kfc maintenance case study - ci partnerskfc maintenance case study.cdr author private created date...
TRANSCRIPT
Case Study: KFC Maintenance
Brief: Ci Parnters has become the preffered supplier to KFC in the Western Capefor all types of maintenance logs.This includes replacing of LED’s, replacement of signage components damaged byvandalism or weather and repairing old wiring and lighting. Upgrading of shopsignage is also within our scope of work.
KFC CeresReplacement of old cladding. Replaced flat logo with 3D illuminated letters
KFC HermanusReplacement of old, vandalised toilet signs to new spec ACM panel signage.
AfterBefore
Before After
KFC PaarlReplacement of PVC print that was vandalised
AfterBefore
KFC PicketburgReplacement of faulty LED’s and power supply.
Before After