keynotesfiles/uk_nbs_code_2017.txt at master · thenbs/keynotesfiles … contiguous pile retaining...

Download KeynotesFiles/UK_NBS_Code_2017.txt at master · theNBS/KeynotesFiles … Contiguous pile retaining wall system 10-35-30: ... 15-05-15/120 In situ reinforced concrete pilecap and ground

If you can't read please download the document

Upload: dinhduong

Post on 23-Mar-2018

253 views

Category:

Documents


23 download

TRANSCRIPT

KeynotesFiles/UK_NBS_Code_2017.txt at master theNBS/KeynotesFiles GitHub

Skip to content

Ignore

Learn more

Please note that GitHub no longer supports your web browser.

We recommend upgrading to the latest Google Chrome or Firefox.

Features Business Explore Marketplace Pricing

This repository

Sign in or Sign up

Watch 7

Star

4

Fork

3

theNBS/KeynotesFiles

Code

Issues 0 Pull requests 0 Projects 0

Insights

Permalink

Branch: master

Switch branches/tags

Branches Tags

master

Nothing to show

Nothing to show

Find file Copy path

KeynotesFiles/Keynote Files/UK_NBS_Code_2017.txt

Fetching contributors

Cannot retrieve contributors at this time

Raw Blame History

13922 lines (13921 sloc) 743 KB

05Districts, facilities and buildings05-00Regions0505-05Districts0505-10Infrastructure0505-20Buildings and landscapes generally0505-20-05Biodiversity and environmental conservation05-2005-20-05/205Design submittals05-20-0505-20-05/210Site parameters for habitat creation and conservation05-20-0505-20-05/215Habitat creation outcomes05-20-0505-20-05/220Habitat restoration outcomes05-20-0505-20-05/225Habitat enhancement outcomes05-20-0505-20-05/230Habitat protection outcomes05-20-0505-20-50Buildings and landscapes - systems outline05-2005-20-60Whole building performance05-2005-20-60/100Project context05-20-6005-20-60/105Functional and operational properties05-20-6005-20-60/110Productive properties05-20-6005-20-60/115Lifecycle of building05-20-6005-20-60/120Accessibility05-20-6005-20-60/125Security and safety05-20-6005-20-60/130Design quality05-20-6005-20-60/135Sustainability05-20-6005-20-60/140Design submittals05-20-6005-20-60/145Compliance with performance requirements05-20-6005-20-60/200Durability05-20-6005-20-60/201Structural design standards05-20-6005-20-60/203Permanent and imposed loads05-20-6005-20-60/205Wind actions05-20-6005-20-60/207Snow loading05-20-6005-20-60/209Thermal actions05-20-6005-20-60/211Loading for mechanical and electrical services05-20-6005-20-60/213Accidental loading05-20-6005-20-60/215Prevention of disproportionate collapse05-20-6005-20-60/217Design of ventilation systems for domestic buildings05-20-6005-20-60/219Ventilation rates for domestic buildings05-20-6005-20-60/221Design of ventilation systems for non-domestic buildings05-20-6005-20-60/223Design parameters for ventilation in non domestic buildings05-20-6005-20-60/225Air conditioning and ventilation strategy issues05-20-6005-20-60/227Design of air conditioning systems05-20-6005-20-60/229Design parameters for air conditioning05-20-6005-20-60/231Design of chilled water systems05-20-6005-20-60/233Design of heating systems05-20-6005-20-60/239Air permeability (Airtightness)05-20-6005-20-60/241Thermal transmittance (U-value)05-20-6005-20-60/243Acoustic performance of dwellings05-20-6005-20-60/245Acoustic performance of schools05-20-6005-20-60/247Acoustic performance of healthcare buildings05-20-6005-20-60/249Acoustic performance of office buildings05-20-6005-20-60/251Acoustic performance of buildings - To British Standards05-20-6005-20-60/255Weighted sound reduction index05-20-6005-20-60/257Weighted normalized flanking level difference05-20-6005-20-60/259Fire safety - special building types05-20-6005-20-60/261Fire resistance Tested to British Standards05-20-6005-20-60/263Fire resistance Tested to Eurocodes05-20-6005-20-60/265Surface spread of flame Tested to British Standards05-20-6005-20-60/267Reaction to fire Tested to Eurocodes05-20-6005-20-60/269Structural fire performance criteria05-20-6005-20-60/271Site preparation and resistance to moisture05-20-6005-20-60/273Resistance to ground contaminants05-20-6005-20-60/275Control of condensation05-20-6005-20-60/277Design of hot and cold water systems05-20-6005-20-60/279BREEAM05-20-6005-20-60/800Acoustic Testing05-20-6005-20-60/810Air permeability and pressure testing05-20-6005-20-60/820Handover, aftercare and post occupancy evaluation05-20-6005-20-60/830Verification of performance05-20-6005-20-61Landscapes - performance05-2005-25Utilities & civil engineering buildings0505-30Industrial buildings0505-35Administrative, commercial & protective service buildings0505-40Medical, health & welfare buildings0505-45Recreational buildings0505-50Religious buildings0505-55Educational, scientific & information buildings0505-60Residential buildings0505-65Other buildings0505-65-05Buildings in the landscape05-6505-70Prefabricated buildings0505-70-10Prefabricated volumetric modular buildings05-7005-70-10/130Volumetric modular buildings05-70-1005-70-10/140Building units (pods)05-70-1005-70-10/204Durability05-70-1005-70-10/206Design supervision and checking05-70-1005-70-10/210Structural steel performance05-70-1005-70-10/212Design of timber framing systems05-70-1005-70-10/214Structural concrete performance05-70-1005-70-10/216Vibration performance05-70-1005-70-10/220Fire performance of timber framed buildings05-70-1005-70-10/232Water penetration05-70-1005-70-10/236Weathertightness of windows and doors05-70-1005-70-10/264Solar transmission (solar factor)05-70-1005-70-10/268Glare control (BREEAM)05-70-1005-70-10/274Emergency egress05-70-1005-70-10/276Safety of glazing05-70-1005-70-10/278Window and door performance05-70-1005-70-10/280Security05-70-1005-70-10/290Compliance with performance requirements05-70-1005-70-10/305Product samples05-70-1005-70-10/310Steel framed module05-70-1005-70-10/315Concrete framed module05-70-1005-70-10/320Timber framed module05-70-1005-70-10/325Composite module05-70-1005-70-10/330Serviced module (pod)05-70-1005-70-10/505Prototypes or mock-ups05-70-1005-70-10/605Transportation05-70-1005-70-10/610Pre-installation survey05-70-1005-70-10/620Execution standards for structural elements05-70-1005-70-10/640Erection05-70-1005-70-10/650Assembly05-70-1005-70-10/660Accuracy of erection05-70-1005-70-10/670Inspection levels05-70-1005-70-10/805Removal of samples05-70-1005-70-10/820Documentation05-70-1005-70-10/895Verification of performance05-70-1005-70-60Prefabricated panelled, framed and modular buildings05-7005-70-75Small landscape and streetscape buildings05-7005-75Activities0505-75-05Generally05-7505-80Spaces0505-85Prefabricated spaces0505-85-60Prefabricated rooms (pods)05-8505-90Elements0505-95Prefabricated elements0510Preparatory systems10-10Site survey systems1010-10-45Ground investigation systems10-1010-10-45/135Geotechnical ground investigation10-10-4510-10-45/165Preliminary geotechnical ground investigation10-10-4510-10-45/205Design of geotechnical ground investigation10-10-4510-10-45/610Desk study for ground investigation10-10-4510-10-45/615Site reconnaissance for ground investigation10-10-4510-10-45/620Quality management of ground investigation10-10-4510-10-45/625Initial conceptual model for ground investigation of potentially contaminated land10-10-4510-10-45/630Unforeseen hazards during ground investigations10-10-4510-10-45/635Preparation for ground investigations generally10-10-4510-10-45/640Excavating trial pits, trenches and shafts10-10-4510-10-45/645Drilling or boring boreholes10-10-4510-10-45/650Gas sampling and monitoring10-10-4510-10-45/655Installing driven probes and standpipes for gas monitoring10-10-4510-10-45/660Measuring groundwater levels and pressures10-10-4510-10-45/662Soil and rock sampling generally10-10-4510-10-45/665Sampling of contaminated ground or groundwater10-10-4510-10-45/670Category A soil sampling10-10-4510-10-45/672Category B soil sampling10-10-4510-10-45/674Category C soil sampling10-10-4510-10-45/676Taking block soil samples10-10-4510-10-45/678Taking open tube soil samples10-10-4510-10-45/679Taking window tube soil samples10-10-4510-10-45/680Field test reporting10-10-4510-10-45/682Cone penetration testing10-10-4510-10-45/684Pressure meter testing10-10-4510-10-45/686Standard penetration testing10-10-4510-10-45/688Dynamic probe testing10-10-4510-10-45/690Vane testing10-10-4510-10-45/692Plate load (PLT) testing10-10-4510-10-45/694Special testing10-10-4510-10-45/696Television survey of boreholes10-10-4510-10-45/700Rock sampling10-10-4510-10-45/720Laboratory testing of soils generally10-10-4510-10-45/725Determining soil classifications and basic physical properties by laboratory testing10-10-4510-10-45/730Determining chemical and electro-chemical characteristics of groundwater by laboratory testing10-10-4510-10-45/732Determining chemical and electro-chemical characteristics of soils by laboratory testing10-10-4510-10-45/734Determining compaction characteristics of soils by laboratory testing10-10-4510-10-45/736Determining compressibility and permeability characteristics of soils by laboratory testing10-10-4510-10-45/738Determining consolidation and permeability characteristics of soils by laboratory testing in hydraulic cells10-10-4510-10-45/740Determining strength characteristics of soils by laboratory testing10-10-4510-10-45/742Determining strength characteristics of soils by laboratory testing using consolidated-undrained specimens10-10-4510-10-45/750Testing laboratory10-10-4510-10-45/755Investigation Supervisor10-10-4510-10-45/760Laboratory testing of rocks generally10-10-4510-10-45/765Field reports and borehole logs10-10-4510-10-45/770Laboratory test records10-10-4510-10-45/775Reinstatement10-10-4510-10-45/805Desk study report10-10-4510-10-45/810Ground investigation report10-10-4510-10-45/830Ground investigation documentation - paper10-10-4510-10-45/840Ground investigation documentation - electronic10-10-4510-10-45/850Presentation to accompany desk study or ground investigation report10-10-4510-10-75Site survey systems10-1010-10-75/105Arboricultural survey10-10-7510-10-75/106Bird and pest survey10-10-7510-10-75/107Invasive and nuisance animal species survey10-10-7510-10-75/110Assessment survey10-10-7510-10-75/125Ecological survey10-10-7510-10-75/135Geophysical survey10-10-7510-10-75/140Invasive species survey10-10-7510-10-75/160Preliminary site survey10-10-7510-10-75/185Topographical survey10-10-7510-10-75/205Bird and pest survey objectives10-10-7510-10-75/207Invasive and nuisance animal survey objectives10-10-7510-10-75/210Parameters for arboricultural surveys10-10-7510-10-75/220Parameters for assessment surveys10-10-7510-10-75/230Parameters for ecological surveys10-10-7510-10-75/240Parameters for geophysical surveys10-10-7510-10-75/250Parameters for invasive species surveys10-10-7510-10-75/260Parameters for preliminary site surveys10-10-7510-10-75/270Parameters for topographical surveys10-10-7510-10-75/605Bird and pest survey instructions10-10-7510-10-75/607Invasive and nuisance animal survey instructions10-10-7510-10-75/610Provision of instructions10-10-7510-10-75/620Desk studies10-10-7510-10-75/630Direct measurement10-10-7510-10-75/640Remote