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Appendix 1 - Solvent Mass Balance Equation

Referring to the designations used within Section 6 of the Solvent Regulations:

F= I1-O1-O5-O6-O7-O8

Where: F=Fugitive Emissions

I1=The quantity of organic solvents or their quantity in preparations purchased which

are used as input into the process in the time frame over which the balance is being

calculated.

O1=Emissions in waste gas

O5= Organic solvents and/or organic compounds lost due to chemical or physical reactions (including for example those which are destroyed, e.g. by incineration or other waste gas or waste water treatments, or captured, e.g. by absorption, as long as they are not counted under O6, O7 or O8).

O6 = Organic solvents contained in collected waste O7 = Organic solvents, or organic solvents in preparation, which are sold or are intended to be sold as a commercially valuable product.

O8 = Organic solvents contained in preparations recovered for reuse but not as input

into their process, as long as not counted under O7.

I1 = 502.15 kg VOC / week

O1 = [(A2-1 flow) x (A2-1 VOC conc.) + (A2-2 flow) x (A2-2 VOC conc.)] kg/week = 46.4 + 38.4

kg/week kg/week = 84.8 kg/week

Where the average VOC concentration for

• A2-1 was 168.2 mg/m^3 and

• A2-2 was 115.8 mg/m^3.

The average flow rate for

• A2-1 was 7067.1 m^3/hr and

• A2-2 was 8507.6 m^3/hr.

• Results are based on a 39 hour standard working week.

O5 = 0

O6 = 0

O7 = 0

O8 = 0

F = 502.15 – 84.8

= 417.35 kg/week.

Therefore fugitive emissions during 2014 averaged 417 kg/week.

Page 13: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural
Page 14: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural
Page 15: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural
Page 16: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Appendix 3 - KSSL Solvent Reduction Scheme Report 2014 g

/lit

re o

f

pli

ed

as

su

pp

lie

r

r g

/lit

re o

f

pli

ed

as

su

pp

lie

r

f p

rod

uc

t

on

th p

eri

od

s u

se

d i

n k

g

en

t u

se

d i

n

ion

Fa

cto

r

le 3

of

ula

tio

ns

lve

nt

for

un

de

r

ch

em

e

nc

e i

n k

g

ab

le s

olv

en

t

tio

n S

ch

em

e

Instructions: The below data sheet provides an easy-to-use tool to determine whether

Figures are for Jan to end Dec 2014, using PG6-23

VO

C g

/kg

or

g/

pro

du

ct

su

pp

li

sp

ec

ifie

d b

y s

u

So

lid

s g

/kg

or

pro

du

ct

su

pp

li

sp

ec

ifie

d b

y s

u

Lit

res

or

kg

of

us

ed

in

12

mo

n

as

su

pp

lie

d

Ma

ss

of

so

lid

s

Ma

ss

of

so

lve

n

kg

Ta

rge

t E

mis

sio

fro

m S

ch

ed

ule

So

lve

nt

Re

gu

la

All

ow

ab

le s

olv

pro

du

ct

in k

g u

Re

du

cti

on

Sc

h

So

lve

nt

ba

lan

c

ag

ain

st

all

ow

a

un

de

r R

ed

uc

tio

434 2266 900 2039 391 0.375 765 374

324 1976 1860 3675 603 0.375 1378 776

412 978 2390 2337 985 0.375 877 -108

257 1313 13392.5 17584 3442 0.375 6594 3152

482 796 2540 2022 1224 0.375 758 -466482 796 2540 2022 1224 0.375 758 -466

272 1048 12080 12660 3286 0.375 4747 1462

618 532 1940 1032 1199 0.375 387 -812

332 2368 200 474 66 0.375 178 111332 2368 200 474 66 0.375 178 111

Page 17: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

551 669 1400 937 771 0.375 351 -420

450 750 20 15 9 0.375 6 -3

405 995 100 100 41 0.375 37 -3

0 0 0.375 0 0

257 1313 300 394 77 0.375 148 71257 1313 300 394 77 0.375 148 71

217 1383 200 277 43 0.375 104 60

304 1126 2260 2545 687 0.375 954 267

290 1080 5340 5767 1549 0.375 2163 614

220 1170 4170 4879 917 0.375 1830 912

390 990 900 891 351 0.375 334 -17

420 790 1100 869 462 0.375 326 -136

418 1042 19140 19944 8001 0.375 7479 -522

70233 78440 24103 29415

.

