key to spreadsheets - muni.org anchorage debit-credit method poa #: ... duration of note # temporary...

25
Spreadsheet # Type Description/Purpose 1a Development & Construction in Waterways 1b Development & Construction in Other Aquatic Areas 1c Indirect Impacts to Waterways from Development & Construction in Other Aquatic Areas 2a List of Waterway Polygons 2b List of Other Aquatic Area Polygons 3a Normalization of WAMA Scores 3b Normalization of AWAM Scores 4a Restoration, Enhancement or Establishment of Waterways 4b-RES Restoration of Other Aquatic Areas 4b-ENH Enhancement of Other Aquatic Areas 4b-EST Establishment of Other Aquatic Areas 4c Assessment of Functional Improvement for Enhancement of Waterways 4d Assessment of Functional Improvement for Enhancement of Wetlands 5a Preservation of Waterways 5b Preservation of Other Aquatic Areas 6a Project Debits 6b Project Credits 6c Debit-Credit Balance Key to Spreadsheets Summary Credits Normalization Debits List To add a row within the body of a spreadsheet, click in any cell in the row below where you want the new row to be, then select "Row" from the "Insert" menu. You will also need to copy formulas into the new row. To do that, right-click on the row number (far left) above or below the new row and select "Copy;" right-click on the new row and select "Paste." To hide rows you don't need, highlight those rows, right-click anywhere in the highlighted area, and select "Hide." The row numbers (far left) for the hidden rows will also be hidden. To "unhide" those rows, highlight the row numbers above and below, right-click and select "Unhide." Follow the same procedure for hiding columns. Tips for Using & Printing Spreadsheets To print only the spreadsheets you used, click on the tabs for those spreadsheets, while holding down the "Ctrl" button, and then select "Active sheet(s)" in the "Print what" section of the Print dialog box. To hide spreadsheets you don't need, click on the spreadsheet tab and select "Sheet," then "Hide" from the "Format" menu. To reveal a hidden spreadsheet, select "Sheet," then "Unhide" from the "Format" menu. Spreadsheets 6a through 6c auto-populate from other spreadsheets and will display error messages if you delete the source sheets. 25

Upload: hoanglien

Post on 18-Mar-2018

233 views

Category:

Documents


10 download

TRANSCRIPT

Spreadsheet # Type Description/Purpose1a Development & Construction in Waterways1b Development & Construction in Other Aquatic Areas1c Indirect Impacts to Waterways from Development & Construction in Other Aquatic Areas2a List of Waterway Polygons2b List of Other Aquatic Area Polygons3a Normalization of WAMA Scores3b Normalization of AWAM Scores4a Restoration, Enhancement or Establishment of Waterways

4b-RES Restoration of Other Aquatic Areas4b-ENH Enhancement of Other Aquatic Areas4b-EST Establishment of Other Aquatic Areas

4c Assessment of Functional Improvement for Enhancement of Waterways4d Assessment of Functional Improvement for Enhancement of Wetlands5a Preservation of Waterways5b Preservation of Other Aquatic Areas6a Project Debits6b Project Credits6c Debit-Credit Balance

Key to Spreadsheets

Summary

Credits

Normalization

Debits

List

To add a row within the body of a spreadsheet, click in any cell in the row below where you want the new row to be, then select "Row" from the "Insert" menu. You will also need to copy formulas into the new row. To do that, right-click on the row number (far left) above or below the new row and select "Copy;" right-click on the new row and select "Paste."

To hide rows you don't need, highlight those rows, right-click anywhere in the highlighted area, and select "Hide." The row numbers (far left) for the hidden rows will also be hidden. To "unhide" those rows, highlight the row numbers above and below, right-click and select "Unhide." Follow the same procedure for hiding columns.

Tips for Using & Printing Spreadsheets

To print only the spreadsheets you used, click on the tabs for those spreadsheets, while holding down the "Ctrl" button, and then select "Active sheet(s)" in the "Print what" section of the Print dialog box.