measurement10-10-7510-10-75/650Site reconnaissance10-10-7510-10-75/660Unforeseen hazards during site surveys10-10-7510-10-75/670Calibration requirements for surveying instruments10-10-7510-10-75/680Control points for topographical surveys10-10-7510-10-75/690Protection during site surveying10-10-7510-10-75/805Pest and nuisance animal survey report10-10-7510-10-75/810Arboricultural survey report10-10-7510-10-75/815Assessment survey report10-10-7510-10-75/820Ecological survey report10-10-7510-10-75/825Invasive species survey report10-10-7510-10-75/830Preliminary site survey report10-10-7510-10-75/835Geophysical survey report10-10-7510-10-75/840Topographical survey report10-10-7510-10-75/845Survey documentation - electronic10-10-7510-10-75/850Survey documentation - paper10-10-7510-10-75/855Presentation to accompany site survey reports10-10-7510-10-95Underground services survey systems10-1010-10-95/110Underground services survey10-10-9510-10-95/210Desk study10-10-9510-10-95/220Detail and accuracy10-10-9510-10-95/240Protection10-10-9510-10-95/610Survey instruments10-10-9510-10-95/620Method of survey10-10-9510-10-95/630Surveyor competence10-10-9510-10-95/640Requirements10-10-9510-10-95/810Survey report10-10-9510-20Building survey systems1010-20-25Building elemental or specialist investigation systems10-2010-20-30Building fabric survey systems10-2010-20-30/110Building survey10-20-3010-20-30/120Deleterious materials survey10-20-3010-20-30/130Specialist or elemental survey10-20-3010-20-30/210Parameters for building surveys10-20-3010-20-30/220Parameters for deleterious materials surveys10-20-3010-20-30/230Parameters for measured surveys10-20-3010-20-30/240Parameters for specialist concrete surveys10-20-3010-20-30/250Parameters for specialist masonry surveys10-20-3010-20-30/260Parameters for specialist timber decay or infestation surveys10-20-3010-20-30/605Special access considerations10-20-3010-20-30/610Provision of instructions10-20-3010-20-30/620Desk studies10-20-3010-20-30/630Building reconnaissance10-20-3010-20-30/640Infrared thermographic survey and analysis10-20-3010-20-30/650Investigation of building fabric condition10-20-3010-20-30/660Investigation of building fabric construction10-20-3010-20-30/670Investigation of concrete defects10-20-3010-20-30/680Investigation of masonry defects10-20-3010-20-30/690Investigation of timber decay and infestation10-20-3010-20-30/700Measurement of building fabric10-20-3010-20-30/710Survey and testing for asbestos containing materials10-20-3010-20-30/720Survey and testing for lead containing materials10-20-3010-20-30/730Survey and testing for moisture10-20-3010-20-30/740Unforeseen hazards during survey10-20-3010-20-30/810Survey report10-20-3010-20-30/820Survey documentation - electronic10-20-3010-20-30/830Survey documentation - paper10-20-3010-20-30/840Presentation to accompany survey reports10-20-3010-20-60Building performance survey systems10-2010-20-60/105Access audit10-20-6010-20-60/110Building fabric performance survey10-20-6010-20-60/125Energy audits and assessments10-20-6010-20-60/175Security audit10-20-6010-20-60/180Structural appraisal10-20-6010-20-60/210Parameters for building performance surveys10-20-6010-20-60/220Parameters for access audits10-20-6010-20-60/230Parameters for building fabric performance surveys10-20-6010-20-60/240Parameters for energy audits and assessments10-20-6010-20-60/250Parameters for security audits10-20-6010-20-60/260Parameters for structural appraisals10-20-6010-20-60/610Provision of instructions10-20-6010-20-60/620Air pressure testing10-20-6010-20-60/630Infrared thermography (thermal imaging)10-20-6010-20-60/640Noise testing10-20-6010-20-60/650Special access considerations10-20-6010-20-60/660Unforeseen hazards during survey10-20-6010-20-60/810Survey report10-20-6010-20-60/820Security audit report10-20-6010-20-60/830Survey documentation - electronic10-20-6010-20-60/840Survey documentation - paper10-20-6010-20-60/850Presentation to accompany building performance survey reports10-20-6010-20-75Engineering services survey systems10-2010-20-75/110Engineering services survey10-20-7510-20-75/202Desk Study10-20-7510-20-75/204Pilot survey10-20-7510-20-75/206Plant space survey10-20-7510-20-75/208Survey detail10-20-7510-20-75/210Incoming water supply connection survey10-20-7510-20-75/211Hot and cold water supply systems survey10-20-7510-20-75/212Fountains and water features survey10-20-7510-20-75/213Rainwater and grey water reclamation systems survey10-20-7510-20-75/214Swimming pool water treatment systems survey10-20-7510-20-75/216Medical gas supply systems survey10-20-7510-20-75/217Medical vacuum systems survey10-20-7510-20-75/218Medical anaesthetic gas scavenging systems survey10-20-7510-20-75/219Compressed air and instrument air supply systems survey10-20-7510-20-75/220Natural gas supply connection survey10-20-7510-20-75/221Liquefied petroleum gas supply systems survey10-20-7510-20-75/222Laboratory gas supply systems survey10-20-7510-20-75/223Biogas supply systems survey10-20-7510-20-75/224Fuel oil supply systems survey10-20-7510-20-75/226Steam and condensate systems survey10-20-7510-20-75/227Fire hose reel systems survey10-20-7510-20-75/228Dry riser systems survey10-20-7510-20-75/229Wet riser systems survey10-20-7510-20-75/230Sprinkler type systems survey10-20-7510-20-75/231Fire hydrant systems survey10-20-7510-20-75/232Gaseous fire-extinguishing systems survey10-20-7510-20-75/233Foam fire-fighting systems survey10-20-7510-20-75/235Heating systems survey10-20-7510-20-75/236Combined heat and power systems survey10-20-7510-20-75/237Heat pump systems survey10-20-7510-20-75/238Cooling systems survey10-20-7510-20-75/239Cold room systems survey10-20-7510-20-75/241General mechanical ventilation systems survey10-20-7510-20-75/242Kitchen extract systems survey10-20-7510-20-75/243Car park ventilation systems survey10-20-7510-20-75/244Smoke and heat control systems survey10-20-7510-20-75/245Safety cabinet and fume cupboard extract systems survey10-20-7510-20-75/246Industrial fume extract systems survey10-20-7510-20-75/250High voltage connection survey10-20-7510-20-75/251High voltage distribution systems survey10-20-7510-20-75/252Low voltage connection survey10-20-7510-20-75/253Generator systems survey10-20-7510-20-75/254Low voltage distribution systems survey10-20-7510-20-75/256Small power systems survey10-20-7510-20-75/258Earthing and bonding systems survey10-20-7510-20-75/260General lighting systems survey10-20-7510-20-75/261Emergency lighting systems survey10-20-7510-20-75/262External lighting systems survey10-20-7510-20-75/263Public address systems survey10-20-7510-20-75/264Induction loop systems survey10-20-7510-20-75/265Infrared listening systems survey10-20-7510-20-75/266Incoming telecommunications connection survey10-20-7510-20-75/267Telecommunications system survey10-20-7510-20-75/268Data distribution systems survey10-20-7510-20-75/269Television and radio distribution systems survey10-20-7510-20-75/270Access control systems survey10-20-7510-20-75/271Intruder detection and alarm systems survey10-20-7510-20-75/272Closed circuit television systems survey10-20-7510-20-75/273Fire detection and alarm system survey10-20-7510-20-75/274Voice alarm systems survey10-20-7510-20-75/275Assistance call systems survey10-20-7510-20-75/276Patient call systems survey10-20-7510-20-75/277Gas detection and alarm systems survey10-20-7510-20-75/278Water leak detection and alarm systems survey10-20-7510-20-75/279Lightning protection system survey10-20-7510-20-75/280Lifts survey10-20-7510-20-75/281Escalators and moving walk systems survey10-20-7510-20-75/610Test instruments10-20-7510-20-75/620Surveyors10-20-7510-20-75/810Survey report10-20-7510-20-80Special building survey systems10-2010-35Site preparation systems1010-35-30Embedded retaining wall systems10-3510-35-30/110Bored king post retaining wall system10-35-3010-35-30/115Contiguous pile retaining wall system10-35-3010-35-30/120Driven king post retaining wall system10-35-3010-35-30/125Reinforced concrete diaphragm retaining wall system10-35-3010-35-30/130In situ unreinforced concrete diaphragm retaining wall system10-35-3010-35-30/135Secant pile retaining wall system10-35-3010-35-30/140Slurry diaphragm retaining wall system10-35-3010-35-30/150Sheet pile retaining wall system10-35-3010-35-30/205Design submittals10-35-3010-35-30/210Structural design standards10-35-3010-35-30/215Geotechnical design10-35-3010-35-30/220Design of embedded retaining wall systems10-35-3010-35-30/225Loads applied to embedded retaining walls10-35-3010-35-30/230Performance of slurry diaphragm walls10-35-3010-35-30/235Limits on damage to existing buildings, structures and services10-35-3010-35-30/240Durability10-35-3010-35-30/245Design supervision and checking10-35-3010-35-30/250Drawings and reinforcement schedules for reinforced concrete construction10-35-3010-35-30/535Cementitious grout10-35-3010-35-30/540Composite steel sheet piles10-35-3010-35-30/550Self-hardening slurry10-35-3010-35-30/565Permanent preformed stop ends10-35-3010-35-30/590Carbon steel spreader plate10-35-3010-35-30/605Preparation of surfaces to receive concrete10-35-3010-35-30/610Inspection of surfaces to receive concrete10-35-3010-35-30/615Testing of permanent water-excluding construction10-35-3010-35-30/617Testing of self-hardening slurry10-35-3010-35-30/618Testing of slurry diaphragm wall construction10-35-3010-35-30/620Sealing leaks in water-excluding construction10-35-3010-35-30/625Installing sealant to sheet pile retaining wall systems10-35-3010-35-30/630Constructing diaphragm walls10-35-3010-35-30/635Constructing secant walls10-35-3010-35-30/640Constructing contiguous pile walls10-35-3010-35-30/645Constructing bored king post retaining walls10-35-3010-35-30/650Constructing driven king post retaining walls10-35-3010-35-30/660Sealing clutches in sheet pile retaining walls10-35-3010-35-30/665Welding clutches in sheet pile retaining walls10-35-3010-35-30/667Non-destructive testing of welds10-35-3010-35-30/670Installing ground anchors10-35-3010-35-30/675Concrete protrusions10-35-3010-35-30/680Constructing slurry diaphragm walls10-35-3010-35-30/685Installation of lagging units10-35-3010-35-30/690Monitoring generally10-35-3010-35-30/696Testing cementitious grout10-35-3010-35-30/705Tests records for cementitious slurry diaphragm walls10-35-3010-35-30/708Testing of ground anchors10-35-3010-35-30/710Test records for ground anchors10-35-3010-35-30/720Site welding generally10-35-3010-35-30/805Geotechnical records10-35-3010-35-30/810Walling completion report10-35-3010-35-30/820Slurry trench wall completion report10-35-3010-35-35Excavating and filling systems10-3510-35-35/125Earthworks excavating system10-35-3510-35-35/127Earthworks filling system10-35-3510-35-35/130Earthworks filling system around trees10-35-3510-35-35/132Earthworks filling system behind retaining walls10-35-3510-35-35/135Erosion control system10-35-3510-35-35/160Puddled clay lining systems10-35-3510-35-35/185Topsoil filling system10-35-3510-35-35/210Testing, filling, compaction and treatment of formations10-35-3510-35-35/305Product samples10-35-3510-35-35/500Excavated