key to spreadsheets - muni.org anchorage debit-credit method poa #: ... duration of note # temporary...
TRANSCRIPT
Spreadsheet # Type Description/Purpose1a Development & Construction in Waterways1b Development & Construction in Other Aquatic Areas1c Indirect Impacts to Waterways from Development & Construction in Other Aquatic Areas2a List of Waterway Polygons2b List of Other Aquatic Area Polygons3a Normalization of WAMA Scores3b Normalization of AWAM Scores4a Restoration, Enhancement or Establishment of Waterways
4b-RES Restoration of Other Aquatic Areas4b-ENH Enhancement of Other Aquatic Areas4b-EST Establishment of Other Aquatic Areas
4c Assessment of Functional Improvement for Enhancement of Waterways4d Assessment of Functional Improvement for Enhancement of Wetlands5a Preservation of Waterways5b Preservation of Other Aquatic Areas6a Project Debits6b Project Credits6c Debit-Credit Balance
Key to Spreadsheets
Summary
Credits
Normalization
Debits
List
To add a row within the body of a spreadsheet, click in any cell in the row below where you want the new row to be, then select "Row" from the "Insert" menu. You will also need to copy formulas into the new row. To do that, right-click on the row number (far left) above or below the new row and select "Copy;" right-click on the new row and select "Paste."
To hide rows you don't need, highlight those rows, right-click anywhere in the highlighted area, and select "Hide." The row numbers (far left) for the hidden rows will also be hidden. To "unhide" those rows, highlight the row numbers above and below, right-click and select "Unhide." Follow the same procedure for hiding columns.
Tips for Using & Printing Spreadsheets
To print only the spreadsheets you used, click on the tabs for those spreadsheets, while holding down the "Ctrl" button, and then select "Active sheet(s)" in the "Print what" section of the Print dialog box.
To hide spreadsheets you don't need, click on the spreadsheet tab and select "Sheet," then "Hide" from the "Format" menu. To reveal a hidden spreadsheet, select "Sheet," then "Unhide" from the "Format" menu. Spreadsheets 6a through 6c auto-populate from other spreadsheets and will display error messages if you delete the source sheets.
25
The Anchorage Debit-Credit Method
POA #:Watershed:
Z.K. M. N. O. P. Q. R. S. T. U. V. W. X. Y.
Using Standard or
Differentiated? (S or D)
Factor
0 0.00 0 0.00 0.00
0 0.00 0 0.00 0.00
0 0.00 0 0.00 0.00
Spreadsheet 1a: Debits for Development & Construction in Waterways
REV 1 Sub-Totals
1
2
Waterway Name:
Date:Prepared by:
L.Existing Indirect Impacts Factor Note #
(if nec)Total Debits (U+Y)
New Indirect Impacts
Debits
New Indirect Impacts Factor
Debit Ratio
(sq ft/db)
ID's (if nec)
Duration of Temporary
Impacts (in days)
Financial Assurance
for Temporary Impacts?
(Y or N)
Size of Impact
(sq ft)
ID's (if nec)
Size of Impact
(sq ft)
Existing Polygons Direct Impacts
REV DebitsDescription
Impacts Permanent
or Temporary?
(P or T)
Applicant:Project Name:
REV 3 Sub-Totals
3
REV 2 Sub-Totals
4
4/8/2010
The Anchorage Debit-Credit Method
0 0.00 0 0.00 0.000 0.00 0 0.00 0.00
Notes:
REV 4 Sub-TotalsTotals
4/8/2010
The Anchorage Debit-Credit Method
POA #: Watershed:
Z. J. K. L. M. N. O. P. Q. R. S. T. U. V. W. X. Y.
Using Standard or
Differentiated? (S or D)
Factor
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.004
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.002
0.00 0.00 0.00 0.003
0.00 0.00 0.00 0.001
0.00 0.00 0.00 0.002
0.00 0.00 0.00 0.003
0.00 0.00 0.00 0.004
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00
Notes:
Spreadsheet 1b: Debits for Development & Construction in the Subtidal Zone, Intertidal Zone, Waterbodies, Wetlands & Certain Uplands
Impacts Permanent
or Temporary?