To hide spreadsheets you don't need, click on the spreadsheet tab and select "Sheet," then "Hide" from the "Format" menu. To reveal a hidden spreadsheet, select "Sheet," then "Unhide" from the "Format" menu. Spreadsheets 6a through 6c auto-populate from other spreadsheets and will display error messages if you delete the source sheets.

25

The Anchorage Debit-Credit Method

POA #:Watershed:

Z.K. M. N. O. P. Q. R. S. T. U. V. W. X. Y.

Using Standard or

Differentiated? (S or D)

Factor

0 0.00 0 0.00 0.00

0 0.00 0 0.00 0.00

0 0.00 0 0.00 0.00

Spreadsheet 1a: Debits for Development & Construction in Waterways

REV 1 Sub-Totals

1

2

Waterway Name:

Date:Prepared by:

L.Existing Indirect Impacts Factor Note #

(if nec)Total Debits (U+Y)

New Indirect Impacts

Debits

New Indirect Impacts Factor

Debit Ratio

(sq ft/db)

ID's (if nec)

Duration of Temporary

Impacts (in days)

Financial Assurance

for Temporary Impacts?

(Y or N)

Size of Impact

(sq ft)

ID's (if nec)

Size of Impact

(sq ft)

Existing Polygons Direct Impacts

REV DebitsDescription

Impacts Permanent

or Temporary?

(P or T)

Applicant:Project Name:

REV 3 Sub-Totals

3

REV 2 Sub-Totals

4

4/8/2010

The Anchorage Debit-Credit Method

0 0.00 0 0.00 0.000 0.00 0 0.00 0.00

Notes:

REV 4 Sub-TotalsTotals

4/8/2010

The Anchorage Debit-Credit Method

POA #: Watershed:

Z. J. K. L. M. N. O. P. Q. R. S. T. U. V. W. X. Y.

Using Standard or

Differentiated? (S or D)

Factor

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.004

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.002

0.00 0.00 0.00 0.003

0.00 0.00 0.00 0.001

0.00 0.00 0.00 0.002

0.00 0.00 0.00 0.003

0.00 0.00 0.00 0.004

0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

Notes:

Spreadsheet 1b: Debits for Development & Construction in the Subtidal Zone, Intertidal Zone, Waterbodies, Wetlands & Certain Uplands

Impacts Permanent

or Temporary?

(P or T)

Duration of Temporary Impacts (in days)

New Indirect Impacts

Note # (if nec)

Total Debits (U+Y)

ID# (if nec)

Existing Polygons

DebitsID# (if nec)

Existing Indirect Impacts Factor

1

Size (acres)

2

Totals

Prepared by:

1

Uplands

Waterbody

Intertidal Zone

1

Subtidal Zone

Wetlands

3

4

2

2

3

Direct Impacts

Project Name:

LandformDebit Ratio

(ac/db)DescriptionREV

Applicant: Name of Aquatic Area:Date:

New Indirect Impacts Factor

Debits Size (acres)

Financial Assurance

for Temporary Impacts? (Y or N)

4/8/2010

The Anchorage Debit-Credit Method

4/8/2010

The Anchorage Debit-Credit Method

4/8/2010

The Anchorage Debit-Credit Method

4/8/2010

The Anchorage Debit-Credit Method

Date:Prepared by:

P. R. S. T. U. V. W. X. Y.

REV ID's (if nec)

Description REV Debit Ratio (ac/db)

Pre-project Width

Width of Encroachment

(feet)

Extent of New Direct Impacts in Setback or

Buffer (acres)

New Indirect Impacts Factor

Debits [(X/U)x(W/V)xY]

Setback 1 1.0 Buffer 2 1.5

Setback 1 1.0 Buffer 2 1.5

Setback 1 1.0 Buffer 2 1.5

Setback 1 1.0 Buffer 2 1.5

0.00 0.00Setback 2 1.5 Buffer 2 1.5

Setback 2 1.5 Buffer 2 1.5

Setback 2 1.5 Buffer 2 1.5

Setback 2 1.5 Buffer 2 1.5

0.00 0.00Setback 3 2.0 Setback 3 2.0 Setback 3 2.0 Setback 3 2.0 Setback 3 2.0 Setback 3 2.0