material for compacted general fill10-35-3510-35-35/510Topsoil10-35-3510-35-35/520Site-made topsoil10-35-3510-35-35/530Growing medium10-35-3510-35-35/600Installation control samples10-35-3510-35-35/602Site clearance generally10-35-3510-35-35/603Monitoring of ground conditions during excavation10-35-3510-35-35/604Analysis of components of site-made topsoil10-35-3510-35-35/606Topsoil analysis10-35-3510-35-35/610Stripping topsoil10-35-3510-35-35/614Handling topsoil for reuse or sale10-35-3510-35-35/616Removal of excavated topsoil10-35-3510-35-35/618Storage of excavated topsoil10-35-3510-35-35/620Treatment of excavated subsoil10-35-3510-35-35/621Storage of excavated subsoil10-35-3510-35-35/622Removal of excavated subsoil10-35-3510-35-35/624Adjacent excavations10-35-3510-35-35/626Excavations next to existing foundations10-35-3510-35-35/628Backfilling to excavations lower than foundation formation level10-35-3510-35-35/630Tolerances for excavated and filled surfaces10-35-3510-35-35/632Formations to receive concrete10-35-3510-35-35/634Inspecting formations generally10-35-3510-35-35/636Inspecting formations in sand and gravel10-35-3510-35-35/638Inspection of formations in shrinkable soils10-35-3510-35-35/640Unsuitable formations10-35-3510-35-35/644Formations for pile supported structures10-35-3510-35-35/646Steps in foundation formations10-35-3510-35-35/648Foundations below made ground10-35-3510-35-35/650Unstable ground10-35-3510-35-35/652Recorded features10-35-3510-35-35/654Unrecorded features10-35-3510-35-35/656Treatment of existing structures crossing new foundations or walls10-35-3510-35-35/658Treatment of existing buried structures beneath new ground supported slab10-35-3510-35-35/660Excess excavation10-35-3510-35-35/662Treatment of underground structures in landscape areas10-35-3510-35-35/664Excavations below ground water level10-35-3510-35-35/666Excavations which encounter springs or running water10-35-3510-35-35/668Variations in ground water level10-35-3510-35-35/670Treatment of existing watercourses10-35-3510-35-35/672Permanent drainage system10-35-3510-35-35/684Installing buried erosion control biodegradable mesh10-35-3510-35-35/686Installing erosion control mattresses10-35-3510-35-35/688Installing tree root barriers10-35-3510-35-35/689Installing gabions, trapions and mattresses10-35-3510-35-35/690Placing fill10-35-3510-35-35/692Placing capping layer of compacted filling10-35-3510-35-35/694Placing hardcore fill10-35-3510-35-35/696Placing venting hardcore layer fill10-35-3510-35-35/698Installing geocomposite gas venting layer10-35-3510-35-35/700Compaction of fill materials10-35-3510-35-35/702Benching in fill10-35-3510-35-35/704Compacting fill for landscape areas10-35-3510-35-35/706Loose tip filling for landscape areas10-35-3510-35-35/708Placing frost susceptible fill materials10-35-3510-35-35/710Placing Types 1 and 2 unbound mixtures10-35-3510-35-35/712Placing subgrade improvement layer (capping)10-35-3510-35-35/714Compaction of general fill10-35-3510-35-35/718Backfilling around foundations10-35-3510-35-35/720Laying sand blinding to surfaces to receive sheet overlays or concrete10-35-3510-35-35/722Compacted general filling/ earthworks in accordance with the Highways England Specification for Highway Works10-35-3510-35-35/724Spreading topsoil generally10-35-3510-35-35/726Loose tipping of topsoil10-35-3510-35-35/728Installing puddled clay linings10-35-3510-35-35/730Documentation for preparation materials10-35-3510-35-40Gravity retaining wall systems10-3510-35-40/110Caged fill retaining wall system10-35-4010-35-40/120Crib retaining wall system10-35-4010-35-40/130Drystack masonry unit retaining wall system10-35-4010-35-40/140In situ reinforced concrete retaining wall system10-35-4010-35-40/150Masonry retaining wall system10-35-4010-35-40/160Precast reinforced concrete stem wall retaining wall system10-35-4010-35-40/170Reinforced earth retaining wall system10-35-4010-35-40/180Timber retaining wall system10-35-4010-35-40/190Tyre bale retaining wall system10-35-4010-35-40/205Design submittals10-35-4010-35-40/215Geotechnical design10-35-4010-35-40/220Design of gravity retaining wall systems10-35-4010-35-40/225Loads applied to gravity retaining walls10-35-4010-35-40/235Limits on damage to existing buildings, structures and services10-35-4010-35-40/240Testing, filling, compaction and treatment of formations10-35-4010-35-40/245Design supervision and checking10-35-4010-35-40/250Reinforcement schedules and drawings for reinforced concrete construction10-35-4010-35-40/255Reinforcement detailing10-35-4010-35-40/305Product samples10-35-4010-35-40/505Prototypes (or mock-ups)10-35-4010-35-40/525Pre-filled caged containers10-35-4010-35-40/530Tyre bales10-35-4010-35-40/540Excavated material for compacted general fill10-35-4010-35-40/610Execution of concrete structures10-35-4010-35-40/615Forming openings and installing inserts and fixings in monolithic wall structures10-35-4010-35-40/620Installing inserts and forming holes and chases generally10-35-4010-35-40/625Inspection of formwork and reinforcement for concrete construction10-35-4010-35-40/638Formations to receive concrete10-35-4010-35-40/640Preparation of surfaces to receive concrete10-35-4010-35-40/642Inspection of surfaces to receive concrete10-35-4010-35-40/644Concrete supply on large pours10-35-4010-35-40/652Adverse temperature conditions10-35-4010-35-40/656Preparation of construction joints10-35-4010-35-40/658Forming construction and movement joints generally10-35-4010-35-40/660Day joints10-35-4010-35-40/662Site adjustments to specification10-35-4010-35-40/682Broken cubes or cylinders from failed strength tests10-35-4010-35-40/696Inspection levels10-35-4010-35-40/706Surface cracking of concrete structures10-35-4010-35-40/710Installation of prototypes or mock-ups10-35-4010-35-40/712Assembling and installing caged containers10-35-4010-35-40/714Assembling and installing bastions10-35-4010-35-40/716Erecting crib walls10-35-4010-35-40/718Laying drystack interlocking masonry10-35-4010-35-40/720Erecting masonry gravity retaining walls10-35-4010-35-40/722Placing precast reinforced concrete stem walls10-35-4010-35-40/724Erecting timber retaining walls10-35-4010-35-40/726Erecting tyre bale retaining walls10-35-4010-35-40/810Monitoring of movement of retaining walls10-35-4010-35-40/815Post completion structural testing10-35-4010-35-40/820Removal of samples10-35-4010-35-40/825Geotechnical records10-35-4010-35-85Soil nailing systems10-3510-35-85/(Recovered)Soil nailing systems10-3510-35-85/110Soil nailing system10-35-8510-35-85/205Design submittals10-35-8510-35-85/210Structural design standards10-35-8510-35-85/215Design of soil nailing systems10-35-8510-35-85/220Geotechnical design10-35-8510-35-85/225Earth retaining loads10-35-8510-35-85/235Design supervision and checking10-35-8510-35-85/240Design life10-35-8510-35-85/245Pull out resistance of soil nails compliance10-35-8510-35-85/250Proof testing of soil nails - compliance10-35-8510-35-85/510Plastics grouting ducts10-35-8510-35-85/515Centralizers for soil nails10-35-8510-35-85/520Cementitious grout10-35-8510-35-85/525Carbon steel bar soil nails10-35-8510-35-85/530Stainless steel bar soil nails10-35-8510-35-85/535Carbon steel section soil nails10-35-8510-35-85/540Stainless steel section soil nails10-35-8510-35-85/545Plastics soil nails10-35-8510-35-85/550Carbon steel nuts for soil nail anchorages10-35-8510-35-85/555Stainless steel nuts for soil nail anchorages10-35-8510-35-85/560Steel wedges10-35-8510-35-85/565Carbon steel bearing plates10-35-8510-35-85/570Stainless steel bearing plates10-35-8510-35-85/575Non-metallic bearing plates10-35-8510-35-85/605Testing of soil face stability10-35-8510-35-85/610Installing centralizers10-35-8510-35-85/615Installing soil nails10-35-8510-35-85/620Installing soil nail anchorages10-35-8510-35-85/625Installing flexible structural facings10-35-8510-35-85/630Installing soft facings10-35-8510-35-85/635Installing cast in situ concrete facing10-35-8510-35-85/640Installing sprayed concrete facing10-35-8510-35-85/645Installing in situ concrete cappings to in situ concrete facing10-35-8510-35-85/650Installing capping to precast concrete facing10-35-8510-35-85/655Forming joints in concrete facings10-35-8510-35-85/660Installing surface drainage10-35-8510-35-85/665Installing facing drainage10-35-8510-35-85/670Installing weep hole relief drainage10-35-8510-35-85/675Installing deep drainage10-35-8510-35-85/680Welding of carbon steel10-35-8510-35-85/685Welding of stainless steel10-35-8510-35-85/690Preparation of test soil nails10-35-8510-35-85/695Testing soil nails generally10-35-8510-35-85/700Procedure for testing soil nails10-35-8510-35-85/705Testing of soil face stability10-35-8510-35-85/710Pull out tests for soil nails10-35-8510-35-85/715Proof load tests for soil nails10-35-8510-35-85/720Testing cementitious grout10-35-8510-35-85/725Movement monitoring during construction10-35-8510-35-85/730Tolerances for installing soil nails10-35-8510-35-85/735Tolerances for faces of new retaining walls10-35-8510-35-85/740Additional tolerances for in situ concrete faces of new retaining walls10-35-8510-35-85/800Records of soil nail construction10-35-8510-35-85/810Long term monitoring10-35-8510-35-85/890Verification of performance10-35-8510-45Building preparation systems1010-45-20Demolition systems10-4510-45-20/110Deconstruction system10-45-2010-45-20/120Demolition system10-45-2010-45-20/205Information submittals10-45-2010-45-20/210Demolition and deconstruction objectives10-45-2010-45-20/220Site clearance objectives10-45-2010-45-20/230Site reinstatement objectives10-45-2010-45-20/240Environmental targets10-45-2010-45-20/615Demolition generally10-45-2010-45-20/618Contractor10-45-2010-45-20/620Bench marks10-45-2010-45-20/625Statutory and private services affected by demolition10-45-2010-45-20/630Location and marking of existing services10-45-2010-45-20/635Disconnection of services10-45-2010-45-20/640Bypass connections for supplies before demolition10-45-2010-45-20/645Maintenance of existing services10-45-2010-45-20/660Health hazards during demolition10-45-2010-45-20/665Gas and vapour risks during demolition10-45-2010-45-20/670Dust control10-45-2010-45-20/675Removal of asbestos-containing materials10-45-2010-45-20/680Unforeseen hazards10-45-2010-45-20/690Treatment of adjoining property affected by demolition10-45-2010-45-20/695Structures and services to be retained10-45-2010-45-20/700Partly demolished structures10-45-2010-45-20/705Management of water on the site during demolition10-45-2010-45-20/710Groundworks during demolition10-45-2010-45-20/715Components and materials arising from demolition10-45-2010-45-20/720Recycled components and materials10-45-2010-45-20/730Grading and laying site surfaces on completion10-45-2010-45-20/810Condition of services on completion10-45-2010-45-20/820Site condition following completion10-45-2010-45-20/830Site records10-45-2010-60Site remediation systems1010-60-35Ground gas venting systems10-6010-60-35/130Ground gas collection and venting system10-60-3510-60-35/210Design submittals10-60-3510-60-35/220Functional