(P or T)
Duration of Temporary Impacts (in days)
New Indirect Impacts
Note # (if nec)
Total Debits (U+Y)
ID# (if nec)
Existing Polygons
DebitsID# (if nec)
Existing Indirect Impacts Factor
1
Size (acres)
2
Totals
Prepared by:
1
Uplands
Waterbody
Intertidal Zone
1
Subtidal Zone
Wetlands
3
4
2
2
3
Direct Impacts
Project Name:
LandformDebit Ratio
(ac/db)DescriptionREV
Applicant: Name of Aquatic Area:Date:
New Indirect Impacts Factor
Debits Size (acres)
Financial Assurance
for Temporary Impacts? (Y or N)
4/8/2010
The Anchorage Debit-Credit Method
Date:Prepared by:
P. R. S. T. U. V. W. X. Y.
REV ID's (if nec)
Description REV Debit Ratio (ac/db)
Pre-project Width
Width of Encroachment
(feet)
Extent of New Direct Impacts in Setback or
Buffer (acres)
New Indirect Impacts Factor
Debits [(X/U)x(W/V)xY]
Setback 1 1.0 Buffer 2 1.5
Setback 1 1.0 Buffer 2 1.5
Setback 1 1.0 Buffer 2 1.5
Setback 1 1.0 Buffer 2 1.5
0.00 0.00Setback 2 1.5 Buffer 2 1.5
Setback 2 1.5 Buffer 2 1.5
Setback 2 1.5 Buffer 2 1.5
Setback 2 1.5 Buffer 2 1.5
0.00 0.00Setback 3 2.0 Setback 3 2.0 Setback 3 2.0 Setback 3 2.0 Setback 3 2.0 Setback 3 2.0
0.00 0.00Setback 4 2.5 Setback 4 2.5 Setback 4 2.5 Setback 4 2.5 Setback 4 2.5 Setback 4 2.5
0.00 0.000.00 0.00
Notes:
REV 1 Sub-totals
1
Totals
4
REV 3 Sub-totals
REV 4 Sub-totals
3
Applicant:Project Name:
Description
Spreadsheet 1c: Debits for Indirect Impacts to Waterways from Development & Construction in Other Aquatic Areas
Note # (if nec)
Affected Setback/Buffer Polygons Affected Waterway Polygons
Z.
Watershed:POA #: Waterway
Name:
REV 2 Sub-totals
2
Q.
4/8/2010
The Anchorage Debit-Credit Method
POA #: Date:
Watershed: Prepared by:
Q. R. S. T. U. V. W. X. Y. Z.
Right Descending
Bank
Left Descending
Bank
Upstream In-channel
Downstream In-channel
Size Factor AggregatePolygon ID Polygon Description Polygon Size
Existing Indirect Impacts Factors
Sheet/Figure # Depicting Polygon #'s (list by sheet, if more than one):
Spreadsheet 2a: List of Waterway Polygons
4
3
2
REV
1
Applicant:
Project Name:
4/8/2010
The Anchorage Debit-Credit Method
N. O. P. Q. R. S. T. U. V. W. X. Y. Z.
Category 1 Activity?
Category 2 Activity?
Category 3 Activity?
Category 1 Category 2 Category 3 Size FactorAggregate
Factor
Within Existing Indirect Impact Zone(s) of…
Existing Indirect Impacts Factors
POA #:Watershed:
REV
Prepared by:
Polygon ID Polygon DescriptionPolygon
Size
Date:
Spreadsheet 2b: List of Subtidal, Intertidal, Waterbody, Wetland & Upland Polygons
Wetlands
Waterbody
Intertidal Zone
1
2
Landform
Applicant:Project Name:
Sheet/Figure # Depicting Polygon #'s (list by sheet, if more than one):
Subtidal Zone
Uplands
1
2
3
4
1
2
3
4
3
4
2
3
1
2
4/8/2010
The Anchorage Debit-Credit Method
V. W. X. Y. Z.
Function ScoreHighest
Possible Score
Normalized Score (W/X)
Contribution to Overall WAMA Score
[(Y/∑Y)x100%]
HYD 101HAB 130SPP 96SOC 60
Totals
Spreadsheet 3a: Normalization of WAMA Scores for Waterways
Watershed:
Prepared by:
POA #:
Project Name:
Date:
Applicant:
4/8/2010
The Anchorage Debit-Credit Method
V. W. X. Y. Z.
Function ScoreHighest Scores for Sub-area
Normalized Score (W/X)
Contribution to Overall AWAM Score
[(Y/∑Y)x100%]
HYD 149HAB 190SPP 147SOC 103
V. W. X. Y. Z.
FunctionPre-project
ScoreHighest Scores for Sub-area
Normalized Score (W/X)
Contribution to Overall AWAM Score
[(Y/∑Y)x100%]
HYD 131HAB 177SPP 127SOC 82
V. W. X. Y. Z.
FunctionPre-project
ScoreHighest Scores for Sub-area
Normalized Score (W/X)
Contribution to Overall AWAM Score
[(Y/∑Y)x100%]
HYD 112HAB 130SPP 96SOC 64
Totals
Spreadsheet 3b: Normalization of AWAM Scores for Wetlands
Watershed:
Prepared by:
POA #:
Project Name:
Date:
Applicant:
Totals
Totals
ANCHORAGE BOWL WETLANDS (i.e., AWMP Units #1-86A)
KNIK ARM WETLANDS (i.e., AWMP Units #100-150)
TURNAGAIN ARM WETLANDS (i.e., AWMP Units #160-219)
4/8/2010
The Anchorage Debit-Credit Method
Date:Prepared by:POA #:
L. M. N. O. P. Q. R. S. T. U. V. W. X. Y. Z.
Pre-Project Polygons
REV Description Description REV
Using Standard or
Differentiated? (S or D)
Factor
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00444
0 0.00
0 0.00
0 0.00
0 0.000 0.00
Notes:
REV 2 Sub-totals
REV 1 Sub-totals
REV 3 Sub-totals
REV 3 Sub-totals
Credits [(V/R)xTx(1+X)xY]
Contribution to Overall Score
(from SS 3a)
Extent Function Improved (from SS 4c)
Function(s) Improved
REV 1 Sub-totals
Type of Activity
2
1
Project Name:Project Proponent:Name of Project to which Credits Apply:
RES
Project Proponent:
REV Improvement
(P-M)
Post-project Indirect Impacts Factor
REV 2 Sub-totals
Credit Ratio
(sq ft/cr)
ENH
EST
3
Size (sq ft)
ID's (if nec.)
Post-Project Polygons
REV 3 Sub-totals
REV 2 Sub-totals
REV 1 Sub-totals
REV 4 Sub-totals
3
2
1
Spreadsheet 4a: Credits for Restoration, Enhancement or Establishment of Waterways
POA #:Watershed:
Totals
2
3
1
4
Note # (if nec)
Waterway Name:
4/8/2010
The Anchorage Debit-Credit Method
POA #:Name of Aquatic Area:
Project Proponent:
L. M. P. S. T. U. V. W. X. Y. Z.
REV REVREV
Improvement (P-M)
Credit Ratio (ac/cr)
Using Standard or
Differentiated? (S or D)
Factor
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.000.00 0.00
Notes:
Description1
O.
Watershed:
N
Description1
2
REV 2 Sub-totals
Restoration Totals
Subtidal Zone
2
REV 1 Sub-totals
3
REV 3 Sub-totals
Spreadsheet 4b-RES: Credits for Restoration of the Subtidal Zone, Intertidal Zone, Waterbodies, Wetlands & Uplands
REV 2 Sub-totals
REV 3 Sub-totals
REV 1 Sub-totals
Pre-Project PolygonsPost-project Indirect
Impacts Factor
1
1
POA #:
ID's (if nec)
Size (acres)
R.Q.
2
REV 2 Sub-totals
Note # (if nec)
Contribution to Overall
Score (from SS 3b)
Credits [(V/R)xTx(1+X)xY]
Date:
Functions Improved
Extent Function Improved (fr SS 4d)
REV 2 Sub-totals
Landform
3
REV 1 Sub-totals
Intertidal Zone
1
Wetlands
Waterbody
Project Proponent:Project Name:
2
Name of Project to which Credits Apply:
3
REV 3 Sub-totals
Prepared by:
4/8/2010
The Anchorage Debit-Credit Method
POA #:Name of Aquatic Area:
Project Proponent:
L. M. P. S. T. U. V. W. X. Y. Z.
REV REVREV
Improvement (P-M)
Credit Ratio (ac/cr)
Using Standard or
Differentiated? (S or D)
Factor
0.00 0.00
0.00 0.00
0.00 0.004
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.000.00 0.00
Notes:
REV 4 Sub-totals
Enhancement Totals
Description1
Watershed:
POA #:
Prepared by:Date:
Spreadsheet 4b-ENH: Credits for Enhancement of the Subtidal Zone, Intertidal Zone, Waterbodies, Wetlands & Uplands
N
Post-Project Polygons
Note # (if nec)
Description1
REV 3 Sub-totals
REV 3 Sub-totals
2
3
REV 2 Sub-totals
REV 1 Sub-totals
1
REV 2 Sub-totals
Pre-Project Polygons
1
REV 1 Sub-totals
ID's (if nec)
Size (acres)
Functions Improved
Contribution to Overall
Score (from SS 3b)
Credits [(V/R)xTx(1+X)xY]
1
REV 1 Sub-totalsIntertidal Zone
Subtidal Zone
Wetlands
2
REV 2 Sub-totals
Uplands
REV 3 Sub-totals
2
REV 2 Sub-totals
3
REV 3 Sub-totals
Name of Project to which Credits Apply:
Project Proponent:
REV 2 Sub-totals
3
1
REV 1 Sub-totals
2
R.
2
3
Waterbody
Project Name:
Landform
Extent Function Improved (fr SS 4d)
Q. Post-project Indirect Impacts Factor
O.
4/8/2010
The Anchorage Debit-Credit Method
POA #:Name of Aquatic Area:
Project Proponent:
L. M. P. S. T. U. V. W. X. Y. Z.
REV REVREV
Improvement (P-M)
Credit Ratio (ac/cr)
Using Standard or
Differentiated? (S or D)
Factor
0.00 0.00
0.00 0.00
0.00 0.004 4
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.000.00 0.00
Notes:
Description1
REV 2 Sub-totals
REV 2 Sub-totals
3
Intertidal Zone
1
REV 1 Sub-totals
2
Subtidal Zone
2
3
REV 3 Sub-totalsEstablishment Totals
Waterbody
1
REV 1 Sub-totals
2
REV 2 Sub-totals
REV 3 Sub-totals
Wetlands
1
REV 1 Sub-totals
2
REV 2 Sub-totals
3
REV 3 Sub-totals
Watershed:Date:Prepared by:
POA #:
Spreadsheet 4b-EST: Credits for Establishment of Subtidal Zone, Intertidal Zone, Waterbodies, Wetlands & Uplands
Project Name:
Landform
Name of Project to which Credits Apply:
Project Proponent:
REV 4 Sub-totals
Contribution to Overall
Score (from SS 3b)
Note # (if nec)
Pre-Project Polygons
Credits [(V/R)xTx(1+X)xY]
ID's (if nec)
Size (acres)
Functions Improved
Extent Function Improved (fr SS 4d)Description1
O.Post-project Indirect
Impacts FactorPost-Project Polygons
NR.Q.
4/8/2010
The Anchorage Debit-Credit Method
Date:Prepared by:
POA #:
Q. S. T. U.
# Description
1a Source of Stormwater Input1b Position in Watershed1c Vulnerability to Flooding1d Bankfull Discharge Constriction Ratio1e Channel Sinuosity1f Sensitivity to Water Quality Degradation1g Pollutant Uptake & Filtration1h Pollutant Sources in Catchment Basin1i Entrenchment Ratio1j Bank Stability
2a Diversity of Channel Form2b Riffle Frequency/Sinuosity2c Density of Instream Habitat Structures2d Embeddedness/Suitability of Pool Substrate2e Average Width of Stream Buffer2f Availability of Off-channel Refuge Habitat2g Extent of Bank Vegetation2h Persistence & Seasonality of Flow2i Wetted Perimeter2j Pollutant Inputs
V. W. X. Y. Z.
3b Significance for Fish Spawning 3eChannel Constriction
Ratio3c Significance for Fish Rearing 3f Bed Gradient3d Aquatic Macroinvertebrates: EPT Taxa Richness 3g Low Flow Depth
3h Perch Height4a Existing Recreational Use4b Educational Use4c Existing Facilities & Programs4d Types of Aesthetic Disturbance4e Extent of Aesthetic Disturbance4f Existing Research/Studies4g Identification as Parkland4h Ownership & Accessibility
Credits earned only through REV Improvement; Spreadsheet 4c not applicable. Enter "All" in Column W of Spreadsheet 4a.Credits earned through either REV Improvement (Spreadsheet 4c not applicable) or Improvement of Function.Not subject to change/not a source of credits.