Mass of

other

solvent solvent

used (kg)

-7114.5

Type of ThSpecific Gravity from Supplier Litres used in 12 month period

Solvent Thinners0.85 8370

Estimated amount of solvent in Amount of waste removed from

Mass of

solvent

4366.5

Type of wa

Estimated amount of solvent in

waste (g/litre)

Amount of waste removed from

site (litres)

solvent

disposed

Collected Waste Solvents - gunwash600 7277.5

Page 18: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Total

Actual

Emission

Total

Target

Emission

Differenc

e (kg)

28470 22301 256428470 22301 2564

ers and equipment cleaning solvents used shows the installation meets the Reduction S

Page 19: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Fitz Scientific

Carrigglass, Longford, Co. Longford

Kiernan Structural Steel

Visit No: 1Year: 2014

P0855-01IPPC Licence5690/M04

1.- Part 1

1.1.- Monitoring Objectives

1.2.- Special Monitoring Remarks

All the sampling points were obtainable Yes

All parameters were sampled Yes

The monitoring was carried out as requested by the management of the company above mentioned. The requirements of BS EN ISO 15259:2007 were not applied for the substances monitored at the emission points listed below.

Opinions and interpretations expressed in this report are outside the scope of any claimed UKAS accreditation.

Additional information

No additional information.

A2-1

Parameter Result

Benzene <0.1 mg/m3

Ethyl benzene 1.9 mg/m3

m+p Xylene 2.6 mg/m3

o-Xylene 1.3 mg/m3

Toluene 4.0 mg/m3

TVOC 41.0 mg/m3

Xylene 3.9 mg/m3

A2-2

Parameter Result

Benzene <0.1 mg/m3

Ethyl benzene 3.4 mg/m3

m+p Xylene 4.6 mg/m3

o-Xylene 2.3 mg/m3

Toluene 9.9 mg/m3

TVOC 99.5 mg/m3

Xylene 6.9 mg/m3

Page 4 of 41

Page 20: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Fitz Scientific

Carrigglass, Longford, Co. Longford

Kiernan Structural Steel

Visit No: 2Year: 2014

P0855-01IPPC Licence5690/M06

1.- Part 1

1.1.- Monitoring Objectives

1.2.- Special Monitoring Remarks

All the sampling points were obtainable Yes

All parameters were sampled Yes

No uncertainty calculated as no measurements for Temperature, Pressure and Velocity were taken

The monitoring was carried out as requested by the management of the company above mentioned. The customer has chosen to sample to the requirements of BS EN 15259:2007 for the substances monitored at the emission points listed below.

Opinions and interpretations expressed in this report are outside the scope of any claimed UKAS accreditation.

Additional information

A2-1

Parameter Result

TVOC 295.42 mg/m3

A2-2

Parameter Result

TVOC 132.07 mg/m3

Page 4 of 23

Page 21: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

CERTIFICATE OF ANALYSIS

Unit 35,

Boyne Business Park,

Drogheda,

Co. Louth

Ireland

Tel:Fax:

Web:email

+353 41 9845440+353 41 9846171

[email protected]

Noel Mc Kiernan

Kiernan Structural Steel Ltd.

Carrigglas

Longford

Co. Longford

15/09/2014

15/09/2014

Lab Report Ref. No. 1086/009/01

Date of Receipt

Date Testing Commenced

Received or Collected

Condition on Receipt

Date of Report

Customer

By Fitz: Conor

Acceptable

23/09/2014Customer PO

Test Parameter SOP Analytical Technique Result Units

A copy of this certificate is available on www.fitzsci.ie

Customer Ref Storm Water - 15/09/14

Acc.