performance10-60-3510-60-35/230Health and safety performance10-60-3510-60-35/610Laying gas proof membrane10-60-3510-60-35/620Laying horizontal gas collection membrane10-60-3510-60-35/630Installing venting hardcore layers10-60-3510-60-35/640Laying collection pipework10-60-3510-60-35/645Installing ventilating pipework10-60-3510-60-35/650Installing plastics depressurization sumps10-60-3510-60-35/670Applying vertical gas venting membranes10-60-3510-60-35/810Inspection of ground gas collection and venting system10-60-3510-60-35/820Documentation for ground gas venting systems10-60-3510-70Building fabric remediation systems1010-70-15Concrete and masonry cleaning systems10-7010-70-15/110Concrete and masonry cleaning trials system10-70-1510-70-15/120Concrete cleaning system10-70-1510-70-15/150Masonry cleaning system10-70-1510-70-15/210Design of cleaning regime10-70-1510-70-15/215Design of cleaning trials10-70-1510-70-15/220Parameters for cleaning trials10-70-1510-70-15/610Removal of fittings10-70-1510-70-15/615Protection10-70-1510-70-15/620Control and disposal of wash water and detritus10-70-1510-70-15/625Cold weather10-70-1510-70-15/630Cleaning generally10-70-1510-70-15/640Brushing and rubbing10-70-1510-70-15/645Tooling10-70-1510-70-15/660Using chemical gels and liquids10-70-1510-70-15/665Using chemical poultices10-70-1510-70-15/670Using detergents and soaps10-70-1510-70-15/680Using plain poultices10-70-1510-70-15/685Using pressured water10-70-1510-70-15/690Using sprayed water10-70-1510-70-15/695Using steam10-70-1510-70-15/705Testing pH values for chemical cleaning10-70-1510-70-15/810Items set aside for reuse10-70-1510-70-15/820Record of main contract cleaning works10-70-1510-70-15/830Record of cleaning trials10-70-1510-70-20Concrete repair systems10-7010-70-20/110Bonded steel plate repair system10-70-2010-70-20/115Concrete crack repair system10-70-2010-70-20/120Concrete or mortar overlay system10-70-2010-70-20/125Concrete protective coating system10-70-2010-70-20/130Concrete repair system10-70-2010-70-20/140Sprayed concrete repair system10-70-2010-70-20/200Objectives of repair and remedial works10-70-2010-70-20/205Design submittals10-70-2010-70-20/210Structural design standards10-70-2010-70-20/220Design working life10-70-2010-70-20/225Reinforcement drawing and schedules for reinforced concrete construction10-70-2010-70-20/230Structural fire performance criteria10-70-2010-70-20/240Abrasion resistance of concrete wearing surfaces10-70-2010-70-20/245Slip resistance of wearing surfaces10-70-2010-70-20/505Prototypes or mock-ups10-70-2010-70-20/510Carbon steel plates10-70-2010-70-20/515Stainless steel plates10-70-2010-70-20/520Liquid emulsion crack sealant10-70-2010-70-20/525Corrosion inhibitors10-70-2010-70-20/605Pre-construction survey for concrete repairs10-70-2010-70-20/610Access, attendance and equipment10-70-2010-70-20/615Temporary Works coordinator10-70-2010-70-20/620Execution Standards for structural elements10-70-2010-70-20/625Removal of fittings and attachments10-70-2010-70-20/630Temporary supports and propping10-70-2010-70-20/635Removal of concrete for treatment or replacement of reinforcement10-70-2010-70-20/640Preparation of reinforcement10-70-2010-70-20/645Preparation of concrete substrates10-70-2010-70-20/650Testing and observation of repair works10-70-2010-70-20/660Lapping new reinforcement with existing10-70-2010-70-20/665Welding new reinforcement to existing10-70-2010-70-20/670Installing mechanical couplers for repairs to reinforcement10-70-2010-70-20/695Site-mixed concrete10-70-2010-70-20/700Executing concrete repair and protection generally10-70-2010-70-20/705Executing concrete crack repairs10-70-2010-70-20/710Applying concrete or mortar overlay system10-70-2010-70-20/715Applying concrete protective coating systems10-70-2010-70-20/720Installing bonded steel plate repair system10-70-2010-70-20/725Applying corrosion inhibitors10-70-2010-70-20/730Curing of concrete and mortar repairs10-70-2010-70-20/800Test records10-70-2010-70-20/810Photographic records10-70-2010-70-20/820Testing of completed repair or renovation system10-70-2010-70-20/830Testing of slip resistance10-70-2010-70-20/835Testing of abrasion resistance10-70-2010-70-20/840Record of location and extent of repairs10-70-2010-70-20/850Removal of prototypes or mock-ups10-70-2010-70-30Fungus and beetle eradication systems10-7010-70-30/120Treatment systems for beetle infected timber10-70-3010-70-30/130Treatment systems for combined fungus and beetle infected timber10-70-3010-70-30/140Treatment systems for fungus infected masonry10-70-3010-70-30/150Treatment systems for fungus infected timber10-70-3010-70-30/210Contractor's design10-70-3010-70-30/215Design submittals10-70-3010-70-30/620Quality assurance10-70-3010-70-30/640Opening up, cutting out and removal of building fabric10-70-3010-70-30/650Removal of fruiting bodies of dry rot10-70-3010-70-30/655Timber affected by dry rot10-70-3010-70-30/660Timber affected by wet rot10-70-3010-70-30/670Drying out of masonry10-70-3010-70-30/680Drying out of timber10-70-3010-70-30/690Preparation for treatment of timber and masonry10-70-3010-70-30/700Applying timber preservatives and masonry fungicides generally10-70-3010-70-30/710Applying timber preservative treatment10-70-3010-70-30/720Drilling timber for injection of preservatives10-70-3010-70-30/730Applying masonry fungicide treatment10-70-3010-70-30/735Hot air treatment10-70-3010-70-30/750Salvaged materials10-70-3010-70-30/810Monitoring10-70-3010-70-30/820Guarantee or warranty10-70-3010-70-50Cavity wall insulation systems10-7010-70-50/110Cavity wall insulation system10-70-5010-70-50/205Design submittals10-70-5010-70-50/210Thermal performance10-70-5010-70-50/610Remedial work to existing walls10-70-5010-70-50/620Suitability of walls10-70-5010-70-50/630Sealing gaps and openings10-70-5010-70-50/640Injection holes10-70-5010-70-50/650Installing loose cavity fill10-70-5010-70-50/660Installing adhesive bonded expanded polystyrene bead cavity fill10-70-5010-70-50/670Installing polyurethane foam cavity fill10-70-5010-70-50/680Installing urea-fomaldehyde foam cavity fill10-70-5010-70-50/690Repairs after installing cavity fill10-70-5010-70-50/700Checking flues10-70-5010-70-50/810Thermographic integrity test10-70-5010-70-50/820Documentation10-70-5010-70-55Masonry repair and renovation systems10-7010-70-55/155Masonry repair system10-70-5510-70-55/205Performance Requirements10-70-5510-70-55/305Product samples10-70-5510-70-55/500Existing templates10-70-5510-70-55/505Prototypes10-70-5510-70-55/510Inspection of drawings, templates, casts, etc10-70-5510-70-55/515Recording profiles10-70-5510-70-55/520Custom-made special shape clay masonry units10-70-5510-70-55/600Survey for masonry repair10-70-5510-70-55/606Site inspection for masonry repair10-70-5510-70-55/610Advance registration of stone or brick for masonry repair10-70-5510-70-55/613Adverse weather (masonry repair)10-70-5510-70-55/616Power tools for masonry repair10-70-5510-70-55/619Use of putlog scaffolding for masonry repair10-70-5510-70-55/620Handling of masonry units and protection of retained and new masonry10-70-5510-70-55/623Maintaining structural stability during masonry repair10-70-5510-70-55/626Disturbance to retained masonry during masonry repair10-70-5510-70-55/629Operative competence for masonry repair10-70-5510-70-55/630Removal of fittings for masonry repair10-70-5510-70-55/633Removal of plant growths for masonry repair10-70-5510-70-55/636Dismantling masonry for reuse10-70-5510-70-55/639Type and location of control samples for masonry repair10-70-5510-70-55/642Preparation for replacement masonry10-70-5510-70-55/645Filling terracotta blocks with semidry mortar10-70-5510-70-55/648Corroded metal fixings in masonry repair10-70-5510-70-55/650Laying replacement masonry units10-70-5510-70-55/653Rebuilding during masonry repair10-70-5510-70-55/656Laying bed joint reinforcement in masonry repairs10-70-5510-70-55/659Replacing defective masonry with tiling10-70-5510-70-55/662Pointing during masonry repair10-70-5510-70-55/665Pointing with tools and irons for masonry repair10-70-5510-70-55/668Grouting joints for masonry repair10-70-5510-70-55/671Mortar repair of cracks for masonry repair10-70-5510-70-55/674Resin injection repair of cracks for masonry repair10-70-5510-70-55/677Making good to injection and insertion holes for masonry repair10-70-5510-70-55/680Orientation of natural stone units for masonry repair10-70-5510-70-55/683Installing stone inserts for masonry repair10-70-5510-70-55/686Grouting rubble filled cores for masonry repair10-70-5510-70-55/689Removal of temporary distance pieces in ashlar stonework for masonry repair10-70-5510-70-55/692Installing pinnings for rubble stonework for masonry repair10-70-5510-70-55/700Weathering ledges at joints for masonry repair10-70-5510-70-55/703Descaling stone for masonry repair10-70-5510-70-55/706Redressing stone for masonry repair10-70-5510-70-55/710Installing joint reinforcement for masonry repair10-70-5510-70-55/713Installing ties for masonry repair10-70-5510-70-55/716Installing lateral restraint ties for masonry repair10-70-5510-70-55/719Site testing lateral restraint ties for masonry repair10-70-5510-70-55/722Installing lateral restraint straps for masonry repair10-70-5510-70-55/725Installing exposed dowels or pins for masonry repair10-70-5510-70-55/728Installing bonded concealed dowels or pins for masonry repair10-70-5510-70-55/750Site mixed cement gauged mortar for masonry repair10-70-5510-70-55/753Site mixed hydraulic lime mortar for masonry repair10-70-5510-70-55/756Site mixed nonhydraulic lime putty:pozzolanic admixture:sand mortar for masonry repair10-70-5510-70-55/759Site mixed nonhydraulic lime putty:sand mortar for masonry repair10-70-5510-70-55/762Site mixed semidry mortar for masonry repair10-70-5510-70-55/765Site mixed grout for masonry repair10-70-5510-70-55/805Removal of samples10-70-5510-70-55/810Record of masonry repair work10-70-5510-70-55/820Reinstatement of fittings and fixtures after masonry repair10-70-5510-70-55/830Removal of protection to masonry10-70-5510-70-65Mortar repair and renovation systems10-7010-70-65/150Mortar repairs system10-70-6510-70-65/155Mortar repointing system10-70-6510-70-65/205Performance requirements10-70-6510-70-65/305Product samples10-70-6510-70-65/505Prototypes10-70-6510-70-65/510Existing templates10-70-6510-70-65/515Recording profiles10-70-6510-70-65/610Site inspection10-70-6510-70-65/615Removal of fittings10-70-6510-70-65/620Removal of plant growths10-70-6510-70-65/625Power tools10-70-6510-70-65/630Adverse weather10-70-6510-70-65/640Use of putlog scaffolding10-70-6510-70-65/645Disturbance to retained masonry10-70-6510-70-65/650Maintaining structural stability10-70-6510-70-65/655Type and location of control samples10-70-6510-70-65/660Survey for mortar repair10-70-6510-70-65/665Preparation for mortar repairs10-70-6510-70-65/670Installing reinforcement for mortar repairs10-70-6510-70-65/675Applying mortar repairs mortar10-70-6510-70-65/680Scraped finish to mortar repairs10-70-6510-70-65/685Float finish to mortar repairs10-70-6510-70-65/690Survey