0.00 0.00Setback 4 2.5 Setback 4 2.5 Setback 4 2.5 Setback 4 2.5 Setback 4 2.5 Setback 4 2.5

0.00 0.000.00 0.00

Notes:

REV 1 Sub-totals

1

Totals

4

REV 3 Sub-totals

REV 4 Sub-totals

3

Applicant:Project Name:

Description

Spreadsheet 1c: Debits for Indirect Impacts to Waterways from Development & Construction in Other Aquatic Areas

Note # (if nec)

Affected Setback/Buffer Polygons Affected Waterway Polygons

Z.

Watershed:POA #: Waterway

Name:

REV 2 Sub-totals

2

Q.

4/8/2010

The Anchorage Debit-Credit Method

POA #: Date:

Watershed: Prepared by:

Q. R. S. T. U. V. W. X. Y. Z.

Right Descending

Bank

Left Descending

Bank

Upstream In-channel

Downstream In-channel

Size Factor AggregatePolygon ID Polygon Description Polygon Size

Existing Indirect Impacts Factors

Sheet/Figure # Depicting Polygon #'s (list by sheet, if more than one):

Spreadsheet 2a: List of Waterway Polygons

4

3

2

REV

1

Applicant:

Project Name:

4/8/2010

The Anchorage Debit-Credit Method

N. O. P. Q. R. S. T. U. V. W. X. Y. Z.

Category 1 Activity?

Category 2 Activity?

Category 3 Activity?

Category 1 Category 2 Category 3 Size FactorAggregate

Factor

Within Existing Indirect Impact Zone(s) of…

Existing Indirect Impacts Factors

POA #:Watershed:

REV

Prepared by:

Polygon ID Polygon DescriptionPolygon

Size

Date:

Spreadsheet 2b: List of Subtidal, Intertidal, Waterbody, Wetland & Upland Polygons

Wetlands

Waterbody

Intertidal Zone

1

2

Landform

Applicant:Project Name:

Sheet/Figure # Depicting Polygon #'s (list by sheet, if more than one):

Subtidal Zone

Uplands

1

2

3

4

1

2

3

4

3

4

2

3

1

2

4/8/2010

The Anchorage Debit-Credit Method

V. W. X. Y. Z.

Function ScoreHighest

Possible Score

Normalized Score (W/X)

Contribution to Overall WAMA Score

[(Y/∑Y)x100%]

HYD 101HAB 130SPP 96SOC 60

Totals

Spreadsheet 3a: Normalization of WAMA Scores for Waterways

Watershed:

Prepared by:

POA #:

Project Name:

Date:

Applicant:

4/8/2010

The Anchorage Debit-Credit Method

V. W. X. Y. Z.

Function ScoreHighest Scores for Sub-area

Normalized Score (W/X)

Contribution to Overall AWAM Score

[(Y/∑Y)x100%]

HYD 149HAB 190SPP 147SOC 103

V. W. X. Y. Z.

FunctionPre-project

ScoreHighest Scores for Sub-area

Normalized Score (W/X)

Contribution to Overall AWAM Score

[(Y/∑Y)x100%]

HYD 131HAB 177SPP 127SOC 82

V. W. X. Y. Z.

FunctionPre-project

ScoreHighest Scores for Sub-area

Normalized Score (W/X)

Contribution to Overall AWAM Score

[(Y/∑Y)x100%]

HYD 112HAB 130SPP 96SOC 64

Totals

Spreadsheet 3b: Normalization of AWAM Scores for Wetlands

Watershed:

Prepared by:

POA #:

Project Name:

Date:

Applicant:

Totals

Totals

ANCHORAGE BOWL WETLANDS (i.e., AWMP Units #1-86A)

KNIK ARM WETLANDS (i.e., AWMP Units #100-150)

TURNAGAIN ARM WETLANDS (i.e., AWMP Units #160-219)

4/8/2010

The Anchorage Debit-Credit Method

Date:Prepared by:POA #:

L. M. N. O. P. Q. R. S. T. U. V. W. X. Y. Z.

Pre-Project Polygons

REV Description Description REV

Using Standard or

Differentiated? (S or D)

Factor

0 0.00

0 0.00

0 0.00

0 0.00

0 0.00

0 0.00444

0 0.00

0 0.00

0 0.00

0 0.000 0.00

Notes:

REV 2 Sub-totals

REV 1 Sub-totals

REV 3 Sub-totals

REV 3 Sub-totals

Credits [(V/R)xTx(1+X)xY]

Contribution to Overall Score

(from SS 3a)

Extent Function Improved (from SS 4c)

Function(s) Improved

REV 1 Sub-totals

Type of Activity

2

1

Project Name:Project Proponent:Name of Project to which Credits Apply:

RES

Project Proponent:

REV Improvement

(P-M)

Post-project Indirect Impacts Factor

REV 2 Sub-totals

Credit Ratio

(sq ft/cr)

ENH

EST

3

Size (sq ft)

ID's (if nec.)

Post-Project Polygons

REV 3 Sub-totals

REV 2 Sub-totals

REV 1 Sub-totals

REV 4 Sub-totals

3

2

1

Spreadsheet 4a: Credits for Restoration, Enhancement or Establishment of Waterways

POA #:Watershed:

Totals

2

3

1

4

Note # (if nec)

Waterway Name:

4/8/2010

The Anchorage Debit-Credit Method

4/8/2010

The Anchorage Debit-Credit Method

POA #:Name of Aquatic Area:

Project Proponent:

L. M. P. S. T. U. V. W. X. Y. Z.

REV REVREV

Improvement (P-M)

Credit Ratio (ac/cr)

Using Standard or

Differentiated? (S or D)

Factor

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.000.00 0.00

Notes:

Description1

O.

Watershed:

N

Description1

2

REV 2 Sub-totals

Restoration Totals

Subtidal Zone

2

REV 1 Sub-totals

3

REV 3 Sub-totals

Spreadsheet 4b-RES: Credits for Restoration of the Subtidal Zone, Intertidal Zone, Waterbodies, Wetlands & Uplands

REV 2 Sub-totals

REV 3 Sub-totals

REV 1 Sub-totals

Pre-Project PolygonsPost-project Indirect

Impacts Factor

1

1

POA #:

ID's (if nec)

Size (acres)

R.Q.

2

REV 2 Sub-totals

Note # (if nec)

Contribution to Overall

Score (from SS 3b)

Credits [(V/R)xTx(1+X)xY]

Date:

Functions Improved

Extent Function Improved (fr SS 4d)

REV 2 Sub-totals

Landform

3

REV 1 Sub-totals

Intertidal Zone

1

Wetlands

Waterbody

Project Proponent:Project Name:

2

Name of Project to which Credits Apply:

3

REV 3 Sub-totals

Prepared by:

4/8/2010

The Anchorage Debit-Credit Method

POA #:Name of Aquatic Area:

Project Proponent:

L. M. P. S. T. U. V. W. X. Y. Z.

REV REVREV

Improvement (P-M)

Credit Ratio (ac/cr)

Using Standard or

Differentiated? (S or D)

Factor

0.00 0.00

0.00 0.00

0.00 0.004

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.000.00 0.00

Notes:

REV 4 Sub-totals

Enhancement Totals

Description1

Watershed:

POA #:

Prepared by:Date:

Spreadsheet 4b-ENH: Credits for Enhancement of the Subtidal Zone, Intertidal Zone, Waterbodies, Wetlands & Uplands

N

Post-Project Polygons

Note # (if nec)

Description1

REV 3 Sub-totals

REV 3 Sub-totals

2

3

REV 2 Sub-totals

REV 1 Sub-totals

1

REV 2 Sub-totals

Pre-Project Polygons

1

REV 1 Sub-totals

ID's (if nec)

Size (acres)

Functions Improved

Contribution to Overall

Score (from SS 3b)

Credits [(V/R)xTx(1+X)xY]

1

REV 1 Sub-totalsIntertidal Zone

Subtidal Zone

Wetlands

2

REV 2 Sub-totals

Uplands

REV 3 Sub-totals

2

REV 2 Sub-totals

3

REV 3 Sub-totals

Name of Project to which Credits Apply:

Project Proponent:

REV 2 Sub-totals

3

1

REV 1 Sub-totals

2

R.