Surface WaterSample Type

15/09/2014Sampled On

Ref 2

Ref 3

uscm -1@20C471112 ElectrometryConductivity (Surface Water at 20C) UKAS

pH Units7.7110 ElectrometrypH (Surface Water) UKAS

mg/L3.15316 TOC analyser (NPOC)Total Organic Carbon

NoneClear170 Visual ComparisonVisual Appearance

Date : 23/09/2014

PVL - Parametric Value Limit as per EU (Drinking water) Regulations (SI 122 2014)

Results shall not be reproduced, except in full, without the approval of Fitz Scientific

Results contained in this report relate only to the samples tested

Aoife Harmon - Technical Supervisor

Signed :

Acc. : Accredited Parameters by ISO 17025:2005

All organic results are analysed as received and all results are corrected for dry weight at 104 C

Page 1 of 1

** : The test result for this parameter may be invalid as it has exceeded the recommended holding time (BS EN ISO 5667-3:2012)

(P) : Presumptive Results

Page 22: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

CERTIFICATE OF ANALYSIS

Unit 35,

Boyne Business Park,

Drogheda,

Co. Louth

Ireland

Tel:Fax:

Web:email

+353 41 9845440+353 41 9846171

[email protected]

Noel Mc Kiernan

Kiernan Structural Steel Ltd.

Carrigglas

Longford

Co. Longford

12/03/2014

12/03/2014

Lab Report Ref. No. 1086/007/01

Date of Receipt

Date Testing Commenced

Received or Collected

Condition on Receipt

Date of Report

Customer

By Fitz: Conor

Acceptable

28/03/2014Customer PO

Test Parameter SOP Analytical Technique Result Units

A copy of this certificate is available on www.fitzsci.ie

Customer Ref Storm Water SL-2

Acc.

Surface WaterSample Type

12/03/2014Sampled On

Ref 2

uscm -1@20C324112 ElectrometryConductivity (Surface Water at 20C) UKAS

pH Units7.6110 ElectrometrypH (Surface Water) UKAS

mg/L8.28316 TOC analyser (NPOC)Total Organic Carbon

NoneClear170 Visual ComparisonVisual Appearance

Date : 28/03/2014

PVL - Parametric Value Limit as per EU Drinking water Regulations (SI 278 2007)

Results shall not be reproduced, except in full, without the approval of Fitz Scientific

Results contained in this report relate only to the samples tested

Aoife Harmon - Technical Supervisor

Signed :

Acc. : Accredited Parameters by ISO 17025:2005

All organic results are analysed as received and all results are corrected for dry weight at 104 C

Page 1 of 1

**The analytical result for this parameter may not be reflective of the concentration present at the time of sampling. The maximum recommended preservation time for this parameter has been exceeded.

(P) : Presumptive Results

Page 23: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

8 8 16 19 Appendix 7 - Releases to Air 6

SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS

Please enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Desc Emission Point 1 T (Total) KG/Year

A (Accidental)

KG/Year

0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING PRTR POLLUTANTS

Please enter all quantities in this section in KGs

A2-1 A2-2

No. Annex II Name M/C/E Method Code Designation or Desc Emission Point 1 Emission Point 2 T (Total) KG/Year

65 Ethyl benzene M EN 13649:2001 FID 25.1 54.1 79.2

73 Toluene M EN 13649:2001 FID 52.9 157.7 210.6

78 Xylenes M EN 13649:2001 FID 51.6 211.8 263.4

62 Benzene M EN 13649:2001 FID 1.3 1.6 2.9

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence)

Please enter all quantities in this section in KGs

A2-1 A2-2

Pollutant No. Name M/C/E Method Code Designation or Desc Emission Point 1 Emission Point 2 Emission Point 3

237 Volatile organic coM EN 13649:2001 FID 542.4 1584.7 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

Additional Data Requested from Landfill operators

Landfill:

Kiernan Structural

Steel Limited

Please enter

summary data on

the quantities of

methane flared

and / or utilised

additional_pollutant

_no T (Total) kg/Year M/C/E Method Code

Designation or

Description

Facility Total

Capacity m3 per

hour

Total estimated

methane

generation (as per

site model) 0.0 N/A

Methane flared 0.0 0.0 (Total Flaring Capacity)

Methane utilised in engine/s 0.0 0.0 (Total Utilising Capacity)

Net methane

emission (as

reported in

Section A above) 0.0 N/A

Method Used

Method Used

RELEASES TO AIR

POLLUTANT METHOD

Method Used

For the purposes of the National Inventory on

Greenhouse Gases, landfill operators are

POLLUTANT METHOD

RELEASES TO AIR

POLLUTANT METHOD

Method Used

RELEASES TO AIR

Page 24: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

6 7 6 8 27

F (Fugitive)

KG/Year

0.0

QUANTITY

A (Accidental)

KG/Year

F (Fugitive)

KG/Year

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

QUANTITY

T (Total) KG/Year

A (Accidental)

KG/Year

F (Fugitive)

KG/Year

24102.1 0.0 21975.0

Page 25: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

5 8 Appendix 8 Treatment & Transfer of Waste

Quantity (Tonnes per

Year)

Transfer Destination

European Waste

Code Hazardous Quantity T/Year Description of Waste

Waste Treatment

Operation M/C/E

To Other Countries 08 01 11 Yes 11.669

waste paint and

varnish containing

organic solvents or

other dangerous

substances D10 M

Within the Country 12 01 01 No 230.48

ferrous metal filings

and turnings R4 M

Method Used

Within the Country 12 01 01 No 230.48 and turnings R4 M

Within the Country 20 03 01 No 40.26

mixed municipal

waste R4 M

Within the Country 10 02 10 No 33.0 mill scales D1 m

* Select a row by double-clicking the Description of Waste then click the delete button

Page 26: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Link to previous years waste data

Link to previous years waste summary data & percentage changeLink to previous years waste summary data & percentage change

Page 27: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

Link to Waste Guidance

Page 28: Kiernan Structural Steel Ltd 2014 Annual Environmental ReportKiernan Structural Steel Ltd 2014 Annual Environmental Report Licence Number P0855 Page 3 of 12 Introduction Kiernan Structural

0

Haz Waste : Name and

Licence/Permit No of Next

Destination Facility Haz Waste : Address of

Name and License /

Permit No. and Address of

Actual Address of Final

Destination i.e. Final Destination Facility

Non Haz Waste: Name

and Licence/Permit No of

Recover/Disposer

Haz Waste : Address of

Next Destination Facility

Non Haz Waste: Address

of Recover/Disposer

Permit No. and Address of

Final Recoverer / Disposer

(HAZARDOUS WASTE

ONLY)

Destination i.e. Final

Recovery / Disposal Site

(HAZARDOUS WASTE

ONLY)

Method Used

Location of

Treatment Name and Licence / Permit No. of Recoverer / Disposer / Broker Address of Recoverer / Disposer / Broker Name and Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Licence / Permit No. of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY)

Weighed Abroad

Enva Ireland,WO184-

1

Clonminan Industrial

Estate,".",Portlaoise,

Co Laois,Ireland

Geocycle,38.152/BP,

Rue de Courriere

49,".",7181

Seneffe,".",Belgium

Rue de Courriere

49,".",7181

Seneffe,".",Belgium

Weighed Offsite in Ireland

Hammond

(Clearway),WP-173-

2008

Garrycastle,"",Athlon

e,Irl,Ireland

Method Used

Weighed Offsite in Ireland 2008 e,Irl,Ireland

Weighed Offsite in Ireland

Mulleadys Ltd,W-016-

1

Cloonaugh,"",Drumli

sh,Irl,Ireland

Weighed Offsite in Ireland

Mulleadys Ltd,W-016-

1

Cloonaugh,"",Drumli

sh,Irl,Ireland