for repointing works10-70-6510-70-65/695Preparation for repointing10-70-6510-70-65/700Pointing10-70-6510-70-65/705Pointing with tools and irons10-70-6510-70-65/710Pointing with injection mortar10-70-6510-70-65/715Brushed finish to joints10-70-6510-70-65/720Grouting joints10-70-6510-70-65/725Installing pinnings for rubble stonework10-70-6510-70-65/730Site mixed cement gauged mortar10-70-6510-70-65/735Site mixed hydraulic lime mortar10-70-6510-70-65/740Site mixed nonhydraulic lime putty:pozzolanic admixture:sand mortar10-70-6510-70-65/745Site mixed nonhydraulic lime putty:sand mortar10-70-6510-70-65/810Record of work10-70-6510-70-65/820Reinstatement of fittings and fixtures10-70-6510-70-85Metal repair systems10-7010-70-85/- CopyMetal repair systems10-7010-70-90Timber repair and renovation systems10-7010-70-90/105Timber defects survey10-70-9010-70-90/120Timber joint strengthening system10-70-9010-70-90/140Timber section repair system10-70-9010-70-90/160Timber section strengthening system10-70-9010-70-90/205Existing design information10-70-9010-70-90/210Design submittals10-70-9010-70-90/220Objectives of repair and remedial works10-70-9010-70-90/230Functional performance repair system10-70-9010-70-90/250Design working life10-70-9010-70-90/260Timber defects survey objectives10-70-9010-70-90/305Product samples10-70-9010-70-90/510Prototypes10-70-9010-70-90/520Custom made carbon steel sections and plates10-70-9010-70-90/530Custom made stainless steel sections and plates10-70-9010-70-90/610Timber defects survey enquiry10-70-9010-70-90/612Inspection10-70-9010-70-90/614Opening up10-70-9010-70-90/616Workmanship10-70-9010-70-90/618Cleaning surfaces10-70-9010-70-90/630Temporary supports and propping10-70-9010-70-90/632Temporary removal of fittings and fixtures10-70-9010-70-90/634Trial samples10-70-9010-70-90/636Protection of timber and wood components before and during installation10-70-9010-70-90/640Processing treated timber10-70-9010-70-90/645Removal of existing finish10-70-9010-70-90/650Reuse of timber sections and wood components10-70-9010-70-90/655Removal of defective timber10-70-9010-70-90/660Moisture content of replacement softwood and hardwood10-70-9010-70-90/665Moisture content checking10-70-9010-70-90/670Repair of timber cutting out members10-70-9010-70-90/675Installing replacement timber10-70-9010-70-90/680Repair of compression members piecing in10-70-9010-70-90/685Repair of distorted timber members10-70-9010-70-90/690Installing internal reinforcement10-70-9010-70-90/695Installing dowels10-70-9010-70-90/710Installing flitch plates10-70-9010-70-90/715Installing external reinforcement10-70-9010-70-90/720Installing lap members10-70-9010-70-90/725Fixing framing anchors and cleats10-70-9010-70-90/730Installing splice plates10-70-9010-70-90/735Fixing gusset plates10-70-9010-70-90/740Installing toothed plate connectors10-70-9010-70-90/745Making connectored joints10-70-9010-70-90/755Fixing nails10-70-9010-70-90/760Critical dimensions for fasteners10-70-9010-70-90/765Installing pegs for mortise and tenon joints in structural timber10-70-9010-70-90/770Adhesive joints10-70-9010-70-90/805Timber defects survey report10-70-9010-70-90/810Mechanically fastened joints10-70-9010-70-90/815Quality control on completed repair system10-70-9010-70-90/820Record of location and extent of repairs10-70-9010-70-90/825Reinstatement of fittings and fixtures10-70-9010-70-90/830Dating timbers used in structural repairs10-70-9010-85Temporary works systems1010-85-15Shoring and facade retention systems10-8510-85-15/110Framed retention structure system10-85-1510-85-15/120Retention structure system10-85-1510-85-15/130Flying shores system10-85-1510-85-15/140Raking shores system10-85-1510-85-15/205Design submittals10-85-1510-85-15/210Design of shoring or retention structure10-85-1510-85-15/220Design of connections between facade and shoring or retention structure10-85-1510-85-15/225Design supervision and checking10-85-1510-85-15/230Design parameters for retention or shoring structure10-85-1510-85-15/235Permanent and imposed loading10-85-1510-85-15/240Ice loading10-85-1510-85-15/245Earth retaining loads10-85-1510-85-15/250Thermal movements10-85-1510-85-15/255Wind loading10-85-1510-85-15/260Accidental loading10-85-1510-85-15/290Compliance with performance requirements10-85-1510-85-15/305Product samples10-85-1510-85-15/505Needles10-85-1510-85-15/520Carbon steel bearing plates10-85-1510-85-15/605Pre-construction survey10-85-1510-85-15/625Enabling work for erection of shoring or retention structures10-85-1510-85-15/630Erecting shoring and facade retention structures10-85-1510-85-15/635Erecting permanent facade retention structures10-85-1510-85-15/640Forming capping to retained facades10-85-1510-85-15/650Initial monitoring of adopted retention structures10-85-1510-85-15/655Movement and crack monitoring10-85-1510-85-15/660Frequency of monitoring of retention structures10-85-1510-85-15/665Planned modifications to retention structure10-85-1510-85-15/685Handing over retention structures10-85-1510-85-15/695Adoption of retention structure10-85-1510-85-15/700Maintenance of shoring or retention structure10-85-1510-85-15/705Maintenance of facade10-85-1510-85-15/710Removal of shoring or facade retention systems10-85-1510-85-15/720Temporary works co-ordinator10-85-1510-85-15/725Personnel10-85-1510-85-15/730Responsibility10-85-1510-85-15/810Post completion survey10-85-1510-85-15/820Maintenance certificates10-85-1510-85-15/830Verification of performance10-85-1510-85-40Temporary crop systems10-8510-85-40/135Intercropping system10-85-4010-85-40/175Spoil heap temporary crop system10-85-4010-85-40/185Topsoil heap temporary crop system10-85-4010-85-40/210Design of temporary crops10-85-4010-85-40/501Custom seed mix10-85-4010-85-40/503Designed inorganic fertilizer10-85-4010-85-40/505Designed organic fertilizer10-85-4010-85-40/605Notice to inspect temporary crops10-85-4010-85-40/611Setting out temporary crops10-85-4010-85-40/613Water restrictions10-85-4010-85-40/615Grading topsoil for temporary crops10-85-4010-85-40/617Final cultivation for temporary crops10-85-4010-85-40/619Seed bed cleaning before sowing temporary crops10-85-4010-85-40/621Season for sowing temporary crops10-85-4010-85-40/623Sowing temporary crops10-85-4010-85-40/805Site visits to inspect temporary crops10-85-4010-85-40/810Cleanliness during works10-85-4010-85-40/815Failures of seeding10-85-4010-85-40/820Watering temporary crops10-85-4010-85-40/825Protective fencing for temporary crops10-85-4010-85-40/830Ploughing in temporary crops10-85-4012-20-05Generally15General structural systems15-05General substructure systems1515-05-15Concrete foundation systems15-0515-05-15/110In situ reinforced concrete pad and strip foundation system15-05-1515-05-15/120In situ reinforced concrete pilecap and ground beam foundation system15-05-1515-05-15/130In situ reinforced concrete raft foundation system15-05-1515-05-15/135In situ unreinforced concrete foundation system for cast in products15-05-1515-05-15/140In situ unreinforced concrete pad and strip foundation system15-05-1515-05-15/150In situ unreinforced concrete trench fill foundation system15-05-1515-05-15/160Precast concrete pad and strip foundation system15-05-1515-05-15/170Steel ground beam foundation system15-05-1515-05-15/205Design submittals15-05-1515-05-15/210Loads applied to foundations15-05-1515-05-15/230Geotechnical design15-05-1515-05-15/235Settlement criteria for buildings and structures15-05-1515-05-15/240Design of unreinforced concrete foundation systems15-05-1515-05-15/245Drawings and reinforcement schedules for reinforced concrete construction15-05-1515-05-15/250Reinforcement detailing15-05-1515-05-15/305Product samples15-05-1515-05-15/610Execution of concrete foundations15-05-1515-05-15/612Installing unreinforced foundations15-05-1515-05-15/615Accuracy of construction15-05-1515-05-15/617Formations to receive concrete15-05-1515-05-15/620Preparation of surfaces to receive concrete15-05-1515-05-15/625Inspection of surfaces to receive concrete15-05-1515-05-15/630Installing substructure formwork15-05-1515-05-15/655Adverse temperature conditions15-05-1515-05-15/660Casting concrete against faces of excavations15-05-1515-05-15/665Concrete supply on large pours15-05-1515-05-15/668Formed finishes in concrete15-05-1515-05-15/672Unformed finishes in concrete15-05-1515-05-15/705Site-mixed concrete15-05-1515-05-15/720Forming construction and movement joints in concrete generally15-05-1515-05-15/730Forming movement joints in concrete rafts and foundations15-05-1515-05-15/735Day joints15-05-1515-05-15/740Preparation of construction joints15-05-1515-05-15/756Curing periods for underpinning works15-05-1515-05-15/810Post completion structural testing of concrete structures15-05-1515-05-15/820Surface cracking of concrete structures15-05-1515-05-50Minor concrete substructure systems15-0515-05-50/110In situ reinforced concrete foundation and plinth system15-05-5015-05-50/120In situ unreinforced concrete foundation system for cast in products15-05-5015-05-50/130In situ unreinforced concrete foundation and plinth system15-05-5015-05-50/140Precast concrete foundation and plinth system15-05-5015-05-50/205Design submittals15-05-5015-05-50/210Reinforcement detailing15-05-5015-05-50/230Geotechnical design15-05-5015-05-50/305Product samples15-05-5015-05-50/610Execution of concrete foundations15-05-5015-05-50/612Installing unreinforced foundations15-05-5015-05-50/615Accuracy of construction15-05-5015-05-50/620Preparation of surfaces to receive concrete15-05-5015-05-50/625Inspection of surfaces to receive concrete15-05-5015-05-50/630Installing substructure formwork15-05-5015-05-50/655Adverse temperature conditions15-05-5015-05-50/660Casting concrete against faces of excavations15-05-5015-05-50/680Formed finishes in concrete15-05-5015-05-50/682Unformed finishes in concrete15-05-5015-05-50/705Site-mixed concrete15-05-5015-05-50/735Day joints15-05-5015-05-50/740Preparation of construction joints15-05-5015-05-65Piling systems15-0515-05-65/110In situ concrete augered piling system15-05-6515-05-65/120In situ concrete bored piling system15-05-6515-05-65/130In situ concrete cased displacement piling system15-05-6515-05-65/140In situ concrete displacement piling system15-05-6515-05-65/150Plunge column piling system15-05-6515-05-65/155Driven precast or prestressed concrete piling system15-05-6515-05-65/160Steel bearing pile system15-05-6515-05-65/170Timber piling system15-05-6515-05-65/180Screw piling system15-05-6515-05-65/185In situ concrete mini-piling or micro-piling system15-05-6515-05-65/190Piling system15-05-6515-05-65/205Design submittals15-05-6515-05-65/220Piling design standards15-05-6515-05-65/225Pile performance criteria15-05-6515-05-65/230Engineer design15-05-6515-05-65/240Geotechnical design15-05-6515-05-65/270Settlement criteria for buildings and structures15-05-6515-05-65/275Reinforcement schedules and drawings for concrete construction15-05-6515-05-65/280Limits on damage to existing buildings, structures and services15-05-6515-05-65/305Product samples15-05-6515-05-65/525Self hardening slurry15-05-6515-05-65/534Cementitious