2

3

Waterbody

Project Name:

Landform

Extent Function Improved (fr SS 4d)

Q. Post-project Indirect Impacts Factor

O.

4/8/2010

The Anchorage Debit-Credit Method

POA #:Name of Aquatic Area:

Project Proponent:

L. M. P. S. T. U. V. W. X. Y. Z.

REV REVREV

Improvement (P-M)

Credit Ratio (ac/cr)

Using Standard or

Differentiated? (S or D)

Factor

0.00 0.00

0.00 0.00

0.00 0.004 4

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.000.00 0.00

Notes:

Description1

REV 2 Sub-totals

REV 2 Sub-totals

3

Intertidal Zone

1

REV 1 Sub-totals

2

Subtidal Zone

2

3

REV 3 Sub-totalsEstablishment Totals

Waterbody

1

REV 1 Sub-totals

2

REV 2 Sub-totals

REV 3 Sub-totals

Wetlands

1

REV 1 Sub-totals

2

REV 2 Sub-totals

3

REV 3 Sub-totals

Watershed:Date:Prepared by:

POA #:

Spreadsheet 4b-EST: Credits for Establishment of Subtidal Zone, Intertidal Zone, Waterbodies, Wetlands & Uplands

Project Name:

Landform

Name of Project to which Credits Apply:

Project Proponent:

REV 4 Sub-totals

Contribution to Overall

Score (from SS 3b)

Note # (if nec)

Pre-Project Polygons

Credits [(V/R)xTx(1+X)xY]

ID's (if nec)

Size (acres)

Functions Improved

Extent Function Improved (fr SS 4d)Description1

O.Post-project Indirect

Impacts FactorPost-Project Polygons

NR.Q.

4/8/2010

The Anchorage Debit-Credit Method

Date:Prepared by:

POA #:

Q. S. T. U.

# Description

1a Source of Stormwater Input1b Position in Watershed1c Vulnerability to Flooding1d Bankfull Discharge Constriction Ratio1e Channel Sinuosity1f Sensitivity to Water Quality Degradation1g Pollutant Uptake & Filtration1h Pollutant Sources in Catchment Basin1i Entrenchment Ratio1j Bank Stability

2a Diversity of Channel Form2b Riffle Frequency/Sinuosity2c Density of Instream Habitat Structures2d Embeddedness/Suitability of Pool Substrate2e Average Width of Stream Buffer2f Availability of Off-channel Refuge Habitat2g Extent of Bank Vegetation2h Persistence & Seasonality of Flow2i Wetted Perimeter2j Pollutant Inputs

V. W. X. Y. Z.

3b Significance for Fish Spawning 3eChannel Constriction

Ratio3c Significance for Fish Rearing 3f Bed Gradient3d Aquatic Macroinvertebrates: EPT Taxa Richness 3g Low Flow Depth

3h Perch Height4a Existing Recreational Use4b Educational Use4c Existing Facilities & Programs4d Types of Aesthetic Disturbance4e Extent of Aesthetic Disturbance4f Existing Research/Studies4g Identification as Parkland4h Ownership & Accessibility

Credits earned only through REV Improvement; Spreadsheet 4c not applicable. Enter "All" in Column W of Spreadsheet 4a.Credits earned through either REV Improvement (Spreadsheet 4c not applicable) or Improvement of Function.Not subject to change/not a source of credits.