SPP
Totals
Project Proponent:Name of Project to Project Proponent:
HYD
3a
See Table at Right
Percent Parameter Improved (Y-X)/X)
Pre-project Value Post-project Value
SOC
Total Percent Improvement
Totals
Use by Birds or Anadromous Fish Significant to the Municipality
Watershed:
Parameter #
Aquatic Wildlife Passage Barriers
HAB
Totals
Totals
Spreadsheet 4c: Assessment of Functional Improvement for Enhancement of Waterways
FunctionPre-
project Score
Post-project Score
Percent Function Improved
(∑U-∑T) / ∑T)
WAMA Parameters
POA #:Project Name:
R.
4/8/2010
The Anchorage Debit-Credit Method
V. X. Y. Z.
#
1.11.21.31.41.51.61.71.81.91.101.111.121.13
2.12.22.32.42.52.62.72.82.92.102.112.122.132.14
3.13.23.33.43.53.63.73.83.93.103.11
4.14.24.34.44.54.64.74.84.94.10
Not subject to change; not a source of credits.
SPP
Totals
Public Use/Open Space ValueDegree of Disturbance/Aesthetic Values
Types of DisturbanceLandscape DistinctnessFacilities and Programs
Habitat for Plants Rare or Unique in the Municipality
Waterfowl Staging
Habitat for Plant Species of Statewide Significance
Migratory Bird Staging AreaBreeding Bird DiversityWaterbird Production
Erosion Buffer
Proximity to Other Wetland HabitatsDiversity of Surrounding Habitat
Long-term Nutrient TrapWater Quality Maintenance
Hardiness Zone
Totals
Open Water Types
Vegetation Community Structure
Intraspersion/Edge Effect of Community TypesNumber of Wetlands Plant Communities
TotalsOwnership/AccessibilityResearch and Studies
Land Identification as Parkland
Soils Type
Educational UseType of Wetland-associated Recreational Use
Significance for Fish Rearing
Nesting of Colonial WaterbirdsScarcity Value
Use by Birds or Fish Significant to the Municipality
Type of Wetland
Type of Stormwater that Wetlands Detains
Description
AWAM ParametersW.
Wetlands Area as % of Catchment Basin SizeSize Evaluation
Land Use along Waterway or WetlandsPosition of Wetlands within Watershed
Project Proponent:
Date: Prepared by:
POA #:Name of Project to which Credits Apply:
HAB
SOC
TotalsWetland Size
Wetland Contiguity with Stream or LakeWater Body Size
Significance for Fish Spawning
Surface Water PersistenceNutrient Status of Surface Water
HYD
Generalized Land Use in Catchment Basin
Project Name:Project Proponent:
POA #:Watershed:
FunctionPre-
project Score
Credits earned through either REV Improvement (SS 4c not applicable) or improvement of function.
Spreadsheet 4d: Assessment of Functional Improvement for Enhancement of Wetlands
Post-project Score
Percent Function Improved
(∑Y-∑X) / ∑X)
Area Dominated by Robust Emergents & SubmergentsSensitive Areas below Subject Wetlands
Site Type (Cowardin Classification)Subject Wetlands as % of Total in Catchment Basin
4/8/2010
The Anchorage Debit-Credit Method
POA #:Watershed:
Project Proponent:
P. R. S. T. U. V. W. X. Y. Z.
Using Standard or
Differentiated? (S or D)
Factor
0 0.00
0 0.00
0 0.00
0 0.000 0.00
Notes:
2
3
4
REV 1 Sub-totals
REV 2 Sub-totals
REV 3 Sub-totals
Credit Ratio (ac/cr)
Q.
Threat (SxT)
ID# (if nec)
Waterway Name:
Name of Project to which Credits Apply:
Project Proponent:Project Name:
POA #:
Prepared by:Date:
Spreadsheet 5a: Credits for Preservation of Waterways
Accessibility Factor
Regulatory Constraints
Factor
Credits [(Y/U)xW]
Note # (if nec)Size
(sq ft)Polygon Description
Post-project Indirect Impacts Factor
Totals:REV 4 Sub-totals
REV
1
4/8/2010
The Anchorage Debit-Credit Method
POA #: Watershed:
O. P. R. S. T. U. V. W. X. Y. Z.
Standard or Differentiated?