grout15-05-6515-05-65/590Composite steel bearing piles15-05-6515-05-65/595Excavated material for compacted fill15-05-6515-05-65/610Marking of piles15-05-6515-05-65/615Installing concrete piles15-05-6515-05-65/618Use of support fluid15-05-6515-05-65/620Installing timber piles15-05-6515-05-65/622Installing king posts15-05-6515-05-65/625Installing reinforcement15-05-6515-05-65/630Placing reinforcement in cast-in place piles15-05-6515-05-65/635Installing permanent casings15-05-6515-05-65/640Installing sleeves for protection against aggressive ground or to reduce friction15-05-6515-05-65/645Monitoring construction of augered piles15-05-6515-05-65/650Instrument failure when augering piles15-05-6515-05-65/655Installing instrumentation for piles15-05-6515-05-65/660Information to be submitted during construction15-05-6515-05-65/665Protection of piles against aggressive ground and ground water15-05-6515-05-65/670Installing test piles15-05-6515-05-65/675Fabricating steel piles15-05-6515-05-65/680Uplift trials15-05-6515-05-65/685Lateral displacement trials15-05-6515-05-65/690Trial of friction reducing method15-05-6515-05-65/695Trial drives15-05-6515-05-65/700Trial bores15-05-6515-05-65/710Dynamic and rapid testing of piles15-05-6515-05-65/715Axial maintained load testing of preliminary piles15-05-6515-05-65/720Axial maintained load proof testing of working piles15-05-6515-05-65/724Pile Constant Rate of Penetration (CRP) test15-05-6515-05-65/726Pile preliminary lateral loading test15-05-6515-05-65/728Timing of pile load testing generally15-05-6515-05-65/732Sampling and testing of materials15-05-6515-05-65/734Non-destructive testing of welds15-05-6515-05-65/736Testing for contaminated ground15-05-6515-05-65/738Testing support fluid15-05-6515-05-65/740Preparation of pile heads for integrity testing15-05-6515-05-65/742Pile integrity testing15-05-6515-05-65/744Sonic logging15-05-6515-05-65/750Ground investigation during construction15-05-6515-05-65/756Driving resistance, dynamic evaluation and set of steel bearing piles15-05-6515-05-65/772Pile installation tolerances - special requirements15-05-6515-05-65/774Installation tolerances for plunged columns15-05-6515-05-65/776Preliminary piles and/or barrettes15-05-6515-05-65/782Installation of plunge king posts and columns15-05-6515-05-65/784Pressure grouting15-05-6515-05-65/786Sub-standard performance of working piles15-05-6515-05-65/790Testing cementitious grout15-05-6515-05-65/792Testing of self-hardening slurry15-05-6515-05-65/800Work to preliminary test pile heads after testing15-05-6515-05-65/820Work to heads of working piles after testing15-05-6515-05-65/840Pile records and piling completion report15-05-6515-05-65/850Piling guarantee15-05-6515-05-65/860Removal of samples15-05-6515-05-65/870Removal of temporary works used for testing15-05-6515-05-90Underpinning systems15-0515-05-90/110Beam and pier underpinning system15-05-9015-05-90/120Grouted underpinning system15-05-9015-05-90/125Jet grouted underpinning system15-05-9015-05-90/130Jacked pile underpinning system15-05-9015-05-90/140Mass concrete underpinning system15-05-9015-05-90/150Pile and cantilever support underpinning system15-05-9015-05-90/160Pile and needle underpinning system15-05-9015-05-90/170Raking pile underpinning system15-05-9015-05-90/205Design submittals15-05-9015-05-90/207Geotechnical design15-05-9015-05-90/210Ground investigation report15-05-9015-05-90/215Geotechnical design report15-05-9015-05-90/220Structural design standards15-05-9015-05-90/225Design supervision and checking15-05-9015-05-90/235Vertical loading criteria for underpinning structures15-05-9015-05-90/240Settlement criteria for buildings and structures15-05-9015-05-90/245Drawings and reinforcement schedules for reinforced concrete construction15-05-9015-05-90/250Reinforcement detailing15-05-9015-05-90/260Limits on damage to existing buildings, structures and services15-05-9015-05-90/525Cementitious grouts15-05-9015-05-90/535Non-cementitious grouts15-05-9015-05-90/540Hard packing15-05-9015-05-90/590Excavated material for compacted general fill15-05-9015-05-90/610Pre-construction exploratory investigations for underpinning systems15-05-9015-05-90/615Disconnection of services in working areas for underpinning systems15-05-9015-05-90/620Installing raking pile underpinning systems15-05-9015-05-90/625Installing jacked piles generally15-05-9015-05-90/630Installing jacked piles beneath existing structures15-05-9015-05-90/635Installing jacked piles through existing foundations15-05-9015-05-90/640Installing jacked piles beneath needle beams15-05-9015-05-90/645Installing pile and cantilevered support underpinning system15-05-9015-05-90/660Installing mass concrete piers15-05-9015-05-90/665Installing heave protection to underpinning structures15-05-9015-05-90/670Installing wall beams15-05-9015-05-90/675Protection of services passing through underpinning systems15-05-9015-05-90/680Installing hard packing for underpinning systems15-05-9015-05-90/685Installing steel stools and flat jacks15-05-9015-05-90/705Underpinning with grout15-05-9015-05-90/710Jet grouting15-05-9015-05-90/715Testing cementitious grout15-05-9015-05-90/720Testing suspension/ chemical grout15-05-9015-05-90/725In situ testing of untreated/ treated soil15-05-9015-05-90/730Laboratory testing of untreated/ treated soil15-05-9015-05-90/810Post completion structural testing of concrete structures15-05-9015-65General structural frame systems1515-65-75Structural framing systems15-6515-65-75/135Heavy steel framing system15-65-7515-65-75/140In situ reinforced concrete framing system15-65-7515-65-75/145Light steel framing system15-65-7515-65-75/160Precast concrete framing system15-65-7515-65-75/185Timber framing system15-65-7515-65-75/205Design submittals15-65-7515-65-75/210Structural design supervision and checking15-65-7515-65-75/215Ice loading15-65-7515-65-75/220Design of framing systems generally15-65-7515-65-75/225Design of steel framing systems15-65-7515-65-75/230Requirements of the National Structural Steelwork Specification (NSSS (CE MARKING))15-65-7515-65-75/232Design of concrete framing systems15-65-7515-65-75/234Design of timber framing systems15-65-7515-65-75/235Design of permanent formwork systems15-65-7515-65-75/240Vibration of floor framing systems15-65-7515-65-75/245Drawings and reinforcement schedules for reinforced concrete construction15-65-7515-65-75/250Reinforcement detailing15-65-7515-65-75/305Product samples15-65-7515-65-75/505Prototypes (or mock-ups)15-65-7515-65-75/568Fabrication15-65-7515-65-75/570Fabrication constraints - steelwork to be galvanized15-65-7515-65-75/575Fabrication constraints connections15-65-7515-65-75/610Execution of concrete structures15-65-7515-65-75/612Execution of steel and composite structures15-65-7515-65-75/616Accuracy of construction15-65-7515-65-75/620Preparation of surfaces to receive concrete15-65-7515-65-75/622Inspection of surfaces to receive concrete15-65-7515-65-75/624Use of permanent support15-65-7515-65-75/626Installing column bases15-65-7515-65-75/627Installing bedding under column baseplates15-65-7515-65-75/628Sealing hollow sections15-65-7515-65-75/660Concrete supply on large pours15-65-7515-65-75/662Formed finishes in concrete15-65-7515-65-75/664Unformed finishes in concrete15-65-7515-65-75/685Site-mixed concrete15-65-7515-65-75/700Forming construction and movement joints in concrete generally15-65-7515-65-75/705Forming joints in concrete generally15-65-7515-65-75/710Day joints15-65-7515-65-75/715Forming movement joints in concrete slabs15-65-7515-65-75/720Preparation of construction joints in concrete15-65-7515-65-75/730Site welding generally15-65-7515-65-75/732Welding15-65-7515-65-75/734Temporary welds15-65-7515-65-75/736Welding of stainless steel15-65-7515-65-75/738Special welding procedures15-65-7515-65-75/740Forming movement joints in steel framing systems15-65-7515-65-75/742Forming notches, holes and joints in timber15-65-7515-65-75/762Modification of steel structures15-65-7515-65-75/784Installation of prototypes or mock-ups15-65-7515-65-75/786Inspection levels15-65-7515-65-75/788Post completion structural testing of concrete structures15-65-7515-65-75/790Non destructive testing (NDT) of welds15-65-7515-65-75/792Site testing of shear stud welding15-65-7515-65-75/794Site testing of anchors to concrete and masonry15-65-7515-65-75/805Removal of samples15-65-7515-75Prefabricated systems1515-75-65Prefabricated panelled, framed and modular buildings15-7515-75-65/110Panelled or framed structures15-75-6515-75-65/120Structural insulated panels15-75-6515-75-65/130Glazed structures15-75-6515-75-65/201Design submittals15-75-6515-75-65/206Design supervision and checking15-75-6515-75-65/208Design working life15-75-6515-75-65/210Structural steel performance15-75-6515-75-65/212Structural timber performance15-75-6515-75-65/214Structural concrete performance15-75-6515-75-65/216Vibration performance15-75-6515-75-65/218Structural timber sections sizes15-75-6515-75-65/220Fixings for wall cladding systems15-75-6515-75-65/222Testing of structural elements to resist fire15-75-6515-75-65/224Fire performance of timber framed buildings15-75-6515-75-65/230Forced ventilation15-75-6515-75-65/232Natural ventilation15-75-6515-75-65/240Solar transmission (solar factor)15-75-6515-75-65/242Glare control (BREEAM)15-75-6515-75-65/244Safety of glazing15-75-6515-75-65/248Window and door performance15-75-6515-75-65/250Emergency egress15-75-6515-75-65/260Security15-75-6515-75-65/270Compliance with performance15-75-6515-75-65/305Product samples15-75-6515-75-65/510Prototype15-75-6515-75-65/520Information from fabricator15-75-6515-75-65/605Transportation15-75-6515-75-65/608Pre-installation survey15-75-6515-75-65/610Execution Standards for structural elements15-75-6515-75-65/630Storage15-75-6515-75-65/650Erection15-75-6515-75-65/660Assembly15-75-6515-75-65/670Inspection levels15-75-6515-75-65/805Removal of samples15-75-6515-75-65/820Documentation15-75-6515-75-65/890Verification of performance15-75-6515-95Simple general structural systems1520Roof, floor and paving systems20-00Pitched, arched and domed roof structure systems2020-00-75Roof structure systems20-0020-00-75/135Heavy steel framed roof structure system20-00-7520-00-75/137Heavy steel space frame system20-00-7520-00-75/139Heavy steel space truss system20-00-7520-00-75/140Light steel framed roof structure system20-00-7520-00-75/145Precast concrete roof structure system20-00-7520-00-75/150Masonry roof structure system20-00-7520-00-75/175Sprayed concrete framed roof structure system20-00-7520-00-75/185Timber framed roof structure system20-00-7520-00-75/205Design submittals20-00-7520-00-75/210Dimensional constraints20-00-7520-00-75/215Structural design supervision and checking20-00-7520-00-75/220Ice loading20-00-7520-00-75/225Design of framing systems generally20-00-7520-00-75/227Design of concrete framing systems20-00-7520-00-75/230Design of steel framing systems20-00-7520-00-75/235Requirements of the National Structural Steelwork Specification (NSSS (CE MARKING))20-00-7520-00-75/240Design of timber framing systems20-00-7520-00-75/245Design