SPP

Totals

Project Proponent:Name of Project to Project Proponent:

HYD

3a

See Table at Right

Percent Parameter Improved (Y-X)/X)

Pre-project Value Post-project Value

SOC

Total Percent Improvement

Totals

Use by Birds or Anadromous Fish Significant to the Municipality

Watershed:

Parameter #

Aquatic Wildlife Passage Barriers

HAB

Totals

Totals

Spreadsheet 4c: Assessment of Functional Improvement for Enhancement of Waterways

FunctionPre-

project Score

Post-project Score

Percent Function Improved

(∑U-∑T) / ∑T)

WAMA Parameters

POA #:Project Name:

R.

4/8/2010

The Anchorage Debit-Credit Method

V. X. Y. Z.

#

1.11.21.31.41.51.61.71.81.91.101.111.121.13

2.12.22.32.42.52.62.72.82.92.102.112.122.132.14

3.13.23.33.43.53.63.73.83.93.103.11

4.14.24.34.44.54.64.74.84.94.10

Not subject to change; not a source of credits.

SPP

Totals

Public Use/Open Space ValueDegree of Disturbance/Aesthetic Values

Types of DisturbanceLandscape DistinctnessFacilities and Programs

Habitat for Plants Rare or Unique in the Municipality

Waterfowl Staging

Habitat for Plant Species of Statewide Significance

Migratory Bird Staging AreaBreeding Bird DiversityWaterbird Production

Erosion Buffer

Proximity to Other Wetland HabitatsDiversity of Surrounding Habitat

Long-term Nutrient TrapWater Quality Maintenance

Hardiness Zone

Totals

Open Water Types

Vegetation Community Structure

Intraspersion/Edge Effect of Community TypesNumber of Wetlands Plant Communities

TotalsOwnership/AccessibilityResearch and Studies

Land Identification as Parkland

Soils Type

Educational UseType of Wetland-associated Recreational Use

Significance for Fish Rearing

Nesting of Colonial WaterbirdsScarcity Value

Use by Birds or Fish Significant to the Municipality

Type of Wetland

Type of Stormwater that Wetlands Detains

Description

AWAM ParametersW.

Wetlands Area as % of Catchment Basin SizeSize Evaluation

Land Use along Waterway or WetlandsPosition of Wetlands within Watershed

Project Proponent:

Date: Prepared by:

POA #:Name of Project to which Credits Apply:

HAB

SOC

TotalsWetland Size

Wetland Contiguity with Stream or LakeWater Body Size

Significance for Fish Spawning

Surface Water PersistenceNutrient Status of Surface Water

HYD

Generalized Land Use in Catchment Basin

Project Name:Project Proponent:

POA #:Watershed:

FunctionPre-

project Score

Credits earned through either REV Improvement (SS 4c not applicable) or improvement of function.

Spreadsheet 4d: Assessment of Functional Improvement for Enhancement of Wetlands

Post-project Score

Percent Function Improved

(∑Y-∑X) / ∑X)

Area Dominated by Robust Emergents & SubmergentsSensitive Areas below Subject Wetlands

Site Type (Cowardin Classification)Subject Wetlands as % of Total in Catchment Basin

4/8/2010

The Anchorage Debit-Credit Method

POA #:Watershed:

Project Proponent:

P. R. S. T. U. V. W. X. Y. Z.

Using Standard or

Differentiated? (S or D)

Factor

0 0.00

0 0.00

0 0.00

0 0.000 0.00

Notes:

2

3

4

REV 1 Sub-totals

REV 2 Sub-totals

REV 3 Sub-totals

Credit Ratio (ac/cr)

Q.

Threat (SxT)

ID# (if nec)

Waterway Name:

Name of Project to which Credits Apply:

Project Proponent:Project Name:

POA #:

Prepared by:Date:

Spreadsheet 5a: Credits for Preservation of Waterways

Accessibility Factor

Regulatory Constraints

Factor

Credits [(Y/U)xW]

Note # (if nec)Size

(sq ft)Polygon Description

Post-project Indirect Impacts Factor

Totals:REV 4 Sub-totals

REV

1

4/8/2010

The Anchorage Debit-Credit Method

POA #: Watershed:

O. P. R. S. T. U. V. W. X. Y. Z.

Standard or Differentiated?

(S or D)Factor

0.00 0.00

0.00 0.00

0.00 0.004

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.004

0.00 0.00

Wetlands

Waterbody 2

1

REV

1

2

3

REV 1 Sub-totals

REV 2 Sub-totals

REV 3 Sub-totals

REV 4 Sub-totals

REV 2 Sub-totals

REV 3 Sub-totals

REV 4 Sub-totals

Landform

3

REV 1 Sub-totals

Credits [(Y/U)xW]

Spreadsheet 5: Credits for Preservation of the Subtidal Zone, Intertidal Zone, Waterbodies, Wetlands & Certain Uplands

Name of Project to which Credits Apply:Project Proponent:Project Name:

POA #:

Prepared by:Date:

Note # (if nec)Size

(acres)

Q.

Threat (SxT)

ID# (if nec)

Credit Ratio (ac/cr)

Accessibility Factor

Regulatory Constraints

Factor

Post-project Indirect Impacts Factor

Polygon Description

Name of Aquatic Area:

Project Proponent:

4/8/2010

The Anchorage Debit-Credit Method

0.00 0.00

0.00 0.003

0.00 0.004

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.003

0.00 0.00

Notes:

Uplands

Intertidal Zone

Subtidal Zone

2

Totals:

2

2

REV 2 Sub-totals

REV 2 Sub-totals

REV 3 Sub-totals

1

1

REV 1 Sub-totals

REV 1 Sub-totals

REV 2 Sub-totals

REV 3 Sub-totals

REV 4 Sub-totals

4/8/2010

The Anchorage Debit-Credit Method

T. U. V. W. X. Y.

REV Subtidal ZoneIntertidal

ZoneWaterways Waterbodies Wetlands Uplands Total Debits

(T+U+V+W+X+Y)1 N/A 0.002 0.003 N/A 0.004 N/A N/A 0.00

Totals 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POA #:

Number of Debits per Landform

Spreadsheet 6a: Project Debit Summary

S. Z.

Applicant:Project Name: Watershed:

Date:Prepared by:

4/8/2010

The Anchorage Debit-Credit Method

Watershed:Date:

Prepared by:

T. U. V. W. X. Y.

Type of Project REV Subtidal ZoneIntertidal

ZoneWaterways Waterbodies Wetlands Uplands

Total Credits (T+U+V+W+X+Y

)1 N/A N/A 0.002 N/A 0.003 N/A N/A 0.001 N/A 0.002 0.003 N/A 0.004 N/A N/A N/A N/A 0.001 N/A N/A 0.002 N/A 0.003 N/A N/A 0.001 N/A 0.002 0.003 N/A 0.004 N/A N/A 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

POA #:Name of Project to which Credits Apply):Project Proponent: POA #:

Totals

Preservation

Number of Credits per Landform

Establishment

Restoration

Enhancement

Spreadsheet 6b: Project Credit Summary

R. S. Z.

Project Name:Applicant:

4/8/2010

The Anchorage Debit-Credit Method

X. S. T. U. V. W.

REV Debits Restoration Enhancement Establishment Preservation Total (S+T+U+V)

Redistribution of Excess Credits1

Balance2

(X+Y)

1 0.00 0.00 0.00 0.00 0.00 0.00 0.002 0.00 0.00 0.00 0.00 0.00 0.00 0.003 0.00 0.00 0.00 0.00 0.00 0.00 0.004 0.00 N/A 0.00 N/A 0.00 0.00 0.00

Totals 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1

2

Spreadsheet 6c: Project Debit-Credit Balance

Project Proponent: POA #:

Date:Watershed:

Name of Project to which Credits Apply:

Q.

POA #: Prepared by:

Project Name:Applicant:

Positive numbers represent net credits and negative numbers net debits.

Y. Number of Credits by Project Type

R.

Net1

(W-R)

Z.

Credits offset debits on a one-to-one basis, regardless of REV (or cost). Applying excess credits to net debits of a higher REV is contingent on a determination by the lead federal agency that the project that produced the excess credits constitutes appropriate compensatory mitigation for the debits.

4/8/2010