(S or D)Factor
0.00 0.00
0.00 0.00
0.00 0.004
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.004
0.00 0.00
Wetlands
Waterbody 2
1
REV
1
2
3
REV 1 Sub-totals
REV 2 Sub-totals
REV 3 Sub-totals
REV 4 Sub-totals
REV 2 Sub-totals
REV 3 Sub-totals
REV 4 Sub-totals
Landform
3
REV 1 Sub-totals
Credits [(Y/U)xW]
Spreadsheet 5: Credits for Preservation of the Subtidal Zone, Intertidal Zone, Waterbodies, Wetlands & Certain Uplands
Name of Project to which Credits Apply:Project Proponent:Project Name:
POA #:
Prepared by:Date:
Note # (if nec)Size
(acres)
Q.
Threat (SxT)
ID# (if nec)
Credit Ratio (ac/cr)
Accessibility Factor
Regulatory Constraints
Factor
Post-project Indirect Impacts Factor
Polygon Description
Name of Aquatic Area:
Project Proponent:
4/8/2010
The Anchorage Debit-Credit Method
0.00 0.00
0.00 0.003
0.00 0.004
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.003
0.00 0.00
Notes:
Uplands
Intertidal Zone
Subtidal Zone
2
Totals:
2
2
REV 2 Sub-totals
REV 2 Sub-totals
REV 3 Sub-totals
1
1
REV 1 Sub-totals
REV 1 Sub-totals
REV 2 Sub-totals
REV 3 Sub-totals
REV 4 Sub-totals
4/8/2010
The Anchorage Debit-Credit Method
T. U. V. W. X. Y.
REV Subtidal ZoneIntertidal
ZoneWaterways Waterbodies Wetlands Uplands Total Debits
(T+U+V+W+X+Y)1 N/A 0.002 0.003 N/A 0.004 N/A N/A 0.00
Totals 0.00 0.00 0.00 0.00 0.00 0.00 0.00
POA #:
Number of Debits per Landform
Spreadsheet 6a: Project Debit Summary
S. Z.
Applicant:Project Name: Watershed:
Date:Prepared by:
4/8/2010
The Anchorage Debit-Credit Method
Watershed:Date:
Prepared by:
T. U. V. W. X. Y.
Type of Project REV Subtidal ZoneIntertidal
ZoneWaterways Waterbodies Wetlands Uplands
Total Credits (T+U+V+W+X+Y
)1 N/A N/A 0.002 N/A 0.003 N/A N/A 0.001 N/A 0.002 0.003 N/A 0.004 N/A N/A N/A N/A 0.001 N/A N/A 0.002 N/A 0.003 N/A N/A 0.001 N/A 0.002 0.003 N/A 0.004 N/A N/A 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
POA #:Name of Project to which Credits Apply):Project Proponent: POA #:
Totals
Preservation
Number of Credits per Landform
Establishment
Restoration
Enhancement
Spreadsheet 6b: Project Credit Summary
R. S. Z.
Project Name:Applicant:
4/8/2010
The Anchorage Debit-Credit Method
X. S. T. U. V. W.
REV Debits Restoration Enhancement Establishment Preservation Total (S+T+U+V)
Redistribution of Excess Credits1
Balance2
(X+Y)
1 0.00 0.00 0.00 0.00 0.00 0.00 0.002 0.00 0.00 0.00 0.00 0.00 0.00 0.003 0.00 0.00 0.00 0.00 0.00 0.00 0.004 0.00 N/A 0.00 N/A 0.00 0.00 0.00
Totals 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1
2
Spreadsheet 6c: Project Debit-Credit Balance
Project Proponent: POA #:
Date:Watershed:
Name of Project to which Credits Apply:
Q.
POA #: Prepared by:
Project Name:Applicant:
Positive numbers represent net credits and negative numbers net debits.
Y. Number of Credits by Project Type
R.
Net1
(W-R)
Z.
Credits offset debits on a one-to-one basis, regardless of REV (or cost). Applying excess credits to net debits of a higher REV is contingent on a determination by the lead federal agency that the project that produced the excess credits constitutes appropriate compensatory mitigation for the debits.
4/8/2010