of permanent formwork systems20-00-7520-00-75/250Drawings and reinforcement schedules for reinforced concrete construction20-00-7520-00-75/260Reinforcement detailing20-00-7520-00-75/305Product samples20-00-7520-00-75/505Prototypes (or mock-ups)20-00-7520-00-75/605Installation control samples20-00-7520-00-75/610Execution of concrete structures20-00-7520-00-75/615Execution of steel structures20-00-7520-00-75/620Modification of steel structures20-00-7520-00-75/625Execution of timber structures20-00-7520-00-75/630Erecting masonry roof structure systems20-00-7520-00-75/632Sealing hollow sections20-00-7520-00-75/635Preparation of surfaces to receive concrete20-00-7520-00-75/637Inspection of surfaces to receive concrete20-00-7520-00-75/639Use of permanent support20-00-7520-00-75/640Production control of sprayed concrete20-00-7520-00-75/645Concrete supply on large pours20-00-7520-00-75/660Site-mixed concrete20-00-7520-00-75/670Qualifications of nozzleman20-00-7520-00-75/675Applying sprayed concrete20-00-7520-00-75/690Installing inserts and forming holes20-00-7520-00-75/700Site welding20-00-7520-00-75/702Welding20-00-7520-00-75/704Temporary welds20-00-7520-00-75/706Welding of stainless steel20-00-7520-00-75/708Special welding procedures20-00-7520-00-75/710Forming movement joints in steel framing systems20-00-7520-00-75/720Inspection levels20-00-7520-00-75/725Pre-construction testing of sprayed concrete20-00-7520-00-75/730Testing of sprayed concrete20-00-7520-00-75/750Non destructive testing (NDT) of welds20-00-7520-00-75/755Site testing of anchors to concrete and masonry20-00-7520-00-75/760Fabrication20-00-7520-00-75/762Fabrication constraints - steelwork to be galvanized20-00-7520-00-75/764Fabrication constraints connections20-00-7520-00-75/805Removal of samples20-00-7520-00-75/810Post completion structural testing20-00-7520-00-75/820Surface cracking of concrete structures20-00-7520-05Flat roof, floor & balcony structure systems2020-05-65Plinth systems (not required)20-0520-05-80Structural deck systems20-0520-05-80/110Composite concrete floor, roof deck or balcony system20-05-8020-05-80/115Composite steel and concrete floor, roof deck or balcony system20-05-8020-05-80/120Post tensioned concrete floor or roof deck system20-05-8020-05-80/130Glazed unit floor or roof deck system20-05-8020-05-80/140Heavy steel floor, roof or balcony decking system20-05-8020-05-80/145In situ reinforced concrete floor, roof deck or balcony system20-05-8020-05-80/150Light steel floor, roof deck or balcony framing system20-05-8020-05-80/160Precast concrete beam and block floor or roof deck system20-05-8020-05-80/165Precast concrete floor or roof deck system20-05-8020-05-80/190Timber floor, roof deck or balcony decking system20-05-8020-05-80/205Design submittals20-05-8020-05-80/210Dimensional constraints20-05-8020-05-80/215Structural design supervision and checking20-05-8020-05-80/220Design of decking systems generally20-05-8020-05-80/225Design of steel decking systems20-05-8020-05-80/230Requirements of the National Structural Steelwork Specification (NSSS (CE MARKING))20-05-8020-05-80/232Design of concrete decking systems20-05-8020-05-80/234Design of timber decking systems20-05-8020-05-80/236Design of permanent formwork systems20-05-8020-05-80/240Drawings and reinforcement schedules for reinforced concrete construction20-05-8020-05-80/250Reinforcement detailing20-05-8020-05-80/260Abrasion resistance of concrete wearing surfaces20-05-8020-05-80/265Slip resistance of wearing surfaces20-05-8020-05-80/270Vibration of floor framing systems20-05-8020-05-80/290Accuracy of construction20-05-8020-05-80/292Tolerances of structural concrete floor levels20-05-8020-05-80/294Surface regularity of concrete floors20-05-8020-05-80/296Surface regularity of vehicular concrete floors20-05-8020-05-80/298Inspection levels20-05-8020-05-80/305Product samples20-05-8020-05-80/505Prototypes (or mock-ups)20-05-8020-05-80/605Installation control samples20-05-8020-05-80/610Execution of concrete structures20-05-8020-05-80/612Execution of steel and composite structures20-05-8020-05-80/614Execution of timber structures20-05-8020-05-80/616Installing post tensioning systems20-05-8020-05-80/618Trials of grouting for post tensioning systems20-05-8020-05-80/620Preparation of surfaces to receive concrete20-05-8020-05-80/622Inspection of surfaces to receive concrete20-05-8020-05-80/624Use of permanent support20-05-8020-05-80/625Fabrication20-05-8020-05-80/626Fabrication constraints - steelwork to be galvanized20-05-8020-05-80/627Fabrication constraints connections20-05-8020-05-80/628Sealing hollow sections20-05-8020-05-80/640Concrete supply on large pours20-05-8020-05-80/650Site-mixed concrete20-05-8020-05-80/660Forming construction and movement joints in concrete generally20-05-8020-05-80/664Day joints20-05-8020-05-80/666Forming expansion joints in concrete slabs20-05-8020-05-80/668Preparation of construction joints in concrete20-05-8020-05-80/670Forming tied longitudinal construction joints20-05-8020-05-80/672Forming sawn grooves20-05-8020-05-80/674Forming contraction joints with wet formed groove20-05-8020-05-80/676Formed joints in concrete wearing surfaces20-05-8020-05-80/680Installing arris armouring20-05-8020-05-80/682Installing bottom of slab crack inducers20-05-8020-05-80/684Installing inserted strip crack inducers20-05-8020-05-80/686Installing shear load connectors20-05-8020-05-80/688Installing in situ concrete structural topping20-05-8020-05-80/690Installing inserts and forming holes and chases20-05-8020-05-80/694Forming notches, holes and joints in timber20-05-8020-05-80/700Site welding generally20-05-8020-05-80/702Welding20-05-8020-05-80/704Temporary welds20-05-8020-05-80/706Welding of stainless steel20-05-8020-05-80/708Special welding procedures20-05-8020-05-80/710Forming movement joints in steel framing systems20-05-8020-05-80/711Formed finishes in concrete20-05-8020-05-80/713Unformed finishes in concrete20-05-8020-05-80/724Modification of steel structures20-05-8020-05-80/728Initial project testing of concrete20-05-8020-05-80/744Inspection levels20-05-8020-05-80/746Testing cement grout20-05-8020-05-80/750Non destructive testing (NDT) of welds20-05-8020-05-80/752Site testing of shear stud welding20-05-8020-05-80/754Site testing of anchors to concrete and masonry20-05-8020-05-80/759Install strutting20-05-8020-05-80/805Removal of prototypes, mock-ups or samples20-05-8020-05-80/820Post completion structural testing of concrete structures20-05-8020-05-80/830Surface cracking of concrete20-05-8020-05-80/840Inspection of tied and partially tied joints20-05-8020-05-80/850Testing of slip resistance20-05-8020-05-80/860Records of post tensioning systems20-05-8020-05-95Water retention sheet lining systems20-0520-05-95/110Ground supported water retention sheet lining system20-05-9520-05-95/120Structure supported water retention sheet lining system20-05-9520-05-95/210Design20-05-9520-05-95/610Suitability of constructed substrates20-05-9520-05-95/620Suitability of excavated substrates20-05-9520-05-95/630Laying fine aggregate bedding to excavated substrates20-05-9520-05-95/640Laying geotextile substrate protection layers20-05-9520-05-95/650Laying and jointing flexible water retention sheet liners20-05-9520-05-95/660Laying geosynthetic clay liners20-05-9520-05-95/670Joint testing to flexible sheet liners20-05-9520-05-95/680Laying geotextile surface protection layers20-05-9520-05-95/690Forming anchor trench for flexible sheet liners20-05-9520-05-95/810System guarantee20-05-9520-05-95/820Subsequent construction works20-05-9520-10Ceiling and soffit structure systems2020-10-10Board ceiling and soffit systems20-1020-10-10/110Board suspended ceiling system20-10-1020-10-10/170Soffit lining and beam casing system20-10-1020-10-10/205Design submittals20-10-1020-10-10/207Board ceiling systems design requirements20-10-1020-10-10/210Structural performance20-10-1020-10-10/215Durability20-10-1020-10-10/217Health, hygiene and environment20-10-1020-10-10/220Fire performance to BS 47620-10-1020-10-10/230Fire performance to BS EN 1350120-10-1020-10-10/240Acoustic performance20-10-1020-10-10/250Airtightness performance20-10-1020-10-10/260Electrical continuity and earth bonding20-10-1020-10-10/290Compliance with performance requirements20-10-1020-10-10/305Product samples20-10-1020-10-10/605Preliminary installation20-10-1020-10-10/610Installing suspension grids for boarded ceilings20-10-1020-10-10/615Installing ceiling systems intended for fire protection20-10-1020-10-10/620Installing insulation above suspended ceilings20-10-1020-10-10/625Installing cavity fire barriers above suspended ceilings20-10-1020-10-10/630Installing sound barriers above suspended ceilings20-10-1020-10-10/640Installing boarded ceilings and soffits20-10-1020-10-10/645Installing plasterboard to metal framing20-10-1020-10-10/650Installing plasterboard to resilient acoustic bars20-10-1020-10-10/655Installing plasterboard to timber20-10-1020-10-10/660Installing additional supports20-10-1020-10-10/665Sealing gaps and air paths20-10-1020-10-10/670Installing air plenum barriers20-10-1020-10-10/675Installing integrated services in suspended ceilings20-10-1020-10-10/680Installing framing generally20-10-1020-10-10/685Installing encasement systems20-10-1020-10-10/805Removal of samples20-10-1020-10-10/830Operation and maintenance manual20-10-1020-10-10/895Verification of performance20-10-1020-10-20Demountable suspended ceiling systems20-1020-10-20/110Acoustic baffle suspended ceiling system20-10-2020-10-20/130Fabric membrane (stretch) ceiling system20-10-2020-10-20/170Raft or island suspended ceiling system20-10-2020-10-20/190Unit (modular) suspended ceiling system20-10-2020-10-20/205Design submittals20-10-2020-10-20/210Demountable suspended ceiling design requirements20-10-2020-10-20/220Durability20-10-2020-10-20/225Health, hygiene and environment20-10-2020-10-20/230Structural performance20-10-2020-10-20/240Fire performance to BS 47620-10-2020-10-20/250Fire performance to BS EN 1350120-10-2020-10-20/260Acoustic performance20-10-2020-10-20/270Airtightness performance20-10-2020-10-20/280Electrical continuity and earth bonding20-10-2020-10-20/290Compliance with performance requirements20-10-2020-10-20/305Product samples20-10-2020-10-20/505Prototypes20-10-2020-10-20/510Custom made isolated soffits20-10-2020-10-20/515Custom made modular ceiling raft20-10-2020-10-20/605Demountable suspended ceiling preliminary installation20-10-2020-10-20/610Demountable suspended ceiling control samples20-10-2020-10-20/615Installing demountable suspended ceilings generally20-10-2020-10-20/620Setting out demountable suspended ceilings20-10-2020-10-20/625Protection of demountable suspended ceilings20-10-2020-10-20/630Demountable suspended ceiling systems intended for fire protection20-10-2020-10-20/675Installing insulation above demountable suspended ceilings20-10-2020-10-20/680Installing edge battens to demountable suspended ceilings20-10-2020-10-20/685Installing cavity fire barriers above demountable suspended ceilings20-10-2020-10-20/690Installing sound barriers above demountable suspended ceilings20-10-2020-10-20/695Installing air plenum barriers above demountable suspended ceilings20-10-2020-10-20/700Installing upstands and bulkheads to demountable suspended ceilings20-10-2020-10-20/710Installing integrated services in demountable suspended ceilings20-10-2020-10-20/805Removal of samples20-10-2020-10-20/820Tools for demountable suspended ceilings20-10-2020-10-20/830Operation and maintenance manual20-10-2020-10-20/840Spares for demountable suspended ceilings20-10-2020-10-20/895Verification of performance20-10-2020-15Paving and hardstanding systems2020-15-03Acrylic and resin-bound aggregate paving systems20-1520-15-05Asphalt paving systems20-1520-15-05/110Asphalt concrete paving system20-15-0520-15-05/125Slurry surfacing overlay system20-15-0520-15-05/130Surface dressing overlay system20-15-0520-15-05/135Hot rolled asphalt paving system20-15-0520-15-05/140Hot rolled asphalt sports paving system20-15-0520-15-05/150Mastic asphalt paving system20-15-0520-15-05/165Porous asphalt concrete paving system20-15-0520-15-05/170Porous asphalt concrete sports paving system20-15-0520-15-05/175Stone mastic asphalt paving system20-15-0520-15-05/190Asphalt paving maintenance system20-15-0520-15-05/195Asphalt sports paving maintenance system20-15-0520-15-05/201Contractor design of asphalt pavements20-15-0520-15-05/205Design submittals20-15-0520-15-05/209Information for asphalt pavement design20-15-0520-15-05/211Functional performance of asphaltic pavements20-15-0520-15-05/213Sport surfacing performance20-15-0520-15-05/215Play surfacing performance20-15-0520-15-05/231Performance of subgrades for permeable asphalt pavements20-15-0520-15-05/241Acoustic performance of asphalt road surfacing20-15-0520-15-05/251Accessibility of asphalt pavements20-15-0520-15-05/252Slip and skid resistance of asphalt pavements20-15-0520-15-05/261Hydraulic performance of asphalt pavements20-15-0520-15-05/305Product samples20-15-0520-15-05/601Installation control samples20-15-0520-15-05/607Surface characteristics of asphalt pavements20-15-0520-15-05/609Surface characteristics of asphalt bases beneath sports surfacing20-15-0520-15-05/611Disposal of arisings20-15-0520-15-05/621Protection of cementitious sub-bases and bases during laying of asphalt pavements20-15-0520-15-05/623Planing and repairs to existing asphalt bases20-15-0520-15-05/625Forming drainage holes in existing bases20-15-0520-15-05/631Laying subgrade, sub-bases and roadbases to asphalt pavements20-15-0520-15-05/635Preparation for final surfacing of asphalt road bases which have been used for construction traffic20-15-0520-15-05/637Site mixed concrete20-15-0520-15-05/641Laying asphalt pavements generally20-15-0520-15-05/645Laying hot rolled asphalt (HRA) drainage channels in asphalt roads and pavings20-15-0520-15-05/647Thickness of asphalt concrete courses20-15-0520-15-05/649Thickness of hot rolled asphalt courses20-15-0520-15-05/651Thickness of courses for vehicular pavements20-15-0520-15-05/653Thickness of courses for pedestrian pavements20-15-0520-15-05/655Laying slurry surfacing20-15-0520-15-05/657Laying surface dressing on asphalt pavements20-15-0520-15-05/659Retexturing treatment to existing asphalt pavements20-15-0520-15-05/661Abutments in asphalt pavements20-15-0520-15-05/671Installing light duty road marking on asphalt pavements20-15-0520-15-05/673Installing thermoplastic road marking on asphalt pavements20-15-0520-15-05/711Applying painted line markings20-15-0520-15-05/713Applying thermoplastic line markings20-15-0520-15-05/801Protection of completed asphalt pavements from traffic and plant20-15-0520-15-05/805Identification of materials20-15-0520-15-05/810Excess chippings from asphalt pavements20-15-0520-15-05/820Declaration of conformity of asphalt pavements20-15-0520-15-05/840Sports surface testing20-15-0520-15-05/845Documentation for sports surfacing20-15-0520-15-05/901Maintaining paving surface generally20-15-0520-15-05/902Graffiti removal20-15-0520-15-05/903Paving sealant application20-15-0520-15-05/904Herbicides to paving20-15-0520-15-05/905Snow clearance to paving20-15-0520-15-05/910Maintaining sports court surfacing generally20-15-0520-15-25External deck and boardwalk systems20-1520-15-25/110Boardwalk system20-15-2520-15-25/125Deck system20-15-2520-15-25/130Footbridge system20-15-2520-15-25/205Design submittals20-15-2520-15-25/210Structural design20-15-2520-15-25/220Permanent and imposed loads20-15-2520-15-25/225Snow loading20-15-2520-15-25/230Functional performance20-15-2520-15-25/250Accessibility20-15-2520-15-25/290Compliance with performance requirements20-15-2520-15-25/305Product samples20-15-2520-15-25/505Prototypes or mock-ups20-15-2520-15-25/605Preliminary installation20-15-2520-15-25/610Installation generally20-15-2520-15-25/630Setting base plates on precast concrete bases20-15-2520-15-25/635Setting components in earth20-15-2520-15-25/640Driven posts20-15-2520-15-25/645Laying polyethylene sheets and gravel under decking20-15-2520-15-25/650Erection of timber structures on prepared bases20-15-2520-15-25/652Execution of timber structures20-15-2520-15-25/655Installation of pedestals under decking boards20-15-2520-15-25/660Installation of deck boards20-15-2520-15-25/665Installing applied slip resistant materials20-15-2520-15-25/805Removal of samples20-15-2520-15-25/810Inspection of timber structures20-15-2520-15-25/820Testing of timber structures20-15-2520-15-25/830Documentation20-15-2520-15-25/840Maintenance20-15-2520-15-25/895Verification of performance20-15-2520-15-35Acrylic and resin-bound aggregate paving systems20-1520-15-35/152Impact absorbing synthetic play and sport paving system20-15-3520-15-35/154Impervious acrylic coated paving system20-15-3520-15-35/155Resin-bonded aggregate paving system20-15-3520-15-35/160Resin-bound aggregate paving system20-15-3520-15-35/170Fibre-reinforced resin-bound aggregate overlay system20-15-3520-15-35/180Resin-bonded aggregate overlay system20-15-3520-15-35/190Bound aggregate paving maintenance system20-15-3520-15-35/195Sport or play paving maintenance system20-15-3520-15-35/201Contractor design of bound aggregate pavements20-15-3520-15-35/205Design submittals20-15-3520-15-35/209Information for bound aggregate pavement design20-15-3520-15-35/213Sport surfacing performance20-15-3520-15-35/215Play surfacing performance20-15-3520-15-35/240Durability of bound aggregate pavements20-15-3520-15-35/270Accessibility of bound aggregate pavements20-15-3520-15-35/275Slip and skid resistance of bound aggregate pavements20-15-3520-15-35/290Hydraulic performance of bound aggregate pavements20-15-3520-15-35/310Product samples20-15-3520-15-35/601Installation control samples20-15-3520-15-35/603Cold weather working with bound aggregate pavements20-15-3520-15-35/605Protection of bound aggregate pavements from traffic and plant20-15-3520-15-35/607Surface characteristics of bound aggregate surfacing20-15-3520-15-35/609Laying acrylic and resin based surfaces generally20-15-3520-15-35/611Disposal of arisings20-15-3520-15-35/621Subgrade, sub-base and base requirements under bound aggregate surfaces20-15-3520-15-35/623Planing and repairs to existing bases20-15-3520-15-35/625Forming drainage holes in existing bases20-15-3520-15-35/651Installation of play surfacing generally20-15-3520-15-35/653Laying polyurethane bound EPDM rubber crumb play surfacing20-15-3520-15-35/655Laying resin bound aggregate surfaces20-15-3520-15-35/667Laying resin bonded aggregate surface course20-15-3520-15-35/701Applying paving sealant20-15-3520-15-35/711Applying painted line markings on sports surfacing20-15-3520-15-35/713Applying self-adhesive tape to sports surfacing20-15-3520-15-35/715Installing inlaid line markings on sports surfacing20-15-3520-15-35/810Sports surface testing20-15-3520-15-35/820Documentation for sports surfacing20-15-3520-15-35/840Play surface testing20-15-3520-15-35/850Documentation for play surfacing20-15-3520-15-35/901Maintaining bound aggregate pavements generally20-15-3520-15-35/902Graffiti removal20-15-3520-15-35/904Herbicides to paving20-15-3520-15-35/905Snow clearance to paving20-15-3520-15-45In situ concrete road and paving systems20-1520-15-45/110In situ concrete grass-filled paving system20-15-4520-15-45/120In situ concrete paving system20-15-4520-15-45/130In situ concrete porous paving system20-15-4520-15-45/205Design submittals20-15-4520-15-45/210Design standards20-15-4520-15-45/220Hydraulic performance of pervious paving systems20-15-4520-15-45/230Slip and skid resistance of concrete pavements20-15-4520-15-45/305Product samples20-15-4520-15-45/602Laying sand blinding to surfaces to receive sheet overlays or concrete20-15-4520-15-45/603Placing subgrade improvement (capping) layer20-15-4520-15-45/605Placing fill in accordance with the Highways England Specification for Highway Works20-15-4520-15-45/606Installing unreinforced and reinforced in situ concrete paving systems generally20-15-4520-15-45/608Installation control samples20-15-4520-15-45/612Formed finishes in concrete20-15-4520-15-45/616Unformed finishes in concrete20-15-4520-15-45/620Installing timber permanent formwork for in situ concrete paving systems20-15-4520-15-45/622Forming imprinted patterns in concrete20-15-4520-15-45/624Installing manhole cover and gully grating frames in in situ concrete paving systems20-15-4520-15-45/626Applying chemical stain to in situ concrete roads20-15-4520-15-45/628Applying sealing coat to chemical stain for in situ concrete roads20-15-4520-15-45/630Day joints20-15-4520-15-45/635Forming construction and movement joints generally20-15-4520-15-45/640Forming contraction joints with wet formed groove20-15-4520-15-45/650Forming tied longitudinal construction joints20-15-4520-15-45/655Formed joints in concrete wearing surfaces20-15-4520-15-45/660Forming expansion joints in concrete slabs and pavements20-15-4520-15-45/665Forming sawn grooves20-15-4520-15-45/675Preparation of construction joints20-15-4520-15-45/690Preparation of surfaces to receive concrete20-15-4520-15-45/695Inspection of surfaces to receive concrete20-15-4520-15-45/700Concrete supply on large pours20-15-4520-15-45/768Testing of compacted fill20-15-4520-15-45/800Times for opening of in situ concrete roads to traffic20-15-4520-15-45/805Removal of samples20-15-4520-15-50Mat and sheet paving systems20-1520-15-50/125Dry ski slope synthetic matting system20-15-5020-15-50/175Polymer play and sports paving system20-15-5020-15-50/180Synthetic grass surfacing system20-15-5020-15-50/190Mat and sheet paving maintenance system20-15-5020-15-50/201Contractor design of mat and sheet paving20-15-5020-15-50/205Design submittals for mat and sheet paving20-15-5020-15-50/209Information for bound aggregate pavement design20-15-5020-15-50/270Accessibility of mat and sheet paving20-15-5020-15-50/275Slip and skid resistance of mat and sheet paving20-15-5020-15-50/290Hydraulic performance of mat and sheet paving20-15-5020-15-50/292Sport surfacing performance20-15-5020-15-50/294Play surfacing performance20-15-5020-15-50/305Product samples20-15-5020-15-50/601Installation control samples20-15-5020-15-50/605